S02 Atch B Drawings - 56 pages.pdf

PDF 20 MB Posted

Attached to
Z1DA--PN: 568A4-23-207, Replace 1 North HVAC System (HS) 36C263-26-AP-1604
Solicitation number
36C26326B0021
Issued by

About this file

This is a comprehensive set of construction drawings and design documents for a federal construction project to replace the 1 North HVAC system at Hot Springs VA Medical Center in Hot Springs, South Dakota. The project is identified as PN 568A4-23-207 and is being procured through the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 23. The scope of work involves replacing an existing Trane HVAC system serving Ward 1 North that has exceeded its useful life, including demolition and installation of new air handling units, ductwork, piping systems, controls, and associated mechanical, electrical, and fire protection components across the crawl space, ground level, and Level 01 of Building 12. The project encompasses approximately 15,925 square feet of renovation area and requires compliance with 2021 IBC, 2024 NFPA 101, 2023 NEC, OSHA standards, and VA HVAC Design Manual (03/01/2024 edition). Key components include a new 7,565 CFM air handling unit (Daikin CAH021GDGM basis of design), direct digital controls integration with the existing automation system, steam to hot water heat exchangers, new hydronic piping with propylene glycol heating water, exhaust fans, fire protection modifications, and electrical infrastructure updates. The design accommodates phased construction to maintain facility operations with minimal disruption, utilizing temporary HVAC units and generators, with work scheduled across day shifts, night shifts, and weekends depending on occupancy requirements. Construction work is estimated at 145-174 days, with infection control risk assessment (ICRA) barriers required throughout, and the facility must remain fully operational during construction. Project coordination requirements include work with the Contracting Officer Representative at Hot Springs VA Medical Center, and the design team comprises Romanyk Consulting (architect, project manager, electrical engineer), IMEG (structural engineer), and associated consultants.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

DRAWING SYMBOLS

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE

LOCATION. THEY ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT

BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW ALL DRAWINGS AND

PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.

2. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE DRAWINGS AND

THE PROJECT MANUAL. CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE

THESE DRAWINGS, THE PROJECT MANUAL, AND IMMEDIATELY NOTIFY THE DESIGN

PROFESSIONAL OF ANY INCONSISTENCIES THAT ARE DISCOVERED.

3. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE A/E.

4. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING

FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED

IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO

SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT/ENGINEER,

AND THE AUTHORITIES HAVING JURISDICTION. THE GENERAL CONTRACTOR IS

RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND

CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, TESTING AND

CERTIFICATES TO THE OWNER.

5. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE

DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL

CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING

OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES

OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR

EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S

EXPENSE.

6. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB

SITE ON A DAILY BASIS.

7. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED

TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE

PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH RESPECT TO

DELIVERY DATE, QUALITY, OR COST.

8. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND

FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE A/E DOES

NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND METHODS

OR FOR TEMPORARY STRUCTURES.

9. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. THE CONTRACTOR SHALL EMPLOY ENGINEERING EXPERTISE AS

NEEDED TO ASSIST IN DEMOLITION.

10. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH CAMPUS AND

LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION

AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY

RESPONSIBLE FOR MEETING OSHA REGULATIONS DURING CONSTRUCTION.

11. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND

PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM

INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL

MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY

COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION.

DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER

INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL

CONTRACTOR'S EXPENSE.

12. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUANTITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.

13. THE GC SHALL BE RESPONSIBLE FOR COORDINATING THE INSTALLATION OF NEW

UTILITIES WITH EXISTING ADJACENT UTILITIES.

14. ANY WORK NOT SHOWN ON THE DRAWINGS, BUT CONSIDERED NECESSARY FOR THE

COMPLETION OF THE WORK IN A PROPER MANNER SHALL BE PROVIDED BY THE GC

WITHOUT ADDITIONAL CHARGE.

15. WHERE PRESENT WORK IS DAMAGED IN THE EXECUTION OF THE CONTRACT OR

WHERE OPENINGS ARE LEFT DUE TO THE REMOVAL OF PIPES, CONDUITS, CABLE

TRAYS, EQUIPMENT OR APPARATUS. REPAIR OR CLOSE UP CORRESPONDING

MATERIAL FINISH TO MATCH THE ADJOINING WORK. WHERE DAMAGE IS NOT

REPAIRABLE, NEW ITEMS OR EQUIPMENT SHALL BE PROVIDED.

16. CONTRACTOR TO COORDINATE WITH THE COR FOR QUESTIONS REGARDING SITE

ACCESS OF WORKERS, MATERIAL DISPOSAL AND HOURS OF OPERATION.

17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND VERIFYING

DIRECTLY WITH THE COR REGARDING ANY OWNER DESIRED CHANGES TO THE

NUMBERING SYSTEM AND/OR NAMING CONVENTION, LABELING AND/OR

IDENTIFICATION FOR (OR ON) THE ELECTRICAL PANELS, MECHANICAL EQUIPMENT,

FIRE ALARM SYSTEMS/PANELS, SIGNAGE, ETC.

OWNER:

Department of Veterans Affairs - Network 23 Contracting Office 111 South 18th Plaza, Suite C151/152 Omaha, Nebraska 68102-2077

CONTRACTING OFFICER REP. (COR):

Hot Springs VA Medical Center 500 North Fifth Street Hot Springs, South Dakota 57747

Douglas Sprinkle Douglas.Sprinkle@va.gov

605.390.8955

PROJECT MANAGER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

319.721.4986 cell

MECHANICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

319.721.4986 cell

ELECTRICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Yumei Wang, PE, PMP, LEED AP yumei.wang@RomanykConsulting.com

855.424.3838 x311

402.321.3766 cell

STRUCTURAL ENGINEER:

IMEG

2882 106th Street Des Moines, Iowa 50322

Danielle Bartlett (DeBoer), PE danielle.j.bartlett@imegcorp.com

309.793.3553

402.670.0823 cell

ARCHITECT:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Gary Friedman Gary.Friedman@RomanykConsulting.com

855.424.3838 x322

720.989.8588 cell

ELEVATION NUMBER

SECTION

INTERIOR ELEVATION

ENLARGEMENT,

DETAIL

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

A101

SIM

EXTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

A101

A101

TRUE NORTH

PLAN NORTHNORTH

NORTH ARROW WITH TRUE

NORTH INDICATION

ROOM

ROOM OCCUPANCY

150 SF

ROOM OCCUPANCY & AREA

SPOT ELEVATION

Name Elevation

FLOOR LEVEL &

NAME

SHEET KEYNOTE#

1i

0 GRID / COLUMN LINE DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

Ga5xFB1

WALL TYPE

WINDOW TYPE

ROOM NAME

ROOM NAME / NUMBER

REVISION TAG

EGRESS ROUTE ID AND

SECTION LENGTH

EGRESS : EGRESS ID

Egress Length

GENERAL NOTES PROJECT TEAM DRAWING INDEX

INDEX OF DRAWINGS

TRUE NORTH

PLAN NORTHNORTH

A ---------------------

A/E ARCHITECT/ENGINEER

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APPROX APPROXIMATE

B ---------------------

BLKG BLOCKING

BOS BOTTOM OF STEEL

BSMT BASEMENT

C ---------------------

CD CONSTRUCTION DOCUMENTS

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CPT CARPET

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

D ---------------------

DEMO DEMOLITION

DET DETAIL

DOC DOCUMENT

E ---------------------

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EXP EXPOSED

OFF OFFICE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

P --------------------

PCC PRECAST CONCRETE

PLYWD PLYWOOD

Q --------------------

QTY QUANTITY

R --------------------

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REQD REQUIRED

RM ROOM

RO ROUGH OPENING

S --------------------

SCHED SCHEDULE

SF SQUARE FOOT (FEET)

SIM SIMILAR

SPEC SPECIFICATION

ST STAIRS

STD STANDARD

STOR STORAGE

T --------------------

TEMP TEMPORARY

TFF TOP OF FINISH FLOOR

TN TRUE NORTH

TOF TOP OF FOOTING

TOP TOP OF PARAPET

TOS TOP OF SLAB

NOTES:

1. NOT ALL LISTED ABREVIATIONSMAY BE USED.

2. SEE OTHER DISCIPLINES FOR ADDITIONAL ABREVIATIONS.

F ---------------------

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

G ---------------------

GALV GALVANIZED

GYP BD GYPSUM BOARD

H ---------------------

HB HOSE BIBB

HM HOLLOW METAL

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

L ---------------------

LAV LAVATORY

LT LIGHT

M ---------------------

MACH RM MACHINE ROOM

MAX MAXIMUM

MECH RM MECHANICAL ROOM

MFR MANUFACTURER

MTL METAL

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOC.

NIC NOT IN CONTRACT

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O -------------------

OFD OVERFLOW DRAIN

ARCHITECTURAL ABBREVIATIONS

BUILDING 12

BUILDING 53

DISCIPLINE DESIGNATOR

MAJOR:

GENERAL - G

ARCHITECTURE - A

PLUMBING - P

MECHANICAL - M

ELECTRICAL - E

BUILDING NUMBER

11 - AE101

SHEET TYPE

DESIGNATOR

DISCIPLINE DESIGNATOR

(MINOR):

SHEET NUMBER

WITHIN SERIES

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

U.S. Department of Veterans Affairs

Sprinklered

A/E

Project TitleDrawing Title Phase

/2

/2

:1

:3

P

M A ut od es k

D oc s:

//V

IS

N

H ot S pr in gs R ep la ce

N or th H

V A

C U ni t/H ot S pr in gs R ep la ce H

V A

C

V

.r vt

GF DC

02/28/2025

568A4-23-207

PROJECT NUMBER - 568A4-23-207

REPLACE 1 NORTH HVAC SYSTEM

02/28/2025

12-GI101

HOT SPRINGS VA MEDICAL CENTER, HOT SPRINGS, SD

SHEET INDEX & GENERAL INFORMATION ISSUED FOR CONSTRUCTION REPLACE 1 NORTH HVAC SYSTEM

568A4 - HOT

SPRINGS, SD

ISSUED FOR CONSTRUCTION

12-GI101

SHEET # SHEET TITLE

SHEET INDEX & GENERAL INFORMATION

12-GI102 SITE PLAN, BUILDING ACCESS & CODE SUMMARY

12-GI103 ICRA NOTES & DETAILS

12-AE101 CRAWL SPACE - OVERALL PHASING PLAN

12-AE102 GROUND LEVEL - OVERALL PHASING PLAN

12-AE103 LEVEL 01 - OVERALL PHASING PLAN

12-AE301 CRAWL SAPCE - ENLARGED FLOOR LIFE SAFETY & ICRA PLAN

FIRE PROTECTION

12-F-001 FIRE PROTECTION, SYMBOLS, NOTES, & ABBREVIATIONS

12-FD131 LEVEL 01 - FIRE PROTECTION DEMOLITION - PARTIAL PLAN

12-FD161 LEVEL 01 - FIRE PROTECTION DEMOLITION - ENLARGED PLAN

ARCHITECTURE

SHEET # SHEET TITLE

12-E-001 ELECTRICAL LEGENDS, SCHEDULES & ABBREVIATIONS

12-E-100 CRAWL SPACE - OVERALL ELECTRICAL PLAN

12-E-101 LEVEL 01 - OVERALL ELECTRICAL PLAN

12-ET111

ELECTRICAL POWER - PARTIAL AND ENLARGED PLANS

12-E-400 ELECTRICAL PARTIAL ONE LINE DIAGRAMS

12-EP600 ELECTRICAL SCHEDULES

12-EP111

ELECTRICAL TEMPORARY POWER - PARTIAL PLAN

ELECTRICAL

12-ED111 ELECTRICAL DEMOLITION - PARTIAL AND ENLARGED PLANS

12-M-001 MECHANICAL SYMBOLS, NOTES & ABBREVIATIONS

12-MD132 LEVEL 01 - MECHANICAL HVAC - PARTIAL DEMOLITION PLAN

12-MD162 LEVEL 01 - MECHANICAL HVAC - ENLARGED DEMOLITION PLAN

12-MD230 CRAWL SPACE - MECHANICAL PIPING - PARTIAL DEMOLITION PLAN

12-MD231 GROUND FLOOR - MECHANICAL PIPING - PARTIAL DEMOLITION PLAN

12-MD232 LEVEL 01 - MECHANICAL PIPING - PARTIAL DEMOLITION PLAN

12-MT131 LEVEL 01 - TEMPORARY HVAC PHASE - PARTIAL PLAN

12-MH-131 LEVEL 01 - MECHANICAL HVAC - PARTIAL PLAN

12-MH161 LEVEL 01 - MECHANICAL HVAC - ENLARGED PLAN

12-MP130 CRAWL SPACE - MECHANICAL PIPING - PARTIAL PLAN

MECHANICAL

12-MP131 GROUND FLOOR - MECHANICAL PIPING - PARTIAL PLAN

12-MP132 LEVEL 01 - MECHANICAL PIPING - PARTIAL PLAN

12-MP162 LEVEL 01 - MECHANICAL PIPING - ENLARGED PLAN

12-AE303 LEVEL 01 - ENLARGED FLOOR LIFE SAFETY & ICRA PLAN

12-AE302 GROUND LEVEL - ENLARGED FLOOR LIFE SAFETY & ICRA PLAN

12-AE304 LEVEL 01 - ENLARGED RCP LIFE SAFETY & ICRA PLAN

12-AE401 LOUVER SCHEDULE & DETAILS

STRUCTURAL

12-S-101 LEVEL 01 - EXISTING FRAMING PLAN

12-MD262 LEVEL 01 - MECHANICAL PIPING - ENLARGED DEMOLITION PLAN

12-MI801 MECHANICAL INSTRUMENTATION AND CONTROLS

12-MI802

12-M-501 MECHANICAL DETAILS

12-M-503

12-M-601 MECHANICAL SCHEDULES

MECHANICAL INSTRUMENTATION AND CONTROLS

12-M-502 MECHANICAL DETAILS

MECHANICAL DETAILS

12-M-504 MECHANICAL DETAILS

12-M-505 MECHANICAL DETAILS

12-M-602 MECHANICAL SCHEDULES

12-M-603 MECHANICAL SCHEDULES

12-M-604 MECHANICAL SCHEDULES

12-M-506 MECHANICAL DETAILS

12-M-605 MECHANICAL SCHEDULES

12-FX131 LEVEL 01 - FIRE PROTECTION SUPRESSION - PARTIAL PLAN

12-FX161 LEVEL 01 - FIRE PROTECTION - ENLARGED PLAN

12-EL111 ELECTRICAL LIGHTING - PARTIAL AND ENLARGED PLANS

12-M-301 MECHANICAL SECTIONS & ISOMETRIC VIEWS

Revisions: Date:

12-M-701 STEAM RISER DIAGRAM

12-M-702 HYDRONIC RISER DIAGRAM

PROJECT GENERAL NOTESCODE SUMMARY

OXYGEN TANK

X

X

X

X

X

X X

X

X

XX X X X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

R

IV

E R

S T R

E E

T E

N T R

A N

C E

TO NATIONAL CEMETERY

A

B

C

TELE.

FUEL

STORAGE

TANKS

LOT

GRAND

STAIRCASE

C O

U R

T

C O

U R

T

P A

T

IO

CARWASH PAD

BUILDING

PLANT

BOILER

N O

R T H

S P A C E S

E M P

D

KEYED NOTES

1. REGULAR MEDICAL CENTER BUSINESS HOURS ARE 8:00AM - 5:00PM. SOME AREAS FUNCTION

24 HOURS A DAY, 7 DAYS A WEEK.

2. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED CONSTRUCTION, SAFETY, AND ICRA

BARRIERS APPROVED BY COR BEFORE CONSTRUCTION COMMENCES WITH THE ICRA

PERMIT DISPLAYED DURING CONSTRUCTION FOR EACH PHASE.

3. ANY UTILITY SHUTDOWNS WILL REQUIRE TWO WEEK CALENDAR DAYS NOTICE AND ANY

SHUTDOWNS THAT MAY DISRUPT NORMAL MEDICAL CENTER OPERATIONS MAY NEED TO BE

PERFORMED OUTSIDE REGULAR MEDICAL CENTER BUSINESS HOURS. MAINTAIN

UNINTERRUPTED OPERATION OF THE EXISTING FACILITIES, AND MINIMIZE DISRUPTIONS TO

THE MEDICAL CENTER FOR ALL SWITCH-OVER OF UTILITIES. COR RESERVES THE RIGHT TO

DETERMINE THE SEVERITY OF THE SHUTDOWN.

4. THE GC SHALL COORDINATE WITH THE COR TO DEVELOP A CRITICAL PATH METHOD (CPM)

SCHEDULE, SEQUENCING, COMPLETION DATES FOR RENOVATION AND NEW CONSTRUCTION

FOR THE PROJECT.

5. THE MEDICAL CENTER MUST REMAIN IN FULL OPERATION DURING CONSTRUCTION WITH

MINIMAL INTERRUPTION DUE TO ALL CONSTRUCTION ACTIVITIES FOR THE PROJECT,

INCLUDING NOISE, DUST, VIBRATION, ETC., CREATED BY CONSTRUCTION ACTIVITIES

RELATED TO THIS PROJECT.

6. THE GC'S SCHEDULES SHOULD INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING:

A. ALL CONSTRUCTION-ACTIVITIES-RELATED ISSUES WHICH MAY AFFECT THE

CONTINUAL OPERATIONS OF THE MEDICAL CENTER.

B. SCHEDULES FOR SHUTTING DOWN EXISTING SYSTEMS OR ACCESS FOR TIE-INS

AND/OR REPLACEMENT.

C. SCHEDULES FOR AFTER-HOURS OR WEEKEND CONSTRUCTION ACTIVITIES.

BARRIERS AND OTHER PROTECTIVE MEASURES SUCH AS ISOLATING THE HVAC

SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCTS, ETC.

IBC (2021) CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION 3302.1 AND 1007.3.5

MAINTAIN REQUIRED CORRIDOR EGRESS AT TEMPORARY BARRIERS AND PROVIDE

SIGNAGE.

D. THE GC SHALL CONSULT WITH COR FOR SITE ACCESS INCLUDING ELEVATORS AND

DEBRIS/MATERIAL HAUL ROUTES.

7. IF MEDICAL CENTER ACCESS PATHWAYS AND ELEVATORS ARE REQUIRED TO BE BLOCKED

OR USED TEMPORARILY TO ACCOMMODATE CONSTRUCTION, COORDINATE ALTERNATE

PATHWAYS WITH THE COR AND PROVIDE TEMPORARY SIGNAGE AND TEMPORARY

PROTECTIVE BARRIERS TO CREATE ALTERNATE PATHWAYS AS REQUIRED. COORDINATE

AND SCHEDULE ANY DOWNTIME FOR THESE ROUTES WITH THE COR.

8. MAINTAIN ACCESS TO ALL EXISTING BUILDINGS, UTILITIES AND FACILITIES WITHIN THE

CONSTRUCTION LIMITS TO ACCESS EQUIPMENT AND TO PROVIDE SERVICE OR

MAINTENANCE OF EXISTING FACILITIES AND EQUIPMENT SERVING THE MEDICAL CENTER.

9. SOME NON STATIONARY EQUIPMENT (EQUIPMENT SITTING ON A COUNTERTOP OR MOBILE

UNITS) MAY BE MOVED. CONTRACTOR TO IDENTIFY AND REQUEST THE MOVEMENT OF THE

EQUIPMENT WITHIN THEIR CONSTRUCTION SCHEDULE. ONLY MEDICAL CENTER PERSONNEL

WILL BE ALLOWED TO MOVE MOBILE EQUIPMENT.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY COVERING, PROTECTION,

MOVING AND/OR STORAGE OF ALL FURNITURE AND EQUIPMENT RELATED TO THE PROJECT.

11. ALL LARGE CONSTRUCTION MATERIAL OR EQUIPMENT DELIVERIES, DEBRIS REMOVAL TO BE

COORDINATED WITH THE COR.

12. THE VA HAS DETERMINED THE RENOVATION AREA IS 100% ASBESTOS FREE.

13. PERSONNEL IN THE PHASED RENOVATION UP-GRADE AREA WILL BE TEMPORARILY

RELOCATED DURING CONSTRUCTION.

PROJECT CODE DATA

DEPARTMENT OF VETERANS AFFAIRS

HOT SPRINGS VA MEDICAL CENTER

500 NORTH 5TH STREET

HOT SPRINGS, SD 57747

SCOPE OF WORK

THIS PROJECT WILL REPLACE AIR HANDELING UNIT SERVING WARD 1 NORH AND ASSOCIATED

MECHANCIAL SYSTEM DEFICIENCIES PER THE VA HVAC DESIGN MANUAL (03/01/2024 EDITION)

LOCATED IN BUILIDNG 12 OF THE HOT SPRINGS VA MEDICAL CENTER. THE FOLLOWING IS A

SUMMARY OF THE PROJECT SCOPE.

1. THE PROJECT WILL REPLACE THE EXISTING TRANE HVAC SYSTEM SERVING WARD 1

NORTH AS THEY HAVE EXCEEDED THEIR USEFUL LIFE.

