This solicitation is for a construction project to renovate the vacated Audiology space at the Ann Arbor VA Medical Center located in Ann Arbor, Michigan. The contractor shall provide all labor, materials, equipment, supervision, as-built documentation and other information to complete the renovation which includes structural, architectural, electrical, mechanical, fire protection and interior design work. Construction will adhere to building codes, VA standards, LEED and energy conservation requirements. The period of performance is 180 calendar days from notice to proceed with work expected to commence in fall 2020. The work site is the first floor of Building 1W at the Ann Arbor VA Medical Center covering approximately 4,200 square feet of existing Audiology and ENT clinic space. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

File Type Posted
36C25020B0046 0004.pdf PDF
RFI 005 - Response.docx DOCX document
RFI 1 work hours - response.docx DOCX document
RFI 004 - response.docx DOCX document
S02RFIFORM50620201.docx DOCX document
WAGE DET MI20200100 08072020 REV3.pdf PDF
RFI 3 project phasing - response.docx DOCX document
RFI 2 New FCU with Existing Reheat Coil - Response.pdf PDF
IMS RFI 02 responseS.docx DOCX document
IMS-RFI 01 response.docx DOCX document
36C25020B0046 0003.pdf PDF
Contractor Addresses -.doc DOC document
RFI 001 (response).docx DOCX document
_506-20-201 VA Ann Arbor - 1W Upgrades - Addendum 01.pdf PDF
Sign In Sheet 506-20-201.pdf PDF
033000.pdf PDF
RFI Form 2 8-3-2020 - response.docx DOCX document
S04 - Pre-Bid Site Visit Agenda 506-20-201.pdf PDF
RFI 1. - Response.pdf PDF
36C25020B0046 0002.pdf PDF
36C25020B0046 0001.pdf PDF
Contractor EMR Certification Form 2020.docx DOCX document
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part2.pdf PDF
506-20-201_PROJECT MANUAL_VOL1_032019 SPECS.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part3.pdf PDF
506-20-201_PROJECT MANUAL_VOL2_032019 SPECS.pdf PDF
S02 506-20-201 1W Upgrades - 100 Percent DRAWINGS_Part4.pdf PDF
WAGE DET MI20200100 07032020 REV2.pdf PDF
S02 - RFI Form 506-20-201.docx DOCX document
36C25020B0046_1.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49008

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

GI001

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB SCC

COVER SHEET UPGRADE 1 WEST -

BLDG 1W

PROJECT TEAM DRAWING SHEET INDEX

MEP ENGINEERING:

ARCHITECTURE/LOW VOLTAGE:

OWNER:

PH: 269.927.0144

ALLIANCE | 7GAE JV

KALAMAZOO, MI 49007

600 E. MICHIGAN AVENUE, SUITE B

PH: 616.361.2664

616.361.1493FX:

PROGRESSIVE AE

GRAND RAPIDS, MI 49525

1811 4 MILE RD. N.E.

OFFICE OF CONSTRUCTION AND

FACILITIES MANAGEMENT

DEPARTMENT OF VETERANS AFFAIRS

MEDICAL CENTER

ANN ARBOR, MI 48105

2215 FULLER ROAD

PROJECT NO. 506-20-201 VA ANN ARBOR UPGRADE 1 WEST - BLDG 1W

VA ANN ARBOR HEALTHCARE SYSTEM

DEPT. of VETERANS AFFAIRS MEDICAL

CENTER - ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

PH: 202.617.8485

ALEXANDRIA, VA 22314

2850 EISENHOWER AVE, SUITE 310

DESCRIPTIONSHEET ISSUE DATE

PL101C FIRST FLOOR PLUMBING PLAN - AREA C MARCH 22, 2019

PL111A FIRST FLOOR MEDICAL GAS PLAN - AREA A MARCH 22, 2019

PL111B FIRST FLOOR MEDICAL GAS PLAN - AREA B MARCH 22, 2019

PL111C FIRST FLOOR MEDICAL GAS PLAN - AREA C MARCH 22, 2019

M001 GENERAL MECHANICAL INFORMATION MARCH 22, 2019

MD101A FIRST FLOOR SHEET METAL DEMOLITION PLAN - AREA A MARCH 22, 2019

MD101B FIRST FLOOR SHEET METAL DEMOLITION PLAN - AREA B MARCH 22, 2019

MD101C FIRST FLOOR SHEET METAL DEMOLITION PLAN - AREA C MARCH 22, 2019

MH101A FIRST FLOOR SHEET METAL PLAN - AREA A MARCH 22, 2019

MH101B FIRST FLOOR SHEET METAL PLAN - AREA B MARCH 22, 2019

MH101C FIRST FLOOR SHEET METAL PLAN - AREA C MARCH 22, 2019

MP101A FIRST FLOOR HYDRONIC PIPING PLAN - AREA A MARCH 22, 2019

MP101B FIRST FLOOR HYDRONIC PIPING PLAN - AREA B MARCH 22, 2019

MP101C FIRST FLOOR HYDRONIC PIPING PLAN - AREA C MARCH 22, 2019

M400 MECHANICAL DETAILS MARCH 22, 2019

M500 MECHANICAL SCHEDULES MARCH 22, 2019

E001 ELECTRICAL SYMBOL LEGENDS MARCH 22, 2019

ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN MARCH 22, 2019

EP101 FIRST FLOOR POWER PLAN - 1 W MARCH 22, 2019

EL101 FIRST FLOOR LIGHTING PLAN - 1W MARCH 22, 2019

E501 ELECTRICAL PANELBOARD SCHEDULES MARCH 22, 2019

E502 ELECTRICAL DETAILS MARCH 22, 2019

E601 ELECTRICAL SCHEDULES MARCH 22, 2019

TD101A LOW VOLTAGE DEMOLITION PLAN - AREA A MARCH 22, 2019

TD101B LOW VOLTAGE DEMOLITION PLAN - AREA B MARCH 22, 2019

TD101C LOW VOLTAGE DEMOLITION PLAN - AREA C MARCH 22, 2019

TY101A LOW VOLTAGE PLAN - AREA A MARCH 22, 2019

TY101B LOW VOLTAGE PLAN - AREA B MARCH 22, 2019

TY101C LOW VOLTAGE PLAN - AREA C MARCH 22, 2019

TY401 LOW VOLTAGE - DETAILS MARCH 22, 2019

TY402 LOW VOLTAGE - NURSE CALL DETAILS MARCH 22, 2019

TY403 LOW VOLTAGE - NURSE CALL DETAILS MARCH 22, 2019

GI001 COVER SHEET MARCH 22, 2019

GI002 GENERAL INFORMATION & SYMBOL LEGEND MARCH 22, 2019

GI003 INTERIOR WALL TYPES MARCH 22, 2019

GI100 LIFE SAFETY CODE ANALYSIS MARCH 22, 2019

GI101 LIFE SAFETY CODE ANALYSIS - FIRST FLOOR MARCH 22, 2019

GC101 FIRST FLOOR PHASING PLAN - PHASE 1 MARCH 22, 2019

GC102 FIRST FLOOR PHASING PLAN - PHASE 2 MARCH 22, 2019

GC103 FIRST FLOOR PHASING PLAN - PHASE 3 MARCH 22, 2019

GC104 FIRST FLOOR PHASING PLAN - PHASE 4 MARCH 22, 2019

AD100 BASEMENT DEMOLITION PLAN MARCH 22, 2019

AD101 FIRST FLOOR DEMOLITION PLAN MARCH 22, 2019

AE001 FIRST FLOOR SLAB IN-FILL PLAN MARCH 22, 2019

AE101 FIRST FLOOR PLAN MARCH 22, 2019

AC121 FIRST FLOOR REFLECTED CEILING PLAN MARCH 22, 2019

AI400 EQUIPMENT SCHEDULE MARCH 22, 2019

AI401A ENLARGED FLOOR PLAN - AREA A MARCH 22, 2019

AI401B ENLARGED FLOOR PLAN - AREA B MARCH 22, 2019

AI401C ENLARGED FLOOR PLAN - AREA C MARCH 22, 2019

AI420 INTERIOR ELEVATIONS MARCH 22, 2019

AI421 INTERIOR ELEVATIONS MARCH 22, 2019

AI422 INTERIOR ELEVATIONS MARCH 22, 2019

AI500 ENLARGED PLAN DETAILS MARCH 22, 2019

AI520 CASEWORK & CEILING DETAILS MARCH 22, 2019

AI600 DOOR & FRAME SCHEDULE & WINDOW TYPES MARCH 22, 2019

AW101 INTERIOR SIGNAGE PLAN & SCHEDULE MARCH 22, 2019

ID100 INTERIOR FINISH KEY & SCHEDULE MARCH 22, 2019

ID101 FIRST FLOOR FINISH PLAN MARCH 22, 2019

FA001 FIRE ALARM GENERAL INFORMATION SHEET MARCH 22, 2019

FA101A FIRE ALARM DEMOLITION PLAN MARCH 22, 2019

FA101B FIRE ALARM FLOOR PLAN MARCH 22, 2019

FX001 FIRE PROTECTION GENERAL INFORMATION SHEET MARCH 22, 2019

FX101A FIRE PROTECTION DEMOLITION PLAN MARCH 22, 2019

FX101B FIRE PROTECTION FLOOR PLAN MARCH 22, 2019

PL000 GENERAL PLUMBING INFORMATION MARCH 22, 2019

PD001 BASEMENT PLUMBING DEMOLITION PLAN MARCH 22, 2019

PD101A FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A MARCH 22, 2019

PD101B FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA B MARCH 22, 2019

PD101C FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA C MARCH 22, 2019

PL001 BASEMENT PLUMBING PLAN MARCH 22, 2019

PL101A FIRST FLOOR PLUMBING PLAN - AREA A MARCH 22, 2019

PL101B FIRST FLOOR PLUMBING PLAN - AREA B MARCH 22, 2019

DESCRIPTIONSHEET ISSUE DATE

REVISIONS DATE

PROJECT LOCATION

PROJECT LOCATION

ANN ARBOR, MICHIGAN

NORTH

3-22-19

A300

A320

A420

A500

ARCHITECTURAL SYMBOLS & PLAN INDICATORS

ABBREVIATIONSBARRIER-FREE DESIGN INFORMATION

ROOMNAME

XXX

A

A

A

A

8'-0"

TOP OF STEEL

ELEV. 10'-0"

A200

TITLE

SCALE X" = 1'-0"

OBSTRUCTED APPROACH

UNOBSTRUCTED APPROACH

TYP. CODE REGULATED MOUNTING HEIGHTS

SCALE: NONE

TYP. EQUIPMENT MOUNTING HEIGHTS

SCALE: NONE

ELEVATION INDICATION

SHEET NO.

ELEVATION NUMBER

SECTION INDICATOR

ENLARGED PLAN OR

ELEVATION

PROPOSED SPOT

EXISTING SPOT

ELEVATION

100.57'

100.57'

STRUCTURAL SPAN

ROOF TRUSSES

FLOOR JOIST OR

RAMP

@ 16" O.C.

2 x 12

1" per 12"

SLOPE UP

REVISION TAG W/

REVISION NUMBER

KEYNOTE TAG

WINDOW TAG W/

WINDOW TYPE

INDICATOR

WALL SECTION CUT

COLUMN LINE

WALL TYPES

ELEVATION

BUILDING SECTION CUT

SHEET LOCATION

DETAIL NUMBER

TYPICAL

DIMENSIONING

SET-BACK LINE

PROPERTY LINE

EXISTING

CONTOUR

TOPOGRAPHY

CONTOUR

100'

100'

TOPOGRAPHY

PROPOSED

SECTIONS & DETAILS

TYPICAL TITLE FOR

DOOR NUMBER

DOOR TAG W/

ROOM NUMBER

ROOM NAME/

NORTH ARROW

60" DIAMETER CLEAR

WHEELCHAIR TURNING

SPACE - REFER TO PLAN

- REFER TO PLAN

AND GROUND SPACE

30" x 48" CLEAR FLOOR

CEILING HEIGHT TAG

GENERAL NOTES:

ACCESSIBLE CONTROLS, OPERATING

MECHANISMS & HARDWARE SHALL COMPLY

WITH SECTIONS 1109.13 OF THE MBC AND

SECTION 309 OF ICC/ANSI A117.1.

ACCESSIBLE SIGNAGE FURNISHED BY OWNER,

SHALL COMPLY WITH SECTIONS 1110 OF THE

MBC AND SECTION 703 OF ICC/ANSI A117.1.

PORTABLE FIRE EXTINGUISHERS TO BE

PROVIDED IN ACCORDANCE WITH THE 2000

ICC INTERNATIONAL FIRE CODE. MBC (906.1).

REFER TO FLOOR PLAN SHEETS FOR

LOCATIONS OF FIRE EXTINGUISHER CABINETS

(FEC)

RECEPTACLE

LIGHT

SWITCH

HVAC

CONTROLS

FIRE

ALARM

FEC

LESS THEN 40#

FEC

GREATER THEN 40#

TEL

PP

RH/CH

GBX

SH1

CL

OT

SPH

CRK SND

PT

SD

HS

XR COM4 MR

CRBG

WP

TP SNR

4'-4"

NOTE: ITEMS SHOWN ON THIS SHEET ARE NOT

NECESSARILY INCLUDED IN THIS

PROJECT.

TV

MOUNTING HEIGHT GENERAL NOTES:

1. REFER TO SHEET A400 FOR EQUIPMENT

ABBREVIATIONS AND LOCATIONS.

2. REFER TO INTERIOR ELEVATIONS FOR

ADDITIONAL INFORMATION.

3. ITEMS ON THIS SHEET ARE NOT NECESSARILY

INCLUDED IN THIS PROJECT.

4. CONTRACTOR TO VERIFY ALL EQUIPMENT

MOUNTING HEIGHTS WITH OWNER.

5. REFER TO MECHANICAL/ELECTRICAL

DRAWINGS FOR DEVICE MOUNTING

HEIGHTS.

XXXNORTH

M A

X

IF

B

A R

R

IE

R F

R E E

M

IN

" 4

" 5

M A

X

M A

X

M A

X

SIDE FRONT

M

A X

M

A X

20" - 25"

M

A X

FRONT

M

A X

20" MAX

SIDE

SIDE FRONT

M

IN

M

A X

M

IN

M

A X

@ AT

A/C AIR CONDITIONIN/AIR CONDITIONER

ACOUS ACOUSTICAL

AD AREA DRAIN, AUTOMATIC DAMPER

ADJ ADJUST, ADJUSTABLE

ALUM ALUMINUM

A.P. ACCESS PANEL

ACT ACOUSTICAL CEILING

B BASE

BAR BARRIER

BD BOARD

B.F. BARRIER FREE

BG BUMPER GUARD

BKT BRACKET

BLDG BUILDING

BLKG BLOCKING

BOTT BOTTOM

C TO C CENTER TO CENTER

CAB CABINET

C.C.T. CUBICAL CURTAIN TRACK

C.E. COLUMN ENCLOSURE

C.G. CORNER GUARD

CIR CIRCLE

CIR CIRCUIT

CL CLOCK

C.L. CENTER LINE, CLEARANCES

CLG CEILING

C.J. CONTROL JOINT

CLKG CAULKING

CLO CLOSET

C.M.T. CERAMIC MOSAIC TILE

C.M.U. CONCRETE MASONRY UNIT

C.O. CLEANOUT

COL COLUMN

COM4

CONC CONCRETE

CONT CONTINUOUS

CORR CORRIDOR

CPT CARPET

CR CARD READER

CRK COAT RACK

C.S.S. CLINICAL SERVICE SINK

C.T. CERAMIC TILE

CTR CENTER

CUR CURTAIN

C.U.H. CABINET UNIT HEATER

DEMO DEMOLITION, DEMOLISH

DEPT DEPARTMENT

D.F. DRINKING FOUNTAIN

DIA, D DIAMETER

DIM DIMENSION

DN DOWN

DR DRAIN

DS DOWNSPOUT

ELECT ELECTRICAL

ELEV ELEVATION

ENTR ENTRANCE

EQ EQUAL

E.P. ELECTRICAL PANEL

EXH EXHAUST

EXP EXPOSED

EXSIST EXISTING, EXSIST'G

EXT EXTERIOR

E.W. EACH WAY

F.A. FIRE ALARM

F.D. FIRE DAMPER OR FLOOR DRAIN

F.E. FIRE EXTINGUISHER

F.E.C. FIRE EXTINGUISHER CABINET

FIN FINISH

FL, FLR FLOOR FINISH

FLG, FLRG FLOORING, FLOOR'G

FURN FURNITURE, FURNACE

F.W.C. FABRIC WALL COVERING

FT FEET, FOOT

GALV GALVANIZE(D)

G.B. GRAB BARS

GBX GLOVE BOX, TRIPPLE

GL GLASS

G.S.B. GYPSUM SHEATHING BOARD

G.WB GYPSUM WALLBOARD

GYP. BD GYPSUM BOARD

HS HAND SANITIZER DISPENSER, WATERLESS

1.D. INSIDE DIAMETER

INSUL INSULATION

IN INCH(ES)

JAN JANITOR'S CLOSET

H.M. HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

HW HEADWALL

LAM LAMINATED

LF LINEAL FEET

LKR LOCKER

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MANUF MANUFACTURED, MANUFACTURER

MIN MINIMUM

MLD'G MOLDING

MMC MOBILE MEDICAL CABINET

M.S. MOP SINK

MTL METAL

MON MONITOR

MR MOP RACK

N NORTH

NAT NATURAL

N.I.C. NOT IN CONTRACT

NORM NORMAL

N.T.S. NOT TO SCALE

O.C. ON CENTER

OPN'G OPENING

O, O2 OXYGEN

P PAINT

PLAST. PLASTIC

PNT PAINT

PREFAB PREFABRICATED

PT PAPER TOWEL DISPENSER

PLYWD PLYWOOD, PLYW'D

R RADIUS

R.A. RETURN AIR

REQ'D REQUIRED

RM ROOM

S SINK, SOUTH, SHINGLE

S.A. SUPPLY AIR

SAN SANITARY

SCC SCOPE CABINET

SD SOAP DISPENSER

S.D. SMOKE DAMPER

SECT SECTION

SH1 SHARPS DISPOSAL CONTAINER, WALL MOUNT

SHWR SHOWER

SIM SIMILAR

SND SANITARY NAPKIN DISPENSER

SNR SANITARY NAPKIN RECEPTACLE

SPEC SPECIFICATION

SPH SPHYGMOMANOMETER, WALL MOUNT

SQ SQUARE

S.S. SERVICE SINK, STAINLESS STEEL

STD STANDARD

STOR STORAGE

SUSP SUSPEND(ED)

SYM SYMBOL, SYMMETRICAL

TOIL TOILET

TEL TELEPHONE

TP TOILET PAPER DISPENSER

TYP TYPICAL

TV TELEVISION

UNFIN UNFINISHED

UTIL UTILITY

VAC VACUUM

V.A.V. VARIABLE AIR VOLUME

V.C.T. VINYL COMPOSITION TILE

V.D. VOLUME DAMPER

VERT VERTICAL

V.I.F. VERIFY IN FIELD

V.T. VINYL TILE

V.W.C. VINYL WALL COVERING

W/ WITH

W.C. WATER CLOSET

WD WOOD

WNDW WINDOW

W. HTR WATER HEATER

W/O WITHOUT

WP WALL PROTECTION

XR X-RAY VIEW BOX

M

A X

2"

TYP. SIGNAGE MOUNTING HEIGHTS & LOCATIONS

SCALE: NONE

IN

A X

RH/CH

"1' - 6"

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

GI002

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB EMP

GENERAL INFORMATION &

SYMBOL LEGEND

UPGRADE 1 WEST -

BLDG 1W

02REVISIONS DATE

5/8" GYP. BD. BOTH

SIDES OF 3-5/8" STEEL

STUDS @ 16" O.C. MAX

ACOUSTICAL

BATT.

INSULATION

CEILING LINE

FLOOR LINE

STRUCTURAL

DECK

3-5/8" STEEL STUD

DEFLECTION TRACK

EXTEND FRAMING TO

BOTTOM OF STRUCTURAL

DECK.

REFERENCE FINISH SCHEDULE

FOR BASE MATERIAL

3-5/8" STEEL STUD

CHANNEL RUNNER

FASTENED TO SLAB

5/8" GYP. BD. ON (1)

SIDE OF 3-5/8" STEEL

STUDS @ 16" O.C. MAX

CEILING LINE

FLOOR LINE

STRUCTURAL

DECK

3-5/8" STEEL STUD

DEFLECTION TRACK

EXTEND FRAMING UP TO

BOTTOM OF STRUCTURAL

DECK.

REFERENCE FINISH SCHEDULE

FOR BASE MATERIAL

3-5/8" STEEL STUD

CHANNEL RUNNER

FASTENED TO SLAB

ACOUSTIC BATT

INSULATION, UNLESS

NOTED OTHERWISE

5/8" GYP. BD. ON (1)

SIDE OF 2-1/2" STEEL

STUDS @ 16" O.C. MAX

2-1/2" STEEL STUD

CHANNEL RUNNER

FASTENED TO SLAB

CEILING LINE

FLOOR LINE

STRUCTURAL

DECK

2-1/2" STEEL STUD

DEFLECTION TRACK

EXTEND FRAMING UP TO

BOTTOM OF STRUCTURAL

DECK.

REFERENCE FINISH

SCHEDULE FOR BASE

MATERIAL

BRICK VENEER INFILL TO MATCH

ADJACENT WALL CONSTRUCTION, VIF.

BRICK VENEER ONLY REQUIRED WHERE

EXPOSED TO EXTERIOR, TOOTH-IN TO

EXISTING ADJACENT WALL

CONSTRUCTION, TYP.

CMU INFILL TO MATCH ADJACENT

WALL CONSTRUCTION, VIF.

TOOTH-IN TO EXISTING ADJACENT

WALL CONSTRUCTION, TYP.

EXISTING WALL AND FLOOR

CONSTRUCTION TO REMAIN

REMOVE EXISTING

PRE-CAST STONE SILL

EXISTING STEEL LINTEL TO REMAIN

EXISTING FURRING VARIES AT WINDOW

LOCATIONS; MATCH EXISTING

ADJACENT WALL FURRING

VARIES

5/8" TYPE 'X' GYP. BD.

BOTH SIDES OF 3-5/8"

STEEL STUDS @ 16" O.C.

MAX

ACOUSTICAL

BATT. INSULATION

CEILING LINE

FLOOR LINE

STRUCTURAL

DECK

3-5/8" STEEL STUD

DEFLECTION TRACK

EXTEND PARTITION TO BOTTOM OF

STRUCTURAL DECK. COPE AROUND

STRUCTURE, AND SEAL SMOKE TIGHT ALL

GAPS, FLUTES, AND PENETRATIONS WITH

FIRE SAFING SPRAYED IN PLACE ON

BOTH SIDES (TYP.)

REFERENCE FINISH SCHEDULE

FOR BASE MATERIAL

3-5/8" STEEL STUD

CHANNEL RUNNER

FASTENED TO SLAB

UL DES U419

UNDERSIDE OF

EXISTING DECK

1 HR RATED TEMPORARY

PARTITION. HI-IMPACT 5/8"

GYP. BOARD ON 3 5/8"

METAL STUDS. FINISH

OCCUPIED SIDE PER ROOM

FINISH SCHEDULE

NOTE:

PLASTER TAPE ALL GYP. BD.

JOINTS; SECURE ALL TAPE

WITH RAM-TACK HIGH TACK

SPRAY OR EQUAL;

CONTRACTOR TO PROVIDE

FINISH WALL ON OCCUPIED

SIDE TO GIVE FINISHED

APPEARANCE; REFER TO

PHASING PLANS FOR

ADDITIONAL INFORMATION

OCCUPIED SIDERENOVATION SIDE

2 1/2" DEEP SLOTTED

METAL DEFLECTION

TRACK FASTENED TO

DECK @ 2'-0" O.C.

COMPRESSIBLE

INSULATION

SEAL PERIMETER

COMPRESSIBLE

INSULATION

SEAL PERIMETER

MECHANICALLY

FASTEN BOTTOM

TRACK TO FLOOR

1/2" MAX DW JOINT

SINGLE LAYER DRYWALL USG #93 CONTROL

JOINT (BOTH SIDES)

3 1/8"

1/2" MAX DW JOINT

2 LAYERS FIRE

RATED DRYWALL

USG #93 CONTROL

JOINT (BOTH SIDES)

DOUBLE JAMB

STUDS (AT DOORS)

FIRE RATED DRYWALL

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218078

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs73

GI003

506-20-201

ANN ARBOR VAMC

MARCH 22, 2019 JRB EMP

INTERIOR WALL TYPES UPGRADE 1 WEST -

BLDG 1W

SCALE: N.T.S.GI003

W1 - 3 5/8" STEEL STUD01

SCALE: 1 1/2" = 1'-0"GI003

W2 - 3 5/8" STEEL STUD02

SCALE: 1 1/2" = 1'-0"GI003

W3 - 2 1/2" STEEL STUD03

SCALE: 1 1/2" = 1'-0"GI003

W4 - 4" BRICK ON 8" CMU WINDOW IN-FILL04

SCALE: 1 1/2" = 1'-0"GI003

W5 - 3 5/8" STEEL STUD RATED05

SCALE: 1 1/2" = 1'-0"GI003

W6 - TEMP. WALL CONSTRUCTION06

SCALE: 1 1/2" = 1'-0"GI003

TYP. RATED WALL CONTROL JOINT07

SCALE: 1 1/2" = 1'-0"GI003

TYP. WALL CONTROL JOINT08

REVISIONS DATE

01 GI001
01 GI002
01 GI003
02 GI100
02 GI101
03 GC101
03 GC102
03 GC103
03 GC104
34 AD100
34 AD101
34 AE001
36A AE101
36B AC121

File details come from the government source that posted it. Updated .