S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part2.pdf

PDF 10 MB Posted

Attached to
Z1DA--Upgrade 1W Building 506-20-201
Solicitation number
36C25020B0046
Issued by

About this file

This solicitation is for a renovation project located at the Ann Arbor VA Medical Center in Ann Arbor, Michigan. The contractor shall provide all labor, materials, equipment, supervision, documentation and other related services to complete a renovation of approximately 4,200 square feet of the existing Audiology and ENT clinics on the first floor of Building 1W. The scope of work includes structural, architectural, electrical, mechanical, fire protection and interior design work to result in complete and usable spaces, following all applicable building codes, VA standards, and sustainable design principles. The period of performance is 180 calendar days from receipt of the notice to proceed, with work expected to commence in fall 2020. The project location is the first floor of Building 1W at the Ann Arbor VA Medical Center.

View the file

Other files

File Type Posted
36C25020B0046 0004.pdf PDF
RFI 005 - Response.docx DOCX document
RFI 1 work hours - response.docx DOCX document
RFI 004 - response.docx DOCX document
S02RFIFORM50620201.docx DOCX document
WAGE DET MI20200100 08072020 REV3.pdf PDF
RFI 3 project phasing - response.docx DOCX document
RFI 2 New FCU with Existing Reheat Coil - Response.pdf PDF
IMS RFI 02 responseS.docx DOCX document
IMS-RFI 01 response.docx DOCX document
36C25020B0046 0003.pdf PDF
Contractor Addresses -.doc DOC document
RFI 001 (response).docx DOCX document
_506-20-201 VA Ann Arbor - 1W Upgrades - Addendum 01.pdf PDF
Sign In Sheet 506-20-201.pdf PDF
033000.pdf PDF
RFI Form 2 8-3-2020 - response.docx DOCX document
S04 - Pre-Bid Site Visit Agenda 506-20-201.pdf PDF
RFI 1. - Response.pdf PDF
36C25020B0046 0002.pdf PDF
36C25020B0046 0001.pdf PDF
Contractor EMR Certification Form 2020.docx DOCX document
506-20-201_PROJECT MANUAL_VOL1_032019 SPECS.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part3.pdf PDF
506-20-201_PROJECT MANUAL_VOL2_032019 SPECS.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part1.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part4.pdf PDF
WAGE DET MI20200100 07032020 REV2.pdf PDF
S02 - RFI Form 506-20-201.docx DOCX document
36C25020B0046_1.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I G'F'E' H'A' C'B' D' K'J

1'

2'

3'

4'

7'

J'

3.9

C1

CORRIDOR

AB01

EVS STORAGE

AB08

CLEAN UTILITY

AB09A

TREATMENT 5

AB09B

TREATMENT 4

AB09C

TREATMENT 3

AB09D

TREATMENT 2

AB09E

TREATMENT 1

AB10

DECON/PROCESSING

AB10A

DECON

CB29

CORRIDOR

CB28

CORRIDOR

AB09N

NOUR

AB09K

MEDS

CB36

PASSAGE

AB09L

MENTOR

AB09I

CHARTING

AB09H

MD WORK

AB09F

WORK

PATIENT TOILET

AB09

NURSE

AB09M

NURSE

TRAUMA 1

TRAUMA 2

AB09Z

OBSERVATION 1

AB09Y

OBSERVATION 2

AB09X

OBSERVATION 3

AB09W

OBSERVATION 4

AB14

OBSERVATION 5

AB15

ANTE RM

AB15A

ISO. RM

AB15A

TOILET RM

AB18

ER NURSE

EDUCATIONAB09V

EXAM 4

AB09U

EXAM 3

AB09T

EXAM 2

AB09S

EXAM 1

AB09R

TRIAGE

AB20

CHIEF

AB22

DIRECTOR

AB24

MENTAL HEALTH

AB30

WOMENS TOILET

CB30

CORRIDOR

CB33

CORRIDOR

C1

CORRIDOR

AB03

WOMEN'S

LOCKER RM

A8B

ELEC

A8

ELECTRICAL

AB02

VOLUNTARY

SERVICE

STORAGE

STAIR #2

STAIR #1

AB91

COMM CLOSET

AB90

TEL CLOSET

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS

SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL

MATERIALS AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT

REFLECT WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE

CONTRACTOR IS TO NOTIFY THE ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT

VERIFYING AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW

THEY RELATE TO THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF

DUMPSTERS TO BE DETERMINED BY OWNER WITH CONTRACTORS INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED

MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY

DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY

AND DISPOSE OF IN A LEGAL MANNER. ONSITE SALE OR BURNING OF

REMOVED ITEMS IS NOT PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE

THE SAFETY OF THE PUBLIC AND/OR WORKMEN ON THE SITE TO PREVENT

ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT OR ADJACENT TO THE

PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS,

ORDINANCES, CODES AND REGULATIONS PERTAINING TO SAFETY AND THE

PREVENTION OF ACCIDENTS.

7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION,

WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR

ALL OR PART OF ITEMS WHICH ARE TO REMAIN.

8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS.

CONTRACTOR TO COORDINATE WITH OWNER.

9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT

COULD CHANGE THEIR LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION

RATIO.

10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION,

REWORK AS REQUIRED, PREPARE FOR NEW CONSTRUCTION AS REQUIRED.

BRICK OR BLOCK PATCHING SHALL BE TOOTHED-IN TO MATCH EXISTING

COURSING PATTERN.

11. WHERE WALLS & CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH

THE WALLS &/OR CEILINGS ARE TO BE REMOVED OR REROUTED. REFER TO

MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL

DEMOLITION NOT SHOWN ON THIS SHEET.

12. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED

AREAS WITH A ONE-HOUR FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST

BARRIER. TAKE CARE THAT CONSTRUCTION DUST IS NOT TRANSMITTED TO

OCCUPIED AREAS BY MECHANICAL SYSTEM.

13. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

14. WHERE WALLS OR ITEMS ATTACHED TO SPRAY APPLIED FIRE PROOFING ARE

REMOVED, THE CONTRACTOR SHALL PATCH THE FIRE RATED SYSTEM AS

REQUIRED TO MAINTAIN THE FIRE RATING OF THE SYSTEM.

15. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT

OR DAMAGED DURING DEMOLITION, BY METHODS AND WITH MATERIALS

SO AS NOT TO VOID EXISTING WARRANTIES.

16. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE

PERFORMED.

17. INTERIOR WALLS TO BE REMOVED, SHALL BE REMOVED THE ENTIRE HEIGHT

OF THE WALL UNLESS REQUIRED OTHERWISE BY NEW OPENINGS IN EXISTING

WALLS TO REMAIN.

18. STRUCTURAL DEMOLITION - SEE STRUCTURAL DRAWINGS.

19. CONTRACTOR TO SALVAGE ALL ROOM SIGNS FOR REUSE. COORDINATE

WITH OWNER NEW SIGN LOCATIONS AND DRAWING AE100 FOR NAMES

AND NUMBERS.

AREA NOT IN CONTRACT

GENERAL DEMO NOTES

REMOVE EXISTING WALL CONSTRUCTION AS SHOWN. PATCH & REPAIR

ADJACENT SURFACES TO REMAIN AS NECESSARY TO PREPARE FOR NEW

CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING DOOR(S), FRAME(S), HARDWARE, ETC. PATCH & REPAIR

ADJACENT SURFACES TO REMAIN AS NECESSARY TO PREPARE FOR NEW

CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING WINDOW SYSTEM & EXTERIOR PRE-CAST STONE SILL AS

SHOWN. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS NECESSARY

TO PREPARE FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING INTERIOR WINDOW SILL. PATCH & REPAIR ADJACENT

SURFACES TO REMAIN AS REQUIRED TO PREPARE FOR NEW CONSTRUCTION

AND/OR NEW FINISHES.

REMOVE EXISTING WALL-MOUNTED HANDRAILS, CORNER GUARDS &

BUMPER GUARDS.

REMOVE EXISTING WALL FINISHES, WALL BASE, & ALL ITEMS ATTACHED TO

THE WALLS (INCLUDING, BUT NOT LIMITED TO: SCOPE CABINETS,

MICROSCOPE, HAND SANITIZIZER, SOAP DISPENSERS, PAPER TOWEL

DISPENSERS, ETC). PATCH & REPAIR EXPOSED SURFACES TO REMAIN AS

REQUIRED FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING FLOORING & FLOOR FINISHES INCLUDING ALL

ADHESIVES, SETTING MATERIALS DOWN TO EXISTING SUBSTRATE (FLOOR

FINISHES INCLUDE, BUT NOT LIMITED TO: CARPET TILE, LVT, VCT, ETC.).

GRIND CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND

UNIFORM SURFACE FOR NEW FINISHES.

REMOVE EXISTING CEILING TILE & GRID SYSTEM. SALVAGE TILE FOR

RECYCLING UNLESS DIRECTED OTHERWISE.

REMOVE EXISTING GYP BD. CEILING & SUPPORT SYSTEM. PATCH & REPAIR

EXPOSED SURFACES TO REMAIN AS REQUIRED FOR NEW CONSTRUCTION

AND/OR NEW FINISHES.

REMOVE EXISTING CASEWORK & WALL MOUNTED EQUIPMENT. PATCH &

REPAIR EXPOSED SURFACES TO REMAIN AS REQUIRED TO RECEIVE NEW

CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING MECHANICAL, PLUMBING, & ELECTRICAL ITEMS - REFER

TO MECHANICAL, PLUMBING, & ELECTRICAL DEMOLITION PLANS FOR

FURTHER INFORMATION. PATCH & REPAIR EXPOSED SURFACES TO REMAIN

AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES.

REMOVE EXISTING AUDIO CONTROL BOOTH. PATCH & REPAIR ADJACENT

SURFACES TO RECEIVE NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING SOUND BOOTH. PATCH & REPAIR ADJACENT SURFACES

TO RECEIVE NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE AND REINSTALL EXISTING CEILING TILE & GRID AS REQUIRED FOR

REMOVAL AND INSTALLATION OF PLUMBING LINES; COORDINATE w/

PLUMBING DRAWINGS.

REMOVE AND SALVAGE EXISTING WALL HUNG SINK FOR REINSTALLATION

ON THE PROJECT. REFER TO PLUMBING DEMOLITION PLANS FOR FURTHER

INFORMATION.

ABATE AND REMOVE EXISTING LEAD WALL PAINT AROUND EXTERIOR

WINDOW SYSTEM. CONTRACTOR TO PATCH & REPAIR SURFACES TO

REMAIN AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND/OR NEW

FINISHES. DISPOSE OF MATERIALS IN ACCORDANCE TO SPECIFICATIONS.

DEMOLITION KEY NOTES

H1

1. COORDINATE ALL REMOVAL OF HAZARDOUS MATERIALS WITH DEMOLITION

PLAN.

2. REFER TO SPECIFICATION SECTION 02 83 33.13 - LEAD BASED PAINT

REMOVAL & DISPOSAL FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

3. NOT ALL HAZARDOUS MATERIALS MAY BE VISIBLE PRIOR TO DEMOLITION.

ANY HAZARDOUS MATERIALS THAT ARE DISCOVERED DURING DEMOLITION

ARE TO BE HANDLED AND REMOVED PER SPECIFICATION REQUIREMENTS.

GENERAL HAZARDOUS MATERIAL NOTES

AREA A

AREA B

AREA C

AREA D

AREA LEG END

AREA 'A'

KEY PLAN

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AD100

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB STL

BASEMENT DEMOLITION

PLAN

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT DEMOLITION PLAN

REVISIONS DATE

I G'F'E' H'A' C'B' D' K'

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4

H1 3 4H1 3 4H1 3 4H1 3 4

H1 3 4H1 3 4

H1 3 4H1 3 4 H1 3 4 H1 3 4

H1 3 4

H1 3 4 H1 3 4 H1 3 4

/2

6 7

6 7

6 7

6 7

6 7

8 11

6 7

8 11

6 7

8 11

10 11

6 7

10 11

6 7

8 10 11

6 7

8 10 11

6 7

8 10 11

6 7

8 10 11

6 7

10 116 7

10 11

6 7

10 11

6 7

10 11

6 7

8 10

10 11

6 7

10 11

6 7

10 11

6 7

10 11

6 7

10 11

6 7

10 11

6 7

10 11 6 7

10 11

6 7

8 10

1213 12 13

6 7

8 11

A138

CHIEF

AUDIO/SPEECH

PATH

A136

AUDIOLOGIST

A139

CHIEF ENT

A137

AUDIOLOGIST

A135

AUDIO CLIN

FELLOWS

A133

AUDIO

TECHS

A132

ENT NURSE

PRACTITIONER

A130

NURSE

A131

HEALTH

TECHNICIAN

A129

COPY RM

A134

AUDIOLOGIST

MECH RM

A127

EXAM

A128

VOICE EXAM

A124

ENT/AUDIO

PREP

A146E

EXAM

C

-1

C O

R R

ID

O

R

A146D

OFFICE

A146C

OFFICE

A146B

HEARING

AID REPAIR

6 7

10 11

A112

GROUP

THERAPY

A114

EAR MOLD

FAB/HEARING

AID REPAIRA110

HEARING

AID FIT

COCHLEAR

IMPLANT

A106

AUDIO EXAM

A104

CONTROL

RM

A100

AUDIO EXAM

A102

CONTROL

RM

C1-102

CORRIDOR

A101

AUDIO EXAM

A103

CONTROL

RM

A107

AUDIOLOGIST

A105

CONTROL

RM A109

HEARING

AID FIT

A109A

STORAGE

A133

STAIR

A113

ELEC.

A113A

FEC

A115

ENT

TREATEMENT

A117

ENT EXAM

A119

ENT EXAM

A121

ENT EXAM

A123

ENT NURSE

PRACTIT.

A141

STAIR #1

C1-104

CORRIDOR

A125

ELEC.

C1-102A

CORRIDOR

A116

HAC

5 6

5 6 7

5 6 7

5 6 7 8 11

NOTE:

CONTRACTOR TO REMOVE ALL EXISTING EXTERIOR

WINDOW SILLS IN THIS AREA. PATCH & REPAIR

ADJACENT SURFACES AS REQUIRED TO RECEIVE NEW

MASONRY WINDOW IN-FILL. CONTRACTOR TO

TOOTH-IN CMU AND BRICK TO PROVIDE A UNIFORM

FINISH

J

1'

2'

3'

4'

7'

J'

3.9

A111

EXIST.

CONFERENCE

ROOM

H1 3 4

3' - 4" ± 3' - 4"

2 2

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS

SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL

MATERIALS AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT

REFLECT WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE

CONTRACTOR IS TO NOTIFY THE ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT

VERIFYING AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW

THEY RELATE TO THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF

DUMPSTERS TO BE DETERMINED BY OWNER WITH CONTRACTORS INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED

MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY

DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY

AND DISPOSE OF IN A LEGAL MANNER. ONSITE SALE OR BURNING OF

REMOVED ITEMS IS NOT PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE

THE SAFETY OF THE PUBLIC AND/OR WORKMEN ON THE SITE TO PREVENT

ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT OR ADJACENT TO THE

PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS,

ORDINANCES, CODES AND REGULATIONS PERTAINING TO SAFETY AND THE

PREVENTION OF ACCIDENTS.

7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION,

WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR

ALL OR PART OF ITEMS WHICH ARE TO REMAIN.

8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS.

CONTRACTOR TO COORDINATE WITH OWNER.

9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT

COULD CHANGE THEIR LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION

RATIO.

10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION,

REWORK AS REQUIRED, PREPARE FOR NEW CONSTRUCTION AS REQUIRED.

BRICK OR BLOCK PATCHING SHALL BE TOOTHED-IN TO MATCH EXISTING

COURSING PATTERN.

11. WHERE WALLS & CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH

THE WALLS &/OR CEILINGS ARE TO BE REMOVED OR REROUTED. REFER TO

MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL

DEMOLITION NOT SHOWN ON THIS SHEET.

12. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED

AREAS WITH A ONE-HOUR FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST

BARRIER. TAKE CARE THAT CONSTRUCTION DUST IS NOT TRANSMITTED TO

OCCUPIED AREAS BY MECHANICAL SYSTEM.

13. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

14. WHERE WALLS OR ITEMS ATTACHED TO SPRAY APPLIED FIRE PROOFING ARE

REMOVED, THE CONTRACTOR SHALL PATCH THE FIRE RATED SYSTEM AS

REQUIRED TO MAINTAIN THE FIRE RATING OF THE SYSTEM.

15. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT

OR DAMAGED DURING DEMOLITION, BY METHODS AND WITH MATERIALS

SO AS NOT TO VOID EXISTING WARRANTIES.

16. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE

PERFORMED.

17. INTERIOR WALLS TO BE REMOVED, SHALL BE REMOVED THE ENTIRE HEIGHT

OF THE WALL UNLESS REQUIRED OTHERWISE BY NEW OPENINGS IN EXISTING

WALLS TO REMAIN.

18. STRUCTURAL DEMOLITION - SEE STRUCTURAL DRAWINGS.

19. CONTRACTOR TO SALVAGE ALL ROOM SIGNS FOR REUSE. COORDINATE

WITH OWNER NEW SIGN LOCATIONS AND DRAWING AE100 FOR NAMES

AND NUMBERS.

AREA NOT IN CONTRACT

GENERAL DEMO NOTES

REMOVE EXISTING WALL CONSTRUCTION AS SHOWN. PATCH & REPAIR

ADJACENT SURFACES TO REMAIN AS NECESSARY TO PREPARE FOR NEW

CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING DOOR(S), FRAME(S), HARDWARE, ETC. PATCH & REPAIR

ADJACENT SURFACES TO REMAIN AS NECESSARY TO PREPARE FOR NEW

CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING WINDOW SYSTEM & EXTERIOR PRE-CAST STONE SILL AS

SHOWN. PATCH & REPAIR ADJACENT SURFACES TO REMAIN AS NECESSARY

TO PREPARE FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING INTERIOR WINDOW SILL. PATCH & REPAIR ADJACENT

SURFACES TO REMAIN AS REQUIRED TO PREPARE FOR NEW CONSTRUCTION

AND/OR NEW FINISHES.

REMOVE EXISTING WALL-MOUNTED HANDRAILS, CORNER GUARDS &

BUMPER GUARDS.

REMOVE EXISTING WALL FINISHES, WALL BASE, & ALL ITEMS ATTACHED TO

THE WALLS (INCLUDING, BUT NOT LIMITED TO: SCOPE CABINETS,

MICROSCOPE, HAND SANITIZIZER, SOAP DISPENSERS, PAPER TOWEL

DISPENSERS, ETC). PATCH & REPAIR EXPOSED SURFACES TO REMAIN AS

REQUIRED FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING FLOORING & FLOOR FINISHES INCLUDING ALL

ADHESIVES, SETTING MATERIALS DOWN TO EXISTING SUBSTRATE (FLOOR

FINISHES INCLUDE, BUT NOT LIMITED TO: CARPET TILE, LVT, VCT, ETC.).

GRIND CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND

UNIFORM SURFACE FOR NEW FINISHES.

REMOVE EXISTING CEILING TILE & GRID SYSTEM. SALVAGE TILE FOR

RECYCLING UNLESS DIRECTED OTHERWISE.

REMOVE EXISTING GYP BD. CEILING & SUPPORT SYSTEM. PATCH & REPAIR

EXPOSED SURFACES TO REMAIN AS REQUIRED FOR NEW CONSTRUCTION

AND/OR NEW FINISHES.

REMOVE EXISTING CASEWORK & WALL MOUNTED EQUIPMENT. PATCH &

REPAIR EXPOSED SURFACES TO REMAIN AS REQUIRED TO RECEIVE NEW

CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING MECHANICAL, PLUMBING, & ELECTRICAL ITEMS - REFER

TO MECHANICAL, PLUMBING, & ELECTRICAL DEMOLITION PLANS FOR

FURTHER INFORMATION. PATCH & REPAIR EXPOSED SURFACES TO REMAIN

AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES.

REMOVE EXISTING AUDIO CONTROL BOOTH. PATCH & REPAIR ADJACENT

SURFACES TO RECEIVE NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING SOUND BOOTH. PATCH & REPAIR ADJACENT SURFACES

TO RECEIVE NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE AND REINSTALL EXISTING CEILING TILE & GRID AS REQUIRED FOR

REMOVAL AND INSTALLATION OF PLUMBING LINES; COORDINATE w/

PLUMBING DRAWINGS.

REMOVE AND SALVAGE EXISTING WALL HUNG SINK FOR REINSTALLATION

ON THE PROJECT. REFER TO PLUMBING DEMOLITION PLANS FOR FURTHER

INFORMATION.

ABATE AND REMOVE EXISTING LEAD WALL PAINT AROUND EXTERIOR

WINDOW SYSTEM. CONTRACTOR TO PATCH & REPAIR SURFACES TO

REMAIN AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND/OR NEW

FINISHES. DISPOSE OF MATERIALS IN ACCORDANCE TO SPECIFICATIONS.

DEMOLITION KEY NOTES

H1

1. COORDINATE ALL REMOVAL OF HAZARDOUS MATERIALS WITH DEMOLITION

PLAN.

2. REFER TO SPECIFICATION SECTION 02 83 33.13 - LEAD BASED PAINT

REMOVAL & DISPOSAL FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

3. NOT ALL HAZARDOUS MATERIALS MAY BE VISIBLE PRIOR TO DEMOLITION.

ANY HAZARDOUS MATERIALS THAT ARE DISCOVERED DURING DEMOLITION

ARE TO BE HANDLED AND REMOVED PER SPECIFICATION REQUIREMENTS.

GENERAL HAZARDOUS MATERIAL NOTES

AREA A

AREA B

AREA C

AREA D

AREA LEG END

AREA 'A'

KEY PLAN

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AD101

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB EMP

FIRST FLOOR DEMOLITION

PLAN

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

I G'F'E' H'A' C'B' D' K'J

1'

2'

3'

4'

7'

3.9

A138

CHIEF

AUDIO/SPEECH

PATH

A136

AUDIOLOGIST

A139

CHIEF ENT

A137

AUDIOLOGIST

A135

AUDIO CLIN

FELLOWS

A133

AUDIO

TECHS

A132

ENT NURSE

PRACTITIONER

A130

NURSE

A131

HEALTH

TECHNICIAN

A129

COPY RM

A134

AUDIOLOGIST

MECH RM

A127

EXAM

A128

VOICE EXAM

A124

ENT/AUDIO

PREP

A146E

EXAM

C

-1

C O

R R

ID

O

R

A146D

OFFICE A146C

OFFICE

A146B

HEARING

AID REPAIRA112

GROUP

THERAPY

A114

EAR MOLD

FAB/HEARING

AID REPAIR

A110

HEARING

AID FIT

COCHLEAR

IMPLANT

A106

AUDIO EXAM

A104

CONTROL

RM

C1-102

CORRIDOR

A109

HEARING

AID FIT

A109A

STORAGE

A133

STAIR

A113

ELEC.

A113A

FEC

A115

ENT

TREATEMENT

A117

ENT EXAM

A119

ENT EXAM

A121

ENT EXAM

A123

ENT NURSE

PRACTIT.

A141

STAIR #1

C1-104

CORRIDOR

A125

ELEC.

C1-102A

CORRIDOR

A116

HAC

A111

EXIST.

CONFERENCE

ROOM

EXISTING WALL REMOVAL GAP AT FLOOR SLAB.

PLAN SHOWS APPROX. LOCATIONS OF NEW

FLOOR INFILL W. DIFFERENCE OF +/- 1/2 INCH

EITHER SIDE OF REMOVED WALL; REFER TO

DETAIL 01/AD111

AE001

AE001

ALIGN

ALIGN

NEW FLOOR FINISH; REFER

TO FINISH SCHEDULE

HYDRAULIC CEMENT SELF-

LEVELING UNDERLAYMENT;

SEE SPECIFICATIONS

EXIST. FLOOR SLAB

DIFFERENCE OF +/- 1/2 INCH AT

EITHER SIDE OF WALL. PROVIDE

FEATHERED TRANSITION NOT TO

EXCEED 1/4 INCH

/2

EXISTING ADJACENT

RAISED FLOORING; V.I.F.

NEW FLOOR FINISH; REFER

TO FINISH KEY & SCHEDULE

ORIGINAL CONCRETE SLAB

LIGHTWEIGHT DEEP FILL

CONCRETE SYSTEM

CONTINUOUS PT 2x WOOD

BLOCKING

NEW WALL CONSTRUCTION;

REFER TO FLOOR PLANS

SLAB INFILL PLAN LEGEND

FLOOR SLAB INFILL AT LOCATIONS OF

EXISTING WALL REMOVAL. REFER TO

DETAIL 01/AD110A

DEEP FILL FLOOR SLAB INFILL AT REMOVAL

OF EXISTING RAISED FLOORING SYSTEM.

REFER TO DETAIL 02/AD110A

AREA NOT IN CONTRACT

AREA A

AREA B

AREA C

AREA D

AREA LEG END

AREA 'A'

KEY PLAN

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AE001

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB STL

FIRST FLOOR SLAB IN-FILL

PLAN

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR SLAB IN-FILL PLAN

SCALE: 3" = 1'-0"AE001

SLAB INFILL DETAIL01

SCALE: 3" = 1'-0"AE001

SLAB INFILL DETAIL02

I G'F'E' H'A' C'B' D'

A100

CVT STATION

A101

SHARED NP

OFFICE

A102

ENT CHIEF

OFFICE

A103

SHARED MD

OFFICE

A104

EXIST.

CONTROL

ROOM

A106

EXIST. AUDIO

EXAM ROOM

A105

SHARED LPN

WORK ROOM A109

SHARED STAFF

OFFICE

A110

PROCEDURE

A112

ENT

PROCEDURE A114

PROCEDURE

A115

ENT

TREATMENT

A116

HAC

A117

ENT EXAM

A119

ENT EXAM

A121

ENT EXAM

A123

ENT EXAM

A124

SOILED

A127

SPEECH/PATH

EXAM

A128

SPEECH/PATH

EXAM

A129

SPEECH/PATH

EXAM

A130

SPEECH/PATH

OFFICE

A131

PFT BODY BOX

A132

STAFF OFFICE

131 SF

A137

PFT BODY BOX

A134

STAFF OFFICE

A136

SPUTUM

147 SF

A139

PFT BODY BOX

A138

EVAL.

HOME/DME

C1-102A

CORRIDOR

A146B

CLEAN

A146D

INTAKE /

VITALS

A146E

SOILED SCOPE

C1-102

CORRIDOR

A135

PORTABLE GAS

STORAGE

A140

CORRIDOR

MECH RM

A133

STAIR

A113

ELEC.

A113A

FEC

A141

STAIR #1

C1-104

CORRIDOR

A125

ELEC.

A116

HAC

A131

A137

A139

A101 A103

A100 A102

C1-102

A105

A135

A

A

A

A

A

A

A A

A

A A A A

A

NOTE:

CONTRACTOR TO PROVIDE TOOTHED-IN CMU &

BRICK IN-FILL AS SHOWN TO PROVIDE A UNIFORM

FINISH IN THIS AREA

6' - 9"

ALIGN

ALIGN

8' - 11" ±

10' - 1 1/2" ± 10' - 0 1/2"

10' - 4" 10' - 4" 17' - 3" ±

/2

/2

22' - 3"

/2

ALIGN

W5

W5

W5

W3

W3

W3W3

W2

W3

W3

W2

W3

W3

W3

W3

W3

W3 W3

W3

W3

W3

W4

W4

W4

W4

W4

W4

W4 W4 W4 W4

A146E

A136

A138

J

1'

2'

3'

4'

7'

J'

3.9

NOTE:

CONTRACTOR TO ENSURE

EXTERIOR WALL IS RATED 1-HR;

WALL WILL BECOME AN INTERIOR

WALL IN A FUTURE VA PROJECT

A111

EXIST.

CONFERENCE

ROOM

A

W4 W4 W4 W4

A146F

ALCOVE

AI500

AI500

AI500

AI500

AI500

AI500

A146A

RECEPTION

9"9"

9" 9"

NOTE:

CONTRACTOR TO ENSURE

EXTERIOR WALL IS RATED 1-HR;

WALL WILL BECOME AN INTERIOR

WALL IN A FUTURE VA PROJECT

A146B-1 A146B-2

AI500

AI500

FLOOR PLAN LEGEND

EXISTING NON-FIRE RATED WALL

NEW NON-FIRE RATED WALL

EXISTING DOOR

NEW DOOR

1-HOUR FIRE RATED PARTITION - UL DES U419

AREA NOT IN CONTRACT

GENERAL NOTES

1. ALL WALLS ARE TYPE (W1) UNLESS NOTED OTHERWISE.

2. REFER TO SHEET GI003 FOR WALL TYPES.

3. ALL FURRING ON CONCRETE COLUMNS TO BE (W3) UNLESS

NOTED OTHERWISE.

4. SEE ENLARGED PLANS ON AE400A, AE400B, AE400C FOR

EQUIPMENT LAYOUT AND INTERIOR ELEVATIONS.

5. ALL COUNTERTOPS AT OUTSIDE CORNERS TO BE 2" RADIUS.

6. PROVIDE BLOCKING IN WALLS FOR OWNER PROVIDED

EQUIPMENT AS SHOWN ON INTERIOR ELEVATIONS AND

ENLARGED FLOOR PLANS.

7. REFER TO SHEET AE600 FOR WINDOW AND DOOR TYPES.

AREA A

AREA B

AREA C

AREA D

AREA LEG END

AREA 'A'

KEY PLAN

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AE101

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB EMP

FIRST FLOOR PLAN UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/8" = 1'-0"

PROPOSED FIRST FLOOR PLAN

A130

SPEECH/PATH

OFFICE

A128

SPEECH/PATH

EXAM

A132

STAFF OFFICE

A134

STAFF OFFICE

A136

SPUTUM

A138

EVAL.

HOME/DME

A139

PFT BODY BOX

A137

PFT BODY BOX

A131

PFT BODY BOX

A135

PORTABLE GAS

STORAGE

A129

SPEECH/PATH

EXAM

A127

SPEECH/PATH

EXAM

A140

CORRIDOR

A114

PROCEDURE

A112

ENT

PROCEDURE

A110

PROCEDURE

A124

SOILED

A146E

SOILED SCOPE

A146D

INTAKE /

VITALS

A146B

CLEAN

C1-102A

CORRIDOR

A119

ENT EXAM

A121

ENT EXAM

A123

ENT EXAM

A115

ENT

TREATMENT

A117

ENT EXAM

A109

SHARED STAFF

OFFICE

A105

SHARED LPN

WORK ROOM

A100

CVT STATION

A102

ENT CHIEF

OFFICE

A104

EXIST.

CONTROL

ROOM

A106

EXIST. AUDIO

EXAM ROOM

A103

SHARED MD

OFFICE

A101

SHARED NP

OFFICE

C1-102

CORRIDOR

A133

STAIR

A113

ELEC

8' - 0"

8' - 0" 8' -

0"

8' - 0"

8' - 0" 8' -

0"

8' - 0"

8' - 0"

8' - 0"

EXIST.

8' - 0"

8' - 0"

7' - 10"

S S

S

S

S

S S S

AP

AP

AP AP

AI520

EXIST.

8' - 0"

EXIST.

EXIST.

A111

EXIST.

CONFERENCE

ROOM

A116

HAC

7' - 10"

5' - 0"

24' - 0 1/2" ±

AI520

P7

P7

P7

8' - 0"

8' - 0"

8' - 0"

7' - 0"

8' - 0"

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

EXIST.

EXIST. EXIST.

EXIST.

EXIST.

REFLECTED CEILING PLAN LEGEND

AREAS TO BE SUSPENDED ACOUSTIC CEILING

AREAS OF EXISTING SUSPENDED ACOUSTIC TILE TO BE

REWORKED DUE TO NEW CONSTRUCTION.

AREAS TO FINISHED GYPSUM BOARD CEILING

SUPPLY DIFFUSER - SEE MECHANICAL DRAWINGS

EXHAUST DIFFUSER - SEE MECHANICAL DRAWINGS

CEILING MOUNTED EXIT SIGN - SEE ELECTRICAL DRAWINGS

RECESSED LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS

CEILING HEIGHT ABOVE FINISHED FLOOR

8'-0"

GENERAL NOTES - CEILING PLAN

1. CEILINGS TO BE CENTERED IN ROOM.

2. ELECTRICAL AND MECHANICAL FIXTURES AND DUCTWORK ARE SHOWN FOR REFERENCE

ONLY. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS.

3. REFER TO FINISH SCHEDULE FOR CEILING FINISHES.

4. ALL EQUIPMENT TO BE HOUSED IN NEW CEILING GRID SYSTEM MUST BE FASTENED TO

HARD CEILING OR FLOOR DECK ABOVE WITH DEDICATED TIES AT EACH CORNER OF

EQUIPMENT.

5. ALL NEW EQUIPMENT TO BE SUSPENDED WITH DEDICATED TIES. NO EQUIPMENT IS TO BE

MOUNTED OR FASTENED TO CEILING GRID TIES, WITH THE EXCEPTION OF CURTAIN TRACK.

RETURN AIR DIFFUSER - SEE MECHANICAL DRAWINGS

AREA NOT IN CONTRACT

CEILING MOUNTED CURTAIN TRACK

S

AP

CEILING MOUNTED WIRELESS ACCESS POINT (GFGI). (2) CAT 6A (1) CAT

5E - REFER TO ET100A, ET100B, AND ET100C FOR ADDITIONAL

INFORMATION

PUBLIC ADDRESS SPEAKER - REFER TO ET100A, ET100B, AND ET100C FOR

ADDITIONAL INFORMATION

IP CAMERA (GFGI) - REFER TO ET100A, ET100B, AND ET100C FOR

ADDITIONAL INFORMATION

LIGHT FIXTURES - SEE ELECTRICAL DRAWINGS

AREA A

AREA B

AREA C

AREA D

AREA LEG END

AREA 'A'

KEY PLAN

AREA 'C'

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AC121

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB EMP

FIRST FLOOR REFLECTED

CEILING PLAN

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR REFLECTED CEILING PLAN

ABBREVIATIONS

A - ARCHITECT

C - CONTRACTOR

G - GOVERNMENT

X - ITEM TO BE INCLUDED WITH ASSOCIATED EQUIPMENT

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AI400

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 Checker Author

EQUIPMENT SCHEDULE UPGRADE 1 WEST -

BLDG 1W

EQUIPMENT SCHEDULE

A B

B R

E V

EQUIPMENT DESCRIPTION S

P

E C

IF

IE

D B

Y

S U

P P

LI

E D

B Y

IN

S

TA

LL

E D

B Y

E

LE

C

D A

TA

C A

B

LE

T V

B

LO

C K

IN

G

W A

TE

R

D R

A

IN

BASIS OF DESIGN -

MANUFACTURER

BASIS OF DESIGN -

MODEL REMARKS Q

U A

N

TI

TY

BG BUMPER GUARD A C C X 34

BG2 BUMPER GUARD, DOUBLE A C C X 3

BIO BIOHAZARD WASTE BIN G G G RUBBERMIAD FG614300RED 10

BRS BOTTLE REFILL STATION A C C X X X Haws Corporation 1455 Kleppe Lane Sparks, NV 89431

2000 1

CART CART, MOBILE G G G 3

CG CORNER GUARD A C C 31

CH COAT HOOK A C C 59

CPU COMPUTER, DESKTOP G G G X X 42

CUR PRIVACY CURTAIN AND TRACK A C C 12

DIA DIAGNOSTIC SET, RAIL MOUNT G G C X X 9

DYN DINAMAP G G G GE GE-2073250-002 5

EL EXAM LIGHT, CEILING MOUNT G G G X SKYTRON AURORA AUA5 4

EMC CART, ENT MOBILE G G G X 4

GBX GLOVE BOX, TRIPLE A C C X 11

GCC GAS CABINET, 4 CYLINDER CABINET A C C X 3

HR HANDRAIL A C C X REFER TO INTERIOR FINISH KEY FOR FACILITY STANDARD HANDRAIL TYPE 32

HS HAND SANITIZER, HAND FREE G G C X 20

LH LINEN HAMPER G G G CONTRACTOR TO COORDINATE FINAL LOCATION & QUANTITY WITH OWNER 1

LKR LOCKER, FULL HEIGHT C-LOCKER G G G X 4

MCW MICROSCOPE, WALL MOUNT G G G X X X ZEISS S100/OPMI PICO 1

MFP PRINTER - MULTI-FUNCTION G G G X X CONTRACTOR TO COORDINATE FINAL LOCATION & QUANTITY WITH OWNER 1

MIR1 MIRROR, STANDARD A C C X BOBRICK CONTRACTOR TO COORDINATE FINAL LOCATION & QUANTITY WITH OWNER 1

MON MONITOR, WALL MOUNT G G G X X MONITOR TO BE USED WITH WALL MOUNTED MICROSCOPE 2

MREF MEDICAL REFRIGERATOR G G G X X HELMER 1

OMNI MEDICATION DISPENSING SYSTEM G G G X X OMNICELL 1

OT OLYMPUS TOWER G G G OLYMPUS 2

PBB PFT BODY BOX G G G X X 1

PGS PORTABLE GAS STORAGE RACK A C C APPLIED

HEALTHCARE

EQUIPMENT

1100-1612 1

PPE PERSONAL PROTECTION EQUIPMENT, WALL

MOUNT

A C C X MARKETLAB ML# 4439 2

PRN PRINTER - DESKTOP G G G X X CONTRACTOR TO COORDINATE FINAL LOCATION & QUANTITY WITH OWNER 1

PT PAPER TOWEL DISPENSER G G C X BOBRICK 20

SC FOLD DOWN SCALE G G C X X SCALE-TRONIX 6202 2

SCC SCOPE CABINET G G C X 3

SD SOAP DISPENSER G G C X BOBRICK 20

SH1 SHARPS DISPOSAL, WALL MOUNT G G G X 15

SHR SHREDDER G G G X CONTRACTOR TO COORDINATE FINAL LOCATION & QUANTITY WITH OWNER 1

SM STADIOMETER G G C X Detecto 3PHTROD-1 1

SS STAINLESS STEEL SHELF A C C X BOBRICK B-295 1

TBL1 EXAM CHAIR G G G X 1

TBL2 EXAM TABLE G G G X BREWER HI-LO 700 3

TC TRASH CAN G G G 12

TEL TELEPHONE, DESK G G G X X 40

TM TREADMILL G G G X 1

TV TELEVISION, WALL MOUNT G G C X X X 1

UCR UNDERCOUNTER REFRIGERATOR G G G X CONTRACTOR TO COORDINATE FINAL LOCATION WITH OWNER 1

WIND-1 DOUBLE ROLLER WINDOW SHADE A C C MECHO URBAN SHADE

DOUBLE-BRACKET

MANUAL

CONTRACTOR TO REFER TO SHEET ID101 FOR QUANTITIES & LOCATIONS 1

WMC WALL MOUNTED CHAIR G G G X Sauder Manufacturing Co.

7023201 BLOCKING TO BE INSTALLED BY CONTRACTOR PRIOR TO INSTALLATION OF CHAIR 12

WS WORK SURFACE G G G X BLOCKING TO BE INSTALLED BY CONTRACTOR PRIOR TO INSTALLATION WORK SURFACE 1

XEMC CART, ENT MOBILE - EXISTING - - G 5

XGC GAS CART, MOBILE - EXISTING/RELOCATED - - G 2

XMCW MICROSCOPE, WALL MOUNT - EXISTING - - G X X - ZEISS S100/OPMI PICO CONTRACTOR TO REMOVE EXISTING MICROSCOPE FOR ROOM FINISH UPGRADES;

REINSTALL MICROSCOPE IN EXACT SAME LOCATION

XOT OLYMPUS TOWER - EXISTING - - G X X 4

XPBB PFT BODY BOX - EXISTING/RELOCATED - - G X X - 2

XSCC SCOPE CABINET - EXISTING - - C X 5

F'' G'F'E'A' C'B' D'

A100

CVT STATION

A101

SHARED NP

OFFICE

A102

ENT CHIEF

OFFICE

A103

SHARED MD

OFFICE

A104

EXIST.

CONTROL

ROOM

A106

EXIST. AUDIO

EXAM ROOM

A105

SHARED LPN

WORK ROOM

A109

SHARED STAFF

OFFICE

A110

PROCEDURE

A112

ENT

PROCEDURE

A114

PROCEDURE

A115

ENT

TREATMENT

A116

HAC

A117

ENT EXAM

A124

SOILED

A128

SPEECH/PATH

EXAM

C1-102A

CORRIDOR

C1-102

CORRIDOR

A133

STAIR

A113

ELEC

AI420

AI420

AI42011

AI420

AI420

AI420

AI422 1314

TBL2 TBL2

EL

CPU

PT

SD

SD PT

DIA

TEL

HS

TEL

CG

CGCG

SH1

HS

CG

TEL

TBL1

CPU

HS

SH1

PT

SD

EL

TBL2

CPU

CG

CG

CG CG

CG

HS

PT

SD

SH1

TEL

CPU

TEL TEL

TEL

TEL

CPU

TEL

TEL

TEL

CPU

TEL

TEL

TEL

DIA

TEL

TEL

WMC

CPU

TEL

SH1

PT

SD

HS

HS

CG

PT

SD

HS CG

CG

CGCG

HR HR HR HR HR HR HR

HR HR HR HR HR

HR

HR

HR

HR

4'

7'

3.9

WMC

SCC

OT

EMC

SCC

EMC

DIA

OT

EMC

XEMC

LKR

LKR

LKR

WMC

SCC

MON

WMC

LKR

MON

DIA

EL

SH1

CPU

TEL

WMC

XSCC

CHCH

CH

CH CH

CH

CH

CH

CH

CH

CH

CH CH CH CH

CH

CH

CH

CH

CH

BIO

BIO

BIO

BIO

CH

CH

CH

CH

CG CG

CART

TCBIO

CH CH

PPE

BG

CPU

CH

CG

EL

MCW

CPU

TEL

CPU

CPU

TEL

CPU

CPU

CPU

TEL

CPU

CPU

TEL

CPU

CPU

CPU

CPU

TEL

CPU

CPU

WS WS WS

WS

WS

WS

WS

WS

WS

WS

WS WS

WS

WS

WS

WS

WSWS

WS

WS

WS

WS

WS

CUR CUR

CUR

CUR

CUR

CH

CH

BRS

GBXGBX

GBX

GBX

GBX

BIO

AREA A

AREA B

AREA C

AREA D

AREA LEG END

AREA 'A'

KEY PLAN

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AI401A

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB SCC

ENLARGED FLOOR PLAN -

AREA A

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED FLOOR PLAN - AREA A

TT

I

G'F'E' H'

A114

PROCEDURE

A116

HAC

A124

SOILED

A127

SPEECH/PATH

EXAM

A128

SPEECH/PATH

EXAM

A129

SPEECH/PATH

EXAM

A130

SPEECH/PATH

OFFICE

A131

PFT BODY BOX

A132

STAFF OFFICE

A137

PFT BODY BOX

A134

STAFF OFFICE

A136

SPUTUM

A139

PFT BODY BOX

A138

EVAL.

HOME/DME

C1-102A

CORRIDOR

A146B

CLEAN

A146D

INTAKE /

VITALSA146E

SOILED SCOPE

A135

PORTABLE GAS

STORAGE

A140

CORRIDOR

AI422 0403

AI422 02

AI422 01

AI420

AI421

AI42011

AI421

AI421

AI421

AI421

AI421

AI421

AI421

AI421

AI421

AI422 1314

A146F

ALCOVE

TEL

CPU

CPU

TEL

PT

SD

HS

SH1

TBL1

PT

SD

CPU

TEL

DIA

PT

SD

HS

HS

SH1

PT

SD

HS

TEL

CPU

TEL

CPU

TEL

CPU

TEL

CPU CART

TEL

CPU

PT

SD

HS

SH1

CART

TEL

CPU

PT SH1

HS

XPBB

GCC

TEL

SD

PT

GCC

XPBB

TEL

HS

SH1

SC

SM

PBB

GCC

TEL

PT

SD

PT

SD

CPU

TEL

HS

SH1

HS

CG

CG

HS

PT

SD

TEL

CPU

CG

CG

HS

CG

CG

CG

SC

CG

CG CG

TV

CG

CG

CG CG

PT

SD

PT

HS

SH1

DIA

CPU

TEL

WMC

WMC

WMC

HR HR

HR

HR

HR

HR

HR

HR HR

HR

HR

HR

HR

HR HR HR

1'

2'

3'

3.9

SD

PT

TM

HS

SH1

WMC

WMC

WMC

DYN

DYN

DYN

DYN

DYN

TC

TC

PGS

PPE

MCW

WMC

EL

OT

LKR

LKR

SCC

EMC

SD

TC

TC

TC

TC

TC

TC

TC

TC

TC

SD

TC

XGC XGC

BIO

BIO

BIO

BIO

CH

CH

CH

CH

BIO

PPE

CH CH

CH CH

CH CH

CH CH

CH CH

CH CH

CH CH

CH CH

CH CH

CH CH

CH CH

CH

CH

WMC

CART

BG2

BG2

BG2

BIO

CG

WS

WS

WS

WS

WSWS

WS WS

WS

WS WS

WS

WS

WS

WS

WS

CUR

CUR

CUR

CUR

CUR

CUR

WMC

MREF

OMNI

CG

CG CG

CGCG

CPU

TEL

BRS

GBX

GBX

GBX

GBX

BIO

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'B'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AI401B

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB SCC

ENLARGED FLOOR PLAN -

AREA B

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED FLOOR PLAN - AREA B

I G'F'E' H'

A114

PROCEDURE

A115

ENT

TREATMENT

A116

HAC

A117

ENT EXAM

A119

ENT EXAM

A121

ENT EXAM

A123

ENT EXAM

A124

SOILED

A127

SPEECH/PATH

EXAM

A128

SPEECH/PATH

EXAM

C1-102A

CORRIDOR

A146B

CLEAN

A146D

INTAKE /

VITALS

A146E

SOILED SCOPE

A133

STAIR

A113

ELEC

AI420

1618 AI42212 11

AI42210 09

AI42208 07 AI42206 05

AI422 0403

AI422 02

AI422 01

AI420

AI421

AI42011

AI420

AI422 1314

CPU

TEL

TBL1

CPU

TEL

HS

SH1

PT

SD

DIA

CG CG CG

PT

SD

HS

SH1

PT

SD

HS

TEL

CPU

HS

CG

PT

SD

CG

TEL

CPU

HS

PT

SD

DIA

PT

SH1

HS

SC

CG

CG

CG

CG CG

HS

PT

SD

EL

TBL2

PT

SD

HS

SH1

DIA

CG

CPU

TEL

CG

CG

DIA

CPU

TEL

DIA

HS

SH1

PT

SD

CPU

TEL

CPU

TEL

PT

SD

DIA

HS

SH1

DIA

HS

SH1

PT

SD

WMC

WMC

HR

HR

HRHR

HR HR HR HR HR HR HR

HRHRHR

HR

HR

J

7'

3.9

XMCW

XEMC

WMC LKR

SH1

XSCC

CH

CH

CH

CH

CH

CH

CH

CH

CH

CH

CH

CH

CHCH

TC

BIO

XOTXOT XOTXOT

XSCC

XSCCXSCC XSCC

CG

EMC

TC

SD

A146F

ALCOVE

BG2

BG2

BG2

PPE BG

PPE

CH CH

TC

OT

BIO

LKR

WMC

MCW

EL

MON

EMC

SCC

CH

CH

BG

CPU

TEL

CPU

BIO

MON

WS

WS

WS

WS

WS

CUR

CUR

CUR

CUR CUR CUR CUR

CUR

XEMC XEMC XEMC XEMC

CG

CG

CPU

TEL

MREF

OMNI

CG

CG CG

CGCG

GBX

GBX

GBX

GBX

GBX

GBX

GBX

GBX

WMC

LH

CH CH

SS

BIO

AREA A

AREA B

AREA C

AREA D

AREA LEG END

KEY PLAN

AREA 'C'

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AI401C

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB SCC

ENLARGED FLOOR PLAN -

AREA C

UPGRADE 1 WEST -

BLDG 1W

NORTH

SCALE: 1/4" = 1'-0"

ENLARGED FLOOR PLAN - AREA C

WALL BASE; REFER

TO FINISH SCHEDULE

FURNITURE

PROVIDED BY

OWNER

SCC

PT

SH1

2' - 0" 2' - 0"

AI520

AI520

2' - 0" 2' - 0"

CH

CHGBX

UPPER CASEWORK W/(2)

ADJ. SHELVES & SLOPED

TOP; LOCKABLE

SINK BASE

W/ADA APRON

RAKKS BRACKET;

3'-0" O.C. MAX

EL

WALL BASE; REFER

TO FINISH SCHEDULE

CHCH

LKR

OT

EXIST. FANCOIL UNITWALL BASE; REFER

TO FINISH SCHEDULE

DIA

EL

EMC

LKR

CPU

/2

WALL BASE; REFER

TO FINISH SCHEDULE

WMC

CPU

TEL

WALL BASE; REFER

TO FINISH SCHEDULE

SCC

EL

DIA

EMC

WMC

/2

CPU

TEL

WALL BASE; REFER

TO FINISH SCHEDULE

EL

BIO

LKR

EXIST. FANCOIL UNIT

TEL

CPU

WALL BASE; REFER

TO FINISH SCHEDULE

CH

LKR

CH

FURNITURE PROVIDED

BY OWNER

FILLER

2' - 0"

2' - 1"2' - 0"

WALL BASE; REFER

TO FINISH SCHEDULE

PT

SH1

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

ADA SINK APRON

AI520

AI520

WMC

SCC

GBX

RAKKS BRACKET;

3'-0" O.C. MAX

PT

SH1

DIA

WALL BASE; REFER

TO FINISH SCHEDULE

CPU

TEL EMC

EL

SCC

GBX

WALL BASE; REFER

TO FINISH SCHEDULE

MON

MCW

EXIST. FANCOIL UNITWALL BASE; REFER

TO FINISH SCHEDULE

CHCH

LKR

WMC

BIO

OT

MCW

WALL BASE; REFER

TO FINISH SCHEDULE

SD

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

2' - 0" 6"

AI520

HR HR HR HR HR HR HR HR HR HRHR

WALL BASE; REFER

TO FINISH SCHEDULE

FILLER (2) EQUAL UNITS

4' - 8"

FILLER

UPPER CASEWORK W/(2)

ADJ. SHELVES; LOCKABLE

COUNTER SUPPORT

BRACKET; 3'-0" O.C. MAX01

AI520

AI520

HS HS HS HSHS

BG BG BGBG

BG BG BG BG BG BG BG BG

SC

HR HR HR HR HR HR HR

HR

FILLER

2' - 8"

FILLER

UPPER CASEWORK W/(2)

ADJ. SHELVES; LOCKABLE

COUNTER SUPPORT

BRACKET; 3'-0" O.C. MAX

WALL BASE; REFER

TO FINISH SCHEDULE01

AI520

AI520

HSHS

PPE

BG

BG BGBGBG BGBG

HS HS HS

BG

BG

BRS

EL

DIA

WALL BASE; REFER

TO FINISH SCHEDULE

MON

XEMC

XMCW

CPU

WALL BASE; REFER

TO FINISH SCHEDULE

LKR

WMC

BIO

WALL BASE; REFER

TO FINISH SCHEDULE

XSCC

PT SH1

EL

AI520

2' - 0" 2' - 0"

CH

CH

2' - 0" 2' - 0"

AI520

RAKKS BRACKET;

3'-0" O.C. MAX

GBX

SINK BASE

W/ADA APRON

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

WALL BASE; REFER

TO FINISH SCHEDULE

CPU

TEL

FURNITURE PROVIDED

BY OWNER

CPU

TEL

WALL BASE; REFER TO

FINISH SCHEDULE

FURNITURE PROVIDED

BY OWNER

SINK BASE W/ADA APRON

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

PT

SD

2' - 0" 2' - 0"

2' - 0" 2' - 0"

BIO TC

RAKKS BRACKET;

3'-0" O.C. MAX

AI520

AI520

SH1

WMC

WALL BASE; REFER

TO FINISH SCHEDULE

CART

CH

CH

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AI420

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB EMP

INTERIOR ELEVATIONS UPGRADE 1 WEST -

BLDG 1W

SCALE: 1/4" = 1'-0"AI420

PROCEDURE/EEG - A11001

SCALE: 1/4" = 1'-0"AI420

PROCEDURE/EEG - A11002

SCALE: 1/4" = 1'-0"AI420

PROCEDURE/EEG - A11003

SCALE: 1/4" = 1'-0"AI420

PROCEDURE/EEG - A11004

SCALE: 1/4" = 1'-0"AI420

ENT PROCEDURE - A11205

SCALE: 1/4" = 1'-0"AI420

ENT PROCEDURE - A11206

SCALE: 1/4" = 1'-0"AI420

ENT PROCEDURE - A11207

SCALE: 1/4" = 1'-0"AI420

ENT PROCEDURE - A11208

SCALE: 1/4" = 1'-0"AI420

PROCEDURE - A11409

SCALE: 1/4" = 1'-0"AI420

PROCEDURE - A11410

SCALE: 1/4" = 1'-0"AI420

PROCEDURE - A11411

SCALE: 1/4" = 1'-0"AI420

PROCEDURE - A11412

SCALE: 1/4" = 1'-0"AI420

CORRIDOR - C1-102A14

SCALE: 1/4" = 1'-0"AI420

CORRIDOR - C1-102A15

SCALE: 1/4" = 1'-0"AI420

ENT TREATMENT - A11516

SCALE: 1/4" = 1'-0"AI420

ENT TREATMENT - A11517

SCALE: 1/4" = 1'-0"AI420

ENT TREATMENT - A11518

SCALE: 1/4" = 1'-0"AI420

ENT TREATMENT - A11519

SCALE: 1/4" = 1'-0"AI420

SPEECH/PATH PROCEDURE - A12820

SCALE: 1/4" = 1'-0"AI420

SPEECH/PATH PROCEDURE - A12821

TO FINISH SCHEDULE

CH

CH

PT SD

WALL BASE; REFER

TO FINISH SCHEDULE

SINK BASE

W/ADA APRON

UPPER CASEWORK W/(2)

ADJ. SHELVES & SLOPED TOP;

LOCKABLE

AI520

AI520

FURNITURE

PROVIDED BY

OWNER

2' - 0" 2' - 0"

2' - 0"2' - 0"

TC

RAKKS BRACKET;

3'-0" O.C. MAX

WALL BASE; REFER

TO FINISH SCHEDULE

CPU CPU

TELTEL

FURNITURE PROVIDED

BY OWNER

TC

FURNITURE PROVIDED

BY OWNER

WALL BASE; REFER

TO FINISH SCHEDULE

CH

CH

CPU CPU

TELTEL

CART

WALL BASE; REFER

TO FINISH SCHEDULE

FURNITURE PROVIDED

BY OWNER

WALL BASE; REFER

TO FINISH SCHEDULE

FURNITURE PROVIDED

BY OWNER

CH

CH

TC

PT

WALL BASE; REFER

TO FINISH SCHEDULE

ADA SINK APRON

UPPER CASEWORK W/(2)

ADJ. SHELVES & SLOPED TOP;

LOCKABLE

AI520

AI520

2' - 0"2' - 0"

2' - 0"2' - 0"

RAKKS BRACKET;

3'-0" O.C. MAX

SH1

BIO TC

GBX

TEL

CPU

WALL BASE; REFER

TO FINISH SCHEDULE

FURNITURE PROVIDED

BY OWNER

CHCH

WMC

CART

PT

SD

SH1

2' - 0"2' - 0"3' - 7 1/2" ±

(2) EQ. UNITS

4' - 0"1' - 6"FILLER

WALL BASE; REFER

TO FINISH SCHEDULE

SINK APRON W/ADA APRON

& FINISHED END PANEL

UPPER CASEWORK W/(2)

ADJ. SHELVES & SLOPED TOP;

LOCKABLE

AI520

AI520

RAKKS BRACKET;

3'-0" O.C. MAX

CHCH

CPU

TEL

WALL BASE; REFER

TO FINISH SCHEDULE

FURNITURE PROVIDED

BY OWNER

TEL

WALL BASE; REFER

TO FINISH SCHEDULE

GCC

TMGCC

WALL BASE; REFER

TO FINISH SCHEDULE

TEL

FURNITURE

PROVIDED BY

OWNER

5' - 1"2' - 0"

5' - 1"2' - 0"

PTSD

WALL BASE; REFER

TO FINISH SCHEDULE

ADA SINK APRON

W/FINISHED END PANELS

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

AI520

AI520

BIO

CHCH

GCC

GCC

WALL BASE; REFER

TO FINISH SCHEDULE

WMC

BIO

XPBB GCC

WALL BASE; REFER

TO FINISH SCHEDULE

FURNITURE PROVIDED

BY OWNER

SH1

GCC

WALL BASE; REFER

TO FINISH SCHEDULE

PTSD

CHCH

BIO TC

SINK BASE W/ADA

APRON & FINISHED

END PANELS

UPPER CASEWORK W/(2)

ADJ. SHELVES & SLOPED TOP;

LOCKABLE

2' - 0"6' - 5"

AI520

AI520

2' - 0"6' - 5"

GCC

WALL BASE; REFER

TO FINISH SCHEDULE

TEL

PBB GCC

WALL BASE; REFER

TO FINISH SCHEDULE

FURNITURE PROVIDED

BY OWNER

WMC

TC

PT

SD

2' - 0"2' - 0"

WALL BASE; REFER

TO FINISH SCHEDULE

RAKKS BRACKET;

3'-0" O.C. MAX

SINK BASE W/ADA

APRON & FINISHED

END PANEL

UPPER CASEWORK W/(2)

ADJ. SHELVES & SLOPED TOP;

LOCKABLE

AI520

AI520

TC

2' - 0" 2' - 0"

WALL BASE; REFER

TO FINISH SCHEDULE

CHCH

CPU

TEL

WALL BASE; REFER

TO FINISH SCHEDULE

FURNITURE PROVIDED

BY OWNER

PT

WALL BASE; REFER

TO FINISH SCHEDULE

SINK BASE

W/ADA APRON

UPPER CASEWORK W/(2)

ADJ. SHELVES & SLOPED TOP;

LOCKABLE

AI520

AI520

2' - 0" 2' - 0"

RAKKS BRACKET;

3'-0" O.C. MAX

2' - 0"2' - 0"

TC

GBX

CH

CH

WMC

2' - 0"5' - 1"

2' - 0"5' - 1"

SDPT

WALL BASE; REFER

TO FINISH SCHEDULE

ADA SINK APRON W/FINISHED END PANELS

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

AI520

AI520

CHCH

TC BIO

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AI421

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB SCC

INTERIOR ELEVATIONS UPGRADE 1 WEST -

BLDG 1W

SCALE: 1/4" = 1'-0"AI421

SPEECH/PATH OFFICE - TREAT - A13001

SCALE: 1/4" = 1'-0"AI421

SPEECH/PATH OFFICE - TREAT - A13002

SCALE: 1/4" = 1'-0"AI421

STAFF OFFICE - A13203

SCALE: 1/4" = 1'-0"AI421

STAFF OFFICE - A13204

SCALE: 1/4" = 1'-0"AI421

STAFF OFFICE - A13405

SCALE: 1/4" = 1'-0"AI421

STAFF OFFICE - A13406

SCALE: 1/4" = 1'-0"AI421

SPUTUM - A13607

SCALE: 1/4" = 1'-0"AI421

SPUTUM - A13608

SCALE: 1/4" = 1'-0"AI421

EVAL. HOME/DME - A13809

SCALE: 1/4" = 1'-0"AI421

EVAL. HOME/DME - A13810

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 1 - A13911

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 1 - A13912

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 2 - A13714

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 2 - A13715

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 2 - A13716

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 3 - A13117

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 3 - A13118

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 3 - A13119

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 3 - A13120

SCALE: 1/4" = 1'-0"AI421

SPEECH/PATH OFFICE - TREAT - A12921

SCALE: 1/4" = 1'-0"AI421

SPEECH/PATH OFFICE - TREAT - A12922

SCALE: 1/4" = 1'-0"AI421

SPEECH/PATH OFFICE - TREAT - A12723

SCALE: 1/4" = 1'-0"AI421

SPEECH/PATH OFFICE - TREAT - A12724

SCALE: 1/4" = 1'-0"AI421

PFT BODY BOX 1 - A13913

HR HR HR HR HR

TO FINISH SCHEDULE

BG2 BG BG BG BG BG BG

HS HS HS HSHS

HR HR HR HR HR HR

WALL BASE; REFER

TO FINISH SCHEDULE

BG

TV

BGBGBG

HS HS HS HS HS

PPE

BGBGBGBG

WALL BASE; REFER

TO FINISH SCHEDULE

BG2

PT

SD

WALL BASE; REFER

TO FINISH SCHEDULE

6' - 0"

SS

STAINLESS STEEL SINK

& COUNTER TOP

DIA SH1

WALL BASE; REFER

TO FINISH SCHEDULE

/2

WALL BASE; REFER

TO FINISH SCHEDULE

5' - 11 1/2" 2' - 0"

RAKKS BRACKET;

3'-0" O.C. MAX

3' - 11 1/2" 2' - 6" 1' - 6"

SD

PT

CH

CH

TC

SINK BASE

W/ADA APRON

AI520

AI520

UPPER CASEWORK W/(2)

ADJ. SHELVES & SLOPED

TOP; LOCKABLE

WALL BASE; REFER TO FINISH

SCHEDULE

SINK BASE

W/ADA APRON

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

SD PT

CPU

TEL

AI520

AI520

FURNITURE PROVIDED BY OWNER

2' - 1" 2' - 0"

2' - 0" 2' - 1"

SH1

GBX

RAKKS BRACKET;

3'-0" O.C. MAX

DIA

WALL BASE; REFER

TO FINISH SCHEDULE

CH

CH

XSCC XEMC XOT

/2

WALL BASE; REFER

TO FINISH SCHEDULE

CPU

TEL

PTSD

PROVIDE FINISHED

END PANELS

1' - 5 1/2" ±

2' - 0" 2' - 1"

SINK BASE

W/ADA APRON

3' - 6 1/2" 2' - 0"

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

AI520

AI520

SH1

GBX

RAKKS BRACKET;

3'-0" O.C. MAX

WALL BASE; REFER

TO FINISH SCHEDULE

DIA

CH

CH

XSCC

XEMC

XOT

/2

"SD PT

CPU

TEL

WALL BASE; REFER

TO FINISH SCHEDULE

RAKKS BRACKET;

3'-0" O.C. MAX

SINK BASE

W/ADA APRON

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

AI520

AI520

2' - 0" 2' - 0"

SH1

2' - 0" 2' - 0"

GBXDIA

WALL BASE; REFER

TO FINISH SCHEDULE

CH

CH

XSCC XOTXEMC

/2

SH1

PTSD

CPU

TEL

1' - 8 1/2" ±

2' - 0" 2' - 0"

WALL BASE; REFER

TO FINISH SCHEDULE

SINK BASE

W/ADA APRON

UPPER CASEWORK

W/(2) ADJ. SHELVES &

SLOPED TOP; LOCKABLE

AI520

AI520

FURNITURE PROVIDED

BY OWNER

CH

CH

2' - 0" 2' - 0"

GBX

RAKKS BACKET;

3'-0" O.C. MAX

WALL BASE; REFER

TO FINISH SCHEDULE

DIA

XSCC

XEMC

XOT

/2

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AI422

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB EMP

INTERIOR ELEVATIONS UPGRADE 1 WEST -

BLDG 1W

SCALE: 1/4" = 1'-0"AI422

CORRIDOR - A14013

SCALE: 1/4" = 1'-0"AI422

CORRIDOR - A14014

SCALE: 1/4" = 1'-0"AI422

ALCOVE - A146F01

SCALE: 1/4" = 1'-0"AI422

SOILED SCOPE - A146E02

SCALE: 1/4" = 1'-0"AI422

INTAKE/VITALS - A146D03

SCALE: 1/4" = 1'-0"AI422

INTAKE/VITALS - A146D04

SCALE: 1/4" = 1'-0"AI422

ENT EXAM - A12305

SCALE: 1/4" = 1'-0"AI422

ENT EXAM - A12306

SCALE: 1/4" = 1'-0"AI422

ENT EXAM - A12107

SCALE: 1/4" = 1'-0"AI422

ENT EXAM - A12108

SCALE: 1/4" = 1'-0"AI422

ENT EXAM - A11909

SCALE: 1/4" = 1'-0"AI422

ENT EXAM - A11910

SCALE: 1/4" = 1'-0"AI422

ENT EXAM - A11711

SCALE: 1/4" = 1'-0"AI422

ENT EXAM - A11712

H'

2' - 3"

5/8" GYPSUM BOARD

ON 2-1/2" METAL STUD

FRAMING

ALIGN

EXISTING WALL

CONSTRUCTION

COUNTERTOP

/2

H'

2'

5/8" GYPSUM BOARD

ON 2-1/2" METAL STUD

FRAMING @ 16" O.C.

NEW EXTERIOR WALL

CONSTRUCTION TO MATCH

AND ALIGN W/ EXISTING

EXISTING EXTERIOR WALL

CONSTRUCTION

EXISTING COLUMN

B'

5/8" GYPSUM BOARD ON

2-1/2" METAL STUD FRAMING

@ 16" O.C.

5/8" GYPSUM BOARD

PM 3-5/8" METAL STUD

FRAMING @ 16" O.C.

DOOR AND FRAME;

REFER TO SCHEDULE

EXISTING COLUMN

1' - 10"

B'

EXISTING WALL

CONSTRUCTION

EXISTING COLUMN

5/8" GYPSUM BOARD

ON 2-1/2" METAL STUD

FRAMING @ 16" O.C.

5/8" GYPSUM BOARD

ON 3-5/8" METAL STUD

FRAMING @ 16" O.C.

5/8" GYPSUM BOARD

ON 3-5/8" METAL STUD

FRAMING @ 16" O.C.

A'

5/8" GYPSUM BOARD ON

3-5/8" METAL STUD

FRAMING @ 16" O.C.

DOOR AND FRAME;

REFER TO SCHEDULE

5/8" GYPSUM BOARD

ON 2-1/2" METAL STUD

FRAMING @ 16" O.C.

EXISTING EXTERIOR

WALL CONSTRUCTION

EXISTING COLUMN

NEW WINDOW ASSEMBLY;

REFER TO SCHEDULE

10"

/2

A'

5/8" GYPSUM BOARD ON

2-1/2" METAL STUD

FRAMING @ 16" O.C.

1' - 8"

5/8" GYPSUM BOARD ON

3-5/8" METAL STUD

FRAMING @ 16" O.C.

EXISTING EXTERIOR WALL

CONSTRUCTION

EXISTING COLUMN

NEW WINDOW ASSEMBLY;

REFER TO SCHEDULE

10"

AI600

F''

5/8" GYP. BD. ON 3-5/8" METAL

STUDS; METAL STUDS @ 16" O.C.

SOLID SURFACE COUNTER TOP

ON RAKKS BRACKETS; RAKKS

BRACKETS 3'-0" O.C. MAX

CORNER GUARD; REFER

TO FINISH SCHEDULE

I

3.9

EXISTING EXTERIOR

WALL CONSTRUCTION

EXISTING COLUMN

5/8" GYP. BD. ON 2-1/2"

METAL STUD FRAMING

ALIGNEXISTING WALL

CONSTRUCTION

3' - 0 1/2" ±

CORNER GUARD; REFER

TO FINISH SCHEDULE

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

AI500

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB STL

ENLARGED PLAN DETAILS UPGRADE 1 WEST -

BLDG 1W

SCALE: 1 1/2" = 1'-0"AI500

PLAN DETAIL05

SCALE: 1 1/2" = 1'-0"AI500

PLAN DETAIL01

SCALE: 1 1/2" = 1'-0"AI500

PLAN DETAIL06

SCALE: 1 1/2" = 1'-0"AI500

PLAN DETAIL03

SCALE: 1 1/2" = 1'-0"AI500

PLAN DETAIL07

SCALE: 1 1/2" = 1'-0"AI500

PLAN DETAIL04

SCALE: 1 1/2" = 1'-0"AI500

PLAN DETAIL08

REVISIONS DATE

SCALE: 1 1/2" = 1'-0"AI500

PLAN DETAIL02

R E

FE

R T

O I N

TE

R

IO

R

E

LE

V A

TI

O

N S

2' - 1"

CONT. SEALANT,

TYP.

BACK & SIDE SPLASH WITH

CONTINUOUS CAULK JOINT

TYPICAL AT ALL WET AREAS;

MATCH COUNTER MATERIAL

1-1/4" SOLID SURFACE

COUNTERTOP W/EASED EDGES

(REFER TO FINISH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .