S02 36C25026B0031 - Upgrade TV System Network - 553-22-209.pdf
PDF 858 KB Posted
- Attached to
- Z1DA-Upgrade TV System IFB 553-22-209 Amendment 003 Federal contract opportunity
- Solicitation number
- 36C25026B0031
About this file
This is a sealed bid solicitation for construction services to upgrade the TV system network at the John D. Dingell VA Medical Center in Detroit, Michigan. The project (553-22-209) is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) under NAICS code 236220 (Commercial and Institutional Building Construction). The contractor must furnish all labor, materials, supervision, equipment, and related resources to install a 1.4 telecom system including approximately 6,000 linear feet of fiber optic cable, cable raceways with 1-inch EMT conduit, up to 40 networking cable mitigation boards, up to 45 fiber distribution boxes, and assembly and installation of government-furnished equipment including up to 35 networking racks, 45 uninterrupted power supplies, 40 ethernet switches, 80 fiber optic transceivers, and 45 keystone patch panels. The work must be completed within 240 calendar days from the Notice to Proceed.
Sealed bids are due by April 28, 2026, at 1:00 p.m. EDT at the Network Contracting Office 10 in Ann Arbor, Michigan. The contract is firm-fixed-price with an estimated magnitude between $500,000 and $1,000,000. A mandatory pre-bid site visit is scheduled for April 8, 2026, at 1:00 p.m. at the facility. Bid guarantees (minimum 20% of bid price, not to exceed $3,000,000) are required, and payment and performance bonds are due within 10 days of award for contracts exceeding $150,000. Performance and payment bonds are required using Standard Form 25. The successful bidder must demonstrate no more than three serious OSHA violations or one repeat/willful violation in the past three years and must submit an Experience Modification Rate (EMR) certification. All contractor personnel are subject to background investigations commensurate with access level needed, and the contractor must comply with E-Verify requirements and privacy training obligations. The RFI deadline is April 17, 2026, and inquiries should be submitted to Contract Specialist Angelo Vivio at Angelo.Vivio@va.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25026B0031 0003.docx | DOCX document | |
| S06 36C25026B0031 0002 - 553-22-209.pdf | ||
| S06 RFI Repsonses 1 - 553-22-209.pdf | ||
| S06 RFI Repsonses 3 - 553-22-209.pdf.pdf | ||
| S06 RFI Repsonses 2 - 553-22-209.pdf | ||
| 36C25026B0031 0002.docx | DOCX document | |
| S04 - Pre Bid Site Visit Attendance Log - 553-22-209.pdf | ||
| 36C25026B0031 0001.docx | DOCX document | |
| ATTACHMENT VAAR 852.219-75 DEVIATION Jan 2023 LIMITATIONS OF SUBCONTRACTING COMPLIANCE CERTIFICATION.pdf | ||
| RFI Form - 553-22-209.doc | DOC document | |
| Specs - TV System Upgrade - 553-22-209.pdf | ||
| Drawings - TV System Upgrade - 553-22-209.pdf | ||
| Wage Determination - MI20260101 01-02-2026 - 553-22-209.pdf | ||
| Contractor EMR Certification Form - 553-22-209.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25026B0031 - Upgrade TV System Network – 553-22-209 – VAMC Detroit, MI
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 72
36C25026B0031 X
04-01-2026
553-22-209
Department of Veterans Affairs Network Contracting Office 10 24 Frank Lloyd Wright Dr.
Lobby M-2200 Ann Arbor MI 48105
Same As Block 7
Vivio, Angelo D. 734-222-4450
Project 553-22-209, Upgrade TV System requires the contractor to furnish all labor, materials, supervision equipment, and all other necessary resources to fully complete the work identified in the contract specification and drawings.
See Important Bidder Information with Scope of Work and Bid submission requirements
This acquisition is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses with the ability to accomplish the work via North American Industry Classification System (NAICS) code 236220 - Commercial and Institutional Building Construction.
Project location is the John D. Dingell VA Medical Center Detroit , MI.
Magnitude of Construction: Between $500,000 and $1,000,000.
Pre-Bid Site Visit Information An organized Site visit has been scheduled for: Tuesday, April 8, 2026 @ 1:00 pm Participants will meet at: VAMC Detroit, MI - Bldg. 100, Engineering Conference Room LL633 Offerors or quoters are urged to inspect the site where the work will be performed.
10 240
X 52.211-10
X
1 13:00
4/28/2026
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Bidding Material starting on page 5. Complete and and attach to this offer page.
Y
Network Contracting Office (NCO) 10 24 Frank Lloyd Wright Dr.
Lobby M-2200 Ann Arbor MI 48105
Financial Management System PO Box 149971 Austin TX 78714-9971 877-353-9791 512-460-5540
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
2.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (NOV 2025) (DEVIATION)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.6 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS
AND CERTIFICATIONS (NOV 2025) (DEVIATION)
2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (DEVIATION
NOV 2025)
3.2 52.209-13 Violation of Arms Control Treaties or Agreements-Certification.
(DEVIATION NOV 2025)
GENERAL CONDITIONS
4.1 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(NOV 2025) (DEVIATION)
4.2 52.223-20 AEROSOLS (MAY 2024)
4.3 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV
2025)
4.4 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
4.5 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.6 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.7 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.8 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (MAY 2020)
4.9 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (MARCH
2026)……………………………………………………………………………………………..46
4.10 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
4.11 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
4.12 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899
(DEVIATION)(APR 2025)
4.13 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.14 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
4.15 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)
4.16 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)
4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
4.21 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.22 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.23 IT CONTRACT SECURITY
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE
AND BONDS
IMPORTANT BIDDER INFORMATION
BIDDING MATERIALS: All bidding materials consisting of the solicitation, all issued amendments, bidding forms, specifications, drawings, and all other related documents will be posted to the Contract Opportunities website located at https://sam.gov/content/opportunities - this is the only official location where solicitation and bidding documents can be obtained and where updates are posted. No ‘hard copy’ bidding materials are available nor is there a ‘bidders list’ maintained.
BID SUBMISSION: The following documents shall be included with the bid submission:
(1) An original, completed, signed and dated SF 1442 Offer page (‘wet ink signature’).
(a) An original completed Bid Schedule if one is provided - otherwise the lump sum bid amount for the entire project is entered in block 17 of the SF1442 Offer page.
Failure to provide a properly completed and signed original offer could result in the bid being determined non-responsive and rejected. EMAILED, FAXED, OR DELIVERY BY ANY OTHER
ELECTRONIC MEANS IS NOT AUTHORIZED.
(2) Acknowledgment of all amendments that are issued by one of the following methods:
a)Completing block 19 of the SF1442 by entering and acknowledging all issued amendments or;
b)Completing blocks 15a, b, and c of each issued amendment and including with the bid submission.
Failure to acknowledge an Amendment or Amendments could (case dependent) result in the bid being determined non-responsive and rejected.
(3) An original completed and signed SF 24 Bid Bond or other allowable Bid Security.
Failure to provide acceptable bid security in the proper amount, form, and content shall result in the bid being determined non-responsive and shall be rejected.
(4) Completed Annual Representations and Certifications (FAR 52.204-8) (MAY 2022). It is recommended that bidders complete their Representations and Certifications online at
WWW.SAM.GOV.
(5) Completed Contractor Experience Modification Rate (EMR) Certification documents (see solicitation attachments for the form).
(6) COMPLETED ATTACHMENT - VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON
SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND
CONSTRUCTION (JAN 2023) (DEVIATION).
Failure to provide a correctly completed certification cited in paragraph (6) above shall result in the https://sam.gov/content/opportunities http://www.sam.gov/ proposal/offer being determined non-responsive and shall be rejected.
(7) Any and all other documentation required by the solicitation.
Bidders are wholly responsible for insuring and verifying their offer and all required bid documents are received at the office designated in block 8 of the SF 1442 by the date and time specified in block 13a. of the SF 1442 (subject to amendment).
ADDITIONAL SOLICITATION INFORMATION
PROJECT: 553-22-209 - Upgrade TV System Network
SCOPE OF WORK STATEMENT:
The Contractor shall furnish all labor, material, equipment, supervision, testing, as-built information and all other related information for Project 553-22-209 Upgrade TV System Network at the VA John D.
Dingell VA Medical Center in Detroit, Michigan.
Detroit VAMC is requesting a Construction Contractor to provide construction services to install a Digital TV Infrastructure in Building 100 at the 1.4 million sqft. Detroit VAMC.
Contractor shall furnish all labor, tools, materials, and equipment to install a 1.4 telecom system associated with the VHA Master Specifications for the requested work at the John D. Dingell VA Medical Center as required by this statement of work and drawings. Contractor shall procure, install, test, and label approximately 6000 linear feet of fiber optic cable and provide pull strings including supplying all patch cables. Testing shall provide all installed cable lengths and passing of continuity. Labeling shall be placed at all ends of cables and conduit. Contractor shall procure and install all necessary cable raceways with 1” (green powder coated) EMT conduit, 1” flex conduit where necessary, j-boxes, j-hooks, fittings, and hardware. All fiber optic cable connectors shall be punched down and terminated. Contractor shall assemble and install up to 40 networking cable mitigation boards, (4’x4’ AC grade 3/4” trade size fire-rated plywood backboard painted high-gloss white with two coats of fire-resistant paint), and shall procure and install up to 45 Fiber distribution boxes for multiple single and multi-mode cables.
Contractors shall use HILTI-FS1, facility unique brand name, fire stopping and installing at both ends of all raceway penetrations. Contractors shall be responsible for all areas of work associated costs that require safety and infectious control measures. Contractors shall seal electrical closet/work area doors with 6mm or greater plastic with dust barrier zippers and follow all prevention control measures IAW the facilities permits, quality controls, and risk assessments. Contractors shall acquire and set up an air scrubber with duct work up to the exhaust fans shrouds and install sticky mats at the doors prior to any work in any area. Contractors shall assemble and install all government furnished equipment; up to 35 new networking racks, up to 45 rack mounted uninterrupted power supplies, up to 40 racks mounted ethernet switches, up to 80 fiber optic transceivers, and up to 45 rack mounted keystone patch panels.
During assembly of the racks, if needed the contractor shall furnish materials/adapters for mounting equipment. All equipment shall be bonded and grounded. Contractor shall wipe down installed equipment, remove all excess and existing materials, and sweep and mop the floors to all work areas when completed. All deducted or unassociated work on the drawings for CAT6A and power drops and any other work not stated in this statement or on the drawings will be completed by others.
3. Performance Period/Schedule
The Contractor shall fully complete the work required under this SOW in 240 calendar days or less from the date of issuance of the Notice to Proceed unless directed otherwise.
WAGE DETERMINATION: Department of Labor General Decision Number MI20260101 dated 01- 02-2026 is included as an attachment to solicitation and is applicable to any resultant contract. If necessary, subsequent revisions will be posted to the solicitation via amendment prior to bid opening.
Revision may also be applicable prior to any contract award. Wage decisions are available at Wage Determinations Online (WDOL) at https://sam.gov/content/wage-determinations .
REQUESTS FOR INFORMATION (RFI): To obtain clarifications and/or additional information concerning the solicitation requirements, specifications and/or drawings, or any other issue pertaining to the advertisement for bids, submit a written RFI utilizing the RFI Form attached to this solicitation and send via email to the attention of Contract Specialist Angelo.Vivio@va.gov. The subject line of the email must read ‘RFI # – 36C25025B0031 - 553-22-209 Upgrade TV System Network. RFIs related to the project technical documents must be specific identifying section, paragraph and page no. of the specifications or cite the drawing number and must be in question format. RFIs related to the solicitation or other related documents shall refer to the specific provision, clause, etc. All RFIs submitted shall include the solicitation number and title, contractor name, city, state, telephone, email address, date submitted, and the RFI question(s). RFI responses will be posted to the original solicitation located at; in amendment format. Deadline for submission of RFIs for this solicitation is 04-17-2026. No questions will be answered after this date unless determined to be in the best interest of the Government as deemed by the Contracting Officer. Telephone requests for information will not be accepted nor returned.
TYPE OF SET-ASIDE
THIS SOLICITATION IS A TOTAL SET-ASIDE FOR
SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (SDVOSB)
SEE VAAR CLAUSE 852.219-73 FOR ELIGIBILITY REQUIREMENTS.
DATABASE REGISTRATION INFORMATION
SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION: The System for Award Management (SAM) website located at https://sam.gov is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS).
Federal Acquisition Regulations require that federal contractors wishing to do business with the Government and bid on work shall have an active registration in SAM. The offeror shall have an active registration in SAM at the time of offer submission otherwise the Contracting Officer shall deem the offeror’s bid non-responsive to the solicitation requirements (see FAR 52.204-7 for complete SAM registration requirements).
THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at https://sam.gov for each person or business https://sam.gov/content/wage-determinations https://sam.gov/ https://sam.gov/ providing services under this contract. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.
VETS-4212 REPORTING REQUIREMENT: Contractors are required to submit a required annual Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year. Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C. 4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process. For more information on this requirement and/or for completing the web-based reporting form, visit the following website https://www.dol.gov/agencies/vets/programs/vets4212. See FAR provision 52.222-38, Compliance with Veterans' Employment Reporting Requirements (FEB 2016) under the Representations, Certifications and Other Statements of Offerors, and FAR clause 52.222-37, Employment Reports on Veterans (JUN 2020) found in the General Conditions section of the solicitation.
BONDING INFORMATION
BID GUARANTEE: A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, shall require rejection of the bid in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds must be provided using Standard Form 24 (see FAR 28.106-1) and the form must be provided in original (no white outs, faxed or copied signatures, seals) with ‘wet ink’ signatures and contain the proper solicitation number, bid opening date, and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties are subject to the approval and acceptance of the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety. Other forms of bid security may be acceptable as denoted in FAR Part 28.203-2.
PERFORMANCE AND PAYMENT BONDS: In accordance with Contract Clause 52.228-15, and FAR 28.102, Contractors are reminded that any amount awarded over $35,000.00 shall require a Payment Bond (SF 25A), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds (SF 25). Payment and Performance bonds are due no later than 10 days after notification of award.
Bonds must be provided with original ‘wet ink’ signatures - no white-outs or other corrections are allowable. Copies and facsimiles of bonds are not acceptable.
SECURITY
BACKGROUND INVESTIGATIONS: All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform the statement of work. This requirement is also applicable to all subcontractor personnel requiring the same level of access.
Levels and associated types of Background Investigations:
• If the project requires that workers have only limited physical access to the VA facility for a period of one year or less, a local flash badge with fingerprint check is issued.
• If the project requires that workers require un-supervised, logical and/or physical access for 180 consecutive or aggregate days in a 365-day period, over a 3 year period, a background https://www.dol.gov/agencies/vets/programs/vets4212 investigation may be required (Special Agency Check (SAC)) which must be completed prior to being allowed access.
• If the project requires that workers have access to a VA Network (such as the Building Management System) or un-supervised, full-time, logical, and/or restricted physical access for more than 6 months or more than 180 aggregate days in a one-year period, a background investigation is required (Special Agency Check and National Agency Check with Written Inquiries (NACI)) and access is not allowed until a favorable SAC completion.
All costs for SAC and NACI checks are borne by the contractor. The VA may at its discretion make deductions against the contract in order to recoup the investigation costs. At present, the VA is not charging contractors for background investigations, but this is subject to change.
MEDICAL CENTER ACCESS: Anyone participating in the site visit, or for any other reason that involves visiting the medical center related to this solicitation, must have a valid ID on their person and their vehicle must be properly registered and insured. Company owned vehicles must be clearly marked.
Visitors are prohibited from possessing weapons while on a federal installation (See 18 USC 930 – Possession of Firearms and Dangerous Weapons in Federal Facilities). Handheld cellphone usage or texting while driving is also prohibited. All VA Medical Centers and associated properties are Federal Property. Smoking and vaping is prohibited on medical center grounds including in vehicles or contractor owned/leased office or storage trailers.
PRIVACY TRAINING: All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the Contracting Officer’s Representative.
E-VERIFY SYSTEM (e-verify.gov): Companies awarded a contract in excess of $150,000 (except for those with performance periods of 120 calendar days or less) with the federal government shall enroll in E-Verify within 30 days of the contract award date. They shall also begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (See FAR Clause 52.222-54).
OTHER IMPORTANT BIDDER INFORMATION
PRIME CONTRACTOR INFORMATION- SAFETY OR ENVIRONMENTAL VIOLATIONS
AND EXPERIENCE MODIFICATION RATING INFORMATION
All Bidders/Offerors shall submit information pertaining to their past Safety and Environmental record.
(using the attached EMR information/data form) pertaining to their past Safety and Environmental record.
The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Bidders/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, Bidder/Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and Puerto Rico shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, Bidder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that it has assigned Bidder/Offeror a Unity Rating of 1.0.
The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS: The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for the contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.
All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the Contracting Officer's Representative will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location.
REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT ENGINEER,
OR PROJECT MANAGER: Any reference contained within contract specifications and/or drawings to the “VA Engineer”, “Resident Engineer”, “Senior Resident Engineer”, “Project Manager”, or their abbreviations are to be read as meaning the “Contracting Officer’s Representative (COR)”.
PAYMENT FOR MATERIALS STORED OFF-SITE: Payment in advance of installation for materials stored off-site is at the discretion of the Contracting Officer after receipt of a request by the contractor. Extraordinary measures are required regarding the security, insurance, labeling, storage, etc. if payment is authorized for materials stored off-site. Payment for materials stored off-site is generally not authorized.
SCHEDULE OF MATERIAL SUBMITTALS: The submittals contemplated by FAR 52.236-5, Material and Workmanship are listed on the Schedule of Material Submittals in the Specifications, if provided. The schedule is for reference only – the selected contractor is responsible to provide all submittals required by the contract.
REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE
ASSESSMENT SYSTEM (CPARS)
(a) As prescribed in Federal Acquisition Regulation (FAR) Part 42.15, the Department of Veterans Affairs (VA) evaluates contractor past performance on all contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS.
(b) Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: www.cpars.gov. Help in registering can be obtained by contacting Customer Support Desk at 207-438-1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor's registered representative.
(c) For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, either by virtue of the original performance period or as modified, the contracting officer will evaluate the contractor's performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor's designated representative for comment. The contractor representative will have thirty days to submit any comments and return.
(d) Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government's evaluation being placed on file in the database with a statement that the “contractor failed to respond.”
NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS POLICIES
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C.
chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the
Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by enough technical documentation to permit understanding and use of the records and data.
4. The Government and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of the Government or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity (HCA).
Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the contractor must report it to Government Contracting Officer. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Government Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to the Government’s control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer who awarded the contract. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by all Government guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with the project location VA Medical Center’s written policy.
8. The Contractor shall not create or maintain any records containing any non-public Government information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. The Government owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government and shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through
FAR 52.227-20.
11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management System (TMS) Item #3873736, Records Management for Records Officers and Liaisons. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. All training shall be coordinate with the Contracting Officer’s Representative assigned to the contract.
OTHER IMPORTANT NOTICES
1. Contractor employees shall not be considered government employees for any purpose under this contract.
2. Contractor employees may be required to undergo Tuberculosis, Influenza, COVID, or other contagious disease screening prior to being authorized to work on-site. Screening is per individual VA Medical Center policy and shall be reviewed and discussed at the pre-construction conference.
3. Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:
Offerors are hereby notified that under Michigan Compiled Laws, Chapter 205 Taxation, Sections 205.54w & 205.54s, Michigan exempts from sales and use taxes personal property purchased by construction contractors that will be affixed to and made a structural part of a non-profit hospital. A “non-profit hospital” is defined as that portion of a building owned or operated by a governmental unit in which medical attention is provided, as well as that portion of real property necessary and related to a such a building. Therefore, VA has determined that the contractor’s purchase of such building and construction materials that will be affixed to or made a structural part of this particular VA construction project is exempt from Michigan Sales or Use Tax. To take advantage of the tax exemption the successful offeror under this solicitation must complete a Michigan Sales and Use Tax Certificate of Exemption and keep on file as required by the Michigan Tax Code.
Notwithstanding FAR 52.229-3, all bids received in response to this solicitation are presumed to reflect any tax benefit that may be realized upon the execution of the exemption certificate.
Link to the Michigan Sales and Use Tax Certificate of Exemption Form: 3372, Michigan Sales and Use Tax Certificate of Exemption
The VA will not field nor respond to any questions regarding the Michigan Sales and Use Tax Certification of Exemption nor any questions regarding Michigan Tax Code.
END OF IMPORTANT BIDDER INFORMATION SECTION
https://www.michigan.gov/taxes/-/media/Project/Websites/taxes/Forms/2007/2007_3372.pdf?rev=f31828b81c1a4d1fb3144ca3f47ca7db&hash=79508DBC3FD550D40428001EA6E19C69 https://www.michigan.gov/taxes/-/media/Project/Websites/taxes/Forms/2007/2007_3372.pdf?rev=f31828b81c1a4d1fb3144ca3f47ca7db&hash=79508DBC3FD550D40428001EA6E19C69
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
2.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.
(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.
(End of Clause)
2.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)
(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Hand-Carried Address:
Network Contracting Office (NCO) 10 24 Frank Lloyd Wright Dr.
Lobby M, Suite 2200 Ann Arbor MI 48105 Mailing Address:
Department of Veterans Affair
Network Contracting Office (NCO) 10 24 Frank Lloyd Wright Dr.
Lobby M, Suite 2200 Ann Arbor MI 48105
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.6 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS
REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)
(a) Definitions. As used in this provision—
Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.
Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.
Marginalized populations of Sudan means—
(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and
(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.
Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted under specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;
(3) Consist of providing goods or services to marginalized populations of Sudan;
(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;
(5) Consist of providing goods or services that are used only to promote health or education;
or
(6) Have been voluntarily suspended.
Sensitive technology—
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—
(i) To restrict the free flow of unbiased information in Iran; or
(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
(b) Procedures.
(1) Covered telecommunications and video surveillance. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”
(2) FASCSA Orders.
(i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
https://www.sam.gov/
(ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
(iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.
(c) Covered telecommunications equipment or services representations. By submission of its offer, the Offeror represents that, after conducting a reasonable inquiry (that looks at any information in the Offeror’s possession but does not need to include an internal or third-party audit)—
(1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation, except as waived by the solicitation, or as disclosed in paragraph (g); and
(2) It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .