S02 695-21-110 Drawings Part 2.pdf
PDF 9 MB Posted
- Solicitation number
- 36C25223B0030
About this file
This is a solicitation for repair work on the North Campus Steam Tunnel at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The solicitation is for structural repairs to the concrete tunnel structure including vaults, risers, and a spur tunnel. Repairs include concrete patching, application of waterproofing membranes, replacement of deteriorated pipe supports, and installation of carbon fiber reinforced polymer for reinforcement of ceilings. The solicitation number is 36C25223B0030 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The anticipated award date is July 2023 and the period of performance is 180 days. Pricing will be fixed price. No set-asides or socioeconomic considerations are included.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR REMOVED
FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
15. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
16. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
17. CONTRACTOR TO COORDINATE WITH VAMC STAFF AND THE COR FOR AREAS ABOVE GRADE TO BE REGRADED
OR MODIFIED IN ANY WAY.
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
9. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
10. DIMENSIONS SHOWN ARE TO FACE OF CONCRETE WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.
11. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
12. PROJECT WORK AREA IS IN A LIMITED ACCESS FACILITY AND WILL REQUIRE ACTIVITIES IN CONFINED SPACES.
13. CONTRACTOR TO FOLLOW VAMC REQUIREMENTS FOR WORKING IN EXISTING STEAM TUNNEL, VAULTS, AND
CONNECTING FACILITIES.
14. CONTRACTOR TO FOLLOW THE OSHA GUIDELINES FOR TRENCHING AND SHORING. COORDINATE OPERATIONS
WITH COR.
15. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE
GOVERNMENT, SHALL BE PROVIDED.
16. THE CONTRACTOR IS RESPONSIBLE FOR THE SUPPORT OF EXISTING SYSTEM COMPONENTS NOT PROPERLY
SUPPORTED AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.
17. CONTRACTOR TO COORDINATE WITH COR TO COMPLY WITH THE CONFINED SPACE ACCESS PROCESS AT THE MILWAUKEE VA CAMPUS. IF PERMIT-REQUIRED CONFINED SPACES ARE PRESENT, CONTRACTORS MUST MARK EACH ENTRY POINT WITH A SIGN READING “DANGER—PERMIT-REQUIRED CONFINED SPACE. DO NOT ENTER”
AND ALSO FOLLOW THE OSHA GUIDELINES FOR CONFINED SPACES.
18. DIMENSIONS SHOWN ON THE DRAWINGS ARE TAKEN FROM THE VA 98% AS-BUILT DRAWINGS. CONTRACTOR
TO FIELD VERIFY AS REQUIRED.
DEMOLITION KEYNOTETYPICAL KEYNOTE ##
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CIP CAST IN-PLACE
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PC PRE-CAST
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:1
P
M C
U s e rs \m la il\
D o c u m e n ts
\A
-1
-V
A M ilw a u k e e
-S te a m
T u n n e l R e p r_ m la ilC
F J
.r v t
G-002
GENERAL INFORMATION
2 3LBB
REPAIR NORTH CAMPUS
STEAM TUNNEL
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 JULY 14, 2023
100% BID DOCUMENTS
695-21-11022-177-Q30
N/A
CLA
GENERAL SYMBOL LEGENDDEMOLITION NOTES
GENERAL NOTES
ARCHITECTURAL SYMBOL LEGEND
ABBREVIATIONS
DocuSign Envelope ID: BF3A282E-37F9-4F35-ABBD-8CF3F5B9B0F8
7/13/2023
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
[MILWAUKEE STEAM TUNNEL]
THIS AREA IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DO NOT ENTER
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS PROJECT IS LEVEL II FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. [AFTER EACH PHASE, PERFORM TASKS STATED IN
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH
OCCUPIED AREAS WITHOUT PRIOR APPROVAL OF THE COR.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE- CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM
CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE VERIFIED DAILY.
4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
5. PROVIDE PROPER VENTILATION IN THE UNDERGROUND STRUCTURES FOR THE DURATION OF THE PROJECT. CONSULT OSHA GUIDELINES
KEYNOTES:
1. ZIPPERED PLASTIC BARRIER, CAUTION TAPE, CONSTRUCTION SIGN, AND STICKY MATS.
2. ZIPPERED PLASTIC BARRIER AND STICKY MATS.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
EXISTING FLOOR
A
PLASTIC BARRIER OR
TEMPORARY WALL SYSTEM
NON RATED
N E
W
C O
N S
T R
U C
T
IO
N
E X
IS
T
IN
G
EXISTING DOOR OR
OPENING
INSTALL ICRA BARRIER AS
DIRECTED BY THE COR.
ZIPPERED PLASTIC
BARRIER
EDGE GUARD/ STARK
WALL SYSTEM
SERVICE CHASE S-1
SERVICE
CHASE S-2
VAULT D
SERVICE
CHASE S-3
VAULT C
VENT SHAFT V-2
MANHOLE M-1
VAULT B
SPUR TUNNEL
BUILDING
BUILDING
BUILDING
BUILDING
VENT SHAFT
V-3
BUILDING
VENT SHAFT V-1
SPUR TUNNEL
TO BUILDING 5
MANHOLE
A EMERGENCY EXIT AT EGRESS
TO BOILER PLANT (PRIMARY)
CEMERGENCY EXIT AT
BUILDING 43
B EMERGENCY EXIT AT
BUILDING 7 (SECONDARY)
B
VAULT B WILL BE THE
PRIMARY ABOVE GRADE
ACCESS POINT FOR THE U.G.
STRUCTURES
PHASE III
PHASE VIII
PHASE X
PHASE I
PHASE VII
PHASE V
PHASE II
PHASE IX
PHASE VI
PHASE IV
POTENTIAL LAYDOWN AND
STAGING AREA. CONFIRM
LOCATION WITH VA COR.
POTENTIAL LAYDOWN AND
STAGING AREA. CONFIRM
LOCATION WITH VA COR.
POTENTIAL LAYDOWN AND
STAGING AREA. CONFIRM
LOCATION WITH VA COR.
ACCESS HATCH
THE FOLLOWING PHASING IS A SUGGESTED METHOD TO COMPLETE THE PROJECT. THE ORDER OF THE ACTIVITIES CAN BE REARRANGED WITH PRIOR
WRITTEN APPROVAL FROM THE COR.
ALL EXTERIOR WORK TO BE COMPLETED FIRST SO TRENCHES CAN BE BACKFILLED QUICKLY.
1. PHASE I VAULT B / RISER – THIS WILL ALLOW THE GC TO GET IN-PLACE THE STORMWATER INFRASTRUCTURE NEEDED TO SUPPORT THE
REMAINING VAULTS AND RISERS FOR THE PROJECT. WORK INSIDE THE VAULT / RISER.
2. PHASE II VAULT C / RISERS – EXCAVATION, PRESSURE WASHING, PATCH AND PREP, INSTALLATION OF HYDRA-DUCT, INSTALL PIPING TO CONNECT
TO MAIN SW DRAINAGE SYSTEM. WORK INSIDE THE VAULT / RISER
3. PHASE III VAULT D / RISER – EXCAVATION, PRESSURE WASHING, PATCH AND PREP, INSTALLATION OF HYDRA-DUCT, INSTALL PIPING TO CONNECT
TO MAIN SW DRAINAGE SYSTEM. WORK INSIDE THE VAULT / RISER.
4. PHASE IV SERVICE CHASE 1 – EXCAVATION, PRESSURE WASHING, PATCH AND PREP, INSTALLATION OF HYDRA-DUCT, INSTALL PIPING TO CONNECT
TO MAIN SW DRAINAGE SYSTEM. WORK INSIDE THE RISER.
5. PHASE V SERVICE CHASE 2 – EXCAVATION, PRESSURE WASHING, PATCH AND PREP, INSTALLATION OF HYDRA-DUCT, INSTALL PIPING TO CONNECT
TO MAIN SW DRAINAGE SYSTEM. WORK INSIDE THE RISER.
6. PHASE VI – VENT SHAFT 3 - EXCAVATION, PRESSURE WASHING, PATCH AND PREP, INSTALLATION OF HYDRA-DUCT, INSTALL PIPING TO CONNECT
TO MAIN SW DRAINAGE SYSTEM. WORK INSIDE THE RISER.
7. PHASE VII TUNNEL SECTION BETWEEN VAULT B / C.
8. PHASE VIII TUNNEL SECTION BETWEEN VAULT C / D.
9. PHASE IX TUNNEL SECTION BETWEEN VAULT D / BLDG 7.
10. PHASE X TUNNEL 43.
NO MORE THAN 2 PHASES CAN TAKE PLACE AT THE SAME TIME
PHASING NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:1
P
M C
U s e rs \m la il\
D o c u m e n ts
\A
-1
-V
A M ilw a u k e e
-S te a m
T u n n e l R e p r_ m la ilC
F J
.r v t
G-003
ICRA INFORMATION AND DETAILS AND
OVERALL PHASING PLAN
3 3LBB
REPAIR NORTH CAMPUS
STEAM TUNNEL
CLEMENT J. ZABLOCKI VAMC
5000 WEST NATIONAL AVENUE
MILWAUKEE, WI 53295 JULY 14, 2023
100% BID DOCUMENTS
695-21-11022-177-Q30
N/A
CLA
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE - PLASTIC
Scale: 1" = 30'-0"
OVERALL PHASING PLAN
NORTH
DocuSign Envelope ID: BF3A282E-37F9-4F35-ABBD-8CF3F5B9B0F8
7/13/2023
RIM 652.54
12"E 650.34
ASPHALT WALK (HANK AARON TRAIL)
EXISTING
BUILDING 4
EXISTING
BUILDING 6
EXISTING
BUILDING 5
EXISTING
BUILDING 7
TRANSFORMER
TRANSFORMER
P O
R C
H
P O
R C
H
P O
R C
H
C O
N C
R
ETE W
ALK
CONCRETE
SERVICE
CHASE WITH
VENT COVER S-2
VENT SHAFT
V-1
CHAIN LINK FENCE
CHAIN LINK FENCE
ASPHALT
C O
N C
R E
TE
CONCRETE WALK
STEPS & HANDS RAILS
WOOD RAMP
PORCH
WOOD RAMP
TRANSFORMER
SERVICE CHASE WITH VENT COVER
S-3 / VAULT D
SEPTIC VENT
C O
N C
R
ETE W
ALK
CONCRETE
C O
N C
W A
LL
CONCRETE
STAIRS
CONCRETE
BRICK WALL
TREES
TREES
TREES
ASPHALT
BUILDING WELL
UTILITY MARKINGS END
HERE, THEY POSSIBLY GO
INTO THE TUNNEL
W W
W W
W W
W W
ROUND DRAIN
TOP OF BEEHIVE 679.67
RIM 679.23
N&S. 675.39
W. 676.02
ROUND DRAIN
TOP OF BEEHIVE 680.11
RIM 679.69
E,W&N. 676.43
FABRIC IN STRUCTURE
15" CMP
IE. 651.72
15" CMP
IE. 651.54
18" RCP
IE. 652.01
18" RCP
IE. 651.47
DOWNSPOUT
DOWNSPOUT
DOWNSPOUT
6" PVC
IE. 662.81
SEPTIC VENT
DOWNSPOUT
DOWNSPOUT
YARD HYDRANT
YARD HYDRANT
DOWNSPOUT
W W W W W W W W
UG
/E
UG
/E
UG
/E
UG/EUG/EUG/E
UG/EUG/EUG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
FOCFOCFOCFOC
FO
C
FO
C
FO
C
FO
C
FOC
FOC
FOC
FOC
FOC
FOCFOCFOCFOCFOC
UG/T
UG/T
UG/T
UG/T UG
/T
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E UG/E UG/E UG/EFOCFOCFOCFOCFOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FOC
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FOC
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
UG/T UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
FOC
FOC
FOC
FO
C
FO
C
FO
C
W
W
W W
W W
W W
W W
WW
W
681681
670 66
666667
MANHOLE
M-1
VAULT C
LOD
LOD
LOD LOD
LOD
LOD
LODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LOD LO
D
LOD LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
SERVICE CHASE WITH
NO COVER UNDER DECK
LOD
LO
DLOD
LOD
EXISTING 4" CORRUGATED
PLASTIC PIPE PER 1998
AS-BUILT DRAWING. NOT
FIELD VERIFIED.
EXISTING 4" CORRUGATED
PLASTIC PIPE PER 1998
AS-BUILT DRAWING. NOT
FIELD VERIFIED.
EXISTING 4" CORRUGATED
PLASTIC PIPE PER 1998
AS-BUILT DRAWING. NOT
FIELD VERIFIED.
EXISTING STEAM TUNNEL
REFERENCED FROM 1998
AS-BUILT DRAWINGS.
NOT FIELD LOCATED
EXISTING STEAM TUNNEL
REFERENCED FROM 1998
AS-BUILT DRAWINGS.
NOT FIELD LOCATED
EXISTING STEAM TUNNEL
REFERENCED FROM 1998
AS-BUILT DRAWINGS.
NOT FIELD LOCATED.
STORAGE AND
STAGING AREA
STORAGE AND
STAGING AREA
RIM 652.54
12"E 650.34
RIM 641.23
IE. 636.23
TO SUMP
(NO VIS. PIPES)
RIM 646.72
N 639.6± S 639.6±
SS
SS
SS
SS
SS
SS
SS
SS
CONCRET
E
W
AL
K
AS
PH
AL
T
AS
PH
AL
T
CHAIN LINK FENCE
CONC.
ASPHALT WALK (HANK AARON TRAIL)
CONC. WALK
C O
N C
R E
TE
W
A
LK
C O
N C
R E
TE
W
A
LK
BM: 641.53'
BW BOLT
ON HYDRANT
FO
C
FO
C
FO
C
UG/E
GAS
GAS
UG/T
UG/T
UG/T
UG/T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C O
N C
R
ETE W
ALK
CONCRETE
SERVICE
CHASE WITH
VENT COVER S-2
SERVICE CHASE
WITH VENT COVER
S-1
VENT SHAFT
V-2 / VAULT B
CHAIN LINK FENCE
STEPS & HANDS RAILS TREES
TREES
FABRIC IN STRUCTURE
15" CMP
IE. 651.72
15" CMP
IE. 651.54
18" RCP
IE. 652.01
18" RCP
IE. 651.47
DOWNSPOUT
6" PVC
IE. 662.81
UG/E
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E
W
GAS
GAS
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
FO
C
FO
C
FO
C
FO
C
FOC
FOC
FOC FOC FOC FOC FOC FOC
UG/EUG/EUG/EUG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
UG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/T
W W
W
W W
W W
W W
W W
W W
W W
W W
W
W W
GAS GAS GAS
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W W W W W W
UG
/E
UG
/E
UG
/E
UG/EUG/EUG/E
UG/EUG/EUG/E
UG
/E
UG
/E
UG
/E
UG
/E
FOCFOCFOCFOC
FO
C
FO
C
FO
C
UG/T
UG/T
UG/T
UG/T UG
/T
670 66
666667
EXISTING
BUILDING 43
UG/T UG/T UG/T UG/TUG/E UG/E UG/E UG/E
LOD
LOD
LOD LOD
LOD
LOD
LODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
DLOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LODLOD
LODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
EXISTING 4" CORRUGATED
PLASTIC PIPE PER 1998
AS-BUILT DRAWING. NOT
FIELD VERIFIED.
EXISTING 4" CORRUGATED
PLASTIC PIPE PER 1998
AS-BUILT DRAWING. NOT
FIELD VERIFIED.
EXISTING STEAM TUNNEL
REFERENCED FROM 1998
AS-BUILT DRAWINGS.
NOT FIELD LOCATED.
STORAGE AND
STAGING AREA
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net JULY 14, 2023 ZLRFCM
REPAIR NORTH CAMPUS
STEAM TUNNEL
695-21-110
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295 4
100% BID DOCUMENTS
N/A
22-177-Q30
LEGEND
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING UNDERGROUND TELEPHONE LINE
LIMITS OF DISTURBANCE
TREE PROTECTION FENCING
EXISTING CONTOURS
EXISTING CONCRETE SIDEWALK AND CURB AND
GUTTER TO BE SAWCUT AND REMOVED
EXISTING ASPHALT PAVING TO BE SAWCUT AND
REMOVED
XXXX
CIVIL DEMOLITION PLAN
CD101
1) IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR
AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE
STRINGENT REQUIREMENTS, OR GREATER QUANTITY OF WORK, AS
DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.
2) ALL NECESSARY EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.
3) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY WITH
APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND UTILITY
INSTALLATION CODES.
4) ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN
ACCORDANCE WITH VA STANDARD SPECIFICATIONS.
5) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
FIELD VERIFY THE LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS
OF CONSTRUCTION AND TO NOTIFY THE ENGINEER AND COR IN CASE
OF DISCREPANCIES THAT AFFECT THE CONSTRUCTION PROJECT.
6) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT ARE
DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR OR
REPLACE SUCH DAMAGED PROPERTY TO THE VA SATISFACTION AT
NO COST TO THE VA.
7) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS AND
SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT OF THE VA
COR.
8) THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE
TEMPORARY MEASURES AS NECESSARY TO MAINTAIN ACCESS TO
THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING
CONSTRUCTION. TEMPORARY PROVISIONS MAY INCLUDE, BUT ARE
NOT LIMITED TO: BARRICADES, FLASHING LIGHTS, FLAGMAN,
TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE AS NECESSARY
TO ACCOMPLISH THE WORK.
9) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF
CONSTRUCTION EQUIPMENT OPERATIONS DURING DEMOLITION
ACTIVITY.
10) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL,
STATE, AND FEDERAL LAWS.
11) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
12) CONTRACTOR TO CONTACT UTILITIES PROTECTION CENTER
PRIOR TO ANY EXCAVATION.
13) CONTRACTOR IS RESPONSIBLE FOR CONTACTING VETERANS
AFFAIRS AND ALL EXISTING UTILITY PROVIDERS BEFORE REMOVING
ANY/ALL UTILITIES FROM THEIR EXISTING LOCATION ON THE SITE.
THE CONTRACTOR SHALL PERFORM ALL UTILITY DEMOLITION OR
RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING
UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.
14) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO
ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL PERMANENT
GROUND COVER IS ESTABLISHED IN ALL DISTURBED AREAS.
15) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL
PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION
DURING CONSTRUCTION.
16) ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY
THE VA COR AS DETERMINED BY FIELD CONDITIONS.
17) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE
PROTECTED FROM SEDIMENTATION AS REQUIRED BY STATE OR
LOCAL CODES.
18) CONTRACTOR SHALL VERIFY THAT ALL SITE FURNISHINGS,
FEATURES, UTILITIES, AND GRADES SHOWN ON THESE DRAWINGS
ARE CONGRUENT WITH FIELD CONDITIONS PRIOR TO WORK
STARTING. NOTIFY VA COR IMMEDIATELY OF ANY DISCREPANCIES.
19) CONTRACTOR TO ENSURE SHORING PLAN AND ACTIVITIES
ADHERES TO ALL REQUIREMENTS OF SPEC SECTION 01 35 26.
SHEET NOTES:
KEY NOTES:
1) EXISTING TREE TO BE REMOVED AND REPLACED WITH SAME
SPECIES.
2) EXISTING CONCRETE TO BE SAWCUT AND REMOVED AND
REPLACED.
3) PROVIDE LOCKABLE CONSTRUCTION FENCING WITH SCREENING.
CONFIRM LOCATION WITH VA COR.
4) POTENTIAL LAYDOWN AND STAGING AREA. CONFIRM LOCATION
WITH VA COR.
LOD LOD LOD
UG/T UG/T
UG/E UG/E
KEY PLAN
MATCHLINE: CD101
1" = 40'
SCALE IN FEET
40 20 40 80 before you dig belowKnow what's
Call
R
KEY PLAN N
AREA OF WORK
SCALE: NO SCALE
MATCHLINE
MATCHLINE: CD101
MATCHLINE: CD101 MATCHLINE: CD101
815 SQUARE FEET
SIDEWALK DEMO
115 SQUARE FEET
SIDEWALK DEMO
535 SQUARE FEET
SIDEWALK DEMO
RIM 652.54
12"E 650.34
ASPHALT WALK (HANK AARON TRAIL)
EXISTING
BUILDING 4
EXISTING
BUILDING 6
EXISTING
BUILDING 5
EXISTING
BUILDING 7
TRANSFORMER
TRANSFORMER
P O
R C
H
P O
R C
H
P O
R C
H
C O
N C
R
ETE W
ALK
CONCRETE
SERVICE
CHASE WITH
VENT COVER S-2
VENT SHAFT
V-1
CHAIN LINK FENCE
CHAIN LINK FENCE
ASPHALT
C O
N C
R E
TE
CONCRETE WALK
STEPS & HANDS RAILS
WOOD RAMP
PORCH
WOOD RAMP
TRANSFORMER
SERVICE CHASE WITH VENT COVER
S-3 / VAULT D
SEPTIC VENT
C O
N C
R
ETE W
ALK
CONCRETE
C O
N C
W A
LL
CONCRETE
STAIRS
CONCRETE
BRICK WALL
TREES
TREES
TREES
ASPHALT
BUILDING WELL
UTILITY MARKINGS END
HERE, THEY POSSIBLY GO
INTO THE TUNNEL
W W
W W
W W
W W
ROUND DRAIN
TOP OF BEEHIVE 679.67
RIM 679.23
N&S. 675.39
W. 676.02
ROUND DRAIN
TOP OF BEEHIVE 680.11
RIM 679.69
E,W&N. 676.43
FABRIC IN STRUCTURE
15" CMP
IE. 651.72
15" CMP
IE. 651.54
18" RCP
IE. 652.01
18" RCP
IE. 651.47
DOWNSPOUT
DOWNSPOUT
DOWNSPOUT
6" PVC
IE. 662.81
SEPTIC VENT
DOWNSPOUT
DOWNSPOUT
YARD HYDRANT
YARD HYDRANT
DOWNSPOUT
W W W W W W W W
UG
/E
UG
/E
UG
/E
UG/EUG/EUG/E
UG/EUG/EUG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
FOCFOCFOCFOC
FO
C
FO
C
FO
C
FO
C
FOC
FOC
FOC
FOC
FOC
FOCFOCFOCFOCFOC
UG/T
UG/T
UG/T
UG/T UG
/T
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E UG/E UG/E UG/EFOCFOCFOCFOCFOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FOC
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FOC
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
UG/T UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
FOC
FOC
FOC
FO
C
FO
C
FO
C
W
W
W W
W W
W W
W W
WW
W
681681
670 66
666667
MANHOLE
M-1
VAULT C
LOC
LOC
LOC LOC
LOC
LOC
LOCLOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC
LOC LO
C
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOCLOC
SERVICE CHASE WITH
NO COVER UNDER DECK
LOC
LO
CLOC
LOC
EXISTING 4" CORRUGATED
PLASTIC PIPE PER 1998
AS-BUILT DRAWING. NOT
FIELD VERIFIED.
EXISTING 4" CORRUGATED
PLASTIC PIPE PER 1998
AS-BUILT DRAWING. NOT
FIELD VERIFIED.
EXISTING 4" CORRUGATED
PLASTIC PIPE PER 1998
AS-BUILT DRAWING. NOT
FIELD VERIFIED.
EXISTING STEAM TUNNEL
REFERENCED FROM 1998
AS-BUILT DRAWINGS.
NOT FIELD LOCATED
EXISTING STEAM TUNNEL
REFERENCED FROM 1998
AS-BUILT DRAWINGS.
NOT FIELD LOCATED
EXISTING STEAM TUNNEL
REFERENCED FROM 1998
AS-BUILT DRAWINGS.
NOT FIELD LOCATED.
STORAGE AND
STAGING AREA
STORAGE AND
STAGING AREA
RIM 652.54
12"E 650.34
RIM 641.23
IE. 636.23
TO SUMP
(NO VIS. PIPES)
RIM 646.72
N 639.6± S 639.6±
SS
SS
SS
SS
SS
SS
SS
SS
CONCRET
E
W
AL
K
AS
PH
AL
T
AS
PH
AL
T
CHAIN LINK FENCE
CONC.
ASPHALT WALK (HANK AARON TRAIL)
CONC. WALK
C O
N C
R E
TE
W
A
LK
C O
N C
R E
TE
W
A
LK
BM: 641.53'
BW BOLT
ON HYDRANT
FO
C
FO
C
FO
C
UG/E
GAS
GAS
UG/T
UG/T
UG/T
UG/T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C O
N C
R
ETE W
ALK
CONCRETE
SERVICE
CHASE WITH
VENT COVER S-2
SERVICE CHASE
WITH VENT COVER
S-1
VENT SHAFT
V-2 / VAULT B
CHAIN LINK FENCE
STEPS & HANDS RAILS TREES
TREES
FABRIC IN STRUCTURE
15" CMP
IE. 651.72
15" CMP
IE. 651.54
18" RCP
IE. 652.01
18" RCP
IE. 651.47
DOWNSPOUT
6" PVC
IE. 662.81
UG/E
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E
W
GAS
GAS
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
FO
C
FO
C
FO
C
FO
C
FOC
FO…
This is the start of the file's text. The full file is on GovTribe.