S02 695-21-110_CvrSht_Amendment3-1.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C25223B0030
About this file
This amendment modifies specifications and drawings for a federal contract opportunity to repair a north campus steam tunnel at the VA Medical Center in Milwaukee, Wisconsin. Specification sections 01 74 19 on construction waste management and 03 01 30 on maintenance of cast-in-place concrete were replaced and added. Drawing CS101 was updated to reference additional civil, grading, and utility plans from a prior project. The statement of work and bidder question responses remained unchanged. A draft pre-construction risk assessment and geotechnical report were included in specification 01 35 26 on safety requirements.
The related federal contract opportunity on the SAM website seeks bids for project number 695-21-110 to repair the north campus steam tunnel, with solicitation number 36C25223B0030 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT NO.3
DATE: November 9, 2023
| RE: | VA Medical Center |
| 5000 West National Avenue | |
| Milwaukee, WI 53295 |
PROJECT NAME: Repair North Campus Steam Tunnel
PROJECT NUMBER: 695-21-110
This amendment contains updated specifications, drawings, PCRA, and RFI Log (bidder question responses).
Specification Section:
· 01 74 19: Construction Waste Management – Replace existing with new.
· 03 01 30: Maintenance of Cast-In Place Concrete – New addition.
Drawing:
· CS101: Civil Site, Grading, and Utility Plan
· Reference Drawings from Project # 695-97-101
The following changes regarding the contract specifications and drawings are hereby provided by amendment. The amendment consists of a specification addition as follows:
Statement of Work:
· No changes to the Statement of Work.
Specifications
· 01 35 26: Safety Requirements - Attached is the draft Pre-Construction Risk Assessment added to this section.
· Attached is the Geotech Report added to this section.
Other Documentation
· Bidder Responses
File details come from the government source that posted it. Updated .