This submittal register outlines over 100 preconstruction submittals required for a federal contract to construct a perimeter fence at the Northampton VAMC in Leeds, Massachusetts. The submittals include site safety plans, schedules, product data and shop drawings for concrete, masonry, structural steel, electrical work and security systems. They also require manufacturer certifications, test reports, samples, operation and maintenance manuals, and training plans. The contractor must submit these documents to the COR during construction to demonstrate compliance with plans and specifications before installing materials or systems.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | Submittal Register (100% Submission) | ||||||
| JOB NAME: | Construct Perimeter Fence | ||||||
| LOCATION: | Northampton VAMC, Leeds, MA | ||||||
| CONTRACT NO: | VA241-17-C-0131 | ||||||
| CONTRACTOR: | |||||||
| Line | Activity # | Transmittal # | Specification Section | SD # | Paragraph # | Submittal Description | Item Submitted |
| 01 00 00 | 1.5.D | Document Control | Electronic Security Memorandum | ||||
| 01 00 00 | 1.5.O.2 | Utilities Services | Request to Interrupt services to COR | ||||
| 01 33 23 | 01 | 1.2.A | Preconstruction Submittals | Site Safety Plan, Construction progress schedule, Schedule of values, Submittal register, List of subcontractors | |||
| 01 33 23 | 01 | 1.2.B | Shop Drawings | Shop Drawings | |||
| 01 33 23 | 1.2.C | Preconstruction Submittals | Product Data | ||||
| 01 33 23 | 11 | 1.2.D | Samples | Materials, equipment or workmanship | |||
| 01 33 23 | 1.2.E | Design Data | Calculations, mix designs, analyses | ||||
| 01 33 23 | 1.2.F | Test Reports | Actual Portion of the work | ||||
| 01 33 23 | 1.2.G | Certificates | As required | ||||
| 01 33 23 | 1.2.H | Manufacturer's Instructions | Pre-printed material | ||||
| 01 33 23 | 1.2.I | Manufacturer's Field Reports | Documentation of testing and verification actions | ||||
| 01 33 23 | 1.2.J | Operation and Maintenance Data | Operate, maintain, troubleshoot, and repair equipment | ||||
| 01 33 23 | 1.2.K | Closeout Submittals | Each phase of construction | ||||
| 01 33 23 | 11 | 1.3.A | Submittal Register | Submittal Register updated by Contractor | |||
| 01 35 26 | 1.3.A | Regulatory Submittal | Matters of interpretation | ||||
| 01 35 26 | 01 | 1.4.A | Preconstruction Submittals | Accident Prevention Plan (APP) | |||
| 01 35 26 | 01 | 1.5 | Preconstruction Submittals | Accident Hazard Analysis (per phase) | |||
| 01 35 26 | 1.7.D | Preconstruction Submittals | List of Contractor Site Safety and Health Officer and Competent Persons | ||||
| 01 35 26 | 1.8.E | Preconstruction Submittals | Safety Training Records | ||||
| 01 35 26 | 1.10 | Preconstruction Submittals | Accidents, OSHA 300 Logs, and Man-Hours logs | ||||
| 01 35 26 | 01 | 1.12.C | Preconstruction Submittals | Dust Control Program | |||
| 01 35 26 | 01 | 1.13.A | Preconstruction Submittals | Fire Safety Plan | |||
| 01 35 26 | 01 | 1.14.C | Preconstruction Submittals | Electrical AHA | |||
| 01 35 26 | 01 | 1.18.B | Preconstruction Submittals | Confined Space Entry Plan | |||
| 01 45 29 | 01 | 1.3.A | Preconstruction Submittals | Certificate of Accreditation and Scope of Accreditation | |||
| 01 45 29 | 01 | 3.1.B | Test Reports | Testing Compaction | |||
| 01 45 29 | 06 | 3.3.A | Test Reports | Batch Plant Inspection | |||
| 01 45 29 | 06 | 3.3.B | Test Reports | Field Test Reports | |||
| 01 45 29 | 06 | 3.3.C | Test Reports | Laboratory Tests of Field Samples | |||
| 01 45 29 | 06 | 3.4.C | Test Reports | Reinforcement Report include test results, heat number, manufacturer, type and grade of steel, and bar size | |||
| 01 45 29 | 3.5.A | Test Reports | Mortar Tests | ||||
| 01 45 29 | 06 | 3.5.B | Test Reports | Grout Tests | |||
| 01 45 29 | 3.5.C | Test Reports | Masonry Unit Tests | ||||
| 01 57 19 | 01 | 1.4.A | Preconstruction Submittals | Environmental Protection Plan | |||
| 01 57 19 | 1.5.F.3 | Test Reports | Sound Level | ||||
| 01 74 19 | 01 | 1.5.B | Preconstruction Submittals | Demolition Debris Management Plan with Designated Manager | |||
| 02 83 33.13 | 1.6.B | Preconstruction Submittals | Manufacturer's Literature and Data | ||||
| 02 83 33.13 | 1.6.C | Test Reports | Test Report for Air Monitoring | ||||
| 02 83 33.13 | 1.6.D | Certificates | Certificates of training | ||||
| 02 83 33.13 | 1.6.E | Qualifications | Paint removal contractor | ||||
| 02 83 33.13 | 1.6.F | Record Documents | Hazardous waste manifest | ||||
| 02 83 33.13 | 1.7.F | Quality Assurance | Lead-based Paint Removal Plan | ||||
| 02 83 33.13 | 1.7.I | Quality Assurance | Hazardous Waste Management Plan | ||||
| 02 83 33.13 | 3.6 | Field Quality Control | Field Tests - Air monitoring, Lead based paint | ||||
| 03 30 00 | 02 | 1.6.B | Shop Drawings | Reinforcing Steel | |||
| 03 30 00 | 06 | 1.6.C | Test Reports | Mill Test Reports: Reinforcing Steel, Cement | |||
| 03 30 00 | 1.6.D | Certificates | Abrasive Aggregate, Air-entraining admixture, Chemical admixtures, Waterproof paper, liquid membrane, non-shrinking grout, adhesive binder. | ||||
| 03 30 00 | 06 | 1.6.F | Test Reports | Test Report for Concrete Mix Designs | |||
| 03 30 00 | 1.6.G | Shoring and Reshoring Sequence | Shoring and reshoring sequence | ||||
| 03 30 00 | 1.8.D | Pre-Concrete Conference | Meeting Minutes | ||||
| 03 30 00 | 2.3.A.2 | Test Reports | Results of each test series | ||||
| 03 30 00 | 2.3.B. | Certificates | Fly Ash Testing Certificate | ||||
| 03 30 00 | 3.2.D.2 | Test Reports | Welding Splices-Test report and field quality control | ||||
| 03 41 33 | 1.3.A | Quality Assurance | Manufacturer Qualifications | ||||
| 03 41 33 | 1.3.E | Quality Assurance | Erector Qualifications | ||||
| 03 41 33 | 1.4.A | Preconstruction Submittal | Shop Drawings, product data, and samples | ||||
| 04 05 13 | 1.4.B | Manufacture's Literature and Data | Description of each product | ||||
| 04 05 13 | 1.4.C | Test Reports | Mortar and Admixtures | ||||
| 04 05 13 | 1.4.D | Certificates | Portland Cement, Masonry Cement, Mortar Cement, Hydrated lime, fine aggregate, color mixture | ||||
| 04 05 13 | 1.4.E | Qualifications | Testing laboratory | ||||
| 04 05 13 | 1.5 | Quality Assurance | Preconstruction Testing | ||||
| 04 05 13 | 3.4 | Field Quality Control | Laboratory testing reports | ||||
| 04 05 16 | 1.4.B | Manufacture's Literature and Data | Description of each product | ||||
| 04 05 16 | 1.4.C | Sustainable Construction Submittal | Recycled Content | ||||
| 04 05 16 | 1.4.D | Test Reports | Grout, Cement, aggregate | ||||
| 04 05 16 | 1.4.E | Certificates | Blended hydraulic cement, Portland Cement, grout, Hydrated lime, aggregate, color mixture | ||||
| 04 05 16 | 1.5 | Preconstruction Testing | Test reports | ||||
| 04 20 00 | 1.4.B | Drawings | Reinforcing bars and masonry shapes | ||||
| 04 20 00 | 1.4.C | Manufacture's Literature and Data | Description of each product, installation instructions | ||||
| 04 20 00 | 1.4.D | Samples | Face brick, ceramic glazed facing brick, concrete masonry units, etc. | ||||
| 04 20 00 | 1.4.E | Sustainable Construction Submittals | Recycled Content | ||||
| 04 20 00 | 1.4.F | Test Reports | Ceramic glazed facing brick | ||||
| 04 20 00 | 1.4.G | Certificates | Face brick, solid and load bearing concrete masonry units, ceramic glazed facing brick | ||||
| 04 20 00 | 1.4.H | Drawings and Calculations | Delegated Design Drawings and Calculations | ||||
| 04 72 00 | 1.3.B | Samples | Cast stone | ||||
| 04 72 00 | 1.3.C | Shop Drawings | Shop Drawings | ||||
| 04 72 00 | 1.3.D | Certificates | Test Results and plant certification | ||||
| 04 72 00 | 1.3.E | Manufacture's Literature and Data | Manufacturer test results | ||||
| 04 72 00 | 1.3.G | Manufacture's Literature | List of jobs furnished by manufacturer | ||||
| 04 72 00 | 1.7.A | Quality Assurance | Manufacturer experience and facilities; plant certification | ||||
| 04 72 00 | 1.7.B | Quality Assurance | Stone setter experience | ||||
| 07 92 00 | 1.3.A | Quality Assurance | Installer qualifications | ||||
| 07 92 00 | 1.4.B | Manufacturer's Literature and Data | Manufacturer's installation instructions | ||||
| 07 92 00 | 06 | 1.4.C | Samples | Cured samples of exposed sealants | |||
| 07 92 00 | 07 | 1.4.D | Manufacturer's Literature and Data | Primers, sealing compound | |||
| 07 92 00 | 1.4.E | Warranty | Manufacturer | ||||
| 07 92 00 | 3.5.A.10 | Test Reports | Sealant | ||||
| 09 91 00 | 1.3.B | Qualifications | Painter qualifications | ||||
| 09 91 00 | 1.3.C | Manufacturer's Literature and Data | Manufacturer's literature and product data | ||||
| 09 91 00 | 1.3.G | Certificates | Manufacturers' certificates for high temperature aluminum paint, epoxy coating, intumescent clear coating or fire retardant paint, plastic floor coating | ||||
| 26 05 11 | 01 | 1.4.B | Preconstruction Submittals | Product Qualifications | |||
| 26 05 11 | 01 | 1.4.C | Preconstruction Submittals | Service Qualifications | |||
| 26 05 11 | 01 | 1.9.C.3 | Preconstruction Submittals | Work Plan | |||
| 26 05 11 | 1.12.A | Preconstruction Submittals | Shop drawings, product data, and samples | ||||
| 26 05 11 | 10 | 1.12.F | Operation and Maintenance | Maintenance and Operation Manuals | |||
| 26 05 11 | 10 | 1.17.C | Operation and Maintenance | Training Schedule | |||
| 10 | |||||||
| 26 05 19 | 02 | 1.4.A.1.a | Shop Drawings | Compliance with drawings and specs | |||
| 26 05 19 | 02 | 1.4.A.1.b.1 | Shop Drawings | Electrical Ratings and Insulation Type for each conductor and cable | |||
| 26 05 19 | 02 | 1.4.A.1.b.2 | Shop Drawings | Splicing Materials and Pulling Lubricant | |||
| 26 05 19 | 02 | 1.4.A.2.a | Certificates | Manufacturer Certifications | |||
| 26 05 19 | 02 | 1.4.A.2.b | Certificates | Contractor Certifications | |||
| 26 05 26 | 1.4.A.1 | Shop Drawings | Shop drawings and plans | ||||
| 26 05 26 | 06 | 1.4.A.2 | Test Reports | Ground Resistance Field Test Reports | |||
| 26 05 26 | 02 | 1.4.A.3 | Certificates | Contractor certifications for grounding equipment | |||
| 26 05 33 | 1.4.A.1 | Shop Drawings | Size and Location of main feeders, panels and pull boxes, conduit penetrations | ||||
| 26 05 33 | 1.4.A.1.d | Shop Drawings | Raceway, conduit bodies, connectors and fittings, junction and pull boxes | ||||
| 26 05 33 | 1.4.A.2.a | Certificates | Manufacturer certifications | ||||
| 26 05 33 | 1.4.A.2.b | Certificates | Contractor certifications | ||||
| 26 05 41 | 02 | 1.4.A.1.a | Shop Drawings | Compliance with drawings and specifications | |||
| 26 05 41 | 02 | 1.4.A.1.b | Shop Drawings | Manholes, pull boxes, ducts and hardware. | |||
| 26 05 41 | 05 | 1.4.A.1.c | Design Data | Deviations from drawings as necessary | |||
| 26 05 41 | 07 | 1.4.A.2.a | Certificates | Manufacturer certifications | |||
| 26 05 41 | 07 | 1.4.A.2.b | Certificates | Contractor certifications | |||
| 26 27 26 | 1.4.A.1.a | Shop Drawings | Compliance with drawings and specifications | ||||
| 26 27 26 | 1.4.A.1.b | Shop Drawings | Electrical Ratings, dimensions, mounting details | ||||
| 26 27 26 | 1.4.A.2 | Manuals | Maintenance and Operating Manuals | ||||
| 26 27 26 | 1.4.A.3.a | Certificates | Manufacturer certifications | ||||
| 26 27 26 | 1.4.A.3.b | Certificates | Contractor certifications | ||||
| 26 29 21 | 1.4.A.1.a | Shop Drawings | Compliance with drawings and specifications | ||||
| 26 29 21 | 1.4.A.1.b | Shop Drawings | Electrical Ratings, dimensions, mounting details | ||||
| 26 29 21 | 1.4.A.2.a | Manuals | Maintenance and Operating Manuals | ||||
| 26 29 21 | 1.4.A.3.a | Certificates | Manufacturer certifications | ||||
| 26 29 21 | 1.4.A.3.b | Certificates | Contractor certifications | ||||
| 28 05 00 | 1.4.A | Quality Assurance | Manufacturers qualifications | ||||
| 28 05 00 | 1.4.B | Quality Assurance | Product qualifications | ||||
| 28 05 00 | 1.4.C | Quality Assurance | Contractor qualifications | ||||
| 28 05 00 | 1.6.D.1 | Preconstruction submittals | Compliance with drawings and specs | ||||
| 28 05 00 | 1.6.D.2 | Preconstruction submittals | Replacement parts recommended by manufacturer | ||||
| 28 05 13 | 1.5.A.1 | Manufacturer's Literature and Data | Cable type and rating | ||||
| 28 05 13 | 1.5.A.2 | Certificates | Accordance with the Drawings and specs | ||||
| 28 05 13 | 1.5.A.3.a | Shop Drawings | Vertical and Horizontal offsets and transitions | ||||
| 28 05 13 | 1.5.A.3.b | Shop Drawings | Clearances for access above and to side of cable trays | ||||
| 28 05 13 | 1.5.A.3.c | Shop Drawings | Vertical elevation of cable trays above the floor or bottom of ceiling | ||||
| 28 05 13 | 1.5.A.3.d | Shop Drawings | Load calculations | ||||
| 28 05 13 | 1.5.A.3.e | Shop Drawings | System labeling schedules | ||||
| 28 05 13 | 1.5.A.4.a | Shop Drawings | Wiring Diagrams: Workstation Outlets, Jacks, and Jack Assemblies | ||||
| 28 05 13 | 1.5.A.4.b | Shop Drawings | Wiring Diagrams: Patch cords | ||||
| 28 05 13 | 1.5.A.4.c | Shop Drawings | Wiring Diagrams: Patch Panels | ||||
| 28 05 13 | 1.5.A.5 | Cable Administration Drawings | Identify system components, wiring, and cabling per 3.7 | ||||
| 28 05 13 | 1.5.A.7 | Maintenance Data | Wire and Cable | ||||
| 28 05 13 | 3.8.F | Test Reports | Test and inspection reports | ||||
| 28 05 26 | 1.3.B.1 | Shop Drawings | Compliance with Drawings and Specs | ||||
| 28 05 26 | 1.3.B.2 | Shop Drawings | Locations of grounding electrode connections and conductors | ||||
| 28 05 26 | 1.3.C | Test Reports | Ground Resistance | ||||
| 28 05 26 | 1.3.D.1 | Certificates | Compliance with Drawings and Specs | ||||
| 28 05 26 | 1.3.D.2 | Certificates | Contractor certification | ||||
| 28 05 26 | 3.12.D | Test Reports | Test and inspection reports | ||||
| 28 05 28.33 | 1.5.B.1 | Shop Drawings | Main Feeders | ||||
| 28 05 28.33 | 1.5.B.2 | Shop Drawings | Panels and Pull Boxes | ||||
| 28 05 28.33 | 1.5.B.3 | Shop Drawings | Conduit Penetrations | ||||
| 28 05 28.33 | 1.5.B.4 | Shop Drawings | Specific item proposed and its area of application | ||||
| 28 05 28.33 | 1.5.C | Certificates | Compliance with Drawings and Specs | ||||
| 28 05 28.33 | 1.5.E | Product Data | Raceways, wireways, fittings, boxes, enclosures, cabinets | ||||
| 28 05 28.33 | 1.5.F.1 | Shop Drawings | Handholes and boxes for underground wiring | ||||
| 28 05 28.33 | 1.5.F.1.a | Shop Drawings | Duct entry provisions | ||||
| 28 05 28.33 | 1.5.F.1.b | Shop Drawings | Frame and cover design | ||||
| 28 05 28.33 | 1.5.F.1.c | Shop Drawings | Grounding Details | ||||
| 28 05 28.33 | 1.5.F.1.d | Shop Drawings | Dimensioned locations of cable rack inserts, and pulling-in and lifting irons | ||||
| 28 05 28.33 | 1.5.F.1.e | Shop Drawings | Joint Details | ||||
| 28 05 28.33 | 1.5.G | Certification | Manufacturer Seismic Qualification Certification | ||||
| 28 05 28.33 | 1.5.H | Test Reports | Source quality-control test reports | ||||
| 28 05 28.33 | 3.9 | Commissioning | Commissioning documentation | ||||
| 28 13 00 | 1.3.C | Quality Assurance | Manufacturers Qualifications | ||||
| 28 13 00 | 1.3.D | Quality Assurance | Product Qualifications | ||||
| 28 13 00 | 1.3.E | Quality Assurance | Contractor Qualifications | ||||
| 28 13 00 | 1.3.F | Quality Assurance | Service Qualifications | ||||
| 28 13 00 | 1.4.B | Certificates | Compliance with Quality Assurance | ||||
| 28 13 00 | 1.4.C | Preconstruction | Pre-installation and as-built design package | ||||
| 28 13 00 | 1.4.D.1.a | Shop Drawings | Define each page of design package | ||||
| 28 13 00 | 1.4.D.1.b | Shop Drawings | Complete list of all security abbreviations and symbols | ||||
| 28 13 00 | 1.4.D.1.c | Shop Drawings | Reference all general notes | ||||
| 28 13 00 | 1.4.D.1.d | Shop Drawings | Specifications and scope of work | ||||
| 28 13 00 | 1.4.E.1 | Shop Drawings | Pre-installation design package 35% | ||||
| 28 13 00 | 1.4.E.2 | Shop Drawings | Pre-installation design package 65% | ||||
| 28 13 00 | 1.4.E.3 | Shop Drawings | Pre-installation design package 90% | ||||
| 28 13 00 | 1.4.E.4 | Shop Drawings | Pre-installation design package 100% | ||||
| 28 13 00 | 1.4.F | Shop Drawings | Security System Operational Test Plan | ||||
| 28 13 00 | 1.4.G | Certificates | Manufacturer's certification | ||||
| 28 13 00 | 1.4.H | Test Reports | System Readiness Checklists | ||||
| 28 13 00 | 1.4.J | Shop Drawings | Group I Technical Data Package | ||||
| 28 13 00 | 1.4.K | Shop Drawings | Group II Technical Data Package | ||||
| 28 13 00 | 1.4.L | Shop Drawings | Group III Technical Data Package | ||||
| 28 13 00 | 1.4.M | Shop Drawings | Group IV Technical Data Package | ||||
| 28 13 00 | 1.4.N | Shop Drawings | Group V Technical Data Package | ||||
| 28 13 00 | 1.4.O | Certificates | Compliance Certificates | ||||
| 28 13 00 | 3.8 | Test Reports | Field tests and inspections test reports | ||||
| 28 13 00 | 3.13 | Test Reports | Training Plans | ||||
| 28 13 16 | 1.3.E | Certificates | Contractor Qualifications | ||||
| 28 13 16 | 1.4.D | Preconstruction | Pre-installation and as-built design package | ||||
| 28 13 16 | 1.4.E.1 | Shop Drawings | Pre-installation design package 35% | ||||
| 28 13 16 | 1.4.E.2 | Shop Drawings | Pre-installation design package 65% | ||||
| 28 13 16 | 1.4.E.3 | Shop Drawings | Pre-installation design package 90% | ||||
| 28 13 16 | 1.4.E.4 | Shop Drawings | Pre-installation design package 100% | ||||
| 28 13 16 | 1.4.F | Shop Drawings | Security System Operational Test Plan | ||||
| 28 13 16 | 1.4.G | Certificates | Manufacturer's certification | ||||
| 28 13 16 | 2.2 | Test Reports | Field tests and inspections test reports | ||||
| 28 13 53 | 1.3.C | Quality Assurance | Manufacturers Qualifications | ||||
| 28 13 53 | 1.3.D | Quality Assurance | Product Qualifications | ||||
| 28 13 53 | 1.3.E | Quality Assurance | Contractor Qualifications | ||||
| 28 13 53 | 1.3.F | Quality Assurance | Service Qualifications | ||||
| 28 13 53 | 1.4.B | Certificates | Compliance with Quality Assurance | ||||
| 28 13 53 | 1.4.C | Shop Drawings | Pre-Installation and As-Built Design | ||||
| 28 13 53 | 1.4.D | Preconstruction | Pre-installation and as-built design package | ||||
| 28 13 53 | 1.4.E.1 | Shop Drawings | Pre-installation design package 35% | ||||
| 28 13 53 | 1.4.E.2 | Shop Drawings | Pre-installation design package 65% | ||||
| 28 13 53 | 1.4.E.3 | Shop Drawings | Pre-installation design package 90% | ||||
| 28 13 53 | 1.4.E.4 | Shop Drawings | Pre-installation design package 100% | ||||
| 28 13 53 | 1.4.F | Shop Drawings | Manufacturer security system product cutsheets | ||||
| 28 13 53 | 1.4.G | Shop Drawings | Security System Operational Test Plan | ||||
| 28 13 53 | 1.4.H | Certificates | Manufacturer's certification | ||||
| 28 13 53 | 1.4.J | Certificates | Contractor certifications; maintenance and operation manuals | ||||
| 28 13 53 | 3.8.C | Test Reports | Test and inspection reports | ||||
| 28 13 53 | 3.9 | Commissioning | Commissioning documentation | ||||
| 28 23 00 | 1.4.D | Quality Assurance | Manufacturers Qualifications | ||||
| 28 23 00 | 1.4.E | Quality Assurance | Product Qualifications | ||||
| 28 23 00 | 1.4.F | Quality Assurance | Contractor Qualifications | ||||
| 28 23 00 | 1.4.G | Quality Assurance | Service Qualifications | ||||
| 28 23 00 | 1.5.B | Preconstruction Submittals | Compliance with Quality Assurance | ||||
| 28 23 00 | 1.5.C | Preconstruction Submittals | Pre-Installation and As-Built Design | ||||
| 28 23 00 | 1.5.D | Preconstruction Submittals | Manufacturer Security System product cut-sheets | ||||
| 28 23 00 | 06 | 1.5.E | Preconstruction Submittals | Manufacture's Certification of Underwriters Laboratories, Inc | |||
| 28 23 00 | 1.5.F | Preconstruction Submittals | System Readiness Checklists | ||||
| 28 23 00 | 01 | 3.5 | Commissioning | Commissioning documentation | |||
| 28 23 00 | 3.6 | Test Reports | Training Plans | ||||
| 06 | |||||||
| 31 20 00 | 1.6.B.1 | Submittal Drawings | Size, configuration, and fabrication and installation details | ||||
| 31 20 00 | 1.6.B.2 | Submittal Drawings | Plot Plan | ||||
| 31 20 00 | 02 | 1.6.B.3 | Submittal Drawings | Blasting Plan | |||
| 31 20 00 | 05 | 1.6.C | Submittal Drawings | Excavation plan | |||
| 31 20 00 | 2.1.A | Submittal Drawings | Delegated Design | ||||
| 31 23 19 | 1.3.B.1 | Submittal Drawings | Drawing and Data with method employed in dewatering excavated areas | ||||
| 31 23 19 | 1.3.B.2 | Submittal Drawings | Show Location, depth and size of wellpoints, headers, sumps, ditches | ||||
| 31 23 19 | 1.3.B.3 | Reports | Written report outlining control procedures | ||||
| 31 23 19 | 1.3.B.4 | Materials | Materials in format acceptable to all regulatory agencies | ||||
| 31 23 19 | 1.3.C | Reports | Inspection Reports | ||||
| 31 23 19 | 1.3.D | Permits | All | ||||
| 31 23 19 | 1.3.E | Submittal Drawings | Drawings and Calculations | ||||
| 01 | |||||||
| 32 05 23 | 06 | 1.4.B.1 | Submittal Drawings | Show size, configuration, and fabrication and installation details | |||
| 32 05 23 | 1.4.B.2 | Submittal Drawings | Show Reinforcing | ||||
| 32 05 23 | 1.4.B.3 | Submittal Drawings | Jointing plan for concrete pavements, curbs and gutters | ||||
| 32 05 23 | 1.4.C.1 | Manufacturer's Literature and Data | Description of each product | ||||
| 32 05 23 | 1.4.C.2 | Manufacturer's Literature and Data | Installation instructions | ||||
| 32 05 23 | 1.4.D | Test Reports | Job-mix formula, select subbase materials | ||||
| 32 05 23 | 1.4.E.1 | Certificates | Expansion joint filler | ||||
| 32 05 23 | 1.4.E.2 | Certificates | Reinforcement | ||||
| 32 05 23 | 1.4.E.3 | Certificates | Curing Materials | ||||
| 32 05 23 | 1.4.E.4 | Certificates | Concrete protective coating | ||||
| 32 05 23 | 1.4.F.1 | Qualifications | Installer with project experience list | ||||
| 32 05 23 | 1.4.F.2 | Qualifications | Land Surveyor | ||||
| 32 05 23 | 1.4.G | Preconstruction Submittals | Concrete mix design | ||||
| 32 05 23 | 1.4.H | Subbase Job-Mix Design | Subbase Job-Mix Design | ||||
| 32 05 23 | 1.5.A | Quality Assurance | Installer Qualifications | ||||
| 32 05 23 | 1.5.C | Quality Assurance | Preconstruction testing reports | ||||
| 32 05 23 | 3.13 | Test Reports | Test Reports | ||||
| 32 31 40 | 1.4.B.1 | Submittal Drawings | Show size, configuration, and fabrication and installation details | ||||
| 32 31 40 | 1.4.C.1 | Manufacturer's Literature and Data | Description of each product | ||||
| 32 31 40 | 1.4.D.1 | Certificates | Fence alignment | ||||
| 32 31 40 | 1.4.D.2 | Certificates | Structural characteristics | ||||
| 32 31 40 | 1.4.D.3 | Certificates | Connections | ||||
| 32 31 40 | 1.4.E.1 | Qualifications | Manufacturer with project experience list | ||||
| 32 31 40 | 1.4.E.2 | Qualifications | Installer with project experience list | ||||
| 32 31 40 | 1.4.E.3 | Qualifications | Welders and welding procedures | ||||
| 34 75 13.13 | 1.4.A | Preconstruction Submittals | Preinstallation meeting | ||||
| 34 75 13.13 | 1.5.B.1 | Submittal Drawings | Show size, configuration, and fabrication and installation details | ||||
| 34 75 13.13 | 1.5.B.2 | Submittal Drawings | Show dimensions and clearances between barriers and other adjacent permanent construction | ||||
| 34 75 13.13 | 1.5.B.3 | Submittal Drawings | Show interconnecting piping between system components | ||||
| 34 75 13.13 | 1.5.B.4 | Submittal Drawings | Show Power and Control wiring diagrams and routing between system components | ||||
| 34 75 13.13 | 1.5.B.5 | Submittal Drawings | Include setting drawings and templates | ||||
| 34 75 13.13 | 1.5.C.1 | Manufacturer's Literature and Data | Description of each product | ||||
| 34 75 13.13 | 1.5.C.2 | Manufacturer's Literature and Data | Current product listing | ||||
| 34 75 13.13 | 1.5.C.3 | Manufacturer's Literature and Data | Installation instructions | ||||
| 34 75 13.13 | 1.5.C.4 | Manufacturer's Literature and Data | Warranty | ||||
| 34 75 13.13 | 1.5.D.1 | Samples | Bollard | ||||
| 34 75 13.13 | |||||||
| 34 75 13.13 | 1.5.E.1 | Test Reports | Certify each product | ||||
| 34 75 13.13 | 1.5.F.1 | Certificates | Show electrical components are UL listed | ||||
| 34 75 13.13 | 1.5.F.2 | Certificates | Factory service representative installation | ||||
| 34 75 13.13 | 1.5.G | Qualifications | Substantiate qualifications comply with specs | ||||
| 34 75 13.13 | 1.5.H.1 | Operation and Maintenance Data | Care instructions | ||||
| 34 75 13.13 | 1.5.H.2 | Operation and Maintenance Data | Start-up, maintenance, troubleshooting, emergency, and shut-down instructions | ||||
| 34 75 13.13 | 3.3 | Certificates | Manufacturer's certification of installation |