RFI 001 (response).docx
DOCX document 16 KB Posted
- Attached to
- Z1DA--Upgrade 1W Building 506-20-201
- Solicitation number
- 36C25020B0046
About this file
This document contains a request for information (RFI) regarding the upgrade of Building 1West at the Department of Veterans Affairs Ann Arbor VAMC located at 2215 Fuller Road in Ann Arbor, Michigan. The contractor RB Construction submitted the RFI to Contract Specialist Madeline Lucena-Pulst with questions about the project specifications. The questions included confirming that approved equals to the basis of design window product EFCO series 510-I would be considered, verifying if the specified window is fixed or projected, and requesting the finish specification for the windows. The contracting officer's responses approved equals if matching quality and performance, indicated the projection direction needs verification in the field, and stated the aluminum window finish should match existing with frame, glass, and finish to be confirmed on site. The RFI number is 001 and responses were requested by August 3, 2020.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
36C25020B0046
| PROJECT NUMBER: |
| 506-20-201 |
| PROJECT TITLE: |
| Upgrade Building 1West |
| PROJECT LOCATION: |
| Department of Veterans Affairs |
Ann Arbor VAMC 2215 Fuller Road Ann Arbor, MI 48105
| SUBMITTED BY: |
| Asim Lodhi – RB Construction |
| City/State: |
| Mt. Clemens, Michigan |
| PHONE NO.: |
| 586-443-8144 |
TO: Contract Specialist Madeline Lucena-Pulst (email: madeline.lucena-pulst@va.gov)
| RFI NO.: 001 |
| DATE: 7/30/20 |
| REFERENCE: |
REPLY NEEDED BY: 8/3/20
INFORMATION NEEDED:
1. Spec section 085113 indicates basis of design as EFCO. We would prefer using a substitute. It does not say anything about substitutes. Please advise. – Approved equals will be evaluated if the product matches the quality and performance of the Basis of Design product.
1. The EFCO series 510-I is a projected window. On sheet A1600 the window type looks like a fixed and not a projected. If it is a projected window, is it a project “in” or a project “Out” – window projection direction to be verified in field.
1. The finish for the window indicates to refer to section 090600 Schedule for Finishes. When we go to that section it does not indicate a specific finish or color for these windows. Please advise finish – alum. window finish to match existing, including frame and glass type; contractor to verify in field.
REPLY: