This solicitation is for a construction project to renovate patient privacy spaces at a Department of Veterans Affairs medical center. The solicitation seeks proposals for general construction and renovation work including demolition, mechanical and electrical upgrades, wall installation, and interior finish work. Proposals are due on August 31, 2023. The construction period is 500 calendar days from notice to proceed. This is a total small business set-aside for Service-Disabled Veteran-Owned Small Businesses, who must perform a minimum of 15% of the construction work. The project location is the Salem VA Medical Center in Salem, Virginia. The estimated value is between $10-20 million.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Patient Privacy Phase II, newest first.
File Type Posted
S06 36C24623R0033 0005.pdf PDF
S06 36C24623R0033 0004.pdf PDF
Wng H Color Board.pdf PDF
143-P61 SANITARY WASTE and VENT RISER DIAGRAM.pdf PDF
143-P59 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143-P36 PARTIAL PLUMBING PLANS 1-4IN equal 1FT.pdf PDF
10 25 13.pdf PDF
143-P35 PARTIAL PLUMBING PLAN 1-4IN equal 1FT.pdf PDF
143-P55 4TH. FLR. MED GAS PLAN ZONE H.pdf PDF
Cubicle Curtain Tracks.pdf PDF
Wing-H_Elec..pdf PDF
281300 Physical Access Control.pdf PDF
143-P60 DOMESTIC WATER_FIRE PROTECTION RISER DIA.pdf PDF
28 05 00.pdf PDF
143 Domestic Water Riser.pdf PDF
S05 RFI Solicitation questions for Renovate Patient Privacy Phase II.pdf PDF
143-P33 PARTIAL PLUMBING PLAN 1-4IN equal 1FT.pdf PDF
Bldg._143_4th_Floor_Hazardous_Materials_Survey.pdf PDF
143-P62 SANITARY WASTE and VENT RISER DIAGRAM.pdf PDF
143-P58 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143-P57 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143 Sanitary Waste and Vent plan.pdf PDF
S06 36C24623R0033 0003.pdf PDF
AMICO Patient Headwalls Submittals_BES RSP.pdf PDF
Access Controls.pdf PDF
143-P21 ZONE H 3RD. FLR. PLUMBING PLAN.pdf PDF
143 Plumbing plans.pdf PDF
S06 36C24623R0033 0002.pdf PDF
S04 Site Visit_Reno Patient Privacy Phase II 8-9-2023.pdf PDF
Vol 2 Drawing 8-1-2023.pdf PDF
Vol 1A Drawing 8-1-2023.pdf PDF
S06 36C24623R0033 0001.pdf PDF
Vol 1B Drawing 8-1-2023.pdf PDF
Vol 16-30_drawings.pdf PDF
Vol 61-72_drawings.pdf PDF
Vol 46-60_drawings.pdf PDF
Vol 31-45_drawings.pdf PDF
Final CD Spec Book_Wing H.pdf PDF
Vol 1-15_drawings.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24623R0033

X 08-01-2023

TBD

TBD

658-23-105

Department of Veterans Affairs Network Contracting Office 6 1970 Roanoke Blvd Salem VA 24153

Department of Veterans Affairs Network Contracting Office 6 1970 Roanoke Blvd Salem VA 24153 Andrew Jackson andrew.jackson@va.gov Project Title: Renovate Patient Privacy Phase II Project Number: 658-23-105 NAICS Code: 236220 – Commercial and Institutional Building Contractors / SBA Size Standard: $45M IAW VAAR 836.204(h)(1), Magnitude of construction is between: $10,000,000 and $20,000,000

Summary Project Description: This project is for the total renovation of the H-zone located on the fourth floor of Building 143 at the Salem VA Medical Center. Renovated space will provide for upgrade patient privacy by accommodating 20 patient rooms and their corresponding support spaces. Contractor shall furnish all labor, materials, tools, equipment, transportation, and qualified supervision necessary to perform general construction, alterations, and certain other items as graphically illustrated on the contract drawings, narratively described in the contract specifications, drawings, and statement of work.

This contract will be awarded in accordance with FAR Part – 15 Contracting by Negotiations

IAW VAAR 819.203-70 established public law, all bidders are required to be registered and current in System for Award Management (SAM) at the time of award. The official U.S. Government website is www.sam.gov.

This is a total Service-Disabled Veteran Owned Small Business (SDVOSB) set aside IAW 38 U.S.C. 8127 (d). SDVOSB is required to perform a minimum of 15% of the construction work on the project with its own labor force. Offerors are required to fill-out and signed 852.219-75 Certificate of compliance for service and construction, if not contractor will be ineligible for award.

Prime SDVOSB shall comply with subcontracting limitation as defined in 13 CFR 125.6

Pre-Proposal Conference / Site Visit: Wednesday, August 9, 2023 @ 10:00AM EST location of site visit is Building 74 (front side of the Building 74)

Questions/Request for Information (RFI) Due Date: Wednesday, August 16, 2023 @ 2:00PM EDT; All questions shall be email to bryant.guerrant@va.gov - No telephone calls will be accepted.

Proposal Due Date: Thursday, August 31, 2023 @ 10:00AM EDT

ALL PROPOSAL SHALL BE EMAIL TO: bryant.guerrant@va.gov

X X

52.211-10 X

Email 1 PDF

10:00AM

EST

08-31-2023 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Bid Item I (Base Bid) $___________________________

Network Contracting Office 6 1970 Roanoke Blvd Salem VA 24153

Financial Services Center P.O. Box 149971 Austin TX 78714-9971 512-460-5049 512-460-5221

SCOPE OF WORK

Renovate for Patient Privacy Phase 2 Project Number 658-23-105 Salem VAMC

Contractor shall provide all labor, material, equipment, and qualified supervision necessary to perform work as described in the drawings and specifications for Project #658-23-105 Renovate For Patient Privacy- Wing H/Elevator Lobby at the Salem VA Medical Center in Salem, VA. Work includes general construction, alterations, mechanical and electrical work, equipment, utility system, necessary removal of existing structures and construction and certain other items, as is necessary to complete the scope of work. Summary scope of work: The project includes the total renovation of the H-Zone of the fourth floor of Salem VA Medical Center Building 143 for patient privacy. This area will be able to accommodate 20 patient rooms and associated support spaces. It is anticipated that the total renovation area will be approximately 20,755 sf.

The project will involve a total renovation, to include but not limited to, demolition in a medical facility environment, mechanical and electrical upgrades, partition wall installation, security equipment installation, medical equipment installation, and interior finish installation. Included in the project will be a renovation of the elevator lobby to include floor, ceiling, and wall renovation and/or replacement.

If selected, the construction time allocated for completion of the work associated with Bid Item I (Base Bid), as described above, is 500 calendar days from notice to proceed (NTP) by the VA. Award is subject to the availability of funds.

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

BID ITEM I:

Statement of Work: Contractor shall provide all labor, material, equipment, and qualified supervision necessary to perform work as described in the drawings and specifications for Project # 658-23-105 Renovate For Patient Privacy- Wing H/Elevator Lobby at the Salem VA Medical Center in Salem, VA. Summary scope of work: The project includes the total renovation of the H-Zone of the fourth floor of Salem VA Medical Center Building 143 for patient privacy. This area will be able to accommodate 20 patient rooms and associated support spaces. It is anticipated that the total renovation area will be approximately 20,755 sf.

The construction time allocated for completion of the work associated with Bid Item I (Base Bid), as described above, is 500 calendar days from notice to proceed (NTP) by the VA.

GRAND TOTAL
__________________

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE2
ITEM INFORMATION2
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS5
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS6
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)25
2.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (OCT 2022)25
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)28
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)29
2.5 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)30
2.6 52.228-1 BID GUARANTEE (SEP 1996)31
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)31
2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)32
2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)32
2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)33
2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)33
REPRESENTATIONS AND CERTIFICATIONS35
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2022)35
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)39
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)41
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)43
GENERAL CONDITIONS46
4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)46
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)46
4.3 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)47
4.4 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)47
4.5 52.223-21 FOAMS (JUN 2016)49
4.6 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)50
4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS53
4.8 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)54
4.9 52.244-2 SUBCONTRACTS (JUN 2020)55
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)58
4.11 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (DEC 2022)58
4.12 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)67
4.13 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)67
4.14 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020)67
4.12 VA Notice of total set-aside for Certified service-disabled veteran-owned small businessES68
(JAN 2023) (DEVIATION)68
4.13 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION71
(JAN 2023) (DEVIATION)71
4.14 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)73
VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)73
VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS–CPM) (NOV 2018) (ALTERNATE I)74
VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)77
VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)78
VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)79
VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)79
VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)80
VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)80
VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018)82
MANDATORY WRITTEN DISCLOSURES82

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

(a) If the bid/offer exceeds $150,000, an offer guarantee is required in an amount not less than twenty (20) percent of the bid/offer price or $3M, whichever is less.

(b) Offerors are reminded that an acceptable Offer Guarantee MUST be received with the bid/offer before the proposal opening. Failure to furnish the required offer guarantee in the proper form and amount, by the time set for opening of bids/offers, will require rejection of the bid/offer in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4, and may be cause for rejection even then. For guidance, Bidders/Offerors are referred to FAR provision 52.228-1, BID GUARANTEE (SEP 1996) in the solicitation, FAR Part 28.101 Bid Guarantees, and FAR Part 28.2 Sureties and Other Security for Bonds. Corporate sureties offered for bonds must appear on the list contained in the Department of Treasury Circular 570, “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies, ” See http://www.fms.treas.gov/c570/c570.html

(c) If the contract will exceed $30,000 but will not exceed $150,000, the bidder/offeror to whom award is made will be required to furnish a Payment Bond, Standard Form 25A, or alternative payment protection.

(d) If the contract will exceed $150,000, the bidder/offeror to whom award is made shall be required to furnish a Payment Bond, Standard Form 25A, and a Performance Bond, Standard Form 25. Copies of the Standard Forms 25A and 25 may be obtained upon application to the Issuing Office.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

INSTRUCTIONS TO OFFERORS FOR PROPOSAL PREPARATION

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE.

A. SAFETY AND ENVIRONMENTAL RECORD: In order to be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an Experience Modification Rate (EMR) of equal to or less than 1.0.

All Offerors shall submit the following information pertaining to their past Safety and Environmental record with their bid.

1. A self-certification on company letterhead that the bidder has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. Bidders shall submit copies of their OSHA logs (OSHA Form 300A) for the past three years with their bid. If the firm has been in business for less than three years, they shall submit copies of their OSHA logs for the period of time they have been in business.

1. Information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the bidder’s/offeror’s insurance company and be furnished on the insurance carrier’s letterhead.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

B. DESCRIPTION OF WORK: See SCOPE OF WORK and PROPOSAL ITEM LIST.

C. DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION FAR 836.204 (h) (1): $10,000,000 - $20,000,000

D. NAICS: The NAICS Code for this procurement is 236220 – Commercial and Institutional Building Construction Contractors; Size Standard: $45 Million.

E. COMPLETION TIME: SEE PROPOSAL ITEM LIST

F. SDVOSB SET-ASIDE: Effective June 20, 2007, Public Law 109-461, the Veterans Benefits, Health Care, and Information Technology Act of 2006 allow procurements to be set-aside for SDVOSBs and VOSBs. This procurement is 100% set-aside for Service-Disabled, Veteran-Owned Small Business (SDVOSB). Bids are solicited only from SDVOSB concerns and bids received from concerns that are not SDVOSB concerns shall be rejected.

G. Plans/Drawings/Specifications: Drawings and specifications are attached in electronic format to this solicitation. Offerors are responsible for downloading and printing their own bid sets. The VA will not provide hard copies of the drawings and specifications to any offeror. Contractors are responsible for ensuring that any construction document package used for proposals or construction is complete and up to date.

H. RESIDENT PROJECT ENGINEER: All reference to "Resident Project Engineer" in the solicitation will be changed to "Contracting Officer’s Representative" or “COR.”

I. GENDER: Wherever masculine gender is used in the solicitation and contract documents; it shall be considered to include both masculine and feminine.

J. ELECTRONIC PROPOSALS AUTHORIZED: Proposals received electronically that conform to this requirement shall be deemed as a qualified vendor. Electronic proposals received after the aforementioned date & time (5:00PM, 1 day prior to proposal due date) shall be deemed ineligible.

Format for electronic submission (email) shall be as follows:

RFP Number, Offeror Name, Email 1 of XX Additionally, the Email shall contain the list of attachment for each email submitted.

Electronic documents shall be submitted in PDF restricted to emails of less than less than 10MB as that is maximum single email size allowable. Communication containing documents in any other format may be blocked or stripped by the Government's server and may not be received by this office. Files in .zip format or file(s) exceeding 10MB may not be received by this office. It is the contractor’s responsibility to verify that all submissions are received

K. DEPARTMENT OF VETERANS AFFAIRS: All reference to "Veteran's Administration" or "VA" in the solicitation will be changed to Department of Veterans Affairs".

L. METRIC PRODUCTS: Products manufactured to metric dimensions will be considered on an equal basis with those manufactured using inch-pound units, providing they fall within the tolerances specified using conversion tables and contained in the latest revision of Federal Standard No. 376, and all other requirements of this document are met. If a product is manufactured to metric dimensions and those dimensions exceed the tolerances specified in inch-pound units, a request should be made to the Contracting Officer, in writing, to determine if the product is acceptable. The Contracting Officer, in concert with the Contracting Officer’s Representative (COR), will accept or reject the product.

M. CONTRACTOR RESPONSIBILITY: Contractor shall be required to complete all contract work and schedule a final inspection within the specified contract performance period. Should the Contractor fail to complete the contract work (including scheduling of the final inspection), and it is determined by the Government to be a Contractor-caused delay, the Contractor shall be in default status. If the Government determines it to be in the best interest of the Government to allow the Contractor to continue to perform contract work, the Contractor shall provide equitable consideration to the Government for additional time granted for completion of contract work. Such agreement shall not be deemed a waiver of the Government’s right to terminate this contract in the event the Contractor fails to complete the contract work (including scheduling of the final inspection) on or before the completion date.

N. TRAINING: Effective July 1, 2005, all employees of the general contractor and subcontractors shall have the 10-hour OSHA certified construction safety course and/or other relevant competency training, as determined by the COTR with input from the ICRA (Infection Control Risk Assessment) team. The General Contractor’s competent person shall have completed the 30-hour OSHA certified construction safety course. Documentation of training shall be submitted to the Contracting Officer for review and approval prior to any work being performed. No ID badge will be issued to an employee who does not provide this documentation. There shall be no exceptions to this requirement.

O. TB TESTING: It is the responsibility of the contractor to provide TB training annually and a PPD test annually for any employee(s) providing services at Salem VAMC. The Government reserves the right to review the contractor’s records.

P. PRE-PROPOSAL CONFERENCE / SITE VISIT: A pre-proposal conference / site visit has been scheduled for Wednesday, August 9, 2023, at 10:00 AM EDT, at the Salem Medical Center Building 74 (Front side of Building 74) Salem VA Medical Center, Salem, VA. This pre-proposal conference will be the only opportunity for potential offerors to visit the site.

All potential offerors, subcontractors, and suppliers are strongly encouraged to attend this pre-proposal conference/site visit.

NOTE: QUESTIONS/RFI’s REGARDING THIS SOLICITATION MUST BE SUBMITTED VIA E-MAIL (bryant.guerrant@va.gov); NO TELEPHONE QUESTIONS WILL BE ACCEPTED. CUT OFF FOR QUESTIONS/RFI’s IS: Wednesday, August 16, 2023, at 2:00 PM EDT.

PROPOSAL IS DUE ON: Thursday, August 31, 2023, at 10:00 AM EDT.

Q. KEYS: All keys provided the Contractor for use during the project shall be returned to the Contracting Officer's Representative (COR) at completion of the work or upon request. No keys shall be reproduced by the Contractor. There shall be a charge of $25.00 for each key that is lost or not returned to the COR. Payment shall be made to the VA Medical Center, Salem, VA upon receipt of a Bill of Collection.

R. PREPARATION OF BIDS/OFFERS/PROPOSALS: Neither the VAMC nor the VISN 6 NCO will pay for any costs incurred in preparation and submission of bids or proposals.

S. PRIVACY AND CONFIDENTIALITY: Contractors to the Department of Veteran Affairs may be unintentionally exposed to sensitive information. Information may be overheard, seen on documents or electronic devices, or observed that could potentially violate the privacy and confidentiality of our veterans, employees, volunteers, and their families. Regulations such as, but not limited to the Health Insurance Portability and Accountability Act of 1996 (HIPAA), Freedom of Information Act (FOIA) and Privacy Act of 1974 have been enacted to protect sensitive information from being improperly disclosed. Information should not be divulged or released to anyone unless specifically authorized by this contract or its’ attached documents in accordance with the contracted services. Failure to comply with applicable statutes and regulation can result in the termination of this contract and civil and criminal penalties, including fines and imprisonment. All suspected or actual breeches of privacy and confidentiality should be reported immediately to the Contracting Officer, Contracting Officer’s Representative (COR) or the Facility Privacy Officer.

The C&A requirements do not apply, and a Security Accreditation Package is not required. If the contractor opts to use a computer or computer system for processing contract documents, the requirements of FIPS 140-2 for encryption of contract documents must be met.

T. VETS 100: Title 38, USC Section 4212(d) and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS 100 reporting information can be done electronically at: VETS 4212. Award cannot be made unless the awardee has filed their VETS 100 report; therefore, all bidders/offerors are encouraged to file every year.

U. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Bidders are encouraged to ensure that they are registered in SAM prior to submitting their bid.

V. VA NOTICE OF LIMITATIONS ON SUBCONTRACTING 852.219-75 – CERTIFICATE OF COMPLIANCE FOR SERVICE AND CONSTRUCTIONS (JAN 2023) (DEVIATION): In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

W. WAGE DETERMINATION: Wages for all contractors and subcontractors must comply with Davis Bacon Wage Determinations. The current determination is General Decision VA20230172 dated 06/02/2023. Be advised the determination that is current at the time of the Contract award is the determination that will apply for the project. Current determinations are always available at: http://www.wdol.gov/

"General Decision Number: VA20230172 06/02/2023

Superseded General Decision Number: VA20220172

State: Virginia

Construction Type: Building

Counties: Botetourt, Craig, Franklin and Roanoke Counties in Virginia.

Includes the independent cities of Roanoke* and Salem* BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. | The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 06/02/2023

ASBE0024-006 04/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2021

Rates Fringes

BOILERMAKER......................$ 42.62 24.81

ENGI0147-019 05/01/2022

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 34.17 15.21 Cranes under 90 tons........$ 33.26 15.12

* IRON0005-010 06/01/2023

Rates Fringes

IRONWORKER.......................$ 36.10 25.19

PAIN0051-033 06/01/2021

Rates Fringes

PAINTER: Spray Only..............$ 25.50 11.27

* SUVA2013-059 01/11/2016

Rates Fringes

BRICKLAYER.......................$ 23.87 6.81

CARPENTER........................$ 13.49 ** 1.10

ELECTRICIAN......................$ 21.78 9.31

IRONWORKER, REINFORCING..........$ 25.36 6.68

LABORER: Common or General, Including Mason Tender - Brick and Cement, and Pipelaying.......................$ 15.15 ** 1.58

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 16.24 0.87

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 16.00 ** 0.00

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 20.01 0.00

PIPEFITTER.......................$ 24.98 9.14

PLUMBER..........................$ 21.15 3.92

ROOFER...........................$ 16.17 ** 3.73

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 18.38 3.30

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 16.58 1.73

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

EVALUATION FACTORS FOR AWARD

(a) GENERAL INSTRUCTIONS:

1. All proposal preparation cost will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost.

2. Cost proposals and Technical proposals of each offeror will be evaluated independently. Offerors shall separately bind each. All copies shall therefore be labeled with the offerors name, business address, and VA Solicitation Number.

3. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

The offer shall consist of three (3) separate parts:

· Part I – TECHNICAL CAPABILITY FACTOR

· Part II – PAST PERFORMANCE FACTOR

· Part III – PRICE FACTOR The Government will award a contract resulting from this solicitation to the responsible Offeror whose proposal, if conforming to the solicitation, will be most advantageous to the Government, price and other factors considered. See Appendix A for a detailed description of all Evaluation Factors and Subfactors. The following factors shall be used to evaluate offers:

a. VOLUME I – TECHNICAL FACTOR

b. VOLUME II – PAST PERFORMANCE FACTOR

c. VOLUME III – PRICE FACTOR

BASIS FOR CONTRACT AWARD: This is a competitive Tradeoff source selection in which all evaluation factors other than price, when combined, are significantly more important than price. The factors other than price include both the Technical Factor and the Past Performance Factor. Award may be made on other than the lowest priced offer(s) where higher priced offers received better Technical and/or Past Performance ratings than the lower priced offer(s). The Source Selection Authority shall make an integrated assessment best value award decision, where the perceived benefits of the selected higher priced proposal, and the rationale for tradeoffs, shall be documented in the contract file in accordance with FAR 15.406.

Regarding the below process, the terms strength, weakness, and deficiency are defined as follows:

i. The term strength means an aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

ii. The term weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.

iii. The term deficiency means a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a solicitation requirement may result in an offer being determined nonresponsive (see below). The evaluation process shall proceed as follows:

Evaluation of Proposals Proposals will be evaluated by the Contracting Officer to ensure Vendor completed all requested instructions within the solicitation prior to being sent to Source Selection. Clarifications may be conducted to identify/confirm missing documentation and a determination will be made regarding whether the offeror should/can be allowed to submit any missing/deficient documentation without adverse effect to other offerors or the timeliness of award. Qualified vendor will be provided to the Technical Evaluation Board (TEB) for the next evaluation stage.

VOLUME I – TECHNICAL CAPABILITY FACTOR:

First, the technical capability of all offers will be evaluated on an Outstanding, Good, Satisfactory, Marginal, or Unsatisfactory basis. Construction Schedule, and Experience sub-factors will be weighted equally, because risk of unsuccessful performance is expected to be minimal, risk is not separately evaluated, but instead is included as part of the technical capability and will be evaluated for acceptability only.

Sub-Factor 1 – Construction Schedule. CRITERIA and SUBMISSION REQUIREMENTS: Offeror must provide a proposed construction schedule not to exceed 500 calendar days. Prepare and submit a practicable construction schedule laying out all necessary performance elements needed to complete this project identified in the solicitation in the proposed period of performance. Please take note of the following key details. Demolition activities noted in the drawings and new work activities will need to be carefully coordinated with the Facility Management Service and Laboratory to ensure continuous operation and minimal impacts. Outages will need to be coordinated with sufficient advance notice per the Specifications that the facility can mitigate impacts to the greatest extent possible. Temporary utilities may be required to mitigate impacts as called out in the Specifications.

MINIMUM STANDARD OF ACCEPTABILITY: The schedule must be submitted in the Microsoft Project format. Offerors should only include the work elements necessary to complete the required work. It is the Offeror’s responsibility to identify all necessary project/work elements, to include the phased construction approach detailed in the drawings, and the proposal adequately identifies acceptable critical elements. The proposal shall effectively demonstrate a detailed timeline that fully addresses elements of work outlined in the Specifications and Design. The approach shall address the start and completion of each event, including but not limited to, the purchasing and installation of long lead time items, hiring of contract personnel, and work start dates, linking all associated critical path elements.

Construction Schedule Rating Method

Adjectival Rating
Description
Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Satisfactory
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Unsatisfactory
Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.

Sub-Factor 2 – Experience. CRITERIA and SUBMISSION REQUIREMENTS: Offerors must provide a minimum of three (3) and a maximum of five (5) examples of their choice of completed projects or in progress of similar contracts in size and scope (commercial building remodel/renovation; minimum threshold value of $1,000,000).

MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a minimum of three (3) and a maximum of five (5) examples of their choice of completed projects or in progress of similar contracts in size and scope (commercial building remodel/renovation; minimum threshold value of $500,000). In describing the construction experience, provide the following information:

a. Project title, location and brief description including the building use (Medical Facility, etc) and contracting method (design build, design bid construct, CM at risk, Turnkey, etc).

b. Project owner and name and telephone number of owner’s contact person.

c. Indicate your firm’s role as a prime contractor or subcontractor, etc.

d. Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s).

Project Statistics including start and completion dates (original vs. actual) for design and construction; cost (with brief explanation of what is included in the cost); square footage; and any awards (prizes) received.

Experience Rating Method

Adjectival Rating
Description
Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Satisfactory
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Unsatisfactory
Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.

VOLUME II – PAST PERFORMACE FACTOR:

Government will evaluate the offeror’s demonstrated past performance of recent and relevant projects, to determine the offeror’s ability to perform the contract successfully and help determine responsibility. An overall Past Performance Confidence Assessment Rating will be assigned, but each past performance reference will first be evaluated for “recency” and “relevancy”. Therefore, the following ratings tables will be used. “Recent” past performance is defined as projects completed within the last ten years, with the actual completion date being not earlier than January 31, 2014. Past Performance examples will be assigned a relevancy rating based on the below rating definitions, in comparison with the scope of work detailed in the Specifications and Drawings

Past Performance Relevancy Rating Method

Adjectival Rating
Description
Very Relevant
Present/past performance effort involved essential the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/past performance effort involved similar same scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the same scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Performance Confidence Assessment Rating Method

Table – Performance Confidence Assessment Ratings

Adjectival Rating
Description
Substantial Confidence
Based on the offeror’s recent/relevant performance record, and performance records generally, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, and performance records generally, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence
Based on the offeror’s recent/relevant performance record, and performance records generally, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror’s recent/relevant performance record, and performance records generally, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

CRITERIA and SUBMISSION REQUIREMENTS: Project owners may be contacted to verify information provided, where necessary, and to obtain documentation regarding successful or unsuccessful performance, and to obtain information regarding the following performance areas.