S02 695-21-110 Drawings Part 3.pdf

PDF 4 MB Posted

Attached to
Z1DA--695-21-110 Repair North Campus Steam Tunnel
Solicitation number
36C25223B0030
Issued by

About this file

This solicitation is for repair work on the North Campus Steam Tunnel at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The required work includes repairs and replacement of existing infrastructure in six segments of the steam tunnel, including replacement of lighting fixtures, electrical conduits, junction boxes, and other system components. The solicitation number is 36C25223B0030 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The contractor shall complete all work by January 15, 2024. The solicitation includes plans, specifications, and details for civil, structural, architectural, and electrical scope.

View the file

Other files

File Type Posted
36C25223B0030 0006.docx DOCX document
S06 Basement Plan_Floor_Arch.pdf PDF
S06 SECTIONS _ DETAILS_Equipment_Arch.pdf PDF
36C25223B0030 0005.docx DOCX document
S06 North Elevation _ Cross Section Social Hall Bldg No. 4_Exterior_Arch.pdf PDF
S06 A0005 Follow Up questions to Amendment 003.docx DOCX document
S06 BUILDING NO 5 COMPANY 10_Exterior_Arch.pdf PDF
36C25223B0030 0004.docx DOCX document
P07 Wage Determination.pdf PDF
S02 695-21-110_BiddersQuestionsLog_FINAL-1.xlsx XLSX spreadsheet
S02 695-21-110_CvrSht_Amendment3-1.docx DOCX document
S02 695-21-110_DwgFrom695-97-101REFERENCE-1.pdf PDF
S02 695-21-110_030130_MaintCIPConcrete-1.pdf PDF
S02 695-21-110_CS101_Amendment3-1.pdf PDF
36C25223B0030 0003.docx DOCX document
S02 695-21-110_017419_ConstrWasteMan-1.pdf PDF
S02 Wage Determination correction.pdf PDF
S02 695-21-110_GeotechReport_210512-1.pdf PDF
S02 695-21-110_PCRA_230901-2.pdf PDF
S04-PreBid2ndSignInSheet-1.pdf PDF
36C25223B0030 0002.docx DOCX document
S04 - Pre-Bid Sign-in Sheet.pdf PDF
36C25223B0030 0001.docx DOCX document
36C25223B0030_1.docx DOCX document
S02 695-21-110 Drawings Part 1.pdf PDF
S02 Wage Determination.pdf PDF
S02 695-21-110 Drawings Part 2.pdf PDF
S02 695-21-110 Specficiations.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01.31-24

01.31-25

01.31-26

02.01-2

02.01-5

02.01-7

02.01-8

02.01-9

02.01-12

02.01-18

02.01-25

02.01-22

02.01-28

02.01-26

02.01-30

02.01-31

02.01-32

02.01-33

02.01-35

02.01-37

02.01-38

02.01-39

02.01-44

02.01-45

02.01-42

02.01-43

13 1

14 4

2 1

14 2

4 1

4 9

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:1

:1

P

M C

U s e rs \m la il\

D o c u m e n ts

\A

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ m la ilC

F J

.r v t

A-101

EXISTING CONDITIONS 2

2 4RF

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

CLA

DocuSign Envelope ID: BF3A282E-37F9-4F35-ABBD-8CF3F5B9B0F8

7/13/2023

EXISTING PIPE

SUPPORT FRAME,

COORD. W/ STRUCT.

EXISTING PIPE

SUPPORT FRAME,

COORD. W/ STRUCT.

EXISTING CONCRETE

TUNNEL

EXISTING LIGHT

FIXTURE TO BE

REMOVED, SEE ELEC.

VIF

6'-0"

EXISTING

CHAMFERED EDGE

EXISTING

CHAMFERED EDGE

EXISTING

CHAMFERED EDGE

EXISTING INSULATED

STEAM PIPES

EXISTING CONDUIT.

E.T.R. UNLESS

OTHERWISE NOTED,

REFER TO

ELECTRICAL

V

IF

EXISTING PIPE

SUPPORT BASE,

COORD. W/ STRUCT.

EXISTING

CHAMFERED EDGE

EXISTING 4'' DRAIN

PIPE

EXAUST COVER

AND FAN, SEE

CIVIL

SEALED MANHOLE,

SEE CIVIL

EXISTING

CONCRETE RISER

EXISTING

PRECAST TUNNEL

EXISTING VENTILATION

SHAFT V-2

EXISTING

MANHOLE M-1

VAULT C

EXISTING STEEL

RUNGS

EXISTING MOVEABLE

PLATE

EXISTING RAIL NOT

SHOWN FOR CLARITY

VIF

21'-3"

V

IF

NEW LADDER AND

LANDING, SEE

A-300

V

IF

LIQUID

WATERPROOFING

MEMBRANE AT

JOINTS (TYP)

CONTINUOUS SEALANT

AT EDGE (TYP)

CONTINUOUS

SEALANT AT EDGE

(TYP)

PRIMER (TYP)

WATERPROOFING

MEMBRANE (TYP)

DRAINAGE MAT SYSTEM

(TYP)

2'-0" 2'-0"

LIGHTWEIGHT CONCRETE

1/8" PER FOOT SLOPE TO

SHED WATER

A-300

EXISTING TUNNEL TO

BUILDING 5 BEYOND

EXISTING PRECAST

TUNNEL

EXISTNG SERVICE

CHASE S-3

VAULT D

CONTINUOUS

SEALANT AT EDGE

(TYP)

4'-0"

4'-8"

VIF

14'-2"

V

IF

NEW LADDER AND

LANDING, SEE

A-300

CONTINUOUS

SEALANT AT EDGE

(TYP)

VENTILATION HOOD,

SEE CIVIL

V

IF

LIQUID

WATERPROOFING

MEMBRANE AT

JOINTS (TYP)

PRIMER (TYP)

WATERPROOFING

MEMBRANE (TYP)

DRAINAGE MAT

SYSTEM (TYP)

2'-0"

2'-0"

LIGHTWEIGHT CONCRETE

1/8" PER FOOT SLOPE TO

SHED WATER

A-300

JOINT FILLER AND

JOINT SEALANT

(TYP)

EXISTING

PRECAST TUNNEL

VENTILATION HOOD,

SEE CIVIL

EXISTING

GRATING

EXISTING STEEL

BEAM

EXISTING VENTILATION

SHAFT V-1.

VAULT B

DEMOLISH AND REMOVE (2) EXISTING

HURLING CHAMBERS. CONFIRM THEY

ARE NOT CONNECTED TO

ELECTRICAL, PLUMBING, OR

MECHANICAL BEFORE DEMOLITION

PRIMER (TYP)

VIF

15'-10"

V

IF

WATERPROOFING

MEMBRANE (TYP)

V

IF

WATER PROOFING SYSTEM

ADHERED TO EXISTING

CONCRETE

2'-0"

V

IF

LIQUID WATERPROOFING

MEMBRANE AT JOINTS

(TYP)

DRAINAGE MAT SYSTEM

(TYP)

CONTINUOUS SEALANT

AT EDGE (TYP)

LIGHTWEIGHT CONCRETE

1/8" PER FOOT SLOPE TO

SHED WATER

CONTINUOUS SEALANT

AT EDGE (TYP)

2'-0"

EXISTING CONCRETE

TUNNEL

LIGHT FIXTURE, COORD.

W/ ELECTRICAL

EXISITNG

CHAMFERED EDGE

EXISTING ARRAY OF

CONDUIT. E.T.R.

UNLESS OTHERWISE

NOTED, REFER TO

ELECTRICAL

EXISTING SERVICE

CHASE

SEALED MANHOLE,

SEE CIVIL

VIF

6'-0"

V

IF

JOINT FILLER AND JOINT

SEALANT

LIQUID

WATERPROOFING

MEMBRANE AT

JOINTS (TYP)

PRIMER (TYP)

WATERPROOFING

MEMBRANE (TYP)

DRAINAGE MAT

SYSTEM (TYP)

CONTINUOUS

SEALANT AT EDGE

(TYP)

CONTINUOUS

SEALANT AT EDGE

(TYP)

2'-0"

EXISTING CONCRETE

TUNNEL

LIGHT FIXTURE, COORD.

W/ ELECTRICAL

EXISTING

CHAMFERED EDGE

EXISTING VENTILATION

SHAFT V-3

EXAUST COVER AND

FAN, SEE CIVIL

VIF

6'-0"

V

IF

CONTINUOUS

SEALANT AT EDGE

(TYP)

CONTINUOUS

SEALANT AT EDGE

(TYP)

EXISTING ARRAY OF

CONDUIT. E.T.R.

UNLESS OTHERWISE

NOTED, REFER TO

ELECTRICAL

JOINT FILLER AND JOINT

SEALANT (TYP)

LIQUID

WATERPROOFING

MEMBRANE AT

JOINTS (TYP)

PRIMER (TYP)

WATERPROOFING

MEMBRANE (TYP)

DRAINAGE MAT

SYSTEM (TYP)

2'-0"

EXISTING MANHOLE,

SEE CIVIL

REMOVE EXISTING

WATERPROOFING

MEMBRANE (TYP)

REMOVE EXISTING

ADHESIVE (TYP)

REMOVE BURRS AND

IRREGUALR FEATUES.

PREP SURFACE FOR NEW

WATERPROOFING

SYSTEM (TYP)

REMOVE EXISTING

JOINT SEALANT AND

JOINT FILLER (TYP)

EXCAVATE AROUND

VERTICAL SHAFTS AND

VAULTS, SEE CIVIL

REMOVE EXISTING

WATERPROOFING

MEMBRANE (TYP)

REMOVE EXISTING

ADHESIVE (TYP)

SHAFT

VAULT

TUNNEL

MANHOLE, SEE CIVIL

ROUGHEN SURFACE TO

1/4" AMPLITUDE AND

APPLY EPOXY BONDING

AGENT

LIGHTWEIGHT CONCRETE

1/8" PER FOOT SLOPE TO

SHED WATER

2'' PROTECTION

BOARD

CONNECT DRAINAGE

MAT SYSTEM TO

EXISTING 4'' DRAIN

PIPE, SEE CIVIL

LIQUID

WATERPROOFING

MEMBRANE AT

JOINTS (TYP)

PRIMER (TYP)

WATERPROOFING

MEMBRANE (TYP)

DRAINAGE MAT

SYSTEM (TYP)

DRAINAGE MAT SYSTEM

(TYP)

RISER

VAULT

TUNNEL

EXISTING CONCRETE

VAULT

WATERPROOFING

MEMBRANE (TYP)

PRIMER (TYP)

EXISTING CONCRETE

VAULT

JOINT FILLER AND

JOINT SEALANT

(TYP)

2'-0"

CONTINUOUS SEALANT AT

EDGE (TYP)

EXCAVATE AROUND

VERTICAL RISER, SEE

CIVIL

EXISTING TUNNEL

EXISTING VERTICAL

RISER

DRAINAGE MAT

SYSTEM WRAPPED

AROUND THE RISER

(18"- 24" RADIUS)

ANCHOR PIPE

EXTENSION TO

RISER

NEW PIPE

CONNECTION TO

AN EXISTING

DRAIN PIPE

EXISTING 4" DRAIN

PIPE

MANHOLE, SEE CIVIL

LIQUID

WATERPROOFING

MEMBRANE AT JOINTS

(TYP)

SEE 1/A-200 FOR

DEMOLITION NOTES

FOR VERTICAL RISER

TUNNEL

RISER

WATERPROOFING

MEMBRANE (TYP)

PRIMER (TYP)

EXISTING CONCRETE

VAULT

JOINT FILLER AND

JOINT SEALANT

(TYP)

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:1

:2

P

M C

U s e rs \m la il\

D o c u m e n ts

\A

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ m la ilC

F J

.r v t

A-200

STEAM TUNNEL AND VAULT SECTIONS

3 4LBB

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

CLA

Scale: 3/4" = 1'-0"

TYPICAL EXISTING TUNNEL SECTION

Scale: 1/4" = 1'-0"

VAULT C SECTION

Scale: 1/4" = 1'-0"

VAULT D SECTION

Scale: 1/4" = 1'-0"

VAULT B SECTION

Scale: 1/4" = 1'-0"

SERVICE CHASE S1 AND S2

Scale: 1/4" = 1'-0"

VENT SHAFT V3

1. ALL EXISTING ELEMENTS ARE EXISTING TO

REMAIN UNLESS NOTED OTHERWISE.

2. CONTRACTOR TO PATCH AND REPAIR ANY

DAMAGE TO THE EXISTING CONCRETE THAT

OCCURS DURING THE PROJECT.

3. THOROUGHLY CLEAN OUT THE EXISTING JOINTS

PRIOR TO INSTALLING NEW JOINT FILLER AND

SEALANT. SEE DETAIL 4/A-300.

Scale: 1/4" = 1'-0"

TYPICAL VERTICAL SHAFTS

AND VAULT DEMOLITION DIAGRAM

1. REMOVE EXISTING WATERPROOF MEMBRANE

AND ADHESIVE, PROVIDE A SMOOTH CLEAN

SURFACE FOR INSTALLATION OF NEW

WATERPROOFING MATERIALS.

2. REMOVE AN BURRS AND ABNORMALITIES FROM

PRECAST CONCRETE SURFACE TO ELIMINATE

POTENTIAL PUNCTURS TO NEW

WATERPROOFING SYSTEM.

3. POWERWASH TO REMOVE BLEMISHES ON

PRECAST CONCRETE.

4. APPLY PRIMER BEFORE THE WATERPROOFING

IS APPLIED.

DEMO NOTES:

SHEET NOTES:

Scale: 1/4" = 1'-0"

TYPICAL VERTICAL SHAFTS

AND VAULT DIAGRAM

Scale: 1/4" = 1'-0"

TYPICAL VERTICAL RISER DIAGRAM

NOTES:

1. CLEAN ALL RESIDUE AND DAMAGED SURFACES

EXISTING CONC. JOINT

OUTSIDE OF

RISER

INSIDE OF

RISER

POLYURETHENE ELASTOMERIC

SEALANT

2'' WIDE LIQUID

MEMBRANE (TYP)

PRIMER (TYP)

WATERPROOFING

MEMBRANE (TYP)

DRAINAGE MAT

(TYP)

MANHOLE COVER,

SEE CIVIL

EXISTING STEEL

RUNGS ETR

A-300

EXISTING CONC.

SHAFT

LIQUID

WATERPROOFING

MEMBRANE AT

JOINTS (TYP)

PRIMER (TYP)

WATERPROOFING

MEMBRANE (TYP)

DRAINAGE MAT

(TYP)

CONTINUOUS SEALANT

AT EDGE (TYP)

2'-0" 2'-0"

POLYURETHENE

ELASTOMERIC

SEALANT & JOINT

FILLER (TYP)

EXISTING CONC CAP @ TUNNEL

C

O

N

D

U

I

T

POLYURETHENE

ELASTOMERIC SEALANT

EXISTING JOINT

FILLER & JOINT SEALANTOUTSIDE TUNNEL

INSIDE TUNNEL

EXISTING CONC WALL

COMPOSITE BOTTOM

DUCT DRAIN

COLLECTOR SYSTEM,

COORD. W/ CIVIL

OUTSIDE OF

VAULT

INSIDE OF

VAULT

POLYURETHENE

ELASTOMERIC

SEALANT

EXISTING CONC. JOINT

PROTECTION BD 2''

RIGID FOAM

PRIMER (TYP)

WATERPROOFING

MEMBRANE (TYP)

DRAINAGE MAT

(TYP)

2'' WIDE LIQUID

MEMBRANE (TYP)

4" DRAINAGE PIPE

DRAINAGE MAT SYSTEM (TYP)

ADHERED (60 MIL)

WP MEMBRANE

INSTALL CORNER AND

CANT DETAILS PER MFR'S

RECOMMENDATIONS

DRAINAGE MAT

ADHERED (60 MIL)

WP MEMBRANE

POLYURETHENE

ELASTOMERIC

SEALANT

8"

/2

OUTSIDE OF

VAULT

INSIDE OF

VAULT

POLYURETHENE

ELASTOMERIC

SEALANT

LIQUID

WATERPROOFING

MEMBRANE AT

JOINTS (TYP)

2'' WIDE LIQUID

MEMBRANE (TYP)

POLYURETHENE

ELASTOMERIC

SEALANT

LIGHTWEIGHT

CONCRETE

2'-1"

1'-10"

ELEVATION PLAN

5 RUNGS @ 1' O.C.

/8

2'-1 3/4"

ELEVATION PLAN

25 RUNGS @ 2 3/4" O.C.

2'-1 3/4"

2'-1 3/4"

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:1

P

M C

U s e rs \l b y rd

\D o c u m e n ts

\A

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ lb y rd

V D

E K

F .r v t

A-300

REPAIR DETAILS

4 4LBB

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

CLA

Scale: 3" = 1'-0"

JOINT SEALANT DETAIL

Scale: 1/2" = 1'-0"

VERTICAL RISER

Scale: 3" = 1'-0"

CONDUIT SEALANT DETAIL

Scale: 3" = 1'-0"

COMPOSITE DRAINAGE DETAIL

Scale: 3" = 1'-0"

VERTICAL RISER TO VAULT TIE IN

Scale: 1/2" = 1'-0"

VAULT D LADDER

Scale: 1/2" = 1'-0"

VAULT C LADDER

L L

SPKR SPEAKER

SP SPARE

SR SURFACE RACEWAY

SS STAINLESS STEEL

SSW SELECTOR SWITCH

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TC TIMECLOCK

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTB TELEPHONE TERMINAL BOARD

TTC TELEPHONE TERMINAL CABINET

TV TELEVISION

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

UT UNDERGROUND TELEPHONE

UTP UNSHIELDED TWISTED PAIR

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Φ PHASE

C CENTER LINE

P PLATE

MTR MOTOR, MOTORIZED

MTS MANUAL TRANSFER SWITCH

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NFDS NON-FUSED SAFETY DISCONNECT

SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OVERHEAD

OL OVERLOAD

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT

UNIT

PCB POLYCHLORINATED BIPHENYL

PC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

POE POWER-OVER-ETHERNET

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (CONDUIT)

PWR POWER

QTY QUANTITY

R RELOCATE/RELOCATED

RCP REFLECTED CEILING PLAN

RCPT RECEPTACLE

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SF SQUARE FEET/FOOT

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

1P 1 POLE (2P, 3P, 4P, ETC.)

1PH 1 PHASE

2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)

2W TWO-WIRE (3W, 4W, ETC.)

3PH 3 PHASE

A AMPERE

AAP ALARM ANNUNCIATOR PANEL

AC ABOVE COUNTER

AIR CONDITIONER

ALTERNATING CURRENT

ACC ACCESSIBLE

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

A/E ARCHITECT/ENGINEER

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT (KILOAMPS)

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT INTERRUPTER

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

APPROX APPROXIMATELY

ARCH ARCHITECT, ARCHITECTURAL

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

BATT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISHED FLOOR

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATED

CAP CAPACITY

CAT CATALOG, CATEGORY

CATV COMMUNITY ANTENNA TELEVISION

CB CIRCUIT BREAKER

CCR CONTROL CONTACTOR

CCT CORRELATED COLOR TEMPERATURE

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR-FURNISHED

CKT CIRCUIT

CLG CEILING

CO CONTRACTING OFFICER

COAX COAXIAL CABLE

COMM COMMUNICATION

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CTR CENTER

CU COPPER

CU FT CUBIC FEET

D DEMOLITION

dB DECIBEL

DB DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLISH/DEMOLITION

DEPT DEPARTMENT

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EG EQUIPMENT GROUND

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ESMT EASEMENT

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WALL HEATER

ELECTRIC WATER HEATER

EX EXISTING

EXP EXPLOSION PROOF

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FU FUSE

FUDS FUSED SAFETY DISCONNECT

SWITCH

FVR FULL VOLTAGE REVERSING

FVNR FULL VOLTAGE NON-REVERSING

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT INTERRUPTER

GND GROUND

GRS GALVANIZED RIGID STEEL (CONDUIT)

GYP BD GYPSUM BOARD

HID HIGH-INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

IES ILLUMINATION ENGINEERING SOCIETY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

I/W INTERLOCK WITH

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LED LIGHT-EMITTING DIODE

LF LINEAR FEET/FOOT

LM LUMEN

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

METAL-CLAD (CONDUIT)

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT SWITCH

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MOA MULTIOUTLET ASSEMBLY

MSBD MAIN SWITCHBOARD

MT MOUNT

A1 b

E1 c d

T1

'LPN'

THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER

CASE LETTER AND NUMBER.

THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.

EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.

EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING

MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES

DIRECTIONAL ARROW ON ILLUMINATED FACE(S).

DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER

FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR

THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND

REQUIREMENTS.

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING

SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR

DESIGNATION CODES.

SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE

NUMBER INDICATED IN THE HEXAGON.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT

DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.

CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL

SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE

A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.

'LPN'-1,3,5

EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE

AND DIRECTIONAL ARROW.

EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE

FACE AND DIRECTIONAL ARROWS.

E2

EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS

CONTROLLED BY SWITCH 'c'.

EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.

EXAMPLE: TRANSFORMER TYPE 'T1'.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.

# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE

NOTE NUMBER INDICATED IN THE SQUARE.

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA

STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING

CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL

ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING HARDWARE TO

SUIT THE PARTICULAR INSTALLATION.

5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT DURING

CONSTRUCTION.

8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.

9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".

10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT

MANUFACTURER'S SPECIFICATIONS.

11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S SCREW

TERMINALS.

12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE- ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR

FINAL CONNECTIONS.

16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED THIRD

PARTY TESTING AGENCY.

17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS.

PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.

PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE GOVERNMENT, SHALL BE

PROVIDED.

19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

20. MINIMUM CONDUIT SIZE TO BE USED IS 3/4".

21. FEEDER TAGS APPENDED WITH 'VD' ARE UPSIZED IN AMPACITY DUE TO VOLTAGE DROP.

22. DOWNTIME RESULTING FROM THE REWORKING AND SPLICING OF THE FIRE ALARM LOOP SHALL BE COORDINATED WITH

THE COR.

23. SOME COMPONENTS OF EXISTING SYSTEMS MAY HAVE CODE VIOLATIONS BEFORE AND DURING DEMOLITION, PARTICULARLY ABOVE CEILINGS, BEHIND CHASE WALLS, IN-WALL, AND ABOVE AND BELOW PRIMARY SPACES TO BE DEMOLISHED WHEN NOT DOCUMENTED ON DRAWINGS, AND NOT OBSERVED DURING SITE WALK-THROUGH.

24. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED AFTER DEMOLITION AND NOT SCHEDULED

FOR WORK.

120V DUPLEX RECEPTACLE

RECEPTACLE MODIFIERS:

AC: 3" ABOVE COUNTERTOP/BACKSPLASH

GFI: GROUND FAULT CURRENT INTERRUPTER

WP: WEATHERPROOF ENCLOSURE

DED: DEDICATED CIRCUIT

120V DUPLEX RECEPTACLE EMERGENCY OUTLET

AND COVER PLATE SHALL BE RED IN COLOR

120V QUADRUPLEX RECEPTACLE

120V QUADRUPLEX RECEPTACLE EMERGENCY

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED

DISCONNECT SWITCH NON-FUSED

DISCONNECT SWITCH FUSED

SINGLE POLE WALL SWITCH: 48" AFF STANDARD UNO

3: 3-WAY SWITCH

SYMBOL HEIGHT DESCRIPTION

18"

18"

18"

18"

AS

NOTED

72" TOP

72" TOP

SWITCH MODIFIERS:

M: MOTOR-RATED

48"

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

TOP: HEIGHT TO TOP OF DEVICE

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.

SPECIAL RECEPTACLE

EQUIPMENT CONNECTION

AS

NOTED

E

208V DUPLEX RECEPTACLE18"

18"

120V DUPLEX RECEPTACLE FLOOR BOX

120V DUPLEX RECEPTACLE EMERGENCY FLOOR BOX

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

120V QUADRUPLEX RECEPTACLE FLOOR BOX

120V QUADUPLEX RECEPTACLE EMERGENCY

FLOOR BOX OUTLET AND COVER PLATE SHALL BE

RED IN COLOR

CLNG

J

J

J

JUNCTION BOX, CEILING MOUNTED, PURPOSE AS

NOTED

JUNCTION BOX, FLOOR MOUNTED, PURPOSE AS

NOTED

120V SIMPLEX RECEPTACLE18"2' X 2' RECESSED ARCHITECTURAL TROFFER

2' X 4' RECESSED ARCHITECTURAL TROFFER

SYMBOL

HEIGHT

AFF * DESCRIPTION

--- 2' X 4' RECESSED FLAT LENS TROFFER

2' LINEAR - WALL MOUNTED

7'-0"

CENTER

4' LINEAR - WALL MOUNTED

7'-0"

CENTER

WALL SCONCE

6'-0"

CENTER

6" DIAMETER RECESSED DOWNLIGHT---

EXIT SIGN - WALL MOUNTED

EXIT SIGN - CEILING MOUNTED---

7'-5"

BOTTOM

SINGLE POLE WALL SWITCH

SWITCH MODIFIERS:

OS: OCCUPANCY SENSOR, LOW VOLTAGE,

DUAL TECHNOLOGY

VS: VACANCY SENSOR, LOW VOLTAGE,

DUAL TECHNOLOGY

DR: DUAL RELAY

VSD: VACANCY SENSOR, LINE VOLTAGE, DIMMER

OSD: OCCUPANCY SENSOR, LINE VOLTAGE, DIMMER

LV: LOW VOLTAGE

LVD: LOW VOLTAGE DIMMER

D: LINE VOLTAGE DIMMER

T: DIGITAL TIMER

K: KEYED

3: 3 WAY

4: 4 WAY

48"

CENTER

OCCUPANCY SENSOR, LOW VOLTAGE,

DUAL TECHNOLOGY - CEILING MOUNTED

--- LOW VOLTAGE LIGHTING CONTROL DEVICE

OCCUPANCY SENSOR, LOW VOLTAGE, DUAL

TECHNOLOGY - WALL/CORNER MOUNTED

EMERGENCY LIGHT BATTERY

OPERATED - WALL MOUNTED

7'-6"

CENTER

RC

* - ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.

LIGHT LEVEL SENSOR, SINGLE ZONE

DIMMING CLOSED LOOP - CEILING MOUNTED

--- LOW VOLTAGE LIGHTING CONTROL

DEVICE WITH 0-10V DIMMING

RCD

OS

OS

LS

4' LINEAR STRIP - SUSPENDED---

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

E-001

ELECTRICAL GENERAL NOTES,

SYMBOL LEGENDS, AND

ABBREVIATIONS

1 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

ELECTRICAL ABBREVIATIONS LIST

ELECTRICAL SYMBOL NOTES

ELECTRICAL GENERAL NOTES

ELECTRICAL SYMBOL LEGENDLIGHTING SYMBOL LEGEND

DocuSign Envelope ID: 691F5C9B-B47B-4F99-8EB6-F65BAB2DAB16

7/13/2023 7/13/2023

ET-101

ET-102

ET-103

ET-104

ET-105

ET-106

SERVICE

CHASE S-1

SERVICE

CHASE S-2

SERVICE

CHASE S-3

VENT SHAFT V-2

MANHOLE M-1

SPUR

TUNNEL

VENT

SHAFT V-1

VENT SHAFT

V-3

TO BOILER PLANT VAULT B

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

VAULT D

VAULT C

SPUR TUNNEL

TO BUILDING 5

TUNNEL NOT IN SCOPE

LEGEND

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

ET-100

ELECTRICAL SITE PLAN

2 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

Scale: 1" = 30'-0"

ELECTRICAL SITE PLAN

NORTH

0 3015 60

GFIW

P

GFIW

P

EXISTING

PANEL

'EPH-Q-VLTB-1'

EXISTING

PANEL

'EPL-Q-VLTB-1'

EXISTING XFMR

'EPH-Q-VLTB-1'

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'

- 13

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'

- 13

VAULT B

SPUR

TUNNEL

VENT

SHAFT V-1

MATCH LINE ET-102

MATCH LINE ET-101

EM

BUILDING

EM

EM

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

ET-101

ENLARGED SITE PLAN - SEGMENT 1

3 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

NORTH

0 4 8 16

1 REPLACE EXISTING LIGHTING FIXTURES

WITH NEW. RETAIN EXISTING CIRCUIT FOR

NEW INSTALLATION. SEE DETAILS 1 AND 3 ON

E-501 FOR MORE INFORMATION.

2 PROVIDE NEW GFI, WEATHER PROOF

RECEPTACLE FED FROM SPARE CIRCUIT IN

PANEL ‘EPL-Q-VLTB-1’. SEE PANEL SCHEDULE

ON E-501 FOR MORE INFORMATION.

3 EXISTING 2-INCH CONDUIT WITH 24 STRAND

FIBER TO REMAIN.

4 REPLACE 10’ OF 3/4” EMT CONDUIT. PROVIDE

2 J-BOXES FOR SPLICE CONNECTIONS.

REFER TO IMAGE ET-101-01 ON SHEET ET-101

FOR MORE INFORMATION.

5 EXISTING FIBER OPTIC CABLE IN INNERDUCT

AT CEILING TO REMAIN.

6 EXISTING FIRE ALARM PULL BOX WITH FIBER

TO REMAIN.

7 EXISTING PULL BOX WITH FIBER TO REMAIN.

8 EXISTING 1/2” CONDUIT TO LIGHTS TO BE

REMOVED ALONG NORTH SIDE OF SPUR

TUNNEL. INSTALL NEW LIGHTS AND

RECEPTACLES AS SHOWN. SEE DETAIL 2 ON

SHEET E-501 FOR MORE INFORMATION.

9 REMOVE EXISTING CONDUIT AND WIRING.

SEAL PENETRATION THROUGH TUNNEL

ROOF. REFER TO IMAGE ET-101-02 ON SHEET

ET-101 AND ARCHITECTURAL SHEETS FOR

MORE INFORMATION.

10 REPLACE 5’ OF CONDUIT GOING INTO VENT

SHAFT ALONG WITH J-BOXES. REFER TO

IMAGE ET-101-03 ON SHEET ET-101 FOR

MORE INFORMATION.

11 PROVIDE NEW LIGHTING FIXTURES. FED

FROM CIRCUIT AS SHOWN.

A. REFER TO DETAIL 2 ON SHEET E-501 FOR

TYPICAL ELEVATIONS FROM VAULT B TO

BLDG 43.

B. REFER TO DETAIL 3 ON SHEET E-501 FOR

TYPICAL ELEVATIONS FROM VAULT B TO

VAULT C.

C. ALL EM FIXTURES ARE FED FROM EXISTING

PANEL '7X' CIRCUIT 10.

D. REPLACE LIGHT FIXTURES ONE CIRCUIT AT

A TIME TO KEEP AS MANY LIGHTS ON AS

POSSIBLE DURING CONSTRUCTION.

E. REPLACE EXISTING CIRCUIT NUMBERS ON

WIRES IN J-BOXES WITH CORRECT CIRCUIT

NUMBERS.

F. CONTRACTOR TO SEAL AROUND CONDUIT

PENETRATION THROUGH TUNNEL

WALL/CEILING.

G. CLEAR OFF DEPOSITS ON EXISTING

CONDUIT.

Scale: 1/8" = 1'-0"

ENLARGED SITE PLAN - SEGMENT 1

ET-101-01

ET-101-02

ET-101-03

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

GFI

WP

SERVICE

CHASE S-1

'EPL-Q-VLTB-1'-

EM

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

EM

MATCH LINE ET-102

MATCH LINE ET-101

MATCH LINE ET-103

MATCH LINE ET-102

TUNNEL NOT IN SCOPE

LEGEND

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

ET-102

ENLARGED SITE PLAN - SEGMENT 2

4 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

NORTH

0 4 8 16

1 REPLACE EXISTING LIGHTING FIXTURES

WITH NEW. RETAIN EXISTING CIRCUIT FOR

NEW INSTALLATION. SEE DETAILS 1 AND 3 ON

E-501 FOR MORE INFORMATION.

2 SWITCHES AND GFI RECEPTACLE ARE

EXISTING TO REMAIN.

3 REPLACE 10’ OF 1” EMT CONDUIT AND

CONTROL CABLING FOR JOHNSON

CONTROLS. PROVIDE 2 J-BOXES FOR SPLICE

CONNECTIONS. REFER TO IMAGE ET-102-01

ON SHEET ET-102 AND DETAIL 3 ON SHEET

E-501 FOR MORE INFORMATION.

4 REPLACE 7’ OF 1” EMT CONDUIT AND

CONTROL CABLING FOR JOHNSON

CONTROLS TO PULL BOX. SEE DETAIL 3 ON

E-501 AND IMAGE ET-102-02 FOR MORE

INFORMATION.

5 EXISTING JOHNSON CONTROLS PULL BOX TO

REMAIN. SEE IMAGE ET-102-03 FOR MORE

INFORMATION.

6 EXISTING FIRE ALARM PULL BOX WITH

CONTACTS FOR MECHANICAL EQUIPMENT TO

REMAIN.

A. REFER TO DETAIL 3 ON E-501 FOR TYPICAL

ELEVATIONS FROM VAULT B TO VAULT C..

B. ALL EM FIXTURES ARE FED FROM EXISTING

PANEL '7X' CIRCUIT 10.

C. REPLACE LIGHT FIXTURES ONE CIRCUIT AT

A TIME TO KEEP AS MANY LIGHTS ON AS

POSSIBLE DURING CONSTRUCTION.

D. REPLACE EXISTING CIRCUIT NUMBERS ON

WIRES IN J-BOXES WITH CORRECT CIRCUIT

NUMBERS.

E. CONTRACTOR TO SEAL AROUND CONDUIT

PENETRATION THROUGH TUNNEL

WALL/CEILING.

F. CLEAR OFF DEPOSITS ON EXISTING

CONDUIT.

Scale: 1/8" = 1'-0"

ENLARGED SITE PLAN - SEGMENT 2

ET-102-01

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

ET-102-02

ET-102-03

WP

'EPL-Q-VLTB-1'-

EM

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

SERVICE

CHASE S-2

MATCH LINE ET-103

MATCH LINE ET-102

MATCH LINE ET-104

MATCH LINE ET-103

BUILDING

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

ET-103

ENLARGED SITE PLAN - SEGMENT 3

5 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

NORTH

0 4 8 16

1 REPLACE EXISTING LIGHTING FIXTURES

WITH NEW. RETAIN EXISTING CIRCUIT FOR

NEW INSTALLATION. SEE DETAILS 1 AND 3 ON

E-501 FOR MORE INFORMATION.

2 GFI RECEPTACLE IS EXISTING TO REMAIN.

3 REPLACE 6’ OF 3/4" CONDUIT FOR

EMERGENCY CIRCUIT. PROVIDE 2 J-BOXES

FOR SPLICE CONNECTIONS. SEE DETAIL 3 ON

E-501 AND IMAGE ET-103-01 FOR MORE

INFORMATION.

4 REPLACE 5’ OF 1 1/2" CONDUIT FOR POWER.

SEE DETAIL 3 ON E-501 AND IMAGE ET-103-01

FOR MORE INFORMATION.

5 REPLACE 6' OF 2" CONDUIT FOR SPARE

CONDUIT. SEE DETAIL 3 ON E-501 AND IMAGE

ET-103-01 FOR MORE INFORMATION.

6 REPLACE 7’ OF 2” CONDUIT AND CONTROL

CABLING FOR FIRE ALARM. SEE DETAIL 3 ON

E-501 AND IMAGE ET-103-01 FOR MORE

INFORMATION.

7 REPLACE 16’ OF 1” EMT CONDUIT AND

CONTROL CABLING FOR JOHNSON

CONTROLS. SEE DETAIL 3 ON E-501 AND

IMAGE ET-103-01 FOR MORE INFORMATION.

8 REPLACE 8”X10”X4” J-BOX FOR POWER TO

LIGHT FIXTURE. REFER TO IMAGE ET-103-02

FOR MORE INFORMATION.

9 REPLACE 2’ OF 1” CONDUIT AND CONTROL

CABLING FOR JOHNSON CONTROLS.

PROVIDE 2 J-BOXES FOR SPLICE

CONNECTIONS. SEE DETAIL 3 ON E-501 AND

IMAGE ET-103-03 FOR MORE INFORMATION.

A. REFER TO DETAIL 3 ON E-501 FOR TYPICAL

ELEVATIONS FROM VAULT B TO VAULT C.

B. ALL EM FIXTURES ARE FED FROM EXISTING

PANEL '7X' CIRCUIT 10.

C. REPLACE LIGHT FIXTURES ONE CIRCUIT AT

A TIME TO KEEP AS MANY LIGHTS ON AS

POSSIBLE DURING CONSTRUCTION.

D. REPLACE EXISTING CIRCUIT NUMBERS ON

WIRES IN J-BOXES WITH CORRECT CIRCUIT

NUMBERS.

E. CONTRACTOR TO SEAL AROUND CONDUIT

PENETRATION THROUGH TUNNEL

WALL/CEILING.

F. CLEAR OFF DEPOSITS ON EXISTING

CONDUIT.

Scale: 1/8" = 1'-0"

ENLARGED SITE PLAN - SEGMENT 3

ET-103-02

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

ET-103-01

3 4 5 6 7

ET-103-03

3 4

7 8

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'PP-7' -

8,10,12

VENT SHAFT V-2

MANHOLE M-1

VAULT C

EF-1

MATCH LINE ET-104

MATCH LINE ET-103

MATCH LINE ET-105

MATCH LINE ET-104

BUILDING

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

ET-104

ENLARGED SITE PLAN - SEGMENT 4

6 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

NORTH

0 4 8 16

1 REPLACE EXISTING LIGHTING FIXTURES WITH

NEW. RETAIN EXISTING CIRCUIT FOR NEW

INSTALLATION. SEE DETAILS 1, 3, AND 4 ON

E-501 FOR MORE INFORMATION.

2 GFI RECEPTACLE IS EXISTING TO REMAIN.

3 REPLACE 10’ OF 3/4" EMT CONDUIT FOR FAN

CIRCUIT. SEE IMAGE ET-104-09 FOR MORE

INFORMATION.

4 REPLACE 15’ OF 1/2” EMT CONDUIT FOR FAN

STARTER/DISCONNECT WITH 3/4" EMT.

REPLACE 3 #12 CONDUCTORS. SEE IMAGE

ET-104-10 FOR MORE INFORMATION.

5 REPLACE 10’ OF 1” EMT CONDUIT AND

CABLING FOR JOHNSON CONTROLS. SEE

DETAIL 3 ON E-501 FOR MORE INFORMATION.

6 REPLACE 6”X6”X4” JOHNSON CONTROLS PULL

BOX AND CONTROL CABLING. REFER TO

IMAGE ET-104-01 FOR MORE INFORMATION.

7 REPLACE 6’ OF 2” EMT CONDUIT SERVING

FIRE ALARM CABLE WITH J-BOXES AND NEW

CONDUIT AND CABLING TO CONTINUE

CIRCUITRY.

8 REMOVE ALL RUST AND CORROSION FROM

EXISTING 2-4” RGS CONDUITS AND PAINT

WITH GRAY RUST INHIBITING PAINT. SEE

ARCHITECTURAL SHEETS AND REFER TO

IMAGE ET-104-02 FOR MORE INFORMATION.

9 REPLACE 6’ UNISTRUT SUPPORT WITH NEW.

REFER TO IMAGE ET-104-03 FOR MORE

INFORMATION.

10 REMOVE ALL RUST AND CORROSION FROM

EXISTING PULL BOX FOR CATV AND PAINT

WITH GRAY RUST INHIBITING PAINT. SEE

ARCHITECTURAL SHEETS AND REFER TO

IMAGE ET-104-03 FOR MORE INFORMATION.

11 REPLACE 20’ OF 1” EMT CONDUIT AND

CONTROL CABLING FOR JOHNSON

CONTROLS. SEE DETAIL 3 ON E-501 FOR

MORE INFORMATION.

12 REMOVE ALL RUST AND CORROSION FROM

EXISTING 2” CONDUIT AND PAINT WITH GRAY

RUST INHIBITING PAINT. SEE ARCHITECTURAL

SHEETS AND REFER TO IMAGE ET-104-04 FOR

MORE INFORMATION.

13 REMOVE ALL RUST AND CORROSION FROM

EXISTING AT&T PULL BOX AND PAINT WITH

GRAY RUST INHIBITING PAINT. SEE

ARCHITECTURAL SHEETS AND REFER TO

IMAGE ET-104-05 FOR MORE INFORMATION.

14 REPLACE FIRE ALARM PULL BOX WITH NEW.

PROVIDE REQUIRED SPLICING FOR RED WIRE

CONTROLLING ALARMS FOR NON-CRITICAL

SUMP PUMP. REFER TO IMAGE ET-104-06/07

AND DETAILS 5 AND 6 ON SHEET E-501 FOR

MORE INFORMATION.

15 PROVIDE SEALANT/CAULKING IN AND

AROUND VERTICAL CONDUIT. SEE IMAGE

ET-104-06 FOR MORE INFORMATION.

16 SUPPORT EXISTING SPLICE BOX AND

ADJACENT CONDUITS WITH UNISTRUT WALL

SUPPORTS. REMOVE RUST AND PAINT WITH

GRAY RUST INHIBITING PAINT. SEE IMAGE

ET-104-08 FOR MORE INFORMATION.

17 EF-1 DISCONNECT EXISTING TO REMAIN.

REFER TO IMAGE ET-104-09 FOR MORE

INFORMATION.

18 FAN HAND/OFF/AUTO SWITCH EXISTING TO

REMAIN. REFER TO IMAGE ET-104-10 FOR

MORE INFORMATION.

A. REFER TO DETAIL 3 ON E-501 FOR TYPICAL

ELEVATIONS FROM VAULT B TO C.

B. REFER TO DETAIL 4 ON E-501 FOR TYPICAL

ELEVATIONS FROM VAULT C TO BUILDING 7.

C. REPLACE LIGHT FIXTURES ONE CIRCUIT AT

A TIME TO KEEP AS MANY LIGHTS ON AS

POSSIBLE DURING CONSTRUCTION.

D. REPLACE EXISTING CIRCUIT NUMBERS ON

WIRES IN J-BOXES WITH CORRECT CIRCUIT

NUMBERS.

E. CONTRACTOR TO SEAL AROUND CONDUIT

PENETRATION THROUGH TUNNEL

WALL/CEILING.

F. CLEAR OFF DEPOSITS ON EXISTING

CONDUIT.

Scale: 1/8" = 1'-0"

ENLARGED SITE PLAN - SEGMENT 4

ET-104-01

ET-104-02

ET-104-03

ET-104-04

ET-104-05

ET-104-06

ET-104-07

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

ET-104-10

ET-104-09

ET-104-08

GFIWP

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

EM

MATCH LINE ET-105

MATCH LINE ET-104

MATCH LINE ET-106

MATCH LINE ET-105

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

ET-105

ENLARGED SITE PLAN - SEGMENT 5

7 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

NORTH

0 4 8 16

1 REPLACE EXISTING LIGHTING FIXTURES

WITH NEW. RETAIN EXISTING CIRCUIT FOR

NEW INSTALLATION. SEE DETAILS 1 AND 4 ON

E-501 FOR MORE INFORMATION.

2 GFI RECEPTACLE IS EXISTING TO REMAIN.

A. REFER TO DETAIL 4 ON E-501 FOR TYPICAL

ELEVATIONS FROM VAULT C TO BUILDING 7.

B. ALL EM FIXTURES ARE FED FROM EXISTING

PANEL '7X' CIRCUIT 10.

C. REPLACE LIGHT FIXTURES ONE CIRCUIT AT

A TIME TO KEEP AS MANY LIGHTS ON AS

POSSIBLE DURING CONSTRUCTION.

D. REPLACE EXISTING CIRCUIT NUMBERS ON

WIRES IN J-BOXES WITH CORRECT CIRCUIT

NUMBERS.

E. CONTRACTOR TO SEAL AROUND CONDUIT

PENETRATION THROUGH TUNNEL

WALL/CEILING.

F. CLEAR OFF DEPOSITS ON EXISTING

CONDUIT.

Scale: 1/8" = 1'-0"

ENLARGED SITE PLAN - SEGMENT 5

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

EXISTING

PANEL '7X'

3 4

5 6

SERVICE

CHASE S-3

VENT SHAFT V-3

EM

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

'EPL-Q-VLTB-1'-

EM

'EPL-Q-VLTB-1'-

EXISTING

PANEL 'PP-7'

VAULT D

MATCH LINE ET-106

MATCH LINE ET-105

BUILDING

BUILDING

'5X'- 5

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

ET-106

ENLARGED SITE PLAN - SEGMENT 6

8 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

NORTH

0 4 8 16

1 REPLACE EXISTING LIGHTING FIXTURES

WITH NEW. RETAIN EXISTING CIRCUIT FOR

NEW INSTALLATION. SEE DETAILS 1 AND 4

ON E-501 FOR MORE INFORMATION.

2 GFI RECEPTACLE IS EXISTING TO REMAIN.

3 REPLACE 4’ OF 2” CONDUIT FOR FIRE

ALARM. REFER TO IMAGE ET-106-01 AND

DETAIL 4 ON E-501 FOR MORE INFORMATION.

4 REPLACE 4’ OF 2” CONDUIT FOR SPARE

CONDUIT. REFER TO IMAGE ET-106-01 AND

DETAIL 4 ON E-501 FOR MORE INFORMATION.

5 REPLACE 10’ OF 1” CONDUIT FOR JOHNSON

CONTROLS. REFER TO IMAGE ET-106-01 AND

DETAIL 4 ON E-501 FOR MORE INFORMATION.

6 REPLACE 5’ OF 3/4" CONDUIT FOR POWER

TO FAN. REFER TO IMAGE ET-106-01 AND

DETAIL 4 ON E-501 FOR MORE INFORMATION.

7 SHIFT OVER EXISTING PULL BOX AND

EXTEND EXISTING CABLING AS REQUIRED.

8 EXISTING JOHNSON CONTROLS SPLICE BOX

TO REMAIN. REFER TO IMAGE ET-106-03 FOR

MORE INFORMATION.

9 REPLACE 12”X12”X4” FIRE ALARM PULL BOX

WITH NEW ALONG WITH 2’ CONDUIT EACH

SIDE OF BOX. REFER TO IMAGE ET-106-04/05

AND DETAILS 5 AND 6 ON E-501 FOR MORE

INFORMATION.

10 REMOVE ALL RUST AND CORROSION FROM

EXISTING PULL BOX FOR CATV AND PAINT

WITH GRAY RUST INHIBITING PAINT. SEE

ARCHITECTURAL SHEETS FOR MORE

INFORMATION.

11 REMOVE ALL RUST AND CORROSION FROM

EXISTING PULL BOX FOR AT&T AND PAINT

WITH GRAY RUST INHIBITING PAINT. SEE

ARCHITECTURAL SHEETS FOR MORE

INFORMATION.

12 CLEAN RUST FROM CONDUIT, PAINT WITH

GRAY RUST INHIBITING PAINT, AND PROVIDE

SEALANT FROM CONDUIT PENETRATING

TUNNEL WALL. REFER TO IMAGES

ET-106-04/05 FOR MORE INFORMATION.

A. REFER TO DETAIL 4 ON E-501 FOR TYPICAL

ELEVATIONS FROM VAULT C TO BUILDING 7.

B. ALL EM FIXTURES ARE FED FROM EXISTING

PANEL '7X' CIRCUIT 10.

C. REPLACE LIGHT FIXTURES ONE CIRCUIT AT

A TIME TO KEEP AS MANY LIGHTS ON AS

POSSIBLE DURING CONSTRUCTION.

D. REPLACE EXISTING CIRCUIT NUMBERS ON

WIRES IN J-BOXES WITH CORRECT CIRCUIT

NUMBERS.

E. CONTRACTOR TO SEAL AROUND CONDUIT

PENETRATION THROUGH TUNNEL

WALL/CEILING.

F. CLEAR OFF DEPOSITS ON EXISTING

CONDUIT.

Scale: 1/8" = 1'-0"

ENLARGED SITE PLAN - SEGMENT 6

ET-106-01

ET-106-02

ET-106-03

ET-106-04

ET-106-05

3 4 5 6

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

NEW LOCATION

8 (BLK) 12 (BLU) 10 (RED)

1 1/2" C-3#12 CONTROL

3#6 POWER FOR RECEPTACLES

4#8 LIGHTING CKTS

1/2" SEALTITE - 2#12 & 1#12 GND (TYP)

2#10 & 1#10 GND

3/4"C (TYP)

J J J

F-1

GFI

EMERGENCY LIGHTING

LIGHTING AND POWER

SPARE

FIRE ALARM

AT&T

TELE

TELE

JOHNSON CONTROL

3/4" MC W/ 4"X4" J-BOX

1 1/2" C W/ 10"X8" J-BOX

2" C W/ 16"X24" J-BOX

2" C W/ 16"X24" J-BOX

4" C W/ 12"X48" J-BOX

1" (SCHED 80-PVC) INNER DUCT FIBER

4" C (SCHED 80-PVC)

4" C (SCHED 80-PVC)

1" C

BASIS OF DESIGN LIGHT FIXTURE

F-1, LITHONIA LIGHTING DMW2,

CAT. NO. DMW2 L24 4000LM PFL

MD MVOLT GZ1 40K 80CRI.

STEAM & WATER

8 OUT TO NEW TUNNEL

EXISTING 2" C

8 PAIRS OUT TO EXISTING TUNNEL

8 PAIRS IN FROM BLDG 113

REPLACE EXISTING PULL

BOX AND REPLACE WITH

NEW 8"DX14"X16" HOFFMAN

NEMA 4R ENCLOSURE

WITH HINGED DOOR

SPLICE EXISTING 12

GAUGE, 2 CONDUCTORS

FOR FIRE ALARM LOOP.

RETAIN PHENOLIC

LABELING

NEW TERMINAL STRIP

NEW JUMPERS

EXISTING 2" C

NEW TERMINAL BOX

EXISTING 2" C

8 PAIRS TO

BUILDING 5

REPLACE ALL EXISTING

BOX SUPPORTS WITH NEW

CLEAN RUST FROM CONDUIT. PAINT

WITH GRAY RUST INHIBITING PAINT.

PROVIDE SEALANT FROM CONDUIT

PENETRATING THE TUNNEL WALL.

BUILDING 7

JB3

JB4

JB5JB6JB8

JB7

JB9 JB10

TO BLDG 2 BY

EXISTING TUNNEL

TO BLDG 7

(FA BOARD)

VAULT D VAULT C

TO FIRE ALARM

PANEL IN BUILDING 5

TO HANDHOLE

FOR BLDG 4

AND OTHERS

VAULT B EXTERIOR

SUMP PUMP FLOAT

VAULT B

EYM, EYA,

EV1, EV2

TO BLDG 6 BY EXISTING TUNNEL

HIGHWATER ALARM

CONNECTED TO

PYROTRONICS

BUILDING 5

EYM, EYA,

EV1, EV2

3/4" C

3/4" C

TO GRAPHICS

BY MANHOLES

EYA, EYM, EV1,

EV2, DYA, DYM,

DV1, DV2

HIGHWATER

ALARM 5 IN PIT,

CONNECTED TO

FIRE ALARM

PANEL IN BLDG 5

EYM, EYA,

EV1, EV2

DYM, DYA,

DV1, DV2

DYM

DYA

EYM

EYA

COM LINE E - 2, 3, 4, 6, 7, 12

COM LINE D - 1, 20, 41, 97, 107, 108

1, 20, 97, 107, 108

3, 4

F-1

GFI

EMERGENCY LIGHTING

LIGHTING AND POWER

SPARE

FIRE ALARM

AT&T

TELE

TELE

JOHNSON CONTROL

3/4" MC W/ 4"X4" J-BOX

1 1/2" C W/ 10"X8" J-BOX

2" C W/ 16"X24" J-BOX

2" C W/ 16"X24" J-BOX

4" C W/ 12"X48" J-BOX

1" (SCHED 80-PVC) INNER DUCT FIBER

4" C (SCHED 80-PVC)

4" C (SCHED 80-PVC)

1" C

STEAM & WATER

3/4" C, EF-1 CIRCUIT

BASIS OF DESIGN LIGHT FIXTURE

F-1, LITHONIA LIGHTING DMW2,

CAT. NO. DMW2 L24 4000LM PFL

MD MVOLT GZ1 40K 80CRI.

F-1

GFI

EMERGENCY LIGHTING

LIGHTING AND POWER

BASIS OF DESIGN LIGHT FIXTURE

F-1, LITHONIA LIGHTING DMW2,

CAT. NO. DMW2 L24 4000LM PFL

MD MVOLT GZ1 40K 80CRI.

STEAM

2" PVC

BLDG 43 CONDENSER PUMP 1" EMT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:1

A

M C

U s e rs \j g o s s e tt \D o c u m e n ts \E

-1

-V

A M ilw a u k e e

-S te a m

T u n n e l R e p r_ jg o s s e tt M

K V

T K

.r v t

E-501

ELECTRICAL DETAILS

9 9JHG

REPAIR NORTH CAMPUS

STEAM TUNNEL

CLEMENT J. ZABLOCKI VAMC

5000 WEST NATIONAL AVENUE

MILWAUKEE, WI 53295 JULY 14, 2023

100% BID DOCUMENTS

695-21-11022-177-Q30

N/A

KTK

NOTES:

TOTAL DEMAND AMPS: 3 A

TOTAL DEMAND LOAD: 1.26 kVA

CONNECTED AMPS: 3 A

CONNECTED LOAD: 1.26 kVA

LIGHTING (GENERAL) 0.00 kVA 0.00% 0.00 kVA

RECEPTACLES (GENERAL) 1.26 kVA 100.00% 1.26 kVA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR DEMAND LOAD TOTALS

TOTAL AMPS: 3 A 5 A 3 A

TOTAL LOAD: 0.36 kVA 0.54 kVA 0.36 kVA

29 0.00 -- 1 -- SPACE 30

27 0.00 -- 1 -- SPACE 28

MAIN 60 A 3

0.00 -- 1 -- SPACE 26

23 0.00 -- 1 -- SPACE 24

21 0.00 -- 1 -- SPACE 22

SUMP 15 A 3

0.00 0.00 20

17 SPACE -- 1 -- 0.00

2 20 A PARKING LOT LIGHTS

15 SPACE -- 1 -- 0.00 1 20 A WEST RECPT 16

13 TUNNEL 43 RECPT (NEW) 20 A 1 0.36 0.00 1 20 A CONDENSER PUMP BLO 43 14

11 NEW CORRIDOR RECPT 20 A 1 0.00 0.00 1 20 A TUNNEL CKT 6 LIGHTING 12

9 NEW CORRIDOR RECPT 20 A 1 0.00 0.00 1 20 A TUNNEL CKT 10 LIGHTING 10

7 NEW CORRIDOR RECPT 20 A 1 0.00 0.00 1 20 A TUNNEL CKT 8 LIGHTING 8

5 FLYGHT PUMP 20 A 1 0.00 0.36 1 20 A TUNNEL CKT 12 RECPT 6

3 SUMP RECPT 20 A 1 0.00 0.54 1 20 A TUNNEL CKT 9 RECPT 4

1 SUMP RECPT 20 A 1 0.00 0.00 1 20 A VAULT B & TUNNEL 43 LIGHTS 2

CKT CIRCUIT DESCRIPTION TRIP POLE A B C A B C POLE TRIP CIRCUIT DESCRIPTION CKT

ENCLOSURE: NEMA 1 SHORT CIRCUIT RATING: 10,000 AMPS SYMMETRICAL

MOUNTING: SURFACE MAINS, TYPE: 100 A MAIN CB

BRANCH: CRITICAL PHASE CREATED: Existing VOLTAGE: 120/208V, 3PH, 4W

PANEL: EPL-Q-VLTB-1

NOTES:

TOTAL DEMAND AMPS: 0 A

TOTAL DEMAND LOAD: 0.00 kVA

CONNECTED AMPS: 0 A

CONNECTED LOAD: 0.00 kVA

LIGHTING (GENERAL) 0.00 kVA 0.00% 0.00 kVA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR DEMAND LOAD TOTALS

TOTAL AMPS: 0 A 0 A 0 A

TOTAL LOAD: 0.00 kVA 0.00 kVA 0.00 kVA

29 0.00 -- 1 -- SPACE 30

27 0.00 0.00 28

PANEL 5X 50 A 3

0.00 0.00 26

23 SOUTH EM LIGHTING 20 A 1 0.00 0.00

3 20 A COMPRESSOR

21 SPARE 20 A 1 0.00 0.00 22

19 SPARE JCI PANEL B-9 20 A 1 0.00 0.00 20

17 SPARE 20 A 1 0.00 0.00

3 20 A SPARE

15 3RD FLR EM LIGHTING 20 A 1 0.00 0.00 1 20 A DOOR OPENER 16

13 3RD FLR EM LIGHTING 20 A 1 0.00 0.00 1 20 A ELEVATOR CAB LIGHT 14

11 3RD FLR EM LIGHTING 20 A 1 0.00 0.00 1 20 A BLDG 7 BASEMENT LIGHTING 12

9 0.00 0.00 1 20 A TUNNEL EM LIGHTING 10

AIR COMPRESSOR 20 A 2

0.00 0.00 1 20 A SPARE 8

5 BASEMENT EM LIGHTING 20 A 1 0.00 0.00 1 20 A SUMP PUMP BLDG 7 PIT 6

3 BASEMENT EM LIGHTING 20 A 1 0.00 0.00 1 20 A FACP 4

1 SPARE 20 A 1 0.00 0.00 1 20 A JC PANEL 2

CKT CIRCUIT DESCRIPTION TRIP POLE A B C A B C POLE TRIP CIRCUIT DESCRIPTION CKT

ENCLOSURE: NEMA 1 SHORT CIRCUIT RATING: 10,000 AMPS SYMMETRICAL

MOUNTING: SURFACE MAINS, TYPE: 100 A MAIN CB

BRANCH: EMERGENCY PHASE CREATED: Existing VOLTAGE: 120/208V, 3PH, 4W

PANEL: 7X

Scale: No Scale

NORMAL TYPICAL LIGHTING FIXTURE/RECEPTACLE INSTALLATION

Scale: No Scale

TYPICAL EXISTING ELEVATION THROUGH STEAM TUNNEL VAULT B TO VAULT C

Scale: No Scale

NEW FIRE ALARM TERMINAL BOX REPLACEMENT DETAIL

Scale: No Scale

EXISTING FIRE ALARM LOOP DIAGRAM

Scale: No Scale

TYPICAL EXISTING ELEVATION THROUGH STEAM TUNNEL VAULT C TO BUILDING 7

Scale: No Scale

TYPICAL EXISTING ELEVATION THROUGH STEAM TUNNEL VAULT B TO BLDG 43

1-Gen 22-177 100% to VA
2-Civil 22-177 100% to VA
CD101 CIVIL DEMOLITION PLAN
CS101 CIVIL SITE, GRADING, AND UTILITY PLAN
CS501 CIVIL DETAILS
3-Struct 22-177 100% to VA
S-001 GENERAL NOTES
S-002 EXISTING CONDITIONS PHOTOS
S-100 VAULT B RISER S-1 PLAN
S-101 VAULT C RISER S-2 PLAN
S-102 NORTH TUNNEL PLAN
S-103 VAULT D RISER S-3 PLAN
S-104 SPUR TUNNEL PLAN
S-200 REPAIR DETAILS
4-Arch 22-177 100% to VA
5-Elec 22-177 100% to VA
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
ET-100 - ELECTRICAL SITE PLAN
ET-101 - ENLARGED SITE PLAN - SEGMENT 1
ET-102 - ENLARGED SITE PLAN - SEGMENT 2
ET-103 - ENLARGED SITE PLAN - SEGMENT 3
ET-104 - ENLARGED SITE PLAN - SEGMENT 4
ET-105 - ENLARGED SITE PLAN - SEGMENT 5
ET-106 - ENLARGED SITE PLAN - SEGMENT 6
E-501 - ELECTRICAL DETAILS