2. DESIGN TO INCLUDE CONVERSION OF EQUIPMENT TO DIRECT DIGITAL CONTROLS

CONNECTING TO CENTRAL AUTOMATION SYSTEM. CONTROL SYSTEMS FOR EACH

MECHANCIAL DEVICE WILL BE REPLACED. AIR HANDLERS AND EXHAUST FANS WILL HAVE

NEW COMPONENTS INCLUDING COILS (PRE-HEAT, COOLING, REHEAT), FILTERS, FANS,

CONTROLS, VARIABLE SPEED DRIVES, HUMIDIFIERS, VALVES, ETC. ADDITIONALLY,

PROVISIONS FOR HUMIDIFYING AND DEHUMIDIFYING, AND COLD WEATHER.

3. REPLACE THE EXISTING LOUVERS IN THE SAME LOCATION.

4. ROOM UNIT HEATERS REMOVED, PLUMBING PIPES CAPPED IN WALL AND REPAIR/PATCH

WALL TO MATCH EXISTING GYPSUM BOARD FINISH.

5. DESIGN WILL KEEP THE FACILITY OPERATIOINAL MOST TIMES, WITH MINIMAL DOWNTIME.

WITH TEMPORARY AIR HANDLER AND GENERATOR SUPPORTING SYSTEMS.

6. DEMO AND NEW CEILING SCOPE TO REPLACE EXISTING ACT / GRID AND OR GYPSUM

BOARD TO MATCH FOR IMPACTED AREAS WITHIN THE ROOMS WITH

MECHANICAL/ELECRICAL WORK.

7. WALL PATCHING AND PAINTING FOR NEW T-STAT H-STAT AND PRESSURE MONITORS.

8. DESIGN DOCUMENTATION CONSIDERATIONS / SCHEDULE FOR LIFE SAFETY, PHASING,

ICRA BARRIERS, SECURITY AND TIME MANAGEMENT WHERE PRIMARY WORK IMPACTS

PATIENTS AND STAFF WITH MINIMA DOWNTIME. CONSTRUCTION WORK WILL BE DONE

DURING NORMAL BUSINESS HOURS (I.E. OFFICES, MECHANICAL ROOM, TOILETS), AT NIGHT

(I.E. CORRIDOR) AND SOME WEEKENDS (I.E. EXAM ROOMS, LASER ROOM, EYE CLINIC,

STORAGE, HOUSEKEEPING).

9. ADDRESS FIRE AND SMOKE PENETRATIONS THROUGH WALLS AND FLOORS.

10. SITE PLAN AND BUILDING DOCUMENTATION SHOWING PROPOSED CONTRACTOR

ACCESS, PARKING, LAYDOWN AREAS, TRAILER, ETC.

11. VA HAS DETERMINED WORK SCOPE DOES NOT CONTAIN ANY HAZARDOUS MATERIALS

AND OR ASBESTOS.

APPLICABLE CODES AND DESIGN CRITERIA

CODES AND LIFE SAFETY STANDARDS

2024 NFPA101 NATIONAL FIRE PROTECTION ASSOCIATION LIFE SAFETY CODE.

2023 NEC NATIONAL ELECTRIC CODE.

2021 IBC INTERNATIONAL BUILDING CODE.

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION 07/01/2023 .

IPC INTERNATIONAL PLUMBING CODE.

APPLICABLE VA DESIGN STANDARDS

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD

APPLICATION GUIDE, AND OTHER GUIDANCE ON TECHNICAL INFORMATION LIBRARY (TIL)

(www.cfm.va.gov/til/).

PG 18-3 DESIGN AND CONSTRUCTION PROCEDURES.

07/01/23 H-18-8 VA SEISMIC DESIGN REQUIREMENTS.

OCCUPANCY GROUP

IBC OCCUPANCY GROUP 1-2 (PRIMARY HEALTHCARE) SECTION 308.3.

NFPA 101 OCCUPANCY GROUP EXISTING HEALTHCARE OCCUPANCY SECTION 43.5.1.3 &

CHAPTER 19.

OCCUPANT LOAD FACTOR

IBC TABLE 1004.5 HEALTHCARE (INPATIENT TREATMENT AREAS) 240 SF.

NFPA 101 TABLE 7.3.1.2 HEALTHCARE 240 SF.

BUILDING 12 AREA OF RENOVATION

BASEMENT CRAWL SPACE 9,500 SF

GROUND LEVEL CHASE 300 SF

LEVEL 1 NORTH WARD 6,125 SF

BUILDING CONSTRUCTION CLASSIFICATION

IBC I-B TABLE 601

NFPA 101 TYPE II (222) CHAPTER 19 EXISTING HEALTHCARE OCCUPANCY 19.1.6.2 & TABLE

19.1.6.1

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS PER IBC TABLE 601

I-B

2 HR. PRIMARY STRUCTURAL FRAME.

2 HR. BEARING WALLS - EXTERIOR.

0 HR. BEARING WALLS - INTERIOR.

NON BEARING WALLS & PARTITIONS TABLE 602.

0 HR. NON BEARING WALLS & PARTITIONS - INTERIOR.

2 HR. FLOOR CONSTRUCTION & SECONDARY MEMBERS SECTION 202.

1 HR. ROOF CONSTRUCTION & ASSOCIATED SECONDARY MEMBERS SECTION 202.

BUILDING IS PROTECTED THROUGHOUT BY AN AUTOMATIC SPRINKLER SYSTEM.

OCCUPANCY SEPARATION NFPA 101 TABLE 6.1.14.4.1(A)

NFPA 101 TABLE A.7.6 COMMON PATH, DEAD-END AND TRAVEL DISTANCE LIMITS (BY

OCCUPANCY)

N/A COMMON PATH OF TRAVEL LIMIT EXISTING HEALTH CARE.

30 FT. DEAD END LIMIT EXISTING HEALTH CARE.

200 FT. TRAVEL DISTANCE LIMIT EXISTING HEALTH CARE.

INTERIOR FINISHES PER IBC TABLE 803.13

CLASS B INTERIOR EXIT STAIRWAYS & RAMPS.

CLASS C CORRIDORS & ENCLOSURE FOR EXIT ACCESS STAIRWAYS & RAMPS.

CLASS C ROOMS & ENCLOSED SPACES.

IBC SECTON 803.1.2 INTERIOR WALL ANDD CEILING FINISH MATERIALS TESTED IN

ACCORDANCE WITH ASTM E84 OR UL 723

CLASS A = FLAME SPREAD INDEX 0-25; SMOKE DEVELOPED INDEX 0-45

CLASS B = FLAME SPREAD INDEX 26-75; SMOKE DEVELOPED INDEX 0-450

CLASS C = FLAME SPREAD INDEX 76-200; SMOKE DEVELOPED INDEX 0-450

NFPA 101 CONCEALED SPACES AND DRAFTSTOPS SECTION 8.6.11.1

CONEALED COMBUSTIABLE SPACE HAVING MATERIALS WITH A FLAME SPREAD GREATER THAN

25 IN ACCORDANCE WITH SECTION 10.2.3 SHALL NOT APPLY WHERE THE SPACE IS PROTECTED

WTHOUGHOUT WITH AN APPROVED AUTOMATIC SPRINKER SYSTEM AND WHERE THE

INSTALLATION IS AN EXISTING INSTALLATION.

1 7 8

1. SITE ACCESS FOR CONTRACTOR PERSONNEL AND

MATERIAL DELIVERY / SUPPLIES.

2. DESIGNATED PARKING FOR CONTRACTOR.

3. VERY SHORT TERM AREA FOR WASTE PICKUP AND

DELIVERY INTO BUILDING FOR PROJECT.

4. CONTRACTOR EQUIPMENT REPLACMENT ACCESS.

5. FENCE - CONTRACTOR BUILDING SECURE WORK AREA.

6. CONTRACTOR TRAILER AND TOILET. AREA SHARED

WITH EHRM CONSTRUCTION PROJECT.

7. CONTRACTOR BUILDING ACCESS TO ELEVATOR.

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

E

D

C

B

A

F

Sprinklered

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

A/E

A ut od es k D oc s:

//V

IS

N

H ot

S pr in gs

R ep la ce

N or th

H V

A C

U ni t/H ot

S pr in gs

R ep la ce

H V

A C

V

.r vt 2/

/2

5:

:3

P M

SITE PLAN, BUILDING ACCESS AND CODE

SUMMARY

GF DC

ISSUED FOR CONSTRUCTION 568A4-23-207

REPLACE 1 NORTH HVAC SYSTEM

HOT SPRINGS VA MEDICAL CENTER, HOT SPRINGS, SD

02/28/2025

12-GI102

568A4 - HOT

SPRINGS, SD

1" = 160'-0"

OVERALL SITE PLAN

Revisions: Date:

INFECTION CONTROL GENERAL NOTES

1. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE

PERFORMED. ALL AIR VENTS MUST BE SEALED OFF NEAR THE

CONSTRUCTION AREA AS REQUIRED AFTER COORDINATION WITH COR TO

ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE PRESSURE

SYSTES. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR

TO DECK.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE

DEFINED AND CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO

BE PROVIDED BY THE CONTRACTOR. ALL EGRESS WAYS MUST BE

MAINTAINED FREE OF DEBRIS AT ALL TIMES. THEY MUST BE UTILIZED AT

SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST MATS MUST

BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY

OR MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED

THROUGH HOSPITAL AREAS MUST BE COMPLETELY TIGHTLY COVERED TO

CONTAIN DUST DURING TRANSPORT. DEBRIS SHALL BE REMOVED IN

EVENINGS OR NON-DUTY TIMES IF POSSIBLE. ALL CART WHEELS MUST BE

CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.

3. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL

BE MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE

CONTRACTOR AND WILL BE HIGH EFFICIENCY PARTICULATE AIR (HEPA)

VACUUMED AND WET MOPPED WITH DISINFECTANT DAILY OR MORE

FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING

SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE

CONSTRUCTION ZONE.

4. INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR TO OBTAIN

INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

5. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO

COORDINATE WITH THE COR PRIOR TO CONSTRUCTION.

6. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE

CONTAINMENT AREA, IF EXISTING WALLS AND/OR PARTITIONS DO NOT

EXTEND TO THE STRUCTURE ABOVE.

7. COORDINATE WITH OTHER ENGINEERING DISCIPLINES.

8. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED

LEVELS. THE VA MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES

(PATIENT CENSUS, OTHER PROJECTS, ETC.), REQUIRE THE GENERAL

CONTRACTOR TO MODIFY EXTENTS AND AREA SIZES OF ICRA

BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME

REQUISITE PROVISIONS REQUIRING CONTAINMENT AIR-PRESSURIZATION

CRITERIA, AND IDENTIFICATION AS NOTED ON INFECTION CONTROL RISK

ASSESSMENT.

9. ANY EXCESSIVE NOISE PERCEIVED OUTSIDE THE CONSTRUCTION

CONTAINMENT BARRIER ABOVE 85 DECIBELS SHALL BE COORDINATED

WITH COR.

10. ANYTHING THE COR HAS DEEMED EXCESSIVE OR DISRUPTIVE TO

PATIENT CARE PROCEDURES. A PLAN OF ACTION WILL BE IMMEDIATELY

PUT IN PLACE TO AVOID DISRUPTIONS TO THE CONSTRUCTION

SCHEDULE.

11. SMOKE AND OR FIRE RATED PARTITION PENETRATIONS MUST MAINTAIN

THEIR INTEGRITY THROUGHOUT THE PHASE(S) FOR ROOMS AND

CORRIDORS DURING DEMOLITION AND NEW CONSTRUCTION SUCH AS

DUCTS, CONDUIT, ETC. IT MAY REQUIRE PLACEMENT OF TEMPORARY

SMOKE AND FIRE RATED BARRIERS SEQUENCED, GC TO PROVIDE

SCHEDULE FOR COR REVIEW.

12. REFER TO SPECIFICATION SECTION 01 35 26 SAFETY REQUIREMENTS

FOR VERTICAL AND HORIZOONTAL BARRIERS, ETC.

13. SPRINKLERS TO REMAIN IN SERVICE DURING PROJECT SCOPE

DEMOLITION AND NEW CONSTRUCTION ABOVE CEILINGS IN ROOMS,

COORDIORS PER NFPA 1 AND 241 CODE. THE OPTIONS AVAILABLE ARE (1)

AT THE END OF EACH DAY OR NIGHT CONSTRUCTION SHIFT

PROVIDE/INSTALL A TEMPORARY 1 HOUR FIRE RATED HORIZONAL CEILING

BARRIER AT THE EXISTING CEILING GRID THAT WAS REMOVED. (2) PLACE

BACK THE ACT OR (3) INSTALL TEMPORARY SPRINKLERS THAT PROTECT

THE OPEN CONCEALED SPACE AREA.

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

E

D

C

B

A

F

Sprinklered

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

A/E

A ut od es k D oc s:

//V

IS

N

H ot

S pr in gs

R ep la ce

N or th

H V

A C

U ni t/H ot

S pr in gs

R ep la ce

H V

A C

V

.r vt 2/

/2

5:

:3

P M

ICRA NOTES & DETAILS

GF DC

ISSUED FOR CONSTRUCTION 568A4-23-207

REPLACE 1 NORTH HVAC SYSTEM

HOT SPRINGS VA MEDICAL CENTER, HOT SPRINGS, SD

02/28/2025

12-GI103

568A4 - HOT

SPRINGS, SD

RO

TAN

K

CR

CRCR

CR

U P

U P

UP

U P

U P

UP

D O

W N

U P

UP

U P

U P

UP

U P

U P

UP

D O

W N

U P

UP

UP

PLAN LEGEND

PHASING GENERAL NOTES

12-AE301

01.B-D

UP

CONTRACTOR

ACCESS

CRAWL SPACE

LEVEL:

BASEMENT - B

GROUND - G

LEVEL ONE - 1

PHASE SEQUENCE:

01.G - D

SHIFT:

D - DAY

N - NIGHT

W - WEEKEND

PHASING INDEX

PHASE DURATION (145-174 DAYS)

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

EXIT STAIRWELL / PASSAGEWAY

EXIT

2 HOUR FIRE SEPARATION WALL

1 HR FIRE BARRIER (HAZARDOUS AREA)

SMOKE BARRIER / 1 HR PARTITION

WITH ACCOMPANYING DOOR RATING

CONTRACTOR ACCESS

2 HOUR FIRE BARRIER

SHIFT - NIGHT (DURATION: CORRIDOR AFTER/BEFORE DEPARTMENT WORKING HOURS)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF TEMPORARY DAILY WALL AND CEILING ICRA BARRIERS. A HEPACART MAY BE USED. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. PROJECT EXISTING AREAS

AROUND WORK SCOPE REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID FOR PROJECT AREA. REMOVAL AND REUSE

OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AT LOCATION

PROVIDED BY THE VA, REF: MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING

SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC.

REMOVE DEMOLITION MATERIALS FROM AREA (AFTER HOURS). PREPARE SPACE FOR NEW

WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS. PAINT WALLS AS A RESULT OF

NEW WORK SCOPE.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS AS A RESULT OF NEW WORK SCOPE.

(1) REMOVE BARRIERS AND CLEAN SPACE, PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

PHASING SCHEDULE

SHIFT - WEEKEND (DURATION-FRIDAY DURING WORKING HOURS, WEEKEND AND MONDAY)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA.

COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. PROTECT IN ROOM, REF: MECHANICAL AND

ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN

ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC. REMOVE EXISTING WALL HEAT UNITS, ELECTRICAL

EQUIPMENT, WIRING, AND CAP PIPES. REMOVE DEMOLITION MATERIALS FROM AREA (AFTER

HOURS). PREPARE SPACE FOR NEW WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS, INSTALL NEW BASE AND FLOORING AS A RESULT OF HEAT UNIT REMOVAL AND

OTHER NEW WORK SCOPE.

(1) CLEAN SPACE, REMOVE BARRIERS AND PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

SHIFT - DAY (DURATION-WORKING HOURS)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AND PROTECT IN ROOM, REF:

MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC. REMOVE EXISTING WALL HEAT UNITS, ELECTRICAL EQUIPMENT, WIRING, AND CAP PIPES. REMOVE DEMOLITION MATERIALS FROM AREA

(AFTER HOURS). PREPARE SPACE FOR NEW WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS, INSTALL NEW BASE AND FLOORING AS A RESULT OF HEAT UNIT REMOVAL AND

OTHER NEW WORK SCOPE.

(1) REMOVE BARRIERS AND CLEAN SPACE, PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

GROUND FLOOR SHIFT-DAY (DURATION WORKING HOURS) TO BE CONCURRENT WITH LEVEL 01- WORK

SCOPE PHASE DURATION

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AND PROTECT IN ROOM, REF:

MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING LEVEL 1 WALL HEATER "VISIBLE PIPING ONLY", CAP

ENDS

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION.

(1) REMOVE BARRIERS AND CLEAN SPACE. PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY-TOTAL DURATION (5) DAYS

1. EXISTING SMOKE AND OR FIRE RATED DOORS AND WALLS

TO REMAIN OPERATIONAL AND AN ICRA ANTEROOM

VESTIBULE IS TO BE PROVIDED IN THE FOLLOWING

PROJECT SCOPE ROOM.

BASEMENT:

CRAWLSPACE

GROUND LEVEL:

X-RAY STORAGE (B001), X-RAY RM (B002), WOMENS TOILET

(B003). WORKROOM (B004), MENS TOILET (B005),

MECHANICAL RM. (B005R), RADIOLOGY SUPERVISOR

(B005D), NUTRITION & FOOD SERVICE (B005E), IMAGE

ROOM NUC MED (B007), NUCLEAR MEDICINE (B009A),

RADIATION RM. (B005C), AMBULANCE PROGRAM (B011),

STORAGE (B012), STORAGE (B014), PROGRAM SUPPORT

NUTRITION FOOD SERVICE (B016)

LEVEL 01:

HOUSEKEEPING (B102), WAITING (B104), PROSTHETICS

STORAGE (B105), EXAM RM. (B107), EYE EXAM (B108), EYE

EXAM (B109), EYE EXAM (B110), AUDIOLOGY EXAM RM.

(B110), LASER RM. (B111), AUDIOLOGY EXAM RM. (B112),

OPTOMETRY TECH (B113), STORAGE (B114), AUDIOLOGY

DEMO (B115), EXAM RM. (B116), EXAM RM. (B118,),

PROSTHETICS OFFICE (B117), AUDIOLOGY (B119), EXAM

RM. (B120), EXAM RM. (B121), WOMENS TOILET (B122),

EXAM RM. (B123), MECHANICAL RN, (B124), MENS TOILET

(B125), COMPENSATION & PENSION (B126), EXAM RM. (B127)

2. SPRINKLERS TO REMAIN IN SERVICE DURING PROJECT

SCOPE DEMOLITION AND NEW CONSTRUCTION ABOVE

CEILINGS IN ROOMS, CORRIDORS PER NFPA 1 AND 241

CODE. THE OPTIONS AVAILABLE ARE (1) AT THE END OF

EACH DAY OR NIGHT CONSTRUCTION SHIFT

PROVIDE/INSTALL A TEMPORARY 1 HOUR FIRE RATED

HORIZONTAL CEILING BARRIER AT THE EXISTING CEILING

GRID THAT WAS REMOVED. (2) PLACE BACK THE ACT OR

(3) INSTALL TEMPORARY SPRINKLERS THAT PROTECT THE

OPEN CONCEALED SPACE AREA.

TRUE NORTH

PLAN NORTHNORTH

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

E

D

C

B

A

F

Sprinklered

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

A/E

KEY PLAN

A ut od es k D oc s:

//V

IS

N

H ot

S pr in gs

R ep la ce

N or th

H V

A C

U ni t/H ot

S pr in gs

R ep la ce

H V

A C

V

.r vt 2/

/2

5:

:4

P M

CRAWL SPACE - OVERALL PHASING PLAN

GF DC

ISSUED FOR CONSTRUCTION 568A4-23-207

REPLACE 1 NORTH HVAC SYSTEM

HOT SPRINGS VA MEDICAL CENTER, HOT SPRINGS, SD

02/28/2025

12-AE101

568A4 - HOT

SPRINGS, SD

1/16" = 1'-0"

CRAWL SPACE - OVERALL PHASING PLAN

KEYPAD

DOWN

U P

UP

KEYPAD

DOWN

DOWN

DOWN

U P

UP

PLAN LEGEND

PHASING GENERAL NOTES

12-AE302

DN

CONTRACTOR

ACCESS

05.G-D

21.1-D)

09.G-D

(28.1-D)

011.G-D

29.1-D

12.G-D

(29.1-D)

04.G-D

(20.1-W) 03.G-D

(19.1-D)

02.G-D

(18.1-W)

37.1-D

17.G-D

(46.1-D)

16.G-D

(44.1-D)

10.G-D

(28.1-D) 09.G-D

(28.1-D)

08.G-W

(27.1-W) 07.G-W

(23.1-W) 06.G-W

(22.1-D)

17.G-D

(46.1-D)

17.G-D

(45.1-D)

13.G-W

(31.1-W) 14.G-W

(33.1-D)

13.G-W

(30.1-W)

15.G-D

(43.1-D)

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

EXIT STAIRWELL / PASSAGEWAY

EXIT

2 HOUR FIRE SEPARATION WALL

1 HR FIRE BARRIER (HAZARDOUS AREA)

SMOKE BARRIER / 1 HR PARTITION

WITH ACCOMPANYING DOOR RATING

CONTRACTOR ACCESS

2 HOUR FIRE BARRIER

LEVEL:

BASEMENT - B

GROUND - G

LEVEL ONE - 1

PHASE SEQUENCE:

01.G - D

SHIFT:

D - DAY

N - NIGHT

W - WEEKEND

PHASING INDEX

PHASE DURATION (145-174 DAYS)

SHIFT - NIGHT (DURATION: CORRIDOR AFTER/BEFORE DEPARTMENT WORKING HOURS)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF TEMPORARY DAILY WALL AND CEILING ICRA BARRIERS. A HEPACART MAY BE USED. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. PROJECT EXISTING AREAS

AROUND WORK SCOPE REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID FOR PROJECT AREA. REMOVAL AND REUSE

OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AT LOCATION

PROVIDED BY THE VA, REF: MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING

SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC.

REMOVE DEMOLITION MATERIALS FROM AREA (AFTER HOURS). PREPARE SPACE FOR NEW

WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS. PAINT WALLS AS A RESULT OF

NEW WORK SCOPE.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS AS A RESULT OF NEW WORK SCOPE.

(1) REMOVE BARRIERS AND CLEAN SPACE, PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

PHASING SCHEDULE

SHIFT - WEEKEND (DURATION-FRIDAY DURING WORKING HOURS, WEEKEND AND MONDAY)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA.

COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. PROTECT IN ROOM, REF: MECHANICAL AND

ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN

ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC. REMOVE EXISTING WALL HEAT UNITS, ELECTRICAL

EQUIPMENT, WIRING, AND CAP PIPES. REMOVE DEMOLITION MATERIALS FROM AREA (AFTER

HOURS). PREPARE SPACE FOR NEW WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS, INSTALL NEW BASE AND FLOORING AS A RESULT OF HEAT UNIT REMOVAL AND

OTHER NEW WORK SCOPE.

(1) CLEAN SPACE, REMOVE BARRIERS AND PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

SHIFT - DAY (DURATION-WORKING HOURS)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AND PROTECT IN ROOM, REF:

MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC. REMOVE EXISTING WALL HEAT UNITS, ELECTRICAL EQUIPMENT, WIRING, AND CAP PIPES. REMOVE DEMOLITION MATERIALS FROM AREA

(AFTER HOURS). PREPARE SPACE FOR NEW WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS, INSTALL NEW BASE AND FLOORING AS A RESULT OF HEAT UNIT REMOVAL AND

OTHER NEW WORK SCOPE.

(1) REMOVE BARRIERS AND CLEAN SPACE, PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

GROUND FLOOR SHIFT-DAY (DURATION WORKING HOURS) TO BE CONCURRENT WITH LEVEL 01- WORK

SCOPE PHASE DURATION

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AND PROTECT IN ROOM, REF:

MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING LEVEL 1 WALL HEATER "VISIBLE PIPING ONLY", CAP

ENDS

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION.

(1) REMOVE BARRIERS AND CLEAN SPACE. PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY-TOTAL DURATION (5) DAYS

1. EXISTING SMOKE AND OR FIRE RATED DOORS AND WALLS

TO REMAIN OPERATIONAL AND AN ICRA ANTEROOM

VESTIBULE IS TO BE PROVIDED IN THE FOLLOWING

PROJECT SCOPE ROOM.

BASEMENT:

CRAWLSPACE

GROUND LEVEL:

X-RAY STORAGE (B001), X-RAY RM (B002), WOMENS TOILET

(B003). WORKROOM (B004), MENS TOILET (B005),

MECHANICAL RM. (B005R), RADIOLOGY SUPERVISOR

(B005D), NUTRITION & FOOD SERVICE (B005E), IMAGE

ROOM NUC MED (B007), NUCLEAR MEDICINE (B009A),

RADIATION RM. (B005C), AMBULANCE PROGRAM (B011),

STORAGE (B012), STORAGE (B014), PROGRAM SUPPORT

NUTRITION FOOD SERVICE (B016)

LEVEL 01:

HOUSEKEEPING (B102), WAITING (B104), PROSTHETICS

STORAGE (B105), EXAM RM. (B107), EYE EXAM (B108), EYE

EXAM (B109), EYE EXAM (B110), AUDIOLOGY EXAM RM.

(B110), LASER RM. (B111), AUDIOLOGY EXAM RM. (B112),

OPTOMETRY TECH (B113), STORAGE (B114), AUDIOLOGY

DEMO (B115), EXAM RM. (B116), EXAM RM. (B118,),

PROSTHETICS OFFICE (B117), AUDIOLOGY (B119), EXAM

RM. (B120), EXAM RM. (B121), WOMENS TOILET (B122),

EXAM RM. (B123), MECHANICAL RN, (B124), MENS TOILET

(B125), COMPENSATION & PENSION (B126), EXAM RM. (B127)

2. SPRINKLERS TO REMAIN IN SERVICE DURING PROJECT

SCOPE DEMOLITION AND NEW CONSTRUCTION ABOVE

CEILINGS IN ROOMS, CORRIDORS PER NFPA 1 AND 241

CODE. THE OPTIONS AVAILABLE ARE (1) AT THE END OF

EACH DAY OR NIGHT CONSTRUCTION SHIFT

PROVIDE/INSTALL A TEMPORARY 1 HOUR FIRE RATED

HORIZONTAL CEILING BARRIER AT THE EXISTING CEILING

GRID THAT WAS REMOVED. (2) PLACE BACK THE ACT OR

(3) INSTALL TEMPORARY SPRINKLERS THAT PROTECT THE

OPEN CONCEALED SPACE AREA.

TRUE NORTH

PLAN NORTHNORTH

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

E

D

C

B

A

F

Sprinklered

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

A/E

KEY PLAN

A ut od es k D oc s:

//V

IS

N

H ot

S pr in gs

R ep la ce

N or th

H V

A C

U ni t/H ot

S pr in gs

R ep la ce

H V

A C

V

.r vt 2/

/2

5:

:4

P M

GROUND LEVEL - OVERALL PHASING PLAN

GF DC

ISSUED FOR CONSTRUCTION 568A4-23-207

REPLACE 1 NORTH HVAC SYSTEM

HOT SPRINGS VA MEDICAL CENTER, HOT SPRINGS, SD

02/28/2025

12-AE102

568A4 - HOT

SPRINGS, SD

1/16" = 1'-0"

GROUND LEVEL - OVERALL PHASING PLAN

C R

UP

DN

DN

U P

DN

DN

DOWN

UP

D O W N

UP

DOWN

C R

UP

U P

DN

DN

DOWN

UP

D O W N

UP

DOWN

PLAN LEGEND

PHASING GENERAL NOTES

PHASING KEY NOTES

12-AE303

29.1-D 28.1-D 27.1W

26.1-W

25.1-W

24.1-W 23.1-D

22.1-D 21.1-D

20.1-W 19.1-D

18.1-W

46.1-D44.1-D

43.1-D

41.1-W

40.1-D

39.1-W

38.1-W

36.1-D

35.1-D

34.1-D

31.1-W

30.1-W

32.1-N

42.1-N 18.1-W

35.1-D

34.1-D

33.1-D

45.1-D

CONTRACTOR

ACCESS

37.1-D

33.1-D

4 5

LEVEL:

BASEMENT - B

GROUND - G

LEVEL ONE - 1

PHASE SEQUENCE:

01.G - D

SHIFT:

D - DAY

N - NIGHT

W - WEEKEND

PHASING INDEX

PHASE DURATION (145-174 DAYS)

SHIFT - NIGHT (DURATION: CORRIDOR AFTER/BEFORE DEPARTMENT WORKING HOURS)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF TEMPORARY DAILY WALL AND CEILING ICRA BARRIERS. A HEPACART MAY BE USED. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. PROJECT EXISTING AREAS

AROUND WORK SCOPE REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID FOR PROJECT AREA. REMOVAL AND REUSE

OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AT LOCATION

PROVIDED BY THE VA, REF: MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING

SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC.

REMOVE DEMOLITION MATERIALS FROM AREA (AFTER HOURS). PREPARE SPACE FOR NEW

WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS. PAINT WALLS AS A RESULT OF

NEW WORK SCOPE.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS AS A RESULT OF NEW WORK SCOPE.

(1) REMOVE BARRIERS AND CLEAN SPACE, PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

PHASING SCHEDULE

SHIFT - WEEKEND (DURATION-FRIDAY DURING WORKING HOURS, WEEKEND AND MONDAY)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA.

COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. PROTECT IN ROOM, REF: MECHANICAL AND

ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN

ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC. REMOVE EXISTING WALL HEAT UNITS, ELECTRICAL

EQUIPMENT, WIRING, AND CAP PIPES. REMOVE DEMOLITION MATERIALS FROM AREA (AFTER

HOURS). PREPARE SPACE FOR NEW WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS, INSTALL NEW BASE AND FLOORING AS A RESULT OF HEAT UNIT REMOVAL AND

OTHER NEW WORK SCOPE.

(1) CLEAN SPACE, REMOVE BARRIERS AND PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

SHIFT - DAY (DURATION-WORKING HOURS)

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AND PROTECT IN ROOM, REF:

MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING DUCTS, ETC. REMOVE EXISTING WALL HEAT UNITS, ELECTRICAL EQUIPMENT, WIRING, AND CAP PIPES. REMOVE DEMOLITION MATERIALS FROM AREA

(AFTER HOURS). PREPARE SPACE FOR NEW WORK SCOPE.

(1) INSTALLATION OF NEW DUCT WORK, THERMOSTAT(S), REF: MECHANICAL AND ELECTRICAL

DRAWINGS. FIRE CAULK PENETRATIONS IN SMOKE OR FIRE WALLS.

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION. PATCH AND

PAINT WALLS, INSTALL NEW BASE AND FLOORING AS A RESULT OF HEAT UNIT REMOVAL AND

OTHER NEW WORK SCOPE.

(1) REMOVE BARRIERS AND CLEAN SPACE, PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY - TOTAL DURATION (6) DAYS

GROUND FLOOR SHIFT-DAY (DURATION WORKING HOURS) TO BE CONCURRENT WITH LEVEL 01- WORK

SCOPE PHASE DURATION

(0) VA TO REMOVE EQUIPMENT AND FURNITURE PRIOR TO GC SCHEDULE PHASE START DATE. PHOTO

DOCUMENTATION OF ROOM WITH COR, WALK-THRU.

(1) GC INSTALLATION OF ICRA BARRIERS. TEMPORARY STORAGE OF ANY ITEMS DIRECTED BY THE VA. COVER BUILT-IN CASE WORK AND TEMPORARY WINDOW UNIT, REF: MECHANICAL DRAWINGS.

(1) LIMIT REMOVAL OF EXISTING ACT CEILING AND GRID. REMOVAL AND REUSE OF EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. STORE AND PROTECT IN ROOM, REF:

MECHANICAL AND ELECTRICAL DRAWINGS. PROTECT EXISTING SPRINKLERS AND ALARM SYSTEMS, TO REMAIN ACTIVE. DEMOLITION OF EXISTING LEVEL 1 WALL HEATER "VISIBLE PIPING ONLY", CAP

ENDS

(1) INSTALL NEW ACT AND GRID TO MATCH EXISTING SURROUNDINGS. RETURN EXISTING LIGHTS, DIFFUSERS, SMOKE DETECTORS, SPEAKERS, ETC. TO ORIGINAL CEILING LOCATION.

(1) REMOVE BARRIERS AND CLEAN SPACE. PREPARE FOR OCCUPANCY. RETURN ANY EQUIPMENT

STORED AND VA TO RETURN EQUIPMENT AND FURNITURE IN TEMPORARY STORAGE.

(1) ONE FLOAT DAY-TOTAL DURATION (5) DAYS

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

EXIT STAIRWELL / PASSAGEWAY

EXIT

2 HOUR FIRE SEPARATION WALL

1 HR FIRE BARRIER (HAZARDOUS AREA)

SMOKE BARRIER / 1 HR PARTITION

WITH ACCOMPANYING DOOR RATING

CONTRACTOR ACCESS

2 HOUR FIRE BARRIER

1. EXISTING SMOKE AND OR FIRE RATED DOORS AND WALLS

TO REMAIN OPERATIONAL AND AN ICRA ANTEROOM

VESTIBULE IS TO BE PROVIDED IN THE FOLLOWING

PROJECT SCOPE ROOM.

BASEMENT:

CRAWLSPACE

GROUND LEVEL:

X-RAY STORAGE (B001), X-RAY RM (B002), WOMENS TOILET

(B003). WORKROOM (B004), MENS TOILET (B005),

MECHANICAL RM. (B005R), RADIOLOGY SUPERVISOR

(B005D), NUTRITION & FOOD SERVICE (B005E), IMAGE

ROOM NUC MED (B007), NUCLEAR MEDICINE (B009A),

RADIATION RM. (B005C), AMBULANCE PROGRAM (B011),

STORAGE (B012), STORAGE (B014), PROGRAM SUPPORT

NUTRITION FOOD SERVICE (B016)

LEVEL 01:

HOUSEKEEPING (B102), WAITING (B104), PROSTHETICS

STORAGE (B105), EXAM RM. (B107), EYE EXAM (B108), EYE

EXAM (B109), EYE EXAM (B110), AUDIOLOGY EXAM RM.

(B110), LASER RM. (B111), AUDIOLOGY EXAM RM. (B112),

OPTOMETRY TECH (B113), STORAGE (B114), AUDIOLOGY

DEMO (B115), EXAM RM. (B116), EXAM RM. (B118,),

PROSTHETICS OFFICE (B117), AUDIOLOGY (B119), EXAM

RM. (B120), EXAM RM. (B121), WOMENS TOILET (B122),

EXAM RM. (B123), MECHANICAL RN, (B124), MENS TOILET

(B125), COMPENSATION & PENSION (B126), EXAM RM. (B127)

2. SPRINKLERS TO REMAIN IN SERVICE DURING PROJECT

SCOPE DEMOLITION AND NEW CONSTRUCTION ABOVE

CEILINGS IN ROOMS, CORRIDORS PER NFPA 1 AND 241

CODE. THE OPTIONS AVAILABLE ARE (1) AT THE END OF

EACH DAY OR NIGHT CONSTRUCTION SHIFT

PROVIDE/INSTALL A TEMPORARY 1 HOUR FIRE RATED

HORIZONTAL CEILING BARRIER AT…

This is the start of the file's text. The full file is on GovTribe.