This document package includes plans and specifications for a construction project to upgrade space in Building 1W at the Ann Arbor VA Medical Center. The project scope includes a complete renovation of approximately 4,200 square feet of vacated Audiology space, including structural, architectural, electrical, mechanical, fire protection and interior design work. Construction will adhere to building codes, VA standards, and sustainable design principles. The work site is the first floor of Building 1W and the period of performance is 180 calendar days after receipt of the notice to proceed, with work likely commencing in fall 2020.

View the file

Other files

File Type Posted
36C25020B0046 0004.pdf PDF
RFI 005 - Response.docx DOCX document
RFI 1 work hours - response.docx DOCX document
RFI 004 - response.docx DOCX document
S02RFIFORM50620201.docx DOCX document
WAGE DET MI20200100 08072020 REV3.pdf PDF
RFI 3 project phasing - response.docx DOCX document
RFI 2 New FCU with Existing Reheat Coil - Response.pdf PDF
IMS RFI 02 responseS.docx DOCX document
IMS-RFI 01 response.docx DOCX document
36C25020B0046 0003.pdf PDF
Contractor Addresses -.doc DOC document
RFI 001 (response).docx DOCX document
_506-20-201 VA Ann Arbor - 1W Upgrades - Addendum 01.pdf PDF
Sign In Sheet 506-20-201.pdf PDF
033000.pdf PDF
RFI Form 2 8-3-2020 - response.docx DOCX document
S04 - Pre-Bid Site Visit Agenda 506-20-201.pdf PDF
RFI 1. - Response.pdf PDF
36C25020B0046 0002.pdf PDF
36C25020B0046 0001.pdf PDF
Contractor EMR Certification Form 2020.docx DOCX document
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part2.pdf PDF
506-20-201_PROJECT MANUAL_VOL1_032019 SPECS.pdf PDF
506-20-201_PROJECT MANUAL_VOL2_032019 SPECS.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part1.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part4.pdf PDF
WAGE DET MI20200100 07032020 REV2.pdf PDF
S02 - RFI Form 506-20-201.docx DOCX document
36C25020B0046_1.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLUMBING GENERAL NOTES

1. COORDINATE ROUTING OF PIPING WITH ALL OTHER TRADES PRIOR TO

INSTALLATION TO AVOID CONFLICTS.

2. COMPLY WITH ALL APPLICABLE LOCAL AND STATE CODES.

3. PROVIDE ROUGH-INS AND FINAL CONNECTIONS TO FIXTURES AND EQUIPMENT

4. PROVIDE TRAP SEAL PROTECTION ON ALL FLOOR DRAINS, FLOOR SINKS AND

HUB DRAINS SUBJECT TO EVAPORATION. INSTALL PER MANUFACTURERS

RECOMMENDATIONS.

5. PROVIDE ASSE 1070 MIXING VALVE AT ALL BARRIER FREE SINKS AND ALL HAND

WASHING SINKS TO PROVIDE TEMPERED WATER TO HOT WATER SIDE OF

FAUCET.

6. PIPING INSTALLED IN THE WAY OF ACCESS OR MAINTENANCE TO EQUIPMENT

SHALL BE RELOCATED AT THE EXPENSE OF THE INSTALLING CONTRACTOR.

7. ALL PLUMBING WORK SHALL MEET MICHIGAN PLUMBING CODE 2015

REQUIREMENTS AS A MINIMUM UNLESS EXCEEDED BY PROJECT CONSTRUCTION

DOCUMENTS.

8. PROVIDE SHUTOFF VALVES AT ALL FIXTURES AND EQUIPMENT.

9. COORDINATE LOCATIONS OF FLOOR DRAINS AND FLOOR SINKS WITH LOCATIONS

OF EQUIPMENT AND EQUIPMENT HOUSEKEEPING PADS. COORDINATE WITH

SLOPING OF FLOOR SO THAT RIM OF DRAIN IS FLUSH WITH FINISH FLOOR.

10. COORDINATE HANGING AND SUPPORT OF PIPING WITH STRUCTURAL.

11. PROVIDE PIPE SLEEVES WHERE PIPES PENETRATE WALLS.

12. BALL VALVES SHALL BE 316 STAINLESS STEEL FOR DOMESTIC HOT WATER

SYSTEM AND BRASS FOR DOMESTIC COLD WATER SYSTEM.

13. INSTALL PIPING IN AN ORGANIZED MANNER. DO NOT ROUTE IN FRONT OF

WINDOWS.

14. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH NEW

SHEET METAL. HVAC PIPING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT

ALL REQUIRED OFFSETS AND FITTINGS ARE INDICATED, BUT SHALL BE

PROVIDED. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR

CLEARANCES.

15. PROVIDE WATER HAMMER ARRESTORS PER PDI WH-201 AND UP STREAM OF ALL

AUTOMATIC AND FAST CLOSING VALVES INCLUDING BUT NOT LIMITED TO

SOLENOID VALVES.

16. COORDINATION AND LAYOUT DRAWINGS SHALL BE SUBMITTED TO THE AE FOR

APPROVAL PRIOR TO INSTALL.

PLUMBING DEMOLITION NOTES

1. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND/OR

REGULATORY AGENCIES, CODES AND REGULATIONS FOR NEW WORK.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WORK

WITH OTHER TRADES AND WITH THE CONSTRUCTION MANAGER.

3. VERIFY ALL CONDITIONS IN FIELD BEFORE START OF CONSTRUCTION. NOTIFY

ARCHITECT/ENGINEER OF DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL

FIELD CONDITIONS.

4. COORDINATE ALL WORK WITH APPROPRIATE TRADES.

5. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR EQUIPMENT WITH

OWNER'S REPRESENTATIVE, MINIMIZE INTERRUPTION OF EXISTING SERVICES.

VERIFY ALL SYSTEMS BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS

WILL NOT LOOSE SERVICE. AREAS SUCH AS THE SECOND FLOOR KITCHEN ARE

CRITICAL TO THE FACILITIES OPERATION.

6. COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC. WITH

ARCHITECTURAL TRADES. PROVIDE TEMPORARY WATER TIGHT SEAL FOR ALL

EXTERIOR WALL AND ROOF PENETRATION AS NECESSARY.

7. COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES BEFORE

CUTTING.

8. HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED WITH

APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.

9. NO ITEMS TO BE ABANDONED IN PLACE.

10. ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING OPEN SYSTEMS

TO BE PATCHED, CAPPED AND SEALED TO PROVIDE A FINISHED SYSTEM.

11. DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO REMAIN OPEN, CAP

AND PROTECT TO AVOID CONTAMINATION TO AND FROM THE SURROUNDING

AREAS.

12. ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED AND RETURNED

TO OPERATION BY END OF SHIFT, NO SYSTEMS ALLOWED TO BE LEFT OPEN

WHEN NOT BEING SUPERVISED BY CONTRACTOR RESPONSIBLE FOR THAT WORK

TRADE.

PLUMBING ABBREVIATIONS

A/E ARCHITECT / ENGINEER

AD AREA DRAIN/ACCESS DOOR

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASD ADJUSTABLE SPEED DRIVES

ASD AUTOMATIC SPRINKLER DRAIN

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BFP REDUCED PRESSURE BACKFLOW PREVENTER

BHP BREAK HORSEPOWER

BSP BLACK STEEL PIPE

BT BATHTUB

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CELSIUS

CA COMPRESSED AIR

CGA COMPRESSED GAS ASSOCIATION

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CO CLEANOUT

CS CLINICAL SINK

CV CONTROL VALVE

DCW DOMESTIC COLD WATER

DFU DRAINAGE FIXTURE UNITS

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL SYSTEM

EPA ENVIROMENTAL PROTECTION AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EWS/SH EYE WASH/DRENCH SHOWER

EX EXISTING

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE) CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FS FLOW SWITCH

FU FIXTURE UNITS

GAL GALLON

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK (DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ID INSIDE DIAMETER

IE INVERT ELEVATION

ICW INDUSTRIAL COLD WATER

IHW INDUSTRIAL HOT WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWH KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH 1000 BTUH

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTADING

MSB MOP SERVICE BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N20 NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM. NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

IPC INTERNATIONAL PLUMBING CODE

PA PASCAL

PD PRESSURE DROP OR DIFFERENCE

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAGE

PTRV PRESSURE TEMPERATURE RELIEF VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RP RECIRCULATION PUMP

RO REVERSE OSMOSIS WATER

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTORS NATIONAL ASSOCIATION

SCFM STANDARD CUBIC FOOT/MINUTE

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SMH SANITARY MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT/SF SQUARE FEET

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TEMPERATURE DIFFERENCE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

W WASTE PIPING

W&V WASTE AND VENT

PLUMBING TAGS SYMBOLS

1W-EX.P 3

BUILDING NUMBER WHERE EQUIPMENT IS LOCATED.

INDICATOR THAT COMPONENT IS EXISTING.

EQUIPMENT ABBREVIATION (PUMP)

PUMP NUMBER

(EXAMPLE: EXISTING PUMP NO.3 IN BUILDING 1 WEST.)

PLUMBING EQUIPMENT/FIXTURE TAG (EXISTING)

1W-P 4

BUILDING NUMBER WHERE EQUIPMENT IS LOCATED.

EQUIPMENT ABBREVIATION (PUMP)

PUMP NUMBER

(EXAMPLE: NEW PUMP NO.4 IN BUILDING 1 WEST.)

PLUMBING EQUIPMENT/FIXTURE TAG (NEW)

DEMOLITION NOTE TAG

PLAN NOTE TAG

A

PL105

SECTION LETTER

DRAWING NUMBER WHERE SHOWN

PL105

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

GLOBE VALVE

PLUG VALVE

LINEAR STOP CHECK VALVE

PRESSURE RELIEF VALVE

CHECK VALVE W/ARROW INDICATING FLOW

GATE VALVE

PRESSURE REDUCING VALVE

GAS VALVE

PLUMBING SYMBOLS

SOLENOID VALVE

MOTORIZED CONTROL VALVE - 2-WAY

PRESSURE REGULATING VALVE - TWO

WAY

PRESSURE REGULATING VALVE - THREE WAY

ANGLE RELIEF VALVE

ANGLED STOP CHECK VALVE

BALANCING VALVE

BUTTERFLY VALVE

BALL VALVE

MOTORIZED CONTROL VALVE - 3-WAY

P

T

F

CB

PRESSURE INDICATOR

FLOW MEASURING DEVICE

MANUAL AIR VENT

TEMPERATURE INDICATOR

THERMOMETER

ANCHOR

CAP

CATCH BASIN

CO

END OF LINE, CLEANOUT

CO

FLOOR, CLEANOUT

WALL, CLEANOUT

WCO

EXPANSION COMPENSATOR OR EXPANSION JOINT

FLEXIBLE PIPE CONNECTOR

FD

FLOOR DRAINS

PIPE GUIDE

STRAINER

UNION

FD

HOSE BIBB

S

M

M

CW WASTEHW VENTDESCRIPTIONFIXTURE/TAG MAKE/MODEL

PLUMBING FIXTURE SCHEDULE

1/2" 2"1/2" 1-1/2"

1/2" 2"1/2" 1-1/2"

SINK (P-501)

MID MARK CASEWORK WITH

INTEGRAL SINK BY OTHERS

MANUAL GOOSENECK FAUCET

SINK (P-502)

BARRIER FREE

UNDERMOUNT

SINK: INTEGRAL TO CASEWORK. REFER TO ARCH PLANS.

TRIM: ANSI A112.18.1 CHROME PLATED, DECK MOUNTED WIDE SPREAD FAUCET WITH 5-1/4 INCH REACH RIGID GOOSENECK, 1.5 GPM LAMINAR FLOW OUTLET, 1/4 TURN CERAMIC DISC CARTRIDGES, 4 INCH WRIST BLADES, 4-INCH CENTERS.

ACCESSORIES: POLISHED CHROME PLATED, 17 GAUGE, BRASS P-TRAP WITH CLEANOUT PLUG, TAILPIECE AND ARM WITH ESCUTCHEON. OFFSET WASTE WITH PERFORATED OPEN STRAINER, UNDERSINK PROTECTIVE PIPE COVERS WITH ANTI-MICROBIAL, LAV GUARD BY TRUBRO.

SUPPLIES: LOOSE KEY STOP AND FLEXIBLE SUPPLY; ASSE 1070 MIXING VALVE.

BASIN: ANSI A112.19.3; SINGLE COMPARTMENT, 20 x 17 INCH OUTSIDE DIMENSIONS, 17 X 11 1/2 X 10 INCH DEEP INSIDE DIMENSIONS, 18 GAUGE, TYPE 304 STAINLESS STEEL, UNDER MOUNT WITH SOUND DEADENING UNDERCOATING, STAINLESS STEEL DRAINS WITH STAINLESS STEEL OPEN GRID STRAINER.

TRIM: ANSI A112.18.1 CHROME PLATED, DECK MOUNTED WIDE SPREAD FAUCET WITH 5-1/4 INCH REACH RIGID GOOSENECK, 1.5 GPM LAMINAR FLOW OUTLET, 1/4 TURN CERAMIC DISC CARTRIDGES, 4 INCH WRIST BLADES, 4-INCH CENTERS.

ACCESSORIES: POLISHED CHROME PLATED, 17 GAUGE, BRASS P-TRAP WITH CLEANOUT PLUG, TAILPIECE AND ARM WITH ESCUTCHEON. OFFSET WASTE WITH PERFORATED OPEN STRAINER, UNDERSINK PROTECTIVE PIPE COVERS WITH ANTI-MICROBIAL, LAV GUARD BY TRUBRO.

SUPPLIES: LOOSE KEY STOP AND FLEXIBLE SUPPLY; ASSE 1070 MIXING VALVE.

1/2" 2"-- 1-1/2"BOTTLE FILLER (P-601)

BARRIER FREE

WALL HUNG

FIXTURE: BOTTLE FILLING UNIT SHALL INCLUDE AN ELECTRONIC SENSOR FOR TOUCHLESS ACTIVATION WITH AUTO 20-SECOND SHUT-OFF TIMER. SHALL INCLUDE GREEN TICKER DISPLAYING COUNT OF PLASTIC BOTTLES SAVED FROM WASTE. BOTTLE FILLER SHALL PROVIDE 1.1 GPM FLOW RATE WITH LAMINAR FLOW TO MINIMIZE SPLASHING. SHALL INCLUDE THE 3000-GALLON CAPACITY FILTER, CERTIFIED TO NSF 42 AND 53, WITH VISUAL MONITOR TO INDICATE WHEN REPLACEMENT IS NECESSARY. SHALL INCLUDE ANTI-MICROBIAL PROTECTION IN KEY AREAS. UNIT SHALL MEET ADA GUIDELINES. UNIT SHALL BE LEAD-FREE DESIGN WHICH IS CERTIFIED TO NSF/ANSI 61 AND 372 AND MEETS FEDERAL AND STATE LOW-LEAD REQUIREMENTS. UNIT SHALL BE CERTIFIED TO UL399.

VERIFY COMPATIBILITY OF BOTTLE FILLING STATION WITH EXISTING ELECTRIC WATER COOLER BASE.

3/ 4"

D H

W

3/ 4"

D H

W

3/ 4"

D H

W

3/ 4"

D H

W R

1/

4" V

3/ 4"

D C

W

1/

4" V

3/ 4"

D C

W

ROUTE DHW DN TO

SINK AND BACK UP

WALL, CONTINUE

TO DOWN STREAM

FIXTURE(S) AS

SHOWN ON PLANS

SINK SINK

MINIMIZE PIPE DISTANCE

TO FAUCET HANDLE

CEILING

2" SAN 2" SAN

MINIMIZE PIPE DISTANCE

TO FAUCET HANDLE

3/4" DHW

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PL000

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

GENERAL PLUMBING

INFORMATION

UPGRADE 1 WEST -

BLDG 1W

PLUMBING SHEET INDEX

NUMBER DESCRIPTION

PL000 GENERAL PLUMBING INFORMATION

PD001 BASEMENT PLUMBING DEMOLITION PLAN

PD101A FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A

PD101B FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA B

PD101C FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA C

PL001 BASEMENT PLUMBING PLAN

PL101A FIRST FLOOR PLUMBING PLAN - AREA A

PL101B FIRST FLOOR PLUMBING PLAN - AREA B

PL101C FIRST FLOOR PLUMBING PLAN - AREA C

PL111A FIRST FLOOR MEDICAL GAS PLAN - AREA A

PL111B FIRST FLOOR MEDICAL GAS PLAN - AREA B

PL111C FIRST FLOOR MEDICAL GAS PLAN - AREA C

Grand total: 12

COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY SPECIFICATION SECTION 220511, PARAGRAPH 1.4 - SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA.

NOT TO SCALE

CONTINUOUS DOMESTIC HOT WATER ROUTING DETAIL

73REVISIONS DATE

EX.2"

SAN

UP

EX.5"SAN

EX.2"V

RISER

EX.2"

SAN

UP

EX.4"SAN

RISER

EX.2"SAN

E X

.3 "S

A N

EX.3"SAN

RISER

EX.CO

EX.4"SAN

RISER

EX.CO

EX.4"SAN

EX.4"SAN

DN

E X

.2 "S

A N

E X

.2 "S

A N

E X

.2 "S

A N

EX.2"SAN

EX.2"

SAN

EX.4"SAN

EX.2"V

RISER

EX.2"V

EX.4"SAN

RISER

EX.3"SAN

RISER

RISER

EX.4"SAN

RISER

EX.4"SAN

RISEREX.2"

EX.2"SANEX.2"SAN

UP TO EX. SK

TO REMAIN

EX.2"SAN

UP TO EX. SK

TO REMAIN

4'

7'

3.9

1'

2'

3'

EX. 4" SAN EX.4"SAN

RISER

DN

EX.4"SAN

C1

CORRIDOR

AB01

EVS STORAGE

AB08

CLEAN UTILITY

AB09A

TREATMENT 5

AB09D

TREATMENT 2

AB09E

TREATMENT 1

AB10

DECON/PROCESSING

AB10A

DECON

CB29

CORRIDOR

CB28

CORRIDOR

AB09N

NOUR

AB09K

MEDS

CB36

PASSAGE

AB09L

MENTOR

AB09I

CHARTING

AB09H

MD WORK

AB09F

WORK

AB09

NURSE

AB09M

NURSE

TRAUMA 1

TRAUMA 2

AB09Z

OBSERVATION 1

AB09Y

OBSERVATION 2

AB09X

OBSERVATION 3

AB09W

OBSERVATION 4

AB15

ANTE RM

AB15A

ISO. RM

AB15A

TOILET RM

AB18

ER NURSE

EDUCATIONAB09V

EXAM 4

AB09U

EXAM 3

AB09T

EXAM 2

AB09S

EXAM 1

AB09R

TRIAGE

AB20

CHIEF

AB22

DIRECTOR

AB24

MENTAL HEALTH

AB30

WOMENS TOILET

CB30

CORRIDOR

CB33

CORRIDOR

C1

CORRIDOR

AB03

WOMEN'S

LOCKER RM

A8B

ELEC A8

ELECTRICAL

AB02

VOLUNTARY

SERVICE

STORAGE

STAIR #2

STAIR #1

AB91

COMM CLOSET

AB90

TEL CLOSET

PATIENT TOILET

AB09B

TREATMENT 4

AB09C

TREATMENT 3

PLUMBING DEMOLITION KEYNOTES??

1. REMOVE EXISTING SANITARY PIPING AND ACCESSORIES AS INDICATED.

PREPARE FOR NEW CONNECTIONS. CONTRACTOR SHALL NOT CREATE DEAD

LEGS AND SHALL REMOVE EXISTING DEAD LEGS.

PLUMBING DEMOLITION NOTES

1. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND/OR

REGULATORY AGENCIES, CODES AND REGULATIONS FOR NEW WORK.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WORK

WITH OTHER TRADES AND WITH THE CONSTRUCTION MANAGER.

3. VERIFY ALL CONDITIONS IN FIELD BEFORE START OF CONSTRUCTION. NOTIFY

ARCHITECT/ENGINEER OF DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL

FIELD CONDITIONS.

4. COORDINATE ALL WORK WITH APPROPRIATE TRADES.

5. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR EQUIPMENT WITH

OWNER'S REPRESENTATIVE, MINIMIZE INTERRUPTION OF EXISTING SERVICES.

VERIFY ALL SYSTEMS BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS

WILL NOT LOOSE SERVICE. AREAS SUCH AS THE SECOND FLOOR KITCHEN ARE

CRITICAL TO THE FACILITIES OPERATION.

6. COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC. WITH

ARCHITECTURAL TRADES. PROVIDE TEMPORARY WATER TIGHT SEAL FOR ALL

EXTERIOR WALL AND ROOF PENETRATION AS NECESSARY.

7. COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES BEFORE

CUTTING.

8. HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED WITH

APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.

9. NO ITEMS TO BE ABANDONED IN PLACE.

10. ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING OPEN SYSTEMS

TO BE PATCHED, CAPPED AND SEALED TO PROVIDE A FINISHED SYSTEM.

11. DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO REMAIN OPEN, CAP

AND PROTECT TO AVOID CONTAMINATION TO AND FROM THE SURROUNDING

AREAS.

12. ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED AND RETURNED

TO OPERATION BY END OF SHIFT, NO SYSTEMS ALLOWED TO BE LEFT OPEN

WHEN NOT BEING SUPERVISED BY CONTRACTOR RESPONSIBLE FOR THAT WORK

TRADE.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PD001

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

BASEMENT PLUMBING

DEMOLITION PLAN

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT PLUMBING DEMOLITION PLAN

EX.1 1/4"DHWR

EX.1 1/4"DHW

EX.2"DCW

UP/DN

UP

EX.1 1/2"DCW DN

EX.O2

EX.VAC

EX.MA

EX.3/4"O2

EX.3/4"VAC

EX.3/4"MA

EX.MED GAS

ZONE VALVE BOX

TO REMAIN

EX.1"DHWR

EX.1"DHW

EX.2"DCW

UP/DN

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.3 /4

"D H

W R

UPEX.3"SAN

EX.2"V

RISER

EX.3/4"

EX.3/4"

EX.3/4"

MA

VAC

O2

EX.2"V

EX.4"SAN

RISER

E X

.1

/4 "V

EX.4"SAN

EX.2"V

RISER

EX.SS TO

REMAIN

E X

.V

E X

.3 /4

"V A

C

E X

.3 /4

EX.2"V

EX.4"SAN

RISER

E X

.1

/2 "V

EX.3/4"

VAC

4'

7'

3.9

E X

.3 /4

"D H

W R

E X

.1 "D

H W

E X

.1 "D

C W

EX.3/4"DHWR

EX.3/4"DHW

EX.3/4"DCW

/4

"D C

W

/4

"D H

W

EX.3/4"DCW

EX.3/4"DHW

EX.3/4"DHWR

RISER

EX.4"SAN

EX.1 1/2"V

UP

RISER

UP

EX.1 1/2"V

EX.4"SAN

E X

.3 /4

"D C

W

E X

.1

/4 "V

EX.5"SAN

EX.2"V

RISER

RISER

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.3 /4

"D H

W R

A130

NURSE

A129

COPY RM

A127

EXAM

A128

VOICE EXAM

A124

ENT/AUDIO

PREP

A146E

EXAM

A112

GROUP

THERAPY A114

EAR MOLD

FAB/HEARING

AID REPAIR

A110

HEARING

AID FIT

COCHLEAR

IMPLANT

A106

AUDIO EXAM

A104

CONTROL

RM

A100

AUDIO EXAM

A102

CONTROL

RM

C1-102

CORRIDOR

A101

AUDIO EXAM

A103

CONTROL

RM

A107

AUDIOLOGIST

A105

CONTROL

RM

A109

HEARING

AID FIT

A109A

STORAGE

A115

ENT

TREATEMENT

A117

ENT EXAM

C1-102A

CORRIDOR

A133

STAIR

A113

ELEC

PLUMBING DEMOLITION NOTES

1. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND/OR

REGULATORY AGENCIES, CODES AND REGULATIONS FOR NEW WORK.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WORK

WITH OTHER TRADES AND WITH THE CONSTRUCTION MANAGER.

3. VERIFY ALL CONDITIONS IN FIELD BEFORE START OF CONSTRUCTION. NOTIFY

ARCHITECT/ENGINEER OF DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL

FIELD CONDITIONS.

4. COORDINATE ALL WORK WITH APPROPRIATE TRADES.

5. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR EQUIPMENT WITH

OWNER'S REPRESENTATIVE, MINIMIZE INTERRUPTION OF EXISTING SERVICES.

VERIFY ALL SYSTEMS BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS

WILL NOT LOOSE SERVICE. AREAS SUCH AS THE SECOND FLOOR KITCHEN ARE

CRITICAL TO THE FACILITIES OPERATION.

6. COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC. WITH

ARCHITECTURAL TRADES. PROVIDE TEMPORARY WATER TIGHT SEAL FOR ALL

EXTERIOR WALL AND ROOF PENETRATION AS NECESSARY.

7. COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES BEFORE

CUTTING.

8. HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED WITH

APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.

9. NO ITEMS TO BE ABANDONED IN PLACE.

10. ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING OPEN SYSTEMS

TO BE PATCHED, CAPPED AND SEALED TO PROVIDE A FINISHED SYSTEM.

11. DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO REMAIN OPEN, CAP

AND PROTECT TO AVOID CONTAMINATION TO AND FROM THE SURROUNDING

AREAS.

12. ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED AND RETURNED

TO OPERATION BY END OF SHIFT, NO SYSTEMS ALLOWED TO BE LEFT OPEN

WHEN NOT BEING SUPERVISED BY CONTRACTOR RESPONSIBLE FOR THAT WORK

TRADE.

PLUMBING DEMOLITION KEYNOTES??

1. REMOVE EXISTING LAVATORY OR SINK, ASSOCIATED PIPING AND

ACCESSORIES. REMOVE EXISTING DOMESTIC WATER, SANITARY AND VENT

PIPING AS INDICATED. CONTRACTOR SHALL NOT CREATE DEAD LEGS AND

SHALL REMOVE EXISTING DEAD LEGS.

2. REMOVE EXISTING MEDICAL GAS PIPING AND ALL ASSOCIATED ACCESSORIES

AS INDICATED.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PD101A

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

FIRST FLOOR PLUMBING

DEMOLITION PLAN - AREA A

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A

EX.1 1/4"DHWR

EX.1 1/4"DHW

EX.2"DCW

UP/DN

UP

EX.1 1/2"DCW DN

EX.O2

EX.VAC

EX.MA

EX.3/4"O2

EX.3/4"VAC

EX.3/4"MA

E X

.1 "D

C W

E X

.1 "D

H W

E X

.3 /4

"D H

W R

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.3 /4

"D H

W R

EX.2"V

UP

EX.4"SANEX.4"SAN

EX.2"V

UP

EX.4"

REMOVE

SAN

DN

EX.4"

REMOVE

SAN

DN

E X

.4 "S

A N

E X

.4

UP

EX.3/4"DCW

EX.3"SAN

EX.2"V

RISER

E X

.1

/4 "V

EX.4"SAN

EX.2"V

RISER

EX.SS TO

REMAIN

E X

.V

E X

.3 /4

"V A

C

E X

.3 /4

EX.2"V

EX.4"SAN

RISER

E X

.1

/2 "V

EX.3/4"

VAC

E X

.1

/4 "V

E X

.3 /4

E X

.3 /4

E X

.3 /4

E X

.1

/2

D H

W

REMOVE EX.

DHW PIPING

AS INDICATED

REUSE EX. WALL-HUNG

LAVATORY BOWL AND

FAUCET IN NEW WORK

PHASE. REFER TO ROOM A114

PROCEDURE ON SHEET P101A

4'

3.9

1'

2'

3'

E X

.3 /4

"D H

W R

E X

.1 "D

H W

E X

.1 "D

C W

EX.3/4"DCW

REUSE EX. WALL-HUNG

LAVATORY BOWL AND

FAUCET IN NEW WORK

PHASE. REFER TO ROOM A124

SOILED ON SHEET P101A

A138

CHIEF

AUDIO/SPEECH

PATH

A136

AUDIOLOGIST

A139

CHIEF ENT

A137

AUDIOLOGIST

A135

AUDIO CLIN

FELLOWS

A133

AUDIO

TECHS

A132

ENT NURSE

PRACTITIONER

A130

NURSE

A131

HEALTH

TECHNICIAN

A129

COPY RM

A134

AUDIOLOGIST

A127

EXAM

A128

VOICE EXAM

A124

ENT/AUDIO

PREP

A146E

EXAM

C

-1

C O

R R

ID

O

R

A146D

OFFICE

A146C

OFFICE

A146B

HEARING

AID REPAIR

A114

EAR MOLD

FAB/HEARING

AID REPAIR

C1-102A

CORRIDOR

PLUMBING DEMOLITION NOTES

1. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND/OR

REGULATORY AGENCIES, CODES AND REGULATIONS FOR NEW WORK.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WORK

WITH OTHER TRADES AND WITH THE CONSTRUCTION MANAGER.

3. VERIFY ALL CONDITIONS IN FIELD BEFORE START OF CONSTRUCTION. NOTIFY

ARCHITECT/ENGINEER OF DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL

FIELD CONDITIONS.

4. COORDINATE ALL WORK WITH APPROPRIATE TRADES.

5. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR EQUIPMENT WITH

OWNER'S REPRESENTATIVE, MINIMIZE INTERRUPTION OF EXISTING SERVICES.

VERIFY ALL SYSTEMS BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS

WILL NOT LOOSE SERVICE. AREAS SUCH AS THE SECOND FLOOR KITCHEN ARE

CRITICAL TO THE FACILITIES OPERATION.

6. COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC. WITH

ARCHITECTURAL TRADES. PROVIDE TEMPORARY WATER TIGHT SEAL FOR ALL

EXTERIOR WALL AND ROOF PENETRATION AS NECESSARY.

7. COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES BEFORE

CUTTING.

8. HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED WITH

APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.

9. NO ITEMS TO BE ABANDONED IN PLACE.

10. ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING OPEN SYSTEMS

TO BE PATCHED, CAPPED AND SEALED TO PROVIDE A FINISHED SYSTEM.

11. DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO REMAIN OPEN, CAP

AND PROTECT TO AVOID CONTAMINATION TO AND FROM THE SURROUNDING

AREAS.

12. ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED AND RETURNED

TO OPERATION BY END OF SHIFT, NO SYSTEMS ALLOWED TO BE LEFT OPEN

WHEN NOT BEING SUPERVISED BY CONTRACTOR RESPONSIBLE FOR THAT WORK

TRADE.

PLUMBING DEMOLITION KEYNOTES??

1. REMOVE EXISTING LAVATORY OR SINK, ASSOCIATED PIPING AND

ACCESSORIES. REMOVE EXISTING DOMESTIC WATER, SANITARY AND VENT

PIPING AS INDICATED. CONTRACTOR SHALL NOT CREATE DEAD LEGS AND

SHALL REMOVE EXISTING DEAD LEGS.

2. REMOVE EXISTING MEDICAL GAS PIPING AND ALL ASSOCIATED ACCESSORIES

AS INDICATED.

3. REMOVE EXISTING ELECTRIC WATER COOLER. PREPARE PIPING FOR NEW

CONNECTION.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PD101B

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

FIRST FLOOR PLUMBING

DEMOLITION PLAN - AREA B

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA B

1 1

EX.1 1/4"DHWR

EX.1 1/4"DHW

EX.2"DCW

UP/DN

UP

EX.1 1/2"DCW DN

EX.O2

EX.VAC

EX.MA

EX.3/4"O2

EX.3/4"VAC

EX.3/4"MA

EX.MED GAS

ZONE VALVE BOX

TO REMAIN

EX.1"DHWR

EX.1"DHW

EX.2"DCW

UP/DN

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.3 /4

"D H

W R

UP

EX.3/4"DCW

EX.3/4"DHW

EX.3/4"DHWR

EX.3"SAN

EX.2"V

RISER

EX.3/4"

EX.3/4"

EX.3/4"

MA

VAC

O2

EX.2"V

EX.4"SAN

RISER

E X

.1

/4 "V

EX.4"SAN

EX.2"V

RISER

EX.SS TO

REMAIN

E X

.V

E X

.3 /4

"V A

C

E X

.3 /4

EX.2"V

EX.4"SAN

RISER

E X

.1

/2 "V

EX.3/4"

VAC

EX.1 1/4"V

E X

.1

/2 "V

REUSE EX. WALL-HUNG

LAVATORY BOWL AND

FAUCET IN NEW WORK

PHASE. REFER TO ROOM A114

PROCEDURE ON SHEET P101A

4'

7'

3.9

E X

.3 /4

"D H

W R

E X

.1 "D

H W

E X

.1 "D

C W

EX.3/4"DHWR

EX.3/4"DHW

EX.3/4"DCW

/4

"D C

W

/4

"D H

W

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.3 /4

"D H

W R

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.1

/4 "V

REUSE EX. WALL-HUNG

LAVATORY BOWL AND

FAUCET IN NEW WORK

PHASE. REFER TO ROOM A124

SOILED ON SHEET P101A

A129

COPY RM

A127

EXAM

A128

VOICE EXAM

A124

ENT/AUDIO

PREP

A146E

EXAM

A146D

OFFICE

A146C

OFFICE

A146B

HEARING

AID REPAIR

A114

EAR MOLD

FAB/HEARING

AID REPAIR

A115

ENT

TREATEMENT

A117

ENT EXAM

A119

ENT EXAM

A121

ENT EXAM

A123

ENT NURSE

PRACTIT.

C1-102A

CORRIDOR

A133

STAIR

A113

ELEC

PLUMBING DEMOLITION NOTES

1. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND/OR

REGULATORY AGENCIES, CODES AND REGULATIONS FOR NEW WORK.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WORK

WITH OTHER TRADES AND WITH THE CONSTRUCTION MANAGER.

3. VERIFY ALL CONDITIONS IN FIELD BEFORE START OF CONSTRUCTION. NOTIFY

ARCHITECT/ENGINEER OF DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL

FIELD CONDITIONS.

4. COORDINATE ALL WORK WITH APPROPRIATE TRADES.

5. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES OR EQUIPMENT WITH

OWNER'S REPRESENTATIVE, MINIMIZE INTERRUPTION OF EXISTING SERVICES.

VERIFY ALL SYSTEMS BEFORE STARTING DEMOLITION TO ASSURE OTHER AREAS

WILL NOT LOOSE SERVICE. AREAS SUCH AS THE SECOND FLOOR KITCHEN ARE

CRITICAL TO THE FACILITIES OPERATION.

6. COORDINATE FLOOR, WALL, AND ROOF PENETRATIONS ETC. WITH

ARCHITECTURAL TRADES. PROVIDE TEMPORARY WATER TIGHT SEAL FOR ALL

EXTERIOR WALL AND ROOF PENETRATION AS NECESSARY.

7. COORDINATE ALL FLOOR CUTTING WITH STRUCTURAL TRADES BEFORE

CUTTING.

8. HOLES AND PENETRATIONS IN RATED WALLS SHALL BE PATCHED WITH

APPROPRIATE FIRESTOP MATERIALS FOR RATING REQUIRED.

9. NO ITEMS TO BE ABANDONED IN PLACE.

10. ALL ITEMS TO BE DEMOLISHED TO BE REMOVED AND REMAINING OPEN SYSTEMS

TO BE PATCHED, CAPPED AND SEALED TO PROVIDE A FINISHED SYSTEM.

11. DEMOLISHED PLUMBING LINE SHALL NOT BE ALLOWED TO REMAIN OPEN, CAP

AND PROTECT TO AVOID CONTAMINATION TO AND FROM THE SURROUNDING

AREAS.

12. ALL SYSTEMS OPENED DURING DEMOLITION SHALL BE CLOSED AND RETURNED

TO OPERATION BY END OF SHIFT, NO SYSTEMS ALLOWED TO BE LEFT OPEN

WHEN NOT BEING SUPERVISED BY CONTRACTOR RESPONSIBLE FOR THAT WORK

TRADE.

PLUMBING DEMOLITION KEYNOTES??

1. REMOVE EXISTING LAVATORY OR SINK, ASSOCIATED PIPING AND

ACCESSORIES. REMOVE EXISTING DOMESTIC WATER, SANITARY AND VENT

PIPING AS INDICATED. CONTRACTOR SHALL NOT CREATE DEAD LEGS AND

SHALL REMOVE EXISTING DEAD LEGS.

2. REMOVE EXISTING MEDICAL GAS PIPING AND ALL ASSOCIATED ACCESSORIES

AS INDICATED.

3. REMOVE EXISTING ELECTRIC WATER COOLER. PREPARE PIPING FOR NEW

CONNECTION.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PD101C

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

FIRST FLOOR PLUMBING

DEMOLITION PLAN - AREA C

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA C

I F'' G'F'E' H'

A' C'B' D'

J

1'

2'

3'

4'

7'

3.9

UP TO

NEW SINK

UP TO

NEW SINK

2"SAN

UP TO

NEW SINK

UP TO

NEW SINK

UP TO

NEW SINK

UP TO

NEW SINK

UP TO

NEW SINK

E X

.2 "S

A N

E X

.2 "S

A N

E X

.2 "S

A N

EX.4"SAN

E X

.2 "S

A N

EX.2"SAN

2"SAN

2"SAN

UP TO

NEW SINK

2"SAN

EX.4"SAN

2"SAN

UP TO

NEW SINK

EX.2"SAN

2"SAN

EX.4"SAN

RISER

EX.4"SAN

DN

RISER

EX.4"SAN

EX.4"SAN

RISER

EX.3"SAN

UP TO

NEW SINK

EX.3"SAN

UP TO EX.

MOP SINK

EX.3"SAN

EX.3"SAN

RISER

2"SAN

UP TO

NEW SINK

EX.4"SAN

RISER

UP TO

NEW SINK

EX.4"SAN

RISER

2"SAN

UP TO

NEW SINK

2"SAN

RISER

EX.4"SAN

3/4"C

UP TO

FCU

3/4"C 3/4"C

UP TO

FCU

EX.2"SAN

UP TO

NEW SINK

3/4"C

UP TO

FCU

"S

A N

UP TO

NEW SINK

2"SAN

3/4"C

"C

EX.2"SAN

UP TO

NEW SINK

EX.V

EX.SAN

EX.2"SAN

UP TO SINK

EX.2"SAN

UP TO SINK

2" SAN

UP TO

NEW SINK

EX.2"V

EX.4"SAN

RISER

UP/DN

EX.2"V

EX.4"SAN

RISER

UP/DN

3/4"C

UP

CO

3/4"C

UP

/4

"C

CO

CO

1"C CO

RISER

CO

CO

4"SAN

UP

CO

1"C

CO

CO

EX.4"SAN

RISER

EX.4"SAN

RISER

2 2

C1

CORRIDOR

AB01

EVS STORAGE

AB08

CLEAN UTILITY

AB09A

TREATMENT 5

AB09B

TREATMENT 4

AB09E

TREATMENT 1

AB10

DECON/PROCESSING

AB10A

DECON

CB29

CORRIDOR

CB28

CORRIDOR

AB09N

NOUR

AB09K

MEDS

CB36

PASSAGE

AB09L

MENTOR

AB09I

CHARTING

AB09H

MD WORKAB09F

WORK

AB09

NURSE

AB09M

NURSE

TRAUMA 1

TRAUMA 2

AB09Z

OBSERVATION 1

AB09Y

OBSERVATION 2

AB09X

OBSERVATION 3

AB09W

OBSERVATION 4

AB15

ANTE RM

AB15A

ISO. RM

AB15A

TOILET RM

AB18

ER NURSE

EDUCATIONAB09V

EXAM 4

AB09U

EXAM 3

AB09T

EXAM 2

AB09S

EXAM 1

AB09R

TRIAGE

AB20

CHIEF

AB22

DIRECTOR

AB30

WOMENS TOILET

CB30

CORRIDOR

CB33

CORRIDOR

C1

CORRIDOR

AB03

WOMEN'S

LOCKER RM

A8B

ELEC

A8

ELECTRICAL

AB02

VOLUNTARY

SERVICE

STORAGE

STAIR #2

STAIR #1

AB91

COMM CLOSET

AB90

TEL CLOSET

PATIENT TOILET

AB09C

TREATMENT 3

AB09C

TREATMENT 3

"S

A N

2"SAN

PLUMBING GENERAL NOTES

1. COORDINATE ROUTING OF PIPING WITH ALL OTHER TRADES PRIOR TO

INSTALLATION TO AVOID CONFLICTS.

2. COMPLY WITH ALL APPLICABLE LOCAL AND STATE CODES.

3. PROVIDE ROUGH-INS AND FINAL CONNECTIONS TO FIXTURES AND EQUIPMENT

4. PROVIDE TRAP SEAL PROTECTION ON ALL FLOOR DRAINS, FLOOR SINKS AND

HUB DRAINS SUBJECT TO EVAPORATION. INSTALL PER MANUFACTURERS

RECOMMENDATIONS.

5. PROVIDE ASSE 1070 MIXING VALVE AT ALL BARRIER FREE SINKS AND ALL HAND

WASHING SINKS TO PROVIDE TEMPERED WATER TO HOT WATER SIDE OF

FAUCET.

6. PIPING INSTALLED IN THE WAY OF ACCESS OR MAINTENANCE TO EQUIPMENT

SHALL BE RELOCATED AT THE EXPENSE OF THE INSTALLING CONTRACTOR.

7. ALL PLUMBING WORK SHALL MEET MICHIGAN PLUMBING CODE 2015

REQUIREMENTS AS A MINIMUM UNLESS EXCEEDED BY PROJECT CONSTRUCTION

DOCUMENTS.

8. PROVIDE SHUTOFF VALVES AT ALL FIXTURES AND EQUIPMENT.

9. COORDINATE LOCATIONS OF FLOOR DRAINS AND FLOOR SINKS WITH LOCATIONS

OF EQUIPMENT AND EQUIPMENT HOUSEKEEPING PADS. COORDINATE WITH

SLOPING OF FLOOR SO THAT RIM OF DRAIN IS FLUSH WITH FINISH FLOOR.

10. COORDINATE HANGING AND SUPPORT OF PIPING WITH STRUCTURAL.

11. PROVIDE PIPE SLEEVES WHERE PIPES PENETRATE WALLS.

12. BALL VALVES SHALL BE 316 STAINLESS STEEL FOR DOMESTIC HOT WATER

SYSTEM AND BRASS FOR DOMESTIC COLD WATER SYSTEM.

13. INSTALL PIPING IN AN ORGANIZED MANNER. DO NOT ROUTE IN FRONT OF

WINDOWS.

14. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH NEW

SHEET METAL. HVAC PIPING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT

ALL REQUIRED OFFSETS AND FITTINGS ARE INDICATED, BUT SHALL BE

PROVIDED. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR

CLEARANCES.

15. PROVIDE WATER HAMMER ARRESTORS PER PDI WH-201 AND UP STREAM OF ALL

AUTOMATIC AND FAST CLOSING VALVES INCLUDING BUT NOT LIMITED TO

SOLENOID VALVES.

16. COORDINATION AND LAYOUT DRAWINGS SHALL BE SUBMITTED TO THE AE FOR

APPROVAL PRIOR TO INSTALL.

PLUMBING KEYNOTES?

1. ROUTE CONDENSATE DRAIN LINE TO SANITARY HUB OUTLET. DISCHARGE

WITH AIR GAP.

2. COORDINATE ACCESS TO BASEMENT AREAS WITH COR. WORK SHALL BE

PERFORMED DURING PREMIUM/AFTER HOURS IN OCCUPIED SPACES.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PL001

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

BASEMENT PLUMBING PLAN UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT PLUMBING PLAN

A101

SHARED NP OFFICE

A103

SHARED MD OFFICE

A105

SHARED LPN WORK

ROOM

A100

CVT STATION

A102

ENT CHIEF OFFICE

A104

EXIST. CONTROL ROOM

A106

EXIST. AUDIO EXAM

ROOM

C1-102

CORRIDOR

C1-102A

CORRIDOR

A110

PROCEDURE

A112

ENT PROCEDURE

A114

PROCEDURE

A109

SHARED STAFF OFFICE

A133

STAIR

C1-102A

CORRIDOR

A113

ELEC

A115

ENT TREATMENT

A117

ENT EXAM

A116

HAC

A124

SOILED

A128

SPEECH/PATH EXAM

A140

CORRIDOR

EX.1 1/4"DHWR

EX.1 1/4"DHW

EX.2"DCW

UP/DN

UP

EX.1 1/2"DCW DN

EX.2"DCW

EX.1"DHW

EX.1"DHWR

UP/DN

P-501

P-501

E X

.1

/2 "V

EX.V UP

EX.SAN RISER

3/4"DHW

1 1/4"V

3/4"DCW

3/4"DCW

1 1/2"V

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.3 /4

"D H

W R

EX.3/4"DCW

EX.1 1/4"V

EX.V

EX.SAN

3/ 4"

D C

W

3/ 4"

D H

W

E X

.3 /4

"D H

W R

E X

.3 /4

"D H

W E

X .3

/4 "D

C W

1W-FCU-1 1W-FCU-1 1W-FCU-2

1W-FCU-1 1W-FCU-1

1W-FCU-1

A146F

ALCOVE

EX.FCU

1W-FCU-2

EX.FCU

2 2

2 2 2

1W-FCU-2 1W-FCU-2

EX.FCU

1/

4" V

EX.SS TO

REMAIN

REUSE EX. WALL-HUNG LAVATORY

AND FAUCET (REFER TO SHEET

PD101C). INSTALL NEW P-TRAP,

MIXING VALVE, PIPING AND

ACCESSORIES

A111

EXIST. CONFERENCE

ROOM

4'

7'

3.9

P-501

P-501

EX.2"V EX.4"SAN

RISER

1/

2" V

3/4"DHW

3/4"DCW

CONNECT TO EXISTING

CONDENSATE DRAIN

EX.2"V

EX.5"SAN

EX.4"SAN

RISER

RISER

EX.2"V

1"DHW

1 1/2"V

1"DCW

EX.1 1/4"V

EX.3/4"DCW

EX.1 1/4"V

EX.3/4"DCW

EX.3/4"DHW

EX.3/4"DCW

EX.1 1/4"V

3/4"DCW

1 1/4"V

3/4"DHW

EX.FCU1W-FCU-2

CONNECT TO EXISTING

CONDENSATE DRAIN

P-601

EX.4"SAN

RISER

EX.4"SAN

RISER

EX.3/4"DHWR

3/4"DHWR

3/ 4"

D H

W

EX.3/4"DHWR

P-501

3/4"DHW

3/4"DHW

3/ 4"

D H

W R

PLUMBING GENERAL NOTES

1. COORDINATE ROUTING OF PIPING WITH ALL OTHER TRADES PRIOR TO

INSTALLATION TO AVOID CONFLICTS.

2. COMPLY WITH ALL APPLICABLE LOCAL AND STATE CODES.

3. PROVIDE ROUGH-INS AND FINAL CONNECTIONS TO FIXTURES AND EQUIPMENT

4. PROVIDE TRAP SEAL PROTECTION ON ALL FLOOR DRAINS, FLOOR SINKS AND

HUB DRAINS SUBJECT TO EVAPORATION. INSTALL PER MANUFACTURERS

RECOMMENDATIONS.

5. PROVIDE ASSE 1070 MIXING VALVE AT ALL BARRIER FREE SINKS AND ALL HAND

WASHING SINKS TO PROVIDE TEMPERED WATER TO HOT WATER SIDE OF

FAUCET.

6. PIPING INSTALLED IN THE WAY OF ACCESS OR MAINTENANCE TO EQUIPMENT

SHALL BE RELOCATED AT THE EXPENSE OF THE INSTALLING CONTRACTOR.

7. ALL PLUMBING WORK SHALL MEET MICHIGAN PLUMBING CODE 2015

REQUIREMENTS AS A MINIMUM UNLESS EXCEEDED BY PROJECT CONSTRUCTION

DOCUMENTS.

8. PROVIDE SHUTOFF VALVES AT ALL FIXTURES AND EQUIPMENT.

9. COORDINATE LOCATIONS OF FLOOR DRAINS AND FLOOR SINKS WITH LOCATIONS

OF EQUIPMENT AND EQUIPMENT HOUSEKEEPING PADS. COORDINATE WITH

SLOPING OF FLOOR SO THAT RIM OF DRAIN IS FLUSH WITH FINISH FLOOR.

10. COORDINATE HANGING AND SUPPORT OF PIPING WITH STRUCTURAL.

11. PROVIDE PIPE SLEEVES WHERE PIPES PENETRATE WALLS.

12. BALL VALVES SHALL BE 316 STAINLESS STEEL FOR DOMESTIC HOT WATER

SYSTEM AND BRASS FOR DOMESTIC COLD WATER SYSTEM.

13. INSTALL PIPING IN AN ORGANIZED MANNER. DO NOT ROUTE IN FRONT OF

WINDOWS.

14. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH NEW

SHEET METAL. HVAC PIPING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT

ALL REQUIRED OFFSETS AND FITTINGS ARE INDICATED, BUT SHALL BE

PROVIDED. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR

CLEARANCES.

15. PROVIDE WATER HAMMER ARRESTORS PER PDI WH-201 AND UP STREAM OF ALL

AUTOMATIC AND FAST CLOSING VALVES INCLUDING BUT NOT LIMITED TO

SOLENOID VALVES.

16. COORDINATION AND LAYOUT DRAWINGS SHALL BE SUBMITTED TO THE AE FOR

APPROVAL PRIOR TO INSTALL.

PLUMBING KEYNOTES?

1. ROUTE 3/4" DOMESTIC HOT WATER DOWN WALL TO SINK. TAP CONTINUATION

OF 3/4" DOMESTIC HOT WATER AS CLOSE AS POSSIBLE TO SINK STOP. ROUTE

CONTINUATION OF HOT WATER PIPING BACK UP WALL AND TO NEXT FIXTURE

DOWNSTREAM. REFER TO DETAIL ON PL000.

2. ROUTE CONDENSATE PIPING DOWN TO FLOOR BELOW.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PL101A

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

FIRST FLOOR PLUMBING

PLAN - AREA A

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLUMBING PLAN - AREA A

A114

PROCEDURE

A116

HAC

A124

SOILED

A128

SPEECH/PATH EXAM

A140

CORRIDOR

A130

SPEECH/PATH OFFICE

A132

STAFF OFFICE

A134

STAFF OFFICE

A136

SPUTUM

A138

EVAL. HOME/DME

A139

PFT BODY BOX 1

A137

PFT BODY BOX 2

A131

PFT BODY BOX 3

A129

SPEECH/PATH EXAM

A127

SPEECH/PATH EXAM

A146E

SOILED SCOPE

A146D

INTAKE / VITALS

A146B

CLEAN

C1-102A

CORRIDOR

EX.1 1/4"DHWR

EX.1 1/4"DHW

EX.2"DCW

UP/DN

UP

EX.1 1/2"DCW DN

A135

PORTABLE GAS

STORAGE

EX.3/4"DCW

P-501

P-501

P-501

P-501

P-501

E X

.1

/4 "V

3/4"DCW

1 1/4"V

E X

.1

/4 "V

E X

.1

/2 "V

EX.V UP

EX.V UP

EX.SAN

EX.SAN RISER

RISER

3/4"DCW

1 1/2"V

E X

.3 /4

"D H

W R

E X

.3 /4

"D H

W E

X .3

/4 "D

C W

E X

.3 /4

"D H

W R

E X

.1 "D

C W

E X

.3 /4

"D H

W R

E X

.3 /4

"D H

W E

X .3

/4 "D

C W

A146F

ALCOVE

EX.FCU

1W-FCU-2 1W-FCU-2

EX.SS TO

REMAIN

P-501

3/4"DHW

3/4"DCW

1 1/4"V

P-502

P-502

EX.FCU

EX.FCU

EX.FCU

EX.FCU

EX.FCU

EX.FCU

EX.FCU EX.FCU

1W-FCU-3

1W-FCU-3

1W-FCU-3

REUSE EX. WALL-HUNG LAVATORY

AND FAUCET (REFER TO SHEET

PD101C). INSTALL NEW P-TRAP,

MIXING VALVE, PIPING AND

ACCESSORIES

4'

3.9

1'

2'

3'

P-501

DN

4"SAN

E X

.4 "S

A N

3/ 4"

C

3/4"C

3/4"C

3/ 4"

C

DN

3/4"C DN

3/ 4"

D C

W

EX.4"SAN

RISER

EX.2"V

3/4"DHWR

2"V

3/4"DCW

3/4"DHW

3/4"DCW

P-501

EX.2"V EX.4"SAN

RISER

1/

2" V

3/4"DHW

3/4"DCW

CONNECT TO EXISTING

CONDENSATE DRAIN

EX.3"SAN

EX.2"V

EX.4"SAN

RISER

EX.2"V

1"DHW

1 1/2"V

1"DCW

EX.1 1/4"V

EX.3/4"DCW

EX.1 1/4"V

EX.3/4"DCW

EX.3/4"DHW

3/4"DHW

3/4"DHWR

EX.3/4"DCW

P-601

3/4"DHWR

3/ 4"

D H

W

EX.3/4"DHWR

EX. FCU RELOCATED.

RECONNECT TO EX.

CONDENSATE DRAIN

EX. FCU

3/ 4"

D H

W

4" S

A N

1"DHW

3/4"DHWR

3/4"DHWR

3/4"DHWR

3/ 4"

D H

W

3/4"DHW

P-501

P-501

PLUMBING GENERAL NOTES

1. COORDINATE ROUTING OF PIPING WITH ALL OTHER TRADES PRIOR TO

INSTALLATION TO AVOID CONFLICTS.

2. COMPLY WITH ALL APPLICABLE LOCAL AND STATE CODES.

3. PROVIDE ROUGH-INS AND FINAL CONNECTIONS TO FIXTURES AND EQUIPMENT

4. PROVIDE TRAP SEAL PROTECTION ON ALL FLOOR DRAINS, FLOOR SINKS AND

HUB DRAINS SUBJECT TO EVAPORATION. INSTALL PER MANUFACTURERS

RECOMMENDATIONS.

5. PROVIDE ASSE 1070 MIXING VALVE AT ALL BARRIER FREE SINKS AND ALL HAND

WASHING SINKS TO PROVIDE TEMPERED WATER TO HOT WATER SIDE OF

FAUCET.

6. PIPING INSTALLED IN THE WAY OF ACCESS OR MAINTENANCE TO EQUIPMENT

SHALL BE RELOCATED AT THE EXPENSE OF THE INSTALLING CONTRACTOR.

7. ALL PLUMBING WORK SHALL MEET MICHIGAN PLUMBING CODE 2015

REQUIREMENTS AS A MINIMUM UNLESS EXCEEDED BY PROJECT CONSTRUCTION

DOCUMENTS.

8. PROVIDE SHUTOFF VALVES AT ALL FIXTURES AND EQUIPMENT.

9. COORDINATE LOCATIONS OF FLOOR DRAINS AND FLOOR SINKS WITH LOCATIONS

OF EQUIPMENT AND EQUIPMENT HOUSEKEEPING PADS. COORDINATE WITH

SLOPING OF FLOOR SO THAT RIM OF DRAIN IS FLUSH WITH FINISH FLOOR.

10. COORDINATE HANGING AND SUPPORT OF PIPING WITH STRUCTURAL.

11. PROVIDE PIPE SLEEVES WHERE PIPES PENETRATE WALLS.

12. BALL VALVES SHALL BE 316 STAINLESS STEEL FOR DOMESTIC HOT WATER

SYSTEM AND BRASS FOR DOMESTIC COLD WATER SYSTEM.

13. INSTALL PIPING IN AN ORGANIZED MANNER. DO NOT ROUTE IN FRONT OF

WINDOWS.

14. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH NEW

SHEET METAL. HVAC PIPING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT

ALL REQUIRED OFFSETS AND FITTINGS ARE INDICATED, BUT SHALL BE

PROVIDED. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR

CLEARANCES.

15. PROVIDE WATER HAMMER ARRESTORS PER PDI WH-201 AND UP STREAM OF ALL

AUTOMATIC AND FAST CLOSING VALVES INCLUDING BUT NOT LIMITED TO

SOLENOID VALVES.

16. COORDINATION AND LAYOUT DRAWINGS SHALL BE SUBMITTED TO THE AE FOR

APPROVAL PRIOR TO INSTALL.

PLUMBING KEYNOTES?

1. ROUTE 1/2" DOMESTIC HOT WATER DOWN WALL TO SINK. TAP CONTINUATION

OF 1/2" DOMESTIC HOT WATER AS CLOSE AS POSSIBLE TO SINK STOP. ROUTE

CONTINUATION OF HOT WATER PIPING BACK UP WALL AND TO NEXT FIXTURE

DOWNSTREAM. REFER TO DETAIL ON PL000.

2. ROUTE CONDENSATE PIPING DOWN TO FLOOR BELOW.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PL101B

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

FIRST FLOOR PLUMBING

PLAN - AREA B

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLUMBING PLAN - AREA B

A112

ENT PROCEDURE

A114

PROCEDURE

A133

STAIR

C1-102A

CORRIDOR

A113

ELEC

A115

ENT TREATMENT

A117

ENT EXAM

A116

HAC

A124

SOILED

A128

SPEECH/PATH EXAM

A140

CORRIDOR

A129

SPEECH/PATH EXAM

A127

SPEECH/PATH EXAM

A146E

SOILED SCOPE

A146D

INTAKE / VITALS

A146B

CLEAN

C1-102A

CORRIDOR

A119

ENT EXAM

A121

ENT EXAM

A123

ENT EXAM

EX.1 1/4"DHWR

EX.1 1/4"DHW

EX.2"DCW

UP/DN

UP

EX.1 1/2"DCW DN

EX.3/4"DCW

EX.3/4"DHW

EX.3/4"DHWR

EX.2"DCW

EX.1"DHW

EX.1"DHWR

UP/DN

P-501 P-501 P-501 P-501

P-501

E X

.1

/2 "V

EX.V UP

EX.SAN RISER

3/4"DCW

1 1/2"V

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

E X

.3 /4

"D H

W R

EX.V

EX.SAN

3/ 4"

D C

W

3/ 4"

D H

W

E X

.3 /4

"D H

W R

E X

.3 /4

"D H

W E

X .3

/4 "D

C W

A146F

ALCOVE

EX.FCU

1W-FCU-2 1W-FCU-2

1/

4" V

EX.SS TO

REMAIN

P-502

P-502

EX.FCU

EX.FCU EX.FCU

REUSE EX. WALL-HUNG LAVATORY

AND FAUCET (REFER TO SHEET

PD101C). INSTALL NEW P-TRAP,

MIXING VALVE, PIPING AND

ACCESSORIES

4'

7'

3.9

P-501

3/ 4"

D C

W

EX.4"SAN

RISER

EX.2"V

3/4"DHWR

2"V

3/4"DCW

3/4"DHW

3/4"DCW

P-501

EX.2"V EX.4"SAN

RISER

1/

2" V

3/4"DHW

3/4"DCW

CONNECT TO EXISTING

CONDENSATE DRAIN

E X

.1

/2 "V

E X

.3 /4

"D C

W E

X .3

/4 "D

H W

EX.1 1/4"V

E X

.3 /4

"D C

W

E X

.3 /4

"D H

W

EX.1 1/2"V

EX.3"SAN

RISER

EX.3"SAN

EX.2"V

EX.4"SAN

RISER

EX.2"V

1"DHW

1 1/2"V

1"DCW

EX.1 1/4"V

EX.3/4"DCW

EX.1 1/4"V

EX.3/4"DCW

EX.3/4"DHW

EX.FCU1W-FCU-2

CONNECT TO EXISTING

CONDENSATE DRAIN

P-601

3/4"DHWR

3/

4" D

H W

EX.3/4"DHWR

3/4"DHWR

3/ 4"

D H

W

3/4"DHW

3/4"DHW

3/ 4"

D H

W R

P-501

EX.FCU EX.FCU

3/4"DHW

3/ 4"

D H

W R

3/4"DHW

3/ 4"

D H

W R

PLUMBING GENERAL NOTES

1. COORDINATE ROUTING OF PIPING WITH ALL OTHER TRADES PRIOR TO

INSTALLATION TO AVOID CONFLICTS.

2. COMPLY WITH ALL APPLICABLE LOCAL AND STATE CODES.

3. PROVIDE ROUGH-INS AND FINAL CONNECTIONS TO FIXTURES AND EQUIPMENT

4. PROVIDE TRAP SEAL PROTECTION ON ALL FLOOR DRAINS, FLOOR SINKS AND

HUB DRAINS SUBJECT TO EVAPORATION. INSTALL PER MANUFACTURERS

RECOMMENDATIONS.

5. PROVIDE ASSE 1070 MIXING VALVE AT ALL BARRIER FREE SINKS AND ALL HAND

WASHING SINKS TO PROVIDE TEMPERED WATER TO HOT WATER SIDE OF

FAUCET.

6. PIPING INSTALLED IN THE WAY OF ACCESS OR MAINTENANCE TO EQUIPMENT

SHALL BE RELOCATED AT THE EXPENSE OF THE INSTALLING CONTRACTOR.

7. ALL PLUMBING WORK SHALL MEET MICHIGAN PLUMBING CODE 2015

REQUIREMENTS AS A MINIMUM UNLESS EXCEEDED BY PROJECT CONSTRUCTION

DOCUMENTS.

8. PROVIDE SHUTOFF VALVES AT ALL FIXTURES AND EQUIPMENT.

9. COORDINATE LOCATIONS OF FLOOR DRAINS AND FLOOR SINKS WITH LOCATIONS

OF EQUIPMENT AND EQUIPMENT HOUSEKEEPING PADS. COORDINATE WITH

SLOPING OF FLOOR SO THAT RIM OF DRAIN IS FLUSH WITH FINISH FLOOR.

10. COORDINATE HANGING AND SUPPORT OF PIPING WITH STRUCTURAL.

11. PROVIDE PIPE SLEEVES WHERE PIPES PENETRATE WALLS.

12. BALL VALVES SHALL BE 316 STAINLESS STEEL FOR DOMESTIC HOT WATER

SYSTEM AND BRASS FOR DOMESTIC COLD WATER SYSTEM.

13. INSTALL PIPING IN AN ORGANIZED MANNER. DO NOT ROUTE IN FRONT OF

WINDOWS.

14. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH NEW

SHEET METAL. HVAC PIPING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT

ALL REQUIRED OFFSETS AND FITTINGS ARE INDICATED, BUT SHALL BE

PROVIDED. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR

CLEARANCES.

15. PROVIDE WATER HAMMER ARRESTORS PER PDI WH-201 AND UP STREAM OF ALL

AUTOMATIC AND FAST CLOSING VALVES INCLUDING BUT NOT LIMITED TO

SOLENOID VALVES.

16. COORDINATION AND LAYOUT DRAWINGS SHALL BE SUBMITTED TO THE AE FOR

APPROVAL PRIOR TO INSTALL.

PLUMBING KEYNOTES?

1. ROUTE 1/2" DOMESTIC HOT WATER DOWN WALL TO SINK. TAP CONTINUATION

OF 1/2" DOMESTIC HOT WATER AS CLOSE AS POSSIBLE TO SINK STOP. ROUTE

CONTINUATION OF HOT WATER PIPING BACK UP WALL AND TO NEXT FIXTURE

DOWNSTREAM. REFER TO DETAIL ON PL000.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PL101C

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

FIRST FLOOR PLUMBING

PLAN - AREA C

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR PLUMBING PLAN - AREA C

UP

EX.O2

EX.VAC

EX.MA

EX.3/4"O2

EX.3/4"VAC

EX.3/4"MA

A101

SHARED NP OFFICE

A103

SHARED MD OFFICE

A105

SHARED LPN WORK

ROOM

A100

CVT STATION

A102

ENT CHIEF OFFICE

A104

EXIST. CONTROL ROOM

A106

EXIST. AUDIO EXAM

ROOM

A110

PROCEDURE

A112

ENT PROCEDURE

A114

PROCEDURE

A109

SHARED STAFF OFFICE

C1-102A

CORRIDOR

C1-102A

CORRIDOR

A115

ENT TREATMENT

A117

ENT EXAM

A133

STAIR

A113

ELEC

A124

SOILED

A128

SPEECH/PATH EXAM

A140

CORRIDOR

A127

SPEECH/PATH EXAM

/4

"O

E X

.3 /4

"V A

C

/4

"M A

EX.ZONE

VALVE BOX

TO REMAIN

A111

EXIST. CONFERENCE

ROOM

4'

7'

3.9

EX.3/4"O2

EX.3/4"VAC

EX.3/4"MA

1/2"O2

1/2"O2

3/4"MA

3/4"VAC

3/4"O2

A146F

ALCOVE

3/4"VAC

1/2"O2

1/2"MA

1/2"MA

1/2"O2

3/4"VAC3/4"VAC

1/2"O2

1/2"MA 1/2"MA

1/2"O2

3/4"VAC

MEDICAL GAS GENERAL NOTES

1. COORDINATE ROUTING OF PIPING WITH ALL OTHER TRADES PRIOR TO

INSTALLATION TO AVOID CONFLICTS.

2. COMPLY WITH ALL APPLICABLE LOCAL AND STATE CODES.

3. PROVIDE ROUGH-INS AND FINAL CONNECTIONS TO FIXTURES AND EQUIPMENT.

4. PIPING INSTALLED IN THE WAY OF ACCESS OR MAINTENANCE TO EQUIPMENT

SHALL BE RELOCATED AT THE EXPENSE OF THE INSTALLING CONTRACTOR.

5. COORDINATE HANGING AND SUPPORT OF PIPING WITH STRUCTURAL.

6. PROVIDE PIPE SLEEVES WHERE PIPES PENETRATE WALLS.

7. INSTALL PIPING IN AN ORGANIZED MANNER. DO NOT ROUTE IN FRONT OF

WINDOWS.

8. THE INSTALLATION OF ALL PIPING SHALL BE CLOSELY COORDINATED WITH NEW

SHEET METAL. HVAC PIPING, ELECTRICAL, AND STRUCTURAL CONDITIONS. NOT

ALL REQUIRED OFFSETS AND FITTINGS ARE INDICATED, BUT SHALL BE

PROVIDED. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR

CLEARANCES.

9. COORDINATION AND LAYOUT DRAWINGS SHALL BE SUBMITTED TO THE AE FOR

APPROVAL PRIOR TO INSTALL.

10. ALL MEDICAL GAS WORK SHALL MEET THE VA TIL GUIDELINES AND BE

COMPLETED BY ASSE G010 CERTIFIED INSTALLER.

11. ALL LINES MUST BE TESTED AND CERTIFIED BEFORE USE.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'A'

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs

PL111A

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 MMK JDK

FIRST FLOOR MEDICAL GAS

PLA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .