36C25020B0046 0003.pdf

PDF 197 KB Posted

Attached to
Z1DA--Upgrade 1W Building 506-20-201
Solicitation number
36C25020B0046
Issued by

About this file

This document package includes an amendment to a federal solicitation along with supporting documents. The solicitation is for construction services at the Ann Arbor VA Medical Center to renovate approximately 4,200 square feet of vacated audiology and ENT clinic space on the first floor of Building 1W. The scope of work includes structural, architectural, electrical, mechanical, fire protection and interior design work to result in complete and usable clinic spaces, adhering to all building codes, VA standards, and energy efficiency requirements. The period of performance is 180 calendar days from notice to proceed, with work anticipated to commence in fall 2020 at the medical center campus. The amendment extends the response deadline for requests for information to August 10th and changes the bid opening to August 11th at 11:00 AM Eastern time. It also provides responses to industry questions on topics such as acceptable window and insulation alternatives, required qualifications for quality control positions, and specifications for concrete and casework.

View the file

Other files

File Type Posted
36C25020B0046 0004.pdf PDF
RFI 005 - Response.docx DOCX document
RFI 1 work hours - response.docx DOCX document
RFI 004 - response.docx DOCX document
S02RFIFORM50620201.docx DOCX document
WAGE DET MI20200100 08072020 REV3.pdf PDF
RFI 3 project phasing - response.docx DOCX document
RFI 2 New FCU with Existing Reheat Coil - Response.pdf PDF
IMS RFI 02 responseS.docx DOCX document
IMS-RFI 01 response.docx DOCX document
Contractor Addresses -.doc DOC document
RFI 001 (response).docx DOCX document
_506-20-201 VA Ann Arbor - 1W Upgrades - Addendum 01.pdf PDF
Sign In Sheet 506-20-201.pdf PDF
033000.pdf PDF
RFI Form 2 8-3-2020 - response.docx DOCX document
S04 - Pre-Bid Site Visit Agenda 506-20-201.pdf PDF
RFI 1. - Response.pdf PDF
36C25020B0046 0002.pdf PDF
36C25020B0046 0001.pdf PDF
Contractor EMR Certification Form 2020.docx DOCX document
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part2.pdf PDF
506-20-201_PROJECT MANUAL_VOL1_032019 SPECS.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part3.pdf PDF
506-20-201_PROJECT MANUAL_VOL2_032019 SPECS.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part1.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part4.pdf PDF
WAGE DET MI20200100 07032020 REV2.pdf PDF
S02 - RFI Form 506-20-201.docx DOCX document
36C25020B0046_1.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25020B0046 0003 / PROJECT 506-20-201 VAMC ANN ARBOR

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

0003 08-05-2020

506-20-4-586-0053

506-20-201

Y 36C250

Department of Veterans Affairs

Network Contracting Office 10

24 Frank Lloyd Wright Drive

Lobby M Suite 2200

Ann Arbor MI 48105

Y

Department of Veterans Affair

Network Contracting Office 10

24 Frank Lloyd Wright Drive

Lobby M Suite 2200

Ann Arbor MI 48105

To all Offerors/Bidders

36C25020B0046

07-13-2020

X

X X

506-3600162-586-854200-3220 23NRNR000

This amendment provides responses to an RFIs, Pre-bid Agenda & Sign-in, Addendum 01, and other important information.

RFI Due date is extended to Monday, August 10th, 2020.

New Bid Open time is Thursday, August 20th at 11:00am EST.

SEE CONTINUATION SHEET

Kyle A Lipper

Contracting Officer

VA-VHA-2020-48FD443A

CONTINUATION PAGE

***IMPORTANT BIDDER INFORMATION***

RFI Due date is extended to Monday, August 10th, 2020.

New Bid Open time is Thursday, August 20th at 11:00am EST.

RFI Responses:

1. Question: Spec section 085113 indicates basis of design as EFCO. We would prefer using a substitute. It does not say anything about substitutes. Please advise.

Answer: Approved equals will be evaluated if the product matches the quality and performance of the Basis of Design product.

2. Question: The EFCO series 510-I is a projected window. On sheet A1600 the window type looks like a fixed and not a projected.

Answer: If it is a projected window, is it a project “in” or a project “Out” – window projection direction to be verified in field.

3. Question: The finish for the window indicates to refer to section 090600 Schedule for

Finishes. When we go to that section it does not indicate a specific finish or color for these windows. Please advise finish

Answer: alum. window finish to match existing, including frame and glass type; contractor to verify in field.

4. Question: Ref specification 01 35 26, 1.7 D and spec 01 45 00, 3.4 A & B- Based on specifications a SSHO and QC manager are required to be onsite full time and need to be separate individuals. The CQC manager can have dual roles as the site superintendent but is required to be a graduate of engineering, architecture or construction management. My interpretation of the spec appears 2 full time managers are required at minimum and 3 full time managers are required if the superintendent does not have a degree in engineering, architecture or construction management.

Please confirm my interpretation is correct as the spec appears overwritten for project of this size.

Answer: this can be a single person under the Prime Contractor who serves as site supervisor, safety officer, and quality control. This person should be competent and have the required 30 hrs. OSHA training

5. Question: Ref drawing AI600- detail 4 and 6 call out foam in place insulation. No further details appear on wall type drawing GI003, 1st floor plan AE101 and no specification provided. Will foam in place insulation be required, and if so, will further details and specifications be provided?

Answer: foam in place insulation only at exterior wall conditions and window in-fill location.

6. Question: Ref drawing AE001- will specifications be provided for concrete floor infills?

Answer: See attached spec section 033000.

7. Question: Ref drawing AI401B- Is wall blocking be required for equipment and bumper guard/handrail in wall cavities where walls and finishes are to remain?

Answer: where existing handrails are already installed, blocking will not be required. Where we call for new handrail to be installed, blocking will need to be installed. Provide fire treated blocking where new blocking is installed.

8. Question: There are no cabinet manufactures listed. Will a division 6400 specification for millwork be provided?

Answer: Refer to issued specification 12 32 00 – Manufactured Wood Casework

END OF AMENDMENT 0003

See attached document: _506-20-201 VA Ann Arbor - 1W Upgrades - Addendum 01.

See attached document: IMS-RFI #01 (response).

See attached document: 033000.

See attached document: RFI 001 (response).

See attached document: Contractor Addresses -.

See attached document: Pre-Bid Site Visit Agenda 506-20-201.

See attached document: Sign In Sheet 506-20-201.

File details come from the government source that posted it. Updated .