Vol 2 Drawing 8-1-2023.pdf

PDF 27 MB Posted

Attached to
Renovate Patient Privacy Phase II Federal contract opportunity
Solicitation number
36C24623R0033
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document provides details on a federal contract opportunity for renovation services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 is soliciting proposals under solicitation number 36C24623R0033 to complete the Renovate Patient Privacy Phase II project. The solicitation seeks contractors to perform renovation and construction services to enhance patient privacy at a VA medical center, as outlined in the 27MB Vol 2 Drawing file from August 1, 2023. Proposals are due by the date specified in the solicitation document. The award is expected to be issued prior to the start of renovation work. The services required and pricing terms will be established upon contract award.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Patient Privacy Phase II, newest first.
File Type Posted
S06 36C24623R0033 0005.pdf PDF
S06 36C24623R0033 0004.pdf PDF
Bldg._143_4th_Floor_Hazardous_Materials_Survey.pdf PDF
143-P62 SANITARY WASTE and VENT RISER DIAGRAM.pdf PDF
143-P58 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143-P57 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143 Sanitary Waste and Vent plan.pdf PDF
S06 36C24623R0033 0003.pdf PDF
Cubicle Curtain Tracks.pdf PDF
Wing-H_Elec..pdf PDF
281300 Physical Access Control.pdf PDF
143-P60 DOMESTIC WATER_FIRE PROTECTION RISER DIA.pdf PDF
28 05 00.pdf PDF
143 Domestic Water Riser.pdf PDF
S05 RFI Solicitation questions for Renovate Patient Privacy Phase II.pdf PDF
143-P33 PARTIAL PLUMBING PLAN 1-4IN equal 1FT.pdf PDF
Wng H Color Board.pdf PDF
143-P61 SANITARY WASTE and VENT RISER DIAGRAM.pdf PDF
143-P59 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143-P36 PARTIAL PLUMBING PLANS 1-4IN equal 1FT.pdf PDF
10 25 13.pdf PDF
143-P35 PARTIAL PLUMBING PLAN 1-4IN equal 1FT.pdf PDF
143-P55 4TH. FLR. MED GAS PLAN ZONE H.pdf PDF
AMICO Patient Headwalls Submittals_BES RSP.pdf PDF
Access Controls.pdf PDF
143-P21 ZONE H 3RD. FLR. PLUMBING PLAN.pdf PDF
143 Plumbing plans.pdf PDF
S06 36C24623R0033 0002.pdf PDF
S04 Site Visit_Reno Patient Privacy Phase II 8-9-2023.pdf PDF
Vol 1B Drawing 8-1-2023.pdf PDF
Vol 1A Drawing 8-1-2023.pdf PDF
S06 36C24623R0033 0001.pdf PDF
S02 36C24623R0033.docx DOCX document
Vol 61-72_drawings.pdf PDF
Vol 46-60_drawings.pdf PDF
Vol 31-45_drawings.pdf PDF
Final CD Spec Book_Wing H.pdf PDF
Vol 16-30_drawings.pdf PDF
Vol 1-15_drawings.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K

L

M

N

O

P

J

I

H

NOT IN SCOPE

NOT IN SCOPE

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

8X6

8X4

8X4

8X6

8X4 8X6

8X8

8X6 8X6

8X6

8X6

8X4

8X4

8X6

8X4

8X6

8X6

8X4

8X4

8X4

8X4

8X6

8X6

8X6

8X4

8X4

8X4

8X4

8X8

12X8

8X6

10X6

14X10

16X12

14X8 12X8

16X10

12X12

8X12 10X12

8X8

8X6

12X10

8X8

4X8

8X4

8X8

8X4

8X4

8X4 8X4

8X4

8X4

8X4

8X6 8X6

8X68X6 8X6

8X6

8X6

8X6

8X6

8X48X4

8X8

10X10

10X814X12

14X12 10X6

14X10

12X12

16X816X10

16X12

10X10 10X12

X

X

X 0 1

X

X

X

X

X

X

X

10X6

10X10

8X6

8X10 8X6

8X6

8X12

8X6

8X4

8X6

8X6

6X8

8X8

10X8

12X8

8X8

14X10 8X10

6X8

8X8

X

X

18X

8X4

4X8

8X4

8X6

8X4

8X8 4X8

10X4

36X16

18X

12X6

8X4

12X8

24X12

48X12 10X6

8X4

8X6

10X8

8X4

X

8X8

8X10

EXHAUST AIR 48X12

RETURN AIR 24X16 (ABOVE)

SUPPLY AIR 28X12 (BELOW)

SUPPLY AIR 34X16

EXHAUST AIR 12X8

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

SNS SMP

MD101

DUCTWORK - WING H

MECHANICAL DEMOLITION PLAN

DEMOLITION NOTES:

MECHANICAL DEMOLITION PLAN

1/8" = 1'-0"

T

T

T

T

T

TYPICAL

TYPICAL

TYPICAL

TYPICAL

IN CORRIDORS AROUND ELEVATOR, REMOVE CEILING AIR DEVICES AS SHOWN.

DEMOLISH ALL INCLUDING AFCVS (AUTOMATIC FLOW CONTROL VALVES).

POINT OF DISCONNECTION AT DUCT PENETRATION OF RATED CHASE TO PENTHOUSE.

DEMOLISH EXISTING BRANCH DUCT FROM ISOLATION ROOMS COMPLETELY BACK TO

DEMOLISH EXISTING BRANCH DUCT RUN-OUT COMPLETELY.

INSULATION, ALL FITTINGS AND ACCESSORIES. TYPICAL FOR ALL SUPPLY DUCTS.

DEMOLISH EXISTING DUCTWORK COMPLETELY INCLUDING SUPPORTS, AIR OUTLETS,

K

L

M

N

O

P

J

I

H

NOT IN SCOPE

NOT IN SCOPE

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

C H

R

H W

R

H W

S

C H

S

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

SNS SMP

MD102

PIPING - WING H

MECHANICAL DEMOLITION PLAN

DEMOLITION NOTES:

MECHANICAL DEMOLITION PLAN

1/8" = 1'-0"

LINES TO BE DEMOLISHED COMPLETELY.

TYPICAL DEMOLITION HASH LINES. INDICATING PIPE

AND JACKETING.

CHS/CHR PIPING RUNOUTS, ALL FITTINGS, VALVES,

INCLUDING SUPPORTS, CONTROLS, DRAIN PIPING,

RADIANT COOLING ONLY PANELS COMPLETELY

DEMOLISH EXISTING CEILING MOUNTED HYDRONIC

AND JACKETING.

AND ACCESSORIES, PIPING SUPPORTS, INSULATION

CHS/CHR, HWS/HWR PIPING, ALL FITTINGS, VALVES,

INCLUDING SUPPORTS, CONTROLS, DRAIN PIPING,

RADIANT HEATING/COOLING PANELS COMPLETELY

DEMOLISH EXISTING CEILING MOUNTED HYDRONIC

INSULATION AND JACKETING.

COMPLETELY INCLUDING PIPING, SUPPORTS,

DISCONNECTION IN SERVICE BAY. DEMOLISH

DEMOLISH EXISTING PIPING BACK TO POINTS OF

TYPICAL

TYPICAL

TYPICAL

EXISTING TO REMAIN

PIPING IN THIS AREA SHALL BE

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

SNS SMP

MH001

ABBREVIATIONS

MECHANICAL LEGEND AND

DESIGN WEATHER CONDITIONS

SUMMER DESIGNWINTER DESIGN

DB (°F) DB (°F) / WB (°F)

15.7

INTERIOR DESIGN CONDITIONS 70.0 75.0 / 62.5

ABBREVIATION DESCRIPTIONSYMBOL ABBREVIATION DESCRIPTION

MLD/MD

A/C

MANUAL DAMPER

ABOVE CEILING

AHU AIR HANDLING UNIT

AD DUCT ACCESS DOOR

T'STAT THERMOSTAT

BTUH BRITISH THERMAL UNITS PER HOUR

CFM CUBIC FEET PER MINUTE

HOT WATER SUPPLY HWS

HOT WATER RETURN HWR

CLG CEILING

DN DOWN

DWGS DRAWINGS

EF EXHAUST FAN

METERED BALANCING VALVE MBV

GATE VALVE GV

ELEC ELECTRIC

CHECK VALVE CV

CHILLED WATER SUPPLY CHS

EXH EXHAUST

CHILLED WATER RETURN CHR

EXIST EXISTING

MOTOR OPERATED (2-WAY) VALVE MOV

GPM GALLONS PER MINUTE

HVAC HEATING VENTILATING & AIR CONDITIONING

STRAINER

UNION

FIRE DAMPER FD

MAX MAXIMUM

MIN MINIMUM

SINGLE LINE DUCT

FLEXIBLE DUCT

DUCT TRANSITION

ROUND

PIPE UP

PIPE OR DUCT DOWN

HWS

HWR

TG TRANSFER GRILLE

TYP TYPICAL

VAV VARIABLE AIR VOLUME UNIT

AFF ABOVE FINISHED FLOOR

DIRECTION OF FLOW

CTE CONNECT TO EXISTING

CHS

CHR

TT

OR

92.3 / 72.8

CO CONTRACTING OFFICER

CONTRACTING OFFICER'S REPRESENTATIVE COR

SYMBOL LOCATION FUNCTION SURFACETYPE

TYPE

X

NECK SIZE

AIR QUANTITY CFM

- 4-WAY

- 3-WAY

- 2-WAY

- 1-WAY

OR

DIRECTION OF BLOW

A

B

C

CEILING

CEILING

CEILING

CEILING SUPPLY

EXHAUST

RETURN

SUPPLY

REGISTER

PERFORATED

LOUVERED FACE

LOUVERED FACE

LAY-IN

LAY-IN

SURFACE MNT

SURFACE MNT D

PERFORATED

REGISTER

SYMBOL/TYPE

EXHAUST

RETURN

WALL

RECTANGULAR DUCT

ROUND DUCT

FLAT OVAL DUCT WXH

WXH

D" /

E CEILING SUPPLY LAY-IN LOUVERED FACE

FLEXIBLE OR ROUND DUCT SHALL BE CONNECTED TO RECTANGULAR OR SQUARE DUCT

WITH A SPIN-IN COLLAR WITH SCOOP AND DAMPER.

48 INCHES ABOVE FINISHED FLOOR TO BOTTOM OF DEVICE.

GENERAL NOTES

COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.

UNLESS OTHERWISE INDICATED, INSTALL ALL SPACE THERMOSTATS, HUMIDISTATS AND SENSORS

TO FABRICATION OF DUCTWORK.

CONTRACTOR SHALL ALSO VERIFY SPACE ABOVE CEILINGS AND IN MECHANICAL ROOMS PRIOR

COR, IN WRITING, IMMEDIATELY AS MODIFICATIONS TO THE DRAWINGS MAY BE REQUIRED.

SHOWN ON THE DESIGN DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND

ANY DEVIATIONS ARE DISCOVERED BETWEEN THE ACTUAL CONDITIONS AND THE CONDITIONS

PLANS WHERE AVAILABLE. AS SUCH, THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS. IF

EXISTING CONDITIONS: THE DESIGN IS BASED ON BASIC FIELD INVESTIGATIONS AND EXISTING

DUCT SIZES SHOWN ARE ACTUAL INSIDE DIMENSIONS.

INSTALL TURNING VANES IN ALL 45 AND 90 DEGREE MITERED ELBOWS.

NOTES FOR SEISMIC BRACING

THE SUPPORTING STRUCTURE MEMBER.

BRACING IS NOT REQUIRED WHEN THE TOP OF THE DUCT OR PIPE IS SUSPENDED 12" OR LESS FROM

WW-H-171 OR BE BOLTED/WELDED AS APPROVED BY THE ENGINEER.

ATTACHMENT TO STRUCTURAL MEMBERS SHALL USE DEVICES PROVIDED BY FEDERAL SPECIFICATION

BRACING FOR DUCTWORK OR PIPING,

WALLS, INCLUDING DRYWALL PARTITIONS, MAY REPLACE REQUIRED TRANSVERSE OR VERTICAL

DESIGN OF SEISMICALLY BRACED MECHANICAL SYSTEMS.

SEE THE SPECIFICATIONS FOR MANUFACTURER'S RESPONSIBILITIES IN SUBMITTING THE PROPER

FLOOR OR OTHER SUPPORT.

FLOOR OR PAD MOUNTED EQUIPMENT, WITHOUT VIBRATION ISOLATORS, SHALL BE BOLTED TO THE

VERTICAL RESTRAINT ON ALL SIDES OF THE BASE TO RESTRICT DISPLACEMENT OF THE EQUIPMENT.

FLOOR MOUNTED EQUIPMENT, WITH VIBRATION ISOLATORS, SHALL BE PROVIDED WITH LATERAL AND

FOR RESILIENTLY SUPPORTED EQUIPMENT.

PROVIDE BRACING FOR RIGID SUPPORT ON ALL SIDES OF SUSPENDED EQUIPMENT, AND RESTRAINTS

1 1/4" DIAMETER AND LARGER.

BRACE ALL PIPES 2 1/2" DIAMETER AND LARGER. RESTRAIN ALL PIPING IN MECHANICAL ROOMS THAT IS

BRACING SHALL OCCUR AT 80 FOOT INTERVALS (MAX).

TRANSVERSE AND VERTICAL BRACING SHALL OCCUR AT 40 FOOT INTERVALS (MAX). LONGITUDINAL

ABOVE THE CENTER OF GRAVITY OF THE RISER.

AT PIPE RISERS, WHEREVER POSSIBLE, SUPPORT THE WEIGHT OF THE RISER AT A POINT OR POINTS

DO NOT USE BRANCH LINES TO RESTRAIN MAIN LINES.

RESPOND DIFFERENTLY DURING AN EARTHQUAKE; IE A WALL AND A ROOF.

DO NOT FASTEN ON RIGID PIPING SYSTEM TO TWO DISSIMILAR PARTS OF THE BUILDING THAT MAY

AIR DISTRIBUTION DEVICESDESIGN CONDITIONSLEGEND & ABBREVIATIONS

LOW PRESSURE STEAM

LOW PRESSURE RETURN LPR

LPS LPS

LPR

AIR FLOW MONITORING STATION AFMS

RF RELIEF FAN

e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

T

T

T

T

T

Fourth Floor

0' - 0"

Penthouse Floor

14' - 0"

30"x18"

30"x18"

52"x14"

MINIMUM OUTSIDE

AIR DUCT

MAXIMUM OUTSIDE

AIR DUCT

RELIEF DUCT

"x

Fourth Floor

0' - 0"

Penthouse Floor

14' - 0"

54"x16"

SNS SMP

MH101

NOTES

DUCTWORK - WING H

MECHANICAL NEW WORK PLAN

1/8" = 1'-0"

MECHANICAL NEW DUCTWORK PLAN

FABRICATION OF DUCTWORK.

CONTRACTOR SHALL ALSO VERIFY SPACE ABOVE CEILINGS AND IN MECHANICAL ROOMS PRIOR TO

CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY AS MODIFICATIONS MAY BE REQUIRED.

BETWEEN THE ACTUAL CONDITIONS AND THE CONDITIONS SHOWN ON THE DESIGN DOCUMENTS, THE

SUCH, THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS. IF ANY DEVIATIONS ARE DISCOVERED

THE DESIGN IS BASED ON BASIC FIELD INVESTIGATIONS AND EXISTING PLANS WHERE AVAILABLE. AS

SEE MH102 FOR PIPING AND THERMOSTAT LOCATIONS.

VAV

1-1

VAV

1-2

VAV

1-3

VAV

1-4

VAV

1-5

VAV

1-6

VAV

1-7

VAV

1-8

VAV

1-9

VAV

1-10

VAV

1-11

VAV

1-12

VAV

1-13

VAV

1-14

VAV

1-15

VAV

1-16

VAV

1-17VAV

1-18

VAV

1-19

VAV

1-21

VAV

1-22

VAV

1-23

VAV

1-24

VAV

1-25

VAV

1-26

VAV

1-27

VAV

1-28

VAV

1-29

VAV

1-30

AHU

5 PROVIDE AND INSTALL DUCT MOUNTED SMOKE DETECTOR IN SUPPLY DUCT.

REQUIRED TO MAINTAIN REQUIRED PRESSURES.

PROVIDE ROOM PRESSURE MONITOR ON WALL OUTSIDE ISOLATION ROOM. MODULATE SUPPLY AIR AS

14X10

12X10

X

12" /

X

X

16X24

8X8

X

X

20X12

X

14X12 12X1010X8

X

X

38X12

16X12

X

X

X

16X12 14X10

X

30X14

X

20X12

14X12 12X10

X

14X12

10" / 8" /

X

54X16

10" /

8" /

X

X

22X14

34X8

X

X

20X16

X1

TYPICAL EXISTING TO REMAIN

TYPICAL NEW WORK

6 DUCT UP. SEE MH103 FOR CONTINUATION.

7 OFFSET DUCTS AS REQUIRED FOR CROSSING EACH OTHER AND ROUTING

8 AIR MONITORING STATION IN DUCT TO PROVIDE REQUIRED OUTSIDE AIR.

PLENUM AS SHOWN.

EXISITNG 5 FT X 6 FT LOUVER. INSTALL PLENUM BOX ON LOUVER AND ATTACH DUCT ON SIDE OF

VAV

1-20

B

14X14

A

12" A

12"

A

12"

A

12"

A

10"

A

12"

A

12"

A

10"

A

12"

A

12" A

12" A

12" A

12"

A

12"

A

10"

A

12"

A

12"

A

12"

A

12"

D

6X6

C

8X8 C

8X8

D

6X6

B

10X10

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

C

8X8

B

8X8

B

8X8

B

8X8

B

8X8

B

8X8

B

8X8

B

8X8

B

8X8

B

8X8 B

8X8 B

8X8 B

8X8

B

8X8

B

8X8

B

8X8

B

14X14

C

8X8

D

6X6

14X8

8X6

8X6

14X8

8X6

8X6

10" /

12X10

6X6

10" /

8X12

8X12

6X6

10" /

X

10" /

X 0 8

X

10X10 8"

8X12

10"

8X12

10"

8"

10X10

8"

8"

X

10"

X

10"

X

10"

X

10"

8"

X

X

10"

8"

8X12

8X12

10"

10"

8X12

10"

B

8X8

8X8

8X8

8X8

8X8 8X8

8X8

8X8

8X8

8X6

8X6

8X8

8X6

8X6

8X6

8X8

10X8

8X6

8X12

14X14

E

6 "

E

8 "

E

8 "

E

8 "

E

6 "

8"

8"

6"

E

10"

6X12

B

8X8

B

10X10

E

6 "

E

6 "

E

6 "

10X10

10"

6"

8"

8"

8" 8"

12"

10X8

8X8 8X6

8X6

8X6

8X6

8X6

8X6 8X6

E

6 "

E

6 " 6X8

6"

E

10"

6"

8" 6X6 6X12

10"

6X6

D

6X6

D

6X6 D

6X6

E

6 "

E

6 "

6X6

6" /

6" / 8" /

10X10

E

8 "

6X10

8" /

B

6X6

B

10X10

C

8X8

C

6X6

B

10X10

D

6X6

E

6 "

6X8

6"

B

6X6

6X6

10X8

C

6X6

C

8X8

6X6 6X6

8X8

8X6

6X6

6X6

10X8

10X10 6X6

E

6 "

E

6 "

E

6 " 8X8

6" / 6" /

B

16X16

16X10

B

16X16

16X10

6X6

B

6X6 B

6X6

E

6 "

E

6 "

D

6X6

10X8

6" /

8" / 6X6

8" /

C

6X6

E

6 "

6" /

E

6 " E

6 "

E

8 "

E

6 "

E

6 "

E

6 "

E

6 "

B

8X8

B

14X14

B

14X14

B

8X8

B

10X10

10 CONNECT TO EXISTING

1/8" = 1'-0"

AHU-1 ELEVATION

MH101

6X8 6"

VAV

1-31

CLOTH. BALANCE EXHAUST AIR TO 100 CFM.

EXHAUST DOWN IN CORNER OF ROOM TO EXHAUST 12" AFF. COVER OPENING WITH 1/2"X1/2" HARDWARE

8 " E

6" /

8" /

6"

14X8

6"

8X4

6"

6"

6"

6"

6"

6"

6"

10X6

8X6

16X6

13 OFFSET AS SHOWN UNDER EXISTING STRUCTURAL.

C

6X6

D

6X6

6"

6"

26 GAUGE METAL OR HEAVIER.

NO FIRE DAMPER IS REQUIRED PER NFPA 90A (2018) PARAGRAPH 5.3.1.1 PROVIDED THAT THE DUCT IS

CORRIDOR

C4-4B

CORRIDOR

WAITING

C4-2B

CORRIDOR

C4-3A

CORRIDOR

C4-3B

ELEVATOR

LOBBY

C4-5

WAITING

C4-2A

PATIENT RM

4H-108

MECH SHAFT

4H-M1

STAIR (NIC)

S-3

4H-137A

PATIENT RM

4H-135

BATH RM

4H-135A

BATH RM

4H-133A

PATIENT RM

4H-133

BATH RM

4H-131A

PATIENT RM

4H-131

BATH RM

4H-130A

PATIENT RM

4H-132

BATH RM

4H-132A

PATIENT RM

4H-128

BATH RM

4H-128A

BATH RM

4H-126A

PATIENT RM

4H-125

BATH RM

4H-125A

BATH RM

4H-124A

PATIENT RM

4H-124

BATH RM

4H-121A

PATIENT RM

4H-115

SVC

BAY/MECH

RM

4H-114

HOUSE

KEEPING

4H-112

PATIENT RM

4H-110

PATIENT RM

4H-106

PATIENT RM

4H-109

BATH RM

4H-108A

BATH RM

4H-109A

BATH RM

4H-107A

BATH RM

4H-106A

BATH RM

4H-122A

4H-111

NEGATIVE

ISOLATION

RM

4H-137

PATIENT RM

4H-130

BARIATRIC

RM

4H-126

PATIENT RM

4H-122

BATH RM

4H-115A

PATIENT RM

4H-107

4H-120

BATH RM

4H-110A

CH4-14

4H-116

4H-136 4H-138 4H-139

4H-141

4H-142

4H-119

4H-129

4H-123

4H-105

4H-113

4H-118

4H-117

4H-140

4H-134

4H-127

4H-119B

PATIENT RM

4H-121

4H-138

4H-102

4H-104

NEGATIVE

BARIATRIC

RM

4H-100

NEGATIVE

ISOLATION

RM

4H-103

ANTE RM

4H-103A

ANTE RM

4H-100A

BATH RM

4H-100B

BATH RM

4H-103B

BATH RM

4H-137B

CH4-18A

CH4-18B

CH4-18C

WAITING

C4-2B

WAITING

C4-2A

FDFDFDFD

FD

FD

FD

FD

FD

FD

FD FD

FD FD

FD

FD

FD

FD

FD

FD

ANTE RM

4H-137A

STATION

NURSE

LINEN

UTILITY

SOILED

UTILITY

CLEAN

EQUIPMENT

STORAGE

STORAGE

MED

NOURISH

ELEC

TLT 1 TLT 2

LINEN

IT TELEMETRY

NURSE MGR

ASSIST

MANAGER

NURSE

STATION

NURSES

CART

CRASH

LOUNGE

LOCKERS

MED GAS

STATION

NURSE

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

VAV

1-1

VAV

1-2

VAV

1-3

VAV

1-4

VAV

1-5

VAV

1-6

VAV

1-7

VAV

1-8

VAV

1-9

VAV

1-10

VAV

1-11

VAV

1-12

VAV

1-13

VAV

1-14

VAV

1-15

VAV

1-16

VAV

1-17VAV

1-18

VAV

1-19

VAV

1-21

VAV

1-22

VAV

1-23

VAV

1-24

VAV

1-25

VAV

1-26

VAV

1-27

VAV

1-28

VAV

1-29

VAV

1-30

AHU

VAV

1-20

VAV

1-31

SNS SMP

MH102

PIPING - WING H

MECHANICAL NEW WORK PLAN

1/8" = 1'-0"

MECHANICAL NEW PIPING PLAN

T

1-1

T 1-2T 1-3

T 1-4

T 1-5

T 1-6

T

1-7

T 1-8

T 1-9

T

1-10

T 1-11

T 1-12

T

1-13

T 1-14

T 1-15

T 1-16

T 1-17

1-18

T 1-19

T

1-20

T

1-21

T 1-22

T 1-23

T

1-24

T 1-25

T 1-26

T

1-27

T 1-28

T

1-29

T

1-30

NOTES

ALL PIPING RUN OUTS TO VAV BOXES SHALL BE 3/4" PIPE, UNLESS OTHERWISE NOTED.

1 1

3" CHS/R

2" HWS/R

1/2" HWS/R

1/2" HWS/R

1-1/2" HWS/R

1" HWS/R

1-1/4" HWS/R

1" HWS/R

3/4" HWS/R

1-1/2" HWS/R

2-1/2" HWS/R

ROUTE CONDENSATE DRAIN FROM UNIT TO NEAREST FLOOR DRAIN.

T 1-31

1 1/2" LPS/LPR

VERIFY LOCATION AND SIZE.

CONNECT HOT WATER, CHILLED WATER, STEAM AND CONDENSATE PIPES TO EXISTING RISERS. FIELD

T e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

2 4 5

K

L

M

N

O

P

73 61.4

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

SNS SMP

MH103

NOTES

WING H

PENTHOUSE/ROOF PLAN -

MECHANICAL NEW WORK

1/8" = 1'-0"

MECHANICAL NEW ROOF PLAN

DUCT DOWN. SEE MH101 FOR CONTINUATION

EF

RF

CONNECT DUCT TO EXISTING LOUVER WHERE ORIGINAL DUCT WAS REMOVED.

EF

EF

3 BAG-IN/BAG-OUT FILTER RACK ON ROOF

WITH GUY WIRES. COORDINATE WITH EXISTING CONDITIONS.

FAN DISCHARGE SHALL BE UP. EXTEND DUCT FROM DISCHARGE 10 FT ABOVE ROOF. SUPPORT DUCT

16X24 24X24

X

24X24

20X16

PLANS.

COORDINATE STAND/SUPPORT FOR FANS, FILTER AND DUCTS WITH STRUCTURAL AND ARCHITECTURAL

7 FIRE DAMPER IN DUCT AT FLOOR PENETRATION. INSTALL 18"X18" DUCT ACCESS DOOR IN DUCT RISE.

CONNECT TO EXISTING

COORDINATE NEW PENETRATION IN ROOF WITH STRUCTURAL AND ARCHITECTURAL PLANS.

COORDINATE NEW PENETRATION IN FLOOR WITH STRUCTURAL AND ARCHITECTURAL PLANS.

e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

SNS SMP

MH401

SCHEDULES

MECHANICAL EQUIPMENT

SYMBOL

MINIMUM CFM

TOTAL CFM

CAPACITY, BTU/HR

ENT. AIR DB, F

ENT. AIR WB, F

LVG. AIR DB, F

LVG. AIR WB, F

LOCATION

REMARKS

C O

O L

IN

G C

O

IL

AHU-1

AIR CFM

MINIMUM OUTSIDE

CHARACTERISTICS

ELECTRICAL

VELOCITY, FPM

MAX. FACE

DROP, IN. H20

MAX AIR PRESSURE

460V/3PH

4H-114

87.0

1.0

53.5

67.3

83.6

435,100

2.0

10,240

11,790

148,950

41.5

55.0

1.0

14.9

H E

A T

IN

G C

O

IL

CAPACITY, BTU/HR

ENT. AIR DB, F

LVG. AIR DB, F

DROP, IN. H20

MAX AIR PRESSURE

VELOCITY, FPM

MAX. FACE

DROP, FT. H20

MAX WATER PRESS.

HOT WATER GPM

TEMP., F

ENTERING WATER

TEMP., F

LEAVING WATER

PRESSURE, IN. H20

EXTERNAL STATIC

GPM

CHILLED WATER,

TEMP., F

ENTERING WATER

TEMP., F

LEAVING WATER

DROP, FT. H20

MAX WATER PRESS.

AIR HANDLING UNITS

SYMBOL

TYPE

LOCATION

REMARKS

400 505

505 400

PRESSURE

0.3

SEE PLANS

VAV-1-2 VAV-1-1

VAV-1-3

MAXIMUM CFM

MINIMUM CFM

DROP, IN. H20

MAXIMUM BOX PRESSURE

HEATING CFM

MAXIMUM N.C. LEVEL

CAPACITY, BTU/HR

ENT. AIR DB, F

LVG. AIR DB, F

H E

A T

IN

G

15,120

19,090

15,880

TEMP., F

ENTERING WATER

TEMP., F

LEAVING WATER

HOT WATER, GPM 1.5

1.9

1.6

VARIABLE AIR VOLUME BOXES

INDEPENDENT

PRESSURE

INDEPENDENT

PRESSURE

INDEPENDENT

VAV-1-4

30,240

3.0

PRESSURE

INDEPENDENT

VAV-1-5

0.2

PRESSURE

INDEPENDENT

SUPPLY MAX. FAN MOTOR HP

EXHAUST FANS

SYMBOL

TYPE

REMARKS

1.0

INLINE

460 V/ 3 PH

LOCATION

CHARACTERISTICS

ELECTRICAL

SEE PLANS

460 V/ 3 PH

1.0

INLINE

CFM

PRESSURE, IN. H20

EXTERNAL STATIC

MAXIMUM MOTOR HP

DRIVE

0.75

DIRECT

11,297

DIRECT

MAXIMUM TIP SPEED, FPM

MAXIMUM FAN SPEED, RPM

VELOCITY, FPM

MAXIMUM OUTLET

EF-1 RF-1

VAV-1-6

10,780

1.1

PRESSURE

INDEPENDENT

VAV-1-7

13,230

1.3

PRESSURE

INDEPENDENT

VAV-1-8

11,900

1.2

PRESSURE

INDEPENDENT

VAV-1-9

12,100

1.2

PRESSURE

INDEPENDENT

VAV-1-10

11,340

1.1

PRESSURE

INDEPENDENT

VAV-1-11

18,150

1.8

PRESSURE

INDEPENDENT

VAV-1-12

12,100

1.2

PRESSURE

INDEPENDENT

VAV-1-13

10,200

1.0

PRESSURE

INDEPENDENT

VAV-1-14

11,340

1.1

PRESSURE

INDEPENDENT

VAV-1-15

11,720

1.2

PRESSURE

INDEPENDENT

VAV-1-16

12,900

1.3

PRESSURE

INDEPENDENT

VAV-1-17

11,900

1.2

PRESSURE

INDEPENDENT

SYMBOL

TYPE

LOCATION

REMARKS

325 305

350 470

PRESSURE

VAV-1-19VAV-1-18

VAV-1-20

MAXIMUM CFM

MINIMUM CFM

DROP, IN. H20

MAXIMUM BOX PRESSURE

HEATING CFM

MAXIMUM N.C. LEVEL

CAPACITY, BTU/HR

ENT. AIR DB, F

LVG. AIR DB, F

H E

A T

IN

G

12,300

11,530

15,700

TEMP., F

ENTERING WATER

TEMP., F

LEAVING WATER

HOT WATER, GPM 1.2

1.2

1.6

VARIABLE AIR VOLUME BOXES

INDEPENDENT

PRESSURE

INDEPENDENT

PRESSURE

INDEPENDENT

VAV-1-21

12,900

1.3

PRESSURE

INDEPENDENT

VAV-1-22

0.9

PRESSURE

INDEPENDENT

VAV-1-23

0.3

PRESSURE

INDEPENDENT

VAV-1-24

12,700

1.3

PRESSURE

INDEPENDENT

VAV-1-25

11,900

1.2

PRESSURE

INDEPENDENT

VAV-1-26

12,500

1.3

PRESSURE

INDEPENDENT

VAV-1-27

12,500

1.3

PRESSURE

INDEPENDENT

VAV-1-28

11,900

1.2

PRESSURE

INDEPENDENT

VAV-1-29

12,300

1.2

PRESSURE

INDEPENDENT

VAV-1-30

16,650

1.7

PRESSURE

INDEPENDENT

AFTER FILTER, AND DISCHARGE.

DIRECT DRIVE PLENUM SUPPLY FANS WITH VFD,

LB/HR, TURNING CHILLED WATER COIL, DUAL

HUMIDIFIER SIZED FOR 15 PSIG STEAM AT 261

HEATING COIL, HUMIDIFIER SECTION WITH

SECTIONS: INTAKE, PREFILTER 1 AND 2, HOT WATER

UNIT SHALL CONSIST OF THE FOLLOWING

EACH 7.5 HP.

MOTOR HORSEPOWER IS TOTAL. UNIT HAS 2 FANS.

460 V/ 3 PH

1.5

UTILITY SET

1.5

BELT

EF-2

460 V/ 3 PH

1.5

UTILITY SET

1.5

BELT

EF-3

MAXIMUM dBA

VAV-1-31

0.2

PRESSURE

INDEPENDENT

e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

SNS SMP

MH501

MECHANICAL HVAC DETAILS

COIL

TEST PLUG (TYP.)

REDUCER, IF REQUIRED

WATER RETURN

MANUAL AIR VENT

(TYP.)

UNION CONNECTIONS

WATER SUPPLY

SHUT OFF VALVE

CONNECTION

DRAIN WITH HOSE

MV

MODULATION CONTROL VALVE

(CV OR VAV)

AIR TERMINAL UNIT

REHEAT COIL

CONNECTOR. SEE DETAIL

FLEXIBLE AIR DUCT

DIFFUSER (TYP.)

CLAMPS AND SEALANT (TYP.)

SEE SPECIFICATIONS FOR

SEE NOTE 5

WATER COIL

SELF-VENTING

COIL IS NOT

AIR VENT WHEN

NOT SELF-DRAINING

DRAIN WHEN COIL IS

(TYP.)

TEST PLUG

PIPING INDEPENDENT OF COIL

PIPE HANGER SHALL SUPPORT REDUCER, IF REQUIRED

DRAIN

WATER COIL

SELF-VENTING

COIL IS NOT

AIR VENT WHEN

(TYP.)

TEST PLUG

PIPING INDEPENDENT OF COIL

PIPE HANGER SHALL SUPPORT

WATER COIL

REDUCER, IF REQUIRED

FLOW ELEMENT

IS NOT SELF-DRAINING

DRAIN WHEN COIL

DRAIN

DIMENSIONS CANNOT BE OBTAINED IN THE RETURN PIPING.

THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED MINIMUM UPSTREAM AND DOWNSTREAM 3.

PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR EQUIPMENT.

PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS OR 2.

LARGER.

WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR EACH PIPE SHALL BE 1.

NOTES:

FE

MV

MV

MV

MV

MV

MV

FE

TI

TI

MV

VALVE (TYP.)

CALIBRATED BALANCING

NTS

AIR HANDLING UNIT DRAIN TRAP DETAIL

B9 NTS

B7

NTS

B5

TERMINAL UNIT WATER COILS -

PIPING CONNECTIONS EXHAUST OR RETURN BRANCH DUCTWORK

NTS

C2

NTS

F9

WATER COILS - PIPING CONNECTIONS

NTS

F2

DUCT CONNECTIONS - AIR TERMINAL UNITS

EXHAUST STACK DETAIL

ROOF

FAN

EXHAUST

(AS REQUIRED)

TRANSITION

DRIP LIP

GUY WIRE (4 REQUIRED)

TO EXHAUST STACK

STEEL STRAP SECURED

1" [25mm] GALVANIZED

EXHAUST STACK

WELDED STAINLESS STEEL

JOINT

WELDED

ROOF (TYP.)

WIRE TO

SECURE GUY

COUPLING

WELDED

[15mm]

1/2"

DRAIN,

F.C.

(TYP.)

ROOF

STACK TO

SECURE

[17.8 M/S] OUTLET VELOCITY

SIZE TO MAINTAIN 3500 FPM

BLANK PLATE

NTS

END OF STEAM LINE DRIP TRAP

E7

CONDENSATE

TO DRAIN

MV

AIR VENT

MANUAL

LOAD

TO BUILDING

TRAP ASSEMBLY

INVERTED BUCKET

TEE

WELDED

STE

AM

PI

PE

300mm[12"]

150mm[6"] SCHEDULE 80 STEEL PIPE

25mm [1"] GATE VALVE

WELDED TEE

DIAGRAM

SEE CONTROL

INDICATION TO ECC

TEMPERATURE

S E

N O

T E

SEE NOTE 3

SEE NOTE 2

SEE NOTE 1

INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE

[1500mm]. USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER

SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0"

FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT

OR BELOW 0.2"/100' [1.64Pa/m].

DUCT TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT

FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A

BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET (3 METERS).

AS THE BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE

A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE

LENGTH 3'-0" [900mm].

THIS BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM

A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO

MINIMUM OF 3 TIMES THE DIAMETER OF INLET

RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A

5.

4.

3.

2.

1.

NOTE:

A S

R

Q U

IR

E D

M

IN

DRAW THRU

BLOW THRU

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

TYPE M UNLESS NOTE BELOW IS MET

PIPING SHALL BE RIGID COPPER TYPE L OR

SIZE AS THE NIPPLE ON THE DRAIN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME

TOWARD DRAIN

PITCH DOWN

CLEAN OUT

FLOOR SINK

PAN

DRAIN

FITTING

DIELECTRIC

B A1

2" PLUS X

1" MINIMUM

METALS ARE TO BE CONNECTED.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR

BARRIERS.

AND IS INDOORS AND DOES NOT PASS THROUGH RATED

1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA

NOTE:

MAIN EXHAUST OR RETURN

FLOW

AIR

FLOW

AIR

AT EACH BRANCH DUCT

PROVIDE VOLUME DAMPER

BRANCH DUCT

VD

W

1/4W OR 4" MIN.

FROM STRUCTURE

SAME AS DIFFUSER

INLET: 5'-0" MAX

FLEXIBLE DUCT SIZE

LENGTH.

12"

CEILING

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

BRANCH DUCT

FOR CHANGE OF

DIRECTION GREATER

USE RIGID ELBOWS

[300mm]

AND SEALANT (TYP.)

SEE SPECIFICATIONS FOR CLAMPS

LAY-IN CLG.

REGISTER IN

DIFFUSER OR

TYPICAL

SEE SPECIFICATIONS

THERMAL INSULATION

NTS

E5

FLEXIBLE AIR DUCT CONNECTOR

SINGLE COIL

DOUBLE COIL

PLAN VIEW

e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions: Date

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of 71

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

SALEM VA MEDICAL CENTER

2019.08.26

658-18-101

LOBBY

PRIVACY WING H/ELEVATOR

RENOVATE FOR PATIENT

SNS SMP

MH601

SCHEMATICS

MECHANICAL HVAC CONTROL

DP-1

DP-2

TS-3

TS-6

C O

O L

TS-8

SA

RA

TS-4

MOTOR (ON/OFF) - STARTER AUXILIARY CONTACT

DIFFERENTIAL PRESSURE SENSOR/SWITCH

DIFFERENTIAL PRESSURE SENSOR/SWITCH

ACROSS FAN

DP-2

ACROSS FILTER

DP-1

CONTROL DIAGRAM LEGEND:

INSTRUCTIONS AND NFPA REQUIREMENTS.

INTO THE ALARM SYSTEM BY THE CONTRACTOR PER FIRE DEPARTMENT

DETECTORS FIRE/SMOKE DAMPERS AND/OR SMOKE DAMPERS SHALL BE TIED

8. FIRE ALARM SYSTEMS SHALL BE WIRED BY CONTRACTOR. DUCT SMOKE

ALL DEVICES NEW UNLESS NOTED OTHERWISE.

3. PROVIDE ALL SENSORS, ACTUATORS, DETECTORS SHOWN IN DIAGRAMS.

CONTROLS.

5. CONTRACTOR SHALL PROGRAM THE SEQUENCE OF OPERATIONS FOR

7. ALL CONTROL AND ELECTRICAL WIRING SHALL BE FIRE AND PLENUM RATED.

INDICATED. CONTROLS ARE TO BE FURNISHED BY THE CONTRACTOR.

4. WIRE CONTROLS TO DIRECT DIGITAL CONTROL (DDC) PANELS AS

6. REFER TO SPECIFICATIONS FOR COMPLETE REQUIREMENTS.

GENERAL NOTES:

OUTSIDE AMBIENT AIR TEMPERATURE SENSOR

SUPPLY AIR TEMPERATURE SENSOR

SPACE TEMPERATURE SENSOR

LOW LIMIT AIR TEMPERATURE SENSOR

TEMPERATURE SENSOR

TS-6

TS-7

TS-8

TS-3

TS-2

OUTSIDE AIR TEMPERATURE SENSOR

MOTORIZED DAMPER

TS-1

VARIABLE FREQUENCY DRIVEVFD

SMOKE DETECTORSD

ANALOG OUTPUTS:

ANALOG INPUTS:

CONTROL WIRING SIGNALS

MINIMUM.

A/D CONVERSION RESOLUTION

4-20 mA OR 1-5 VDC WITH 12-BIT

MINIMUM.

CONVERSION RESOLUTION

0-10 VDC WITH 8-BIT D/A

AIR HUMIDITY SENSORHS-1

RETURN AIR TEMPERATURE SENSORTS-4

HS-1

SD

CV-1

CHILLED WATER CONTROL VALVE (2-WAY)CV-1

SA

AV-1

H W C

O

IL

CV-2

TS-7

VFD

NTS

P R

E F

IL

T E

R

F

IL

T E

R

MD-1

SUPPLY AIRSA

EXHAUST AIREA

RETURN AIRRA

DUCT STATIC PRESSURE SENSORDS-1

AIR VALVE ACTUATORAV-1

NTS

TS-7

MIN OA

DSP DUCT STATIC PRESSURE

HOT WATER CONTROL VALVE (2-WAY)CV-2

CV-3

DUCT TEMPERATURE SENSOR

SYMBOL

ITEM

DESCRIPTION

SMOKE DAMPER

VOLUME DAMPER

VARIABLE FREQUENCY DRIVE

S

C

STEAM COIL

C

C

COOLING COIL

FAN

T

FZ

FREEZESTAT

2-WAY CONTROL VALVE

DA

DAMPER ACTUATOR

T-5

AIIR FILTER

3-WAY CONTROL VALVE

DPS

STATIC PRESSURE SWITCH

SPT

STATIC PRESSURE TRANSMITTER

CO2 SENSOR

SMOKE DETECTOR

TS

SD

CONTROLS SYMBOL LEGEND

SPACE TEMPERATURE SENSOR

SYMBOL

ITEM

DESCRIPTION

VFD

CO2

SD

MOTOR STARTERMS

EXHAUST FAN

MS

(TYP.)

(TYP.)NTS

(TYP.)NTS

TS-3

TS-6

P R

E H

E A

T

CV-2

DP-1

F

IL

T E

R

CV-3

AFMS-1

MD-2

MAX OA

AFMS-2

RELIEF AIR

MD-3 MD-4

MS

MS

MD

STEAM CONTROL VALVE (2-WAY)

CAMPUS WIDE ENERGY CONTROL MANAGEMENT SYSTEM (ECMS).

10. THE BUILDING WEB BASED DDC SYSTEM SHALL BE INTEGRATED WITH THE

9. LOCATE TEMPERATURE AND HUMIDITY SENSORS ON WALL 48" AFF.

NEUTRAL PRESSURE COMPARED TO THE CORRIDOR.

SWITCH THAT ALLOWS SETTING THE ROOM TO A POSITIVE, NEGATIVE OR

THE ROOM PRESSURIZATION MONITOR PANEL CONTAINS A 3-POSITION KEY

WILL BE INITIATED, AS WELL AS A SOFTWARE ALARM TO THE DDC SYSTEM.

PRESSURE IS OUTSIDE OF THE PRESET ALARM LIMITS, A LOCAL ALARM

CORRIDOR AND REPORT THAT VALUE TO THE DDC SYSTEM. IF THE ROOM

MONITOR THE ROOM PRESSURIZATION LEVEL AS COMPARED TO THE

A HALLWAY MOUNTED ROOM PRESSURIZATION MONITOR PANEL WILL

ROOM PRESSURIZATION MONITORING

OWNER.

FANS FOR EQUAL RUN TIME. COORDINATE DESIRED RUNTIME WITH

REDUNDANCY. THE DDC SYSTEM SHALL SET A SCHEDULE TO ALTERNATE

SIGNAL WILL BE SENT TO THE DDC SYSTEM. THE SYSTEM HAS 2 FANS FOR

LIGHT WILL BE ENERGIZED AT THE AIR FILTER SENSOR AND AN ALARM

IF THE HEPA FILTER PRESSURE DROP EXCEEDS THE SETPOINT, AN ALARM

MONITOR THE EXHAUST FAN STATUS AND HEPA FILTER PRESSURE DROP.

THE EXHAUST FANS SHALL RUN CONTINUOUSLY. THE DDC SYSTEM SHALL

ISOLATION ROOM EXHAUST FANS

WILL SOUND ROOM PRESSURIZATION MONITOR PANEL.

SETPOINT. IF THE ROOM PRESSURIZATION IS OUT OF RANGE, AN ALARM

FAN WILL MODULATE TO MAINTAIN THE FIXED EXHAUST AIR FLOW

TO MAINTAIN ROOM TEMPERATURE SETPOINT. THE BATHROOM EXHAUST

MONITOR PANEL. THE SUPPLY AIR TERMINAL UNIT REHEAT WILL MODULATE

NEGATIVE OR NEUTRAL PRESSURIZATION AT THE ROOM PRESSURIZATION

THE AIRFLOW DIFFERENTIAL, BASED ON WHETHER THE ROOM IS SET FOR

SUPPLY AIR TERMINAL AND THE PATIENT ROOM EXHAUST FAN TO MAINTAIN

THE ROOM PRESSURE CONTROLLER MODULATES THE CONSTANT VOLUME

OCCUPIED MODE

THE HVAC SYSTEMS OPERATE CONTINUOUSLY.

THE ISOLATION ROOMS ARE CONSIDERED CONTINUOUSLY OCCUPIED AND

GENERAL

AND RELIEF FANS. SUPPLY FANS SHALL MODULATE AS REQUIRED TO MAINTAIN SET PRESSURE IN THE SUPPLY DUCT.

DETECTOR IN THE SUPPLY DUCT IS ENERGIZED, IT SHALL SEND A SIGNAL TO THE FIRE ALARM AND DE-ENERGIZE THE SUPPLY

STEAM HUMIDIFIER SHALL BE ENERGIZED AS NEEDED TO MAINTAIN HUMIDITY SENSED IN THE RETURN DUCT. IF THE SMOKE

TEMPERATURE SENSOR FAILS THE CHILLED WATER VALVE SHALL CLOSE AND AN ALARM SHALL BE ANNUNCIATED AT THE BAS.

AND THE RETURN DAMPER CLOSE AND THE RELIEF DAMPER OPEN ENERGIZING THE RELIEF FAN. IF THE DISCHARGE AIR

DISCHARGE AIR TEMPERATURE SETPOINT. IF ECONOMIZING IS ENABLED THE MAXIMUM OUTSIDE AIR DAMPER SHALL ALSO OPEN

VENTILATION REQUIREMENT. THE PREHEAT HOT WATER AND CHILLED WATER VALVES SHALL MODULATE TO MAINTAIN THE

THE SUPPLY FAN SHALL RUN CONTINUOUSLY AND THE MINIMUM OUTSIDE AIR DAMPER SHALL OPEN TO MAINTAIN MINIMUM

OCCUPIED:

WITH THE BAS THE CONTROLLER SHALL OPERATE USING DEFAULT MODES AND SETPOINTS.

HEAT/COOL MODES, THE BAS SHALL ALSO SEND THE DISCHARGE AIR TEMPERATURE SETPOINT. IF COMMUNICATION IS LOST

THE BUILDING AUTOMATION SYSTEM (BAS) SHALL SEND THE MORNING WARM-UP/PRE-COOL, OCCUPIED/UNOCCUPIED AND

BUILDING AUTOMATION SYSTEM INTERFACE:

SEQUENCE OF OPERATIONS FOR VARIABLE VOLUME AIR HANDLING UNIT AHU

H U

M

ID

IF

IE

R

S T

E A

M

DSP-1

1. REFER TO SHEET MH001 FOR MECHANICAL LEGEND.

2. REFER TO SHEET MH401 FOR MECHANICAL SCHEDULES.

VAV TERMINAL UNIT

SEQUENCE OF OPERATION FOR ISOLATION ROOMS

EF-ISOLATION ROOMS

EF TYPICAL

AHU

ELECTRICAL LEGEND

ELECTRICAL NOTES

1. MATERIALS, EQUIPMENT, AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF THE AMERICAN SOCIETY FOR TESTING

MATERIALS (ASTM), 2017 NATIONAL ELECTRIC CODE (NEC). THE UNDERWRITERS LABORATORY (UL), THE NATIONAL ELECTRIC MANUFACTURER'S

ASSOCIATION (NEMA), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AND OTHER

NATIONALLY RECOGNIZED AGENCIES AS WELL AS APPLICABLE LOCAL CODES.

2. ANYTHING DRAWN OR SPECIFIED SHALL NOT BE CONSTRUED TO CONFLICT WITH ANY LOCAL, MUNICIPAL OR STATE LAW, REGULATION OR

ORDINANCE WHICH GOVERNS THE INSTALLATION OF ANY ELECTRICAL OR RELATED WORK. ITEMS SHALL NOT BE INSTALLED IN CONFLICT WITH

THE NEC. RESOLVE ANY AND ALL CONFLICTS BEFORE INSTALLATION AT NO ADDITIONAL EXPENSE TO THE OWNER.

3. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED AND LABELED FOR THE QUALIFIED USE. VERIFY CIRCUIT BREAKER INTERRUPT CAPACITY

NEEDED FOR EACH PANEL WITH LOCAL UTILITY. FOR BID PURPOSES, ASSUME 25,000 AIC FOR SERVICE ENTRANCE EQUIPMENT, 14,000 AIC FOR

480/277V EQUIPMENT , AND 10,000 AIC FOR 208/120V EQUIPMENT. BALANCE THE POWER EQUALLY (+/- 10%) ON ALL PHASES.

4. THE SYSTEMS SHOWN ON DRAWINGS SHALL BE PROVIDED TO SERVE ALL FIXTURES, EQUIPMENT, AND AREAS WITHIN THE CONTRACT LIMIT

LINES AS SET FORTH BY THE ARCHITECTURAL SOLUTION FOR THE PROJECT. THE BIDDING AND CONTRACT REQUIREMENTS, GENERAL

REQUIREMENTS, AND GENERAL PROVISIONS SHALL APPLY TO THIS SECTION. SYSTEMS SHALL INCLUDE ALL EQUIPMENT, APPURTENANCES, SAFETY DEVICES, AND CONTROLS NECESSARY FOR THE INTENDED SERVICE.

5. ALL PERMITS AND FEES REQUIRED FOR THE WORK SHALL BE SECURED AND PAID FOR BY THE ELECTRICAL CONTRACTOR AND INCLUDED IN

BID PRICE.

6. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OF INSTALLATION OR

NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER

CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION OF THE OWNER.

7. BIDDERS SHALL BE LICENSED CONTRACTORS IN ACCORDANCE WITH LOCAL AND STATE LAWS.

8. ALL EQUIPMENT SHALL BE NEW AND UNUSED. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S

RECOMMENDATIONS, EXCEPT WHERE THESE SPECIFICATIONS REQUIRE A HIGHER QUALITY INSTALLATION THAN RECOMMENDED BY THE

MANUFACTURER.

9. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE ON SITE. REPLACE ANY AND ALL

CONTRACTOR-SUPPLIED DEFECTIVE DEVICES, ITEMS OR SYSTEMS AT CONTRACTOR'S OWN EXPENSE BEFORE COMPLETION OF THE PROJECT.

10. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED OR FIELD ERECTED, ALL FACTORY

ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH

INSTALLING MANUFACTURER'S GUARANTEED EQUIPMENT. THIS CONTRACTOR'S GUARANTEE SHALL EXIST FOR A PERIOD OF ONE (1) YEAR

FROM THE DATE OF FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO DEFECTS IN MATERIAL AND TO DEFECTIVE WORKMANSHIP

OF ANY KIND.

11. VERIFY FINAL LOCATIONS FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH THE REQUIREMENTS OF THE ACTUAL EQUIPMENT TO BE

CONNECTED. VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS.

12. SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF ELECTRICAL MATERIALS AND EQUIPMENT FOR EFFICIENT FLOW OF THE

WORK. GIVE PARTICULAR ATTENTION TO LARGE EQUIPMENT REQUIRING POSITIONING PRIOR TO CLOSING-IN THE BUILDING. COORDINATE THE

CUTTING AND PATCHING OF BUILDING COMPONENTS TO ACCOMMODATE INSTALLATION OF ELECTRICAL EQUIPMENT AND MATERIALS.

13. COORDINATE THE INSTALLATION OF ELECTRICAL MATERIALS AND EQUIPMENT ABOVE CEILINGS WITH SUSPENSION SYSTEM, MECHANICAL

EQUIPMENT AND SYSTEMS, AND STRUCTURAL COMPONENTS. COORDINATE ELECTRICAL EQUIPMENT AND MATERIALS INSTALLATION WITH

OTHER BUILDING COMPONENTS.

14. WHERE MOUNTING HEIGHTS ARE NOT DETAILED OR DIMENSIONED, INSTALL ELECTRICAL SERVICES AND OVERHEAD EQUIPMENT TO

PROVIDE THE MAXIMUM HEADROOM POSSIBLE. INSTALL ELECTRICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR REPLACEMENT

OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH MINIMUM OF

INTERFERENCE WITH OTHER INSTALLATIONS.

15. COORDINATE CONNECTION OF ELECTRICAL SYSTEMS WITH EXTERIOR UNDERGROUND AND OVERHEAD UTILITIES AND SERVICES. COMPLY

WITH REQUIREMENTS OF GOVERNING REGULATIONS, FRANCHISED SERVICE COMPANIES, AND CONTROLLING AGENCIES. PROVIDE REQUIRED

CONNECTION FOR EACH SERVICE.

16. DO NOT ENDANGER OR DAMAGE INSTALLED WORK THROUGH PROCEDURES AND PROCESSES OF CUTTING AND PATCHING. ARRANGE FOR

REPAIRS REQUIRED TO RESTORE OTHER WORK, BECAUSE OF DAMAGE CAUSED AS A RESULT OF ELECTRICAL INSTALLATIONS.

17. BIDDERS SHALL THOROUGHLY ACQUAINT THEMSELVES WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. THEY

SHALL EXAMINE ALL SERVICES, EQUIPMENT, SURFACES, ETC., WHICH THIS WORK IS IN ANY WAY DEPENDENT UPON, AND BRING ANY

DISCREPANCIES DETERMINED OR OMISSIONS FOUND IN THE DRAWINGS TO THE OWNER'S ATTENTION BEFORE SUBMITTING BID.

18. VERIFY MECHANICAL EQUIPMENT SWITCH AND CONNECTION REQUIREMENTS, ITEM BY ITEM, WITH THE MECHANICAL CONTRACTOR, BEFORE

WIRING EQUIPMENT. RESOLVE ALL DISCREPANCIES WITHOUT FURTHER COST TO OWNER.

19. ALL WIRING SHALL BE IN CONDUIT, 3/4" MINIMUM WITH STEEL COMPRESSION FITTINGS SUPPORTED AT 10'-0" INTERVALS.

20. ALL WIRING SHALL BE THHN/THWN COPPER (NO. 12 AWG MINIMUM) UNLESS OTHERWISE NOTED. WIRE AND CONDUIT SIZES ARE SHOWN ON

THE PANEL SCHEDULE.

21. ALL PANELS, CONTROL DEVICES AND MISCELLANEOUS ELECTRICAL APPARATUS SHALL BE CLEARLY MARKED FOR EASY IDENTIFICATION

AND SAFETY. USE BLACK PLASTIC OR BAKELITE NAME PLATE ENGRAVED WITH WHITE LETTERS 1/4" HIGH FOR NORMAL POWER AND RED

PLASTIC OR BAKELITE NAME PLATE ENGRAVED WITH WHITE LETTERS 1/4" HIGH FOR EMERGENCY POWER. PUNCHED TAPE IS NOT

ACCEPTABLE.

22. PANELS SHALL BE PROVIDED WITH A TYPEWRITTEN DIRECTORY AFFIXED TO INSIDE OF PANEL DOOR WITH A CLEAR PLASTIC SLEEVE. . THE

ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND ARE FOR CIRCUIT ALLOCATION ONLY. DO NOT SCALE DRAWINGS.

23. ELECTRICAL CONTRACTOR SHALL FURNISH RECORD SET OF DRAWINGS WITH ANY DEVIATIONS MARKED IN RED INK.

ELECTRICAL NOTES & LEGEND

E001

RD JP

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location

Sheet of

CONSTRUCTION DOCUMENTS

FULLY SPRINKLED

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

Revisions: Date:

RENOVATE FOR PATIENT

PRIVACY WING H/ ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

GENERAL DEMOLITION NOTES

DEMOLITION NOTES

NOT IN SCOPE

NOT IN SCOPE

NOT

IN

SCOPE

APPROXIMATE LOCATION OF

TEMPORARY 1HR CONSTRUCTION WALL

LIGHTING DEMOLITION PLAN

ED101

WING-H

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location

Sheet of

CONSTRUCTION DOCUMENTS

FULLY SPRINKLED

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

Revisions: Date:

RENOVATE FOR PATIENT

PRIVACY WING H/ ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

RD JP

MATCH LINE

NOT IN SCOPE

NOT IN SCOPE

NOT

IN

SCOPE

APPROXIMATE LOCATION OF

TEMPORARY 1HR CONSTRUCTION WALL

DEMOLITION NOTES

POWER DEMOLITION PLAN

ED102

WING H

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location

Sheet of

CONSTRUCTION DOCUMENTS

FULLY SPRINKLED

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

Revisions: Date:

RENOVATE FOR PATIENT

PRIVACY WING H/ ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

NOT IN SCOPE

NOT IN SCOPE

NOT

IN

SCOPE

APPROXIMATE LOCATION OF

TEMPORARY 1HR CONSTRUCTION WALL

COMMUNICATIONS

ED103

DEMOLITION PLAN - WING H

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location

Sheet of

CONSTRUCTION DOCUMENTS

FULLY SPRINKLED

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

Revisions: Date:

RENOVATE FOR PATIENT

PRIVACY WING H/ ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

RD JP

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

NOT IN SCOPE

NOT IN SCOPE

NOT

IN

SCOPE

APPROXIMATE LOCATION OF

TEMPORARY 1HR CONSTRUCTION WALL

NURSE CALL/CODE BLUE

ED104

DEMOLITION PLAN - WING H

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location

Sheet of

CONSTRUCTION DOCUMENTS

FULLY SPRINKLED

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

Revisions: Date:

RENOVATE FOR PATIENT

PRIVACY WING H/ ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

GENERAL NEW WORK NOTES

NEW WORK NOTES

NOT IN SCOPE

NOT IN SCOPE

NOT

IN

SCOPE

4H-108

4H-M1

4H-137A

4H-135

4H-135A

4H-133A

4H-133

4H-131A

4H-131

4H-130A

4H-132

4H-132A

4H-128

4H-128A

4H-126A

4H-125

4H-125A

4H-124A

4H-124

4H-121A

4H-115

4H-114

4H-112

4H-110

4H-106

4H-109

4H-108A

4H-109A

4H-107A

4H-122A

4H-111

4H-137

4H-130

4H-126

4H-122

4H-115A

4H-107

4H-120

CH4-19

4H-110A

CH4-14

4H-116

4H-136

4H-138 4H-139

4H-141

4H-142

4H-119

4H-129

4H-123

4H-105

4H-113

4H-118

4H-117

4H-140

4H-134

4H-127

4H-119B

4H-121

CH4-16

4J-138

4H-102

4H-104

4H-100

4H-103

4H-103A

4H-100A

4H-100B

4H-103B

4H-137B

CH4-17

CH4-15

CH4-20

CH4-18A

CH4-18B

CH4-18C

C4-4B

C4-4A

C4-2B

C4-3A

C4-3B

C4-5

C4-2A

4H-106A

4J-156

LIGHTING NEW WORK PLAN

EL101

WING H

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location

Sheet of

CONSTRUCTION DOCUMENTS

FULLY SPRINKLED

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

Revisions: Date:

RENOVATE FOR PATIENT

PRIVACY WING H/ ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

KEY PLAN

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

PLAN

NORTH

H

J

RD JP

ROOM # ROOM NAME

4H-100

4H-100A ANTE ROOM

4H-100B

NEGATIVE ISOLATION RM

4H-102 IT ROOM

LINEN

ASST NURSE MANAGER

PATIENT ROOM

BATH ROOM

PATIENT RM

BATH RM

PATIENT RM

BATH RM

PATIENT RM

BATH RM

PATIENT RM

BATH RM

CRASH CART

HOUSE KEEPING

NURSE MANAGER

EXIST MECH RM/SVC BAY

MED

NOURISH

LOUNGE

LOCKERS

CART / STRETCHER ALCOVE

PATIENT RM

BATH RM

PATIENT RM

BATH RM

CRASH MOBILE CARTS X-RAY

STORAGE EQUIPMENT

NEGATIVE BARIATRIC RM

ANTE RM

BATH RM

WAITING

WAITING

CORRIDOR

ELEVATOR LOBBY

NEW WORK AREA SCHEDULE -WING H/ELEVATOR LOBBY

4H-103

4H-103A

4H-103B

4H-104

4H-105

4H-106

4H-106A

ANTE RM

BATH RM

NEGATIVE ISOLATION RM

BATH RM

4H-107

4H-107A

4H-108

4H-108A

4H-109

4H-109A

4H-110

4H-110A

4H-111

4H-112

4H-113

4H-114

PATIENT RM

BATH RM

4H-115

4H-115A

4H-116

4H-117

4H-118

EXIST ELECT

4H-119

4H-119B

4H-120

PATIENT RM

BATH RM

PATIENT RM

BATH RM

4H-121

4H-121A

4H-122

4H-122A

TELEM4H-123

PATIENT RM

BATH RM

PATIENT RM

BATH RM

PATIENT RM

BATH RM

4H-124

4H-124A

4H-125

4H-125A

4H-126

4H-126A

4H-127

4H-128

4H-128A

4H-129

PATIENT RM

BATH RM

TLT 2

TLT 1

PATIENT ROOM

BATH ROOM

PATIENT RM

BATH RM

PATIENT RM

BATH RM

PATIENT RM

BATH RM

PATIENT RM

BATH RM

4H-130

4H-130A

4H-131

4H-131A

4H-132

4H-132A

4H-133

4H-133A

4H-135

4H-135A

MED GAS4H-134

SOILED UTILITY4H-136

4H-137

4H-137A

4H-138

4H-138

CLEAN UTILITY

4H-137B

4H-139

LINEN4H-140

PHARMACY4H-141

CRASH CART4H-142

CH4-14

CH4-15

CH4-16

CH4-17

CH4-18A

CH4-18B

CH4-18C

CH4-19

CH4-20 CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

NURSE STATION

NURSE STATION

NURSE STATION

NURSE STATION

CORRIDOR

CH4-2A

CH4-2B

CH4-3A

CH4-3B

CH4-4A

CH4-4B

CH4-5

CORRIDOR

NOT TO SCALE

EMERGENCY LIGHTING CONTROL UNIT WIRING DETAIL

NOT TO SCALE

DIGITAL DIMMING LIGHTING CONTROL W/ EMERGENCY WIRING DETAIL

DIGITAL OCCUPANCY

SENSOR (WALL OR

CEILING AS INDICATED ON

PLANS

BASIS OF DESIGN WATTSTOPPER

BASIS OF DESIGN WATTSTOPPER

SEQUENCE OF OPERATION FOR ROOMS WITH OCCUPANCY SENSORS

ROOM

STATUS

OCCUPANCY

SENSOR STATUS LIGHTING FIXTURE LIGHT LEVEL STATUS

UNOCCUPIED

INACTIVE

( NO PERSON SENSED )

OCCUPIED

BUTTON STATUS

NO BUTTON ACTIVATED

DIMMER SWITCH

ALL LIGHT FIXTURES OFF. ALL SCENES INACTIVE.

UNOCCUPIED

INACTIVE ( NO PERSON

SENSED FOR 5 MINUTES )

ACTIVATED

( PERSON(S) SENSED )

ALL LIGHT FIXTURES OFF.

ALL LIGHT FIXTURES ON @ PRESET LIGHT LEVEL OF 50% +/-

USER CAN ADJUST LIGHTING TO DESIRED LEVELS

DIGITAL OCCUPANCY

SENSOR (WALL OR

CEILING AS INDICATED ON

PLANS

NOT TO SCALE

DIGITAL LIGHTING CONTROL WIRING DETAIL

BASIS OF DESIGN WATTSTOPPER

NOT TO SCALE

HEADWALL LIGHTING CONTROL WIRING DETAIL

BASIS OF DESIGN WATTSTOPPER

DIGITAL OCCUPANCY

SENSOR (WALL OR

CEILING AS INDICATED ON

PLANS

NOT TO SCALE

DIGITAL DIMMING LIGHTING CONTROL WIRING DETAIL

BASIS OF DESIGN WATTSTOPPER

DIGITAL OCCUPANCY

SENSOR (WALL OR

CEILING AS INDICATED ON

PLANS

NOT TO SCALE

DIGITAL DIMMING LIGHTING CONTROL W/ EMERGENCY WIRING DETAIL

LIGHTING DETAILS

EL501

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location

Sheet of

CONSTRUCTION DOCUMENTS

FULLY SPRINKLED

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

Revisions: Date:

RENOVATE FOR PATIENT

PRIVACY WING H/ ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

RD JP

AND SCHEDULE

GENERAL NEW WORK NOTESNEW WORK NOTES

NOT IN SCOPE

NOT IN SCOPE

NOT

IN

SCOPE

4H-108

4H-M1

4H-137A

4H-135

4H-135A

4H-133A

4H-133

4H-131A

4H-131

4H-130A

4H-132

4H-132A

4H-128

4H-128A

4H-126A

4H-125

4H-125A

4H-124A

4H-124

4H-121A

4H-115

4H-114

4H-112

4H-110

4H-106

4H-109

4H-108A

4H-109A

4H-107A

4H-122A

4H-111

4H-137

4H-130

4H-126

4H-122

4H-115A

4H-107

4H-120

CH4-19

4H-110A

CH4-14

4H-116

4H-136 4H-138

4H-139

4H-141

4H-142 4H-119

4H-129

4H-123

4H-105

4H-113

4H-118

4H-117

4H-140

4H-134

4H-127

4H-119B

4H-121

CH4-16

4J-138

4H-102

4H-104

4H-100

4H-103

4H-103A

4H-100A

4H-100B

4H-103B

4H-137B

CH4-17

CH4-15

CH4-20

CH4-18A

CH4-18B

CH4-18C

C4-4B

C4-4A

C4-2B

C4-3A

C4-3B

C4-5

C4-2A

4H-106A

4J-156

4J-156

ROOM 4H-139 SOUTH WALL ELEVATION

ROOM 4H-139 SOUTH WALL ELEVATION

ROOM 4H-139 EAST WALL ELEVATION

20A, 120V, DECORA

STYLE, DUPLEX

RECEPTACLE (TYPICAL)

NO SCALE

NO SCALENO SCALE

TYP

POWER NEW WORK PLAN

EP101

WING H

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .