Vol 2 Drawing 8-1-2023.pdf
PDF 27 MB Posted
- Attached to
- Renovate Patient Privacy Phase II Federal contract opportunity
- Solicitation number
- 36C24623R0033
About this file
This document provides details on a federal contract opportunity for renovation services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 is soliciting proposals under solicitation number 36C24623R0033 to complete the Renovate Patient Privacy Phase II project. The solicitation seeks contractors to perform renovation and construction services to enhance patient privacy at a VA medical center, as outlined in the 27MB Vol 2 Drawing file from August 1, 2023. Proposals are due by the date specified in the solicitation document. The award is expected to be issued prior to the start of renovation work. The services required and pricing terms will be established upon contract award.
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
K
L
M
N
O
P
J
I
H
NOT IN SCOPE
NOT IN SCOPE
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
8X6
8X4
8X4
8X6
8X4 8X6
8X8
8X6 8X6
8X6
8X6
8X4
8X4
8X6
8X4
8X6
8X6
8X4
8X4
8X4
8X4
8X6
8X6
8X6
8X4
8X4
8X4
8X4
8X8
12X8
8X6
10X6
14X10
16X12
14X8 12X8
16X10
12X12
8X12 10X12
8X8
8X6
12X10
8X8
4X8
8X4
8X8
8X4
8X4
8X4 8X4
8X4
8X4
8X4
8X6 8X6
8X68X6 8X6
8X6
8X6
8X6
8X6
8X48X4
8X8
10X10
10X814X12
14X12 10X6
14X10
12X12
16X816X10
16X12
10X10 10X12
X
X
X 0 1
X
X
X
X
X
X
X
10X6
10X10
8X6
8X10 8X6
8X6
8X12
8X6
8X4
8X6
8X6
6X8
8X8
10X8
12X8
8X8
14X10 8X10
6X8
8X8
X
X
18X
8X4
4X8
8X4
8X6
8X4
8X8 4X8
10X4
36X16
18X
12X6
8X4
12X8
24X12
48X12 10X6
8X4
8X6
10X8
8X4
X
8X8
8X10
EXHAUST AIR 48X12
RETURN AIR 24X16 (ABOVE)
SUPPLY AIR 28X12 (BELOW)
SUPPLY AIR 34X16
EXHAUST AIR 12X8
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
SNS SMP
MD101
DUCTWORK - WING H
MECHANICAL DEMOLITION PLAN
DEMOLITION NOTES:
MECHANICAL DEMOLITION PLAN
1/8" = 1'-0"
T
T
T
T
T
TYPICAL
TYPICAL
TYPICAL
TYPICAL
IN CORRIDORS AROUND ELEVATOR, REMOVE CEILING AIR DEVICES AS SHOWN.
DEMOLISH ALL INCLUDING AFCVS (AUTOMATIC FLOW CONTROL VALVES).
POINT OF DISCONNECTION AT DUCT PENETRATION OF RATED CHASE TO PENTHOUSE.
DEMOLISH EXISTING BRANCH DUCT FROM ISOLATION ROOMS COMPLETELY BACK TO
DEMOLISH EXISTING BRANCH DUCT RUN-OUT COMPLETELY.
INSULATION, ALL FITTINGS AND ACCESSORIES. TYPICAL FOR ALL SUPPLY DUCTS.
DEMOLISH EXISTING DUCTWORK COMPLETELY INCLUDING SUPPORTS, AIR OUTLETS,
K
L
M
N
O
P
J
I
H
NOT IN SCOPE
NOT IN SCOPE
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
C H
R
H W
R
H W
S
C H
S
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
SNS SMP
MD102
PIPING - WING H
MECHANICAL DEMOLITION PLAN
DEMOLITION NOTES:
MECHANICAL DEMOLITION PLAN
1/8" = 1'-0"
LINES TO BE DEMOLISHED COMPLETELY.
TYPICAL DEMOLITION HASH LINES. INDICATING PIPE
AND JACKETING.
CHS/CHR PIPING RUNOUTS, ALL FITTINGS, VALVES,
INCLUDING SUPPORTS, CONTROLS, DRAIN PIPING,
RADIANT COOLING ONLY PANELS COMPLETELY
DEMOLISH EXISTING CEILING MOUNTED HYDRONIC
AND JACKETING.
AND ACCESSORIES, PIPING SUPPORTS, INSULATION
CHS/CHR, HWS/HWR PIPING, ALL FITTINGS, VALVES,
INCLUDING SUPPORTS, CONTROLS, DRAIN PIPING,
RADIANT HEATING/COOLING PANELS COMPLETELY
DEMOLISH EXISTING CEILING MOUNTED HYDRONIC
INSULATION AND JACKETING.
COMPLETELY INCLUDING PIPING, SUPPORTS,
DISCONNECTION IN SERVICE BAY. DEMOLISH
DEMOLISH EXISTING PIPING BACK TO POINTS OF
TYPICAL
TYPICAL
TYPICAL
EXISTING TO REMAIN
PIPING IN THIS AREA SHALL BE
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
SNS SMP
MH001
ABBREVIATIONS
MECHANICAL LEGEND AND
DESIGN WEATHER CONDITIONS
SUMMER DESIGNWINTER DESIGN
DB (°F) DB (°F) / WB (°F)
15.7
INTERIOR DESIGN CONDITIONS 70.0 75.0 / 62.5
ABBREVIATION DESCRIPTIONSYMBOL ABBREVIATION DESCRIPTION
MLD/MD
A/C
MANUAL DAMPER
ABOVE CEILING
AHU AIR HANDLING UNIT
AD DUCT ACCESS DOOR
T'STAT THERMOSTAT
BTUH BRITISH THERMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
HOT WATER SUPPLY HWS
HOT WATER RETURN HWR
CLG CEILING
DN DOWN
DWGS DRAWINGS
EF EXHAUST FAN
METERED BALANCING VALVE MBV
GATE VALVE GV
ELEC ELECTRIC
CHECK VALVE CV
CHILLED WATER SUPPLY CHS
EXH EXHAUST
CHILLED WATER RETURN CHR
EXIST EXISTING
MOTOR OPERATED (2-WAY) VALVE MOV
GPM GALLONS PER MINUTE
HVAC HEATING VENTILATING & AIR CONDITIONING
STRAINER
UNION
FIRE DAMPER FD
MAX MAXIMUM
MIN MINIMUM
SINGLE LINE DUCT
FLEXIBLE DUCT
DUCT TRANSITION
ROUND
PIPE UP
PIPE OR DUCT DOWN
HWS
HWR
TG TRANSFER GRILLE
TYP TYPICAL
VAV VARIABLE AIR VOLUME UNIT
AFF ABOVE FINISHED FLOOR
DIRECTION OF FLOW
CTE CONNECT TO EXISTING
CHS
CHR
TT
OR
92.3 / 72.8
CO CONTRACTING OFFICER
CONTRACTING OFFICER'S REPRESENTATIVE COR
SYMBOL LOCATION FUNCTION SURFACETYPE
TYPE
X
NECK SIZE
AIR QUANTITY CFM
- 4-WAY
- 3-WAY
- 2-WAY
- 1-WAY
OR
DIRECTION OF BLOW
A
B
C
CEILING
CEILING
CEILING
CEILING SUPPLY
EXHAUST
RETURN
SUPPLY
REGISTER
PERFORATED
LOUVERED FACE
LOUVERED FACE
LAY-IN
LAY-IN
SURFACE MNT
SURFACE MNT D
PERFORATED
REGISTER
SYMBOL/TYPE
EXHAUST
RETURN
WALL
RECTANGULAR DUCT
ROUND DUCT
FLAT OVAL DUCT WXH
WXH
D" /
E CEILING SUPPLY LAY-IN LOUVERED FACE
FLEXIBLE OR ROUND DUCT SHALL BE CONNECTED TO RECTANGULAR OR SQUARE DUCT
WITH A SPIN-IN COLLAR WITH SCOOP AND DAMPER.
48 INCHES ABOVE FINISHED FLOOR TO BOTTOM OF DEVICE.
GENERAL NOTES
COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.
UNLESS OTHERWISE INDICATED, INSTALL ALL SPACE THERMOSTATS, HUMIDISTATS AND SENSORS
TO FABRICATION OF DUCTWORK.
CONTRACTOR SHALL ALSO VERIFY SPACE ABOVE CEILINGS AND IN MECHANICAL ROOMS PRIOR
COR, IN WRITING, IMMEDIATELY AS MODIFICATIONS TO THE DRAWINGS MAY BE REQUIRED.
SHOWN ON THE DESIGN DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND
ANY DEVIATIONS ARE DISCOVERED BETWEEN THE ACTUAL CONDITIONS AND THE CONDITIONS
PLANS WHERE AVAILABLE. AS SUCH, THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS. IF
EXISTING CONDITIONS: THE DESIGN IS BASED ON BASIC FIELD INVESTIGATIONS AND EXISTING
DUCT SIZES SHOWN ARE ACTUAL INSIDE DIMENSIONS.
INSTALL TURNING VANES IN ALL 45 AND 90 DEGREE MITERED ELBOWS.
NOTES FOR SEISMIC BRACING
THE SUPPORTING STRUCTURE MEMBER.
BRACING IS NOT REQUIRED WHEN THE TOP OF THE DUCT OR PIPE IS SUSPENDED 12" OR LESS FROM
WW-H-171 OR BE BOLTED/WELDED AS APPROVED BY THE ENGINEER.
ATTACHMENT TO STRUCTURAL MEMBERS SHALL USE DEVICES PROVIDED BY FEDERAL SPECIFICATION
BRACING FOR DUCTWORK OR PIPING,
WALLS, INCLUDING DRYWALL PARTITIONS, MAY REPLACE REQUIRED TRANSVERSE OR VERTICAL
DESIGN OF SEISMICALLY BRACED MECHANICAL SYSTEMS.
SEE THE SPECIFICATIONS FOR MANUFACTURER'S RESPONSIBILITIES IN SUBMITTING THE PROPER
FLOOR OR OTHER SUPPORT.
FLOOR OR PAD MOUNTED EQUIPMENT, WITHOUT VIBRATION ISOLATORS, SHALL BE BOLTED TO THE
VERTICAL RESTRAINT ON ALL SIDES OF THE BASE TO RESTRICT DISPLACEMENT OF THE EQUIPMENT.
FLOOR MOUNTED EQUIPMENT, WITH VIBRATION ISOLATORS, SHALL BE PROVIDED WITH LATERAL AND
FOR RESILIENTLY SUPPORTED EQUIPMENT.
PROVIDE BRACING FOR RIGID SUPPORT ON ALL SIDES OF SUSPENDED EQUIPMENT, AND RESTRAINTS
1 1/4" DIAMETER AND LARGER.
BRACE ALL PIPES 2 1/2" DIAMETER AND LARGER. RESTRAIN ALL PIPING IN MECHANICAL ROOMS THAT IS
BRACING SHALL OCCUR AT 80 FOOT INTERVALS (MAX).
TRANSVERSE AND VERTICAL BRACING SHALL OCCUR AT 40 FOOT INTERVALS (MAX). LONGITUDINAL
ABOVE THE CENTER OF GRAVITY OF THE RISER.
AT PIPE RISERS, WHEREVER POSSIBLE, SUPPORT THE WEIGHT OF THE RISER AT A POINT OR POINTS
DO NOT USE BRANCH LINES TO RESTRAIN MAIN LINES.
RESPOND DIFFERENTLY DURING AN EARTHQUAKE; IE A WALL AND A ROOF.
DO NOT FASTEN ON RIGID PIPING SYSTEM TO TWO DISSIMILAR PARTS OF THE BUILDING THAT MAY
AIR DISTRIBUTION DEVICESDESIGN CONDITIONSLEGEND & ABBREVIATIONS
LOW PRESSURE STEAM
LOW PRESSURE RETURN LPR
LPS LPS
LPR
AIR FLOW MONITORING STATION AFMS
RF RELIEF FAN
e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
T
T
T
T
T
Fourth Floor
0' - 0"
Penthouse Floor
14' - 0"
30"x18"
30"x18"
52"x14"
MINIMUM OUTSIDE
AIR DUCT
MAXIMUM OUTSIDE
AIR DUCT
RELIEF DUCT
"x
Fourth Floor
0' - 0"
Penthouse Floor
14' - 0"
54"x16"
SNS SMP
MH101
NOTES
DUCTWORK - WING H
MECHANICAL NEW WORK PLAN
1/8" = 1'-0"
MECHANICAL NEW DUCTWORK PLAN
FABRICATION OF DUCTWORK.
CONTRACTOR SHALL ALSO VERIFY SPACE ABOVE CEILINGS AND IN MECHANICAL ROOMS PRIOR TO
CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY AS MODIFICATIONS MAY BE REQUIRED.
BETWEEN THE ACTUAL CONDITIONS AND THE CONDITIONS SHOWN ON THE DESIGN DOCUMENTS, THE
SUCH, THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS. IF ANY DEVIATIONS ARE DISCOVERED
THE DESIGN IS BASED ON BASIC FIELD INVESTIGATIONS AND EXISTING PLANS WHERE AVAILABLE. AS
SEE MH102 FOR PIPING AND THERMOSTAT LOCATIONS.
VAV
1-1
VAV
1-2
VAV
1-3
VAV
1-4
VAV
1-5
VAV
1-6
VAV
1-7
VAV
1-8
VAV
1-9
VAV
1-10
VAV
1-11
VAV
1-12
VAV
1-13
VAV
1-14
VAV
1-15
VAV
1-16
VAV
1-17VAV
1-18
VAV
1-19
VAV
1-21
VAV
1-22
VAV
1-23
VAV
1-24
VAV
1-25
VAV
1-26
VAV
1-27
VAV
1-28
VAV
1-29
VAV
1-30
AHU
5 PROVIDE AND INSTALL DUCT MOUNTED SMOKE DETECTOR IN SUPPLY DUCT.
REQUIRED TO MAINTAIN REQUIRED PRESSURES.
PROVIDE ROOM PRESSURE MONITOR ON WALL OUTSIDE ISOLATION ROOM. MODULATE SUPPLY AIR AS
14X10
12X10
X
12" /
X
X
16X24
8X8
X
X
20X12
X
14X12 12X1010X8
X
X
38X12
16X12
X
X
X
16X12 14X10
X
30X14
X
20X12
14X12 12X10
X
14X12
10" / 8" /
X
54X16
10" /
8" /
X
X
22X14
34X8
X
X
20X16
X1
TYPICAL EXISTING TO REMAIN
TYPICAL NEW WORK
6 DUCT UP. SEE MH103 FOR CONTINUATION.
7 OFFSET DUCTS AS REQUIRED FOR CROSSING EACH OTHER AND ROUTING
8 AIR MONITORING STATION IN DUCT TO PROVIDE REQUIRED OUTSIDE AIR.
PLENUM AS SHOWN.
EXISITNG 5 FT X 6 FT LOUVER. INSTALL PLENUM BOX ON LOUVER AND ATTACH DUCT ON SIDE OF
VAV
1-20
B
14X14
A
12" A
12"
A
12"
A
12"
A
10"
A
12"
A
12"
A
10"
A
12"
A
12" A
12" A
12" A
12"
A
12"
A
10"
A
12"
A
12"
A
12"
A
12"
D
6X6
C
8X8 C
8X8
D
6X6
B
10X10
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
C
8X8
B
8X8
B
8X8
B
8X8
B
8X8
B
8X8
B
8X8
B
8X8
B
8X8
B
8X8 B
8X8 B
8X8 B
8X8
B
8X8
B
8X8
B
8X8
B
14X14
C
8X8
D
6X6
14X8
8X6
8X6
14X8
8X6
8X6
10" /
12X10
6X6
10" /
8X12
8X12
6X6
10" /
X
10" /
X 0 8
X
10X10 8"
8X12
10"
8X12
10"
8"
10X10
8"
8"
X
10"
X
10"
X
10"
X
10"
8"
X
X
10"
8"
8X12
8X12
10"
10"
8X12
10"
B
8X8
8X8
8X8
8X8
8X8 8X8
8X8
8X8
8X8
8X6
8X6
8X8
8X6
8X6
8X6
8X8
10X8
8X6
8X12
14X14
E
6 "
E
8 "
E
8 "
E
8 "
E
6 "
8"
8"
6"
E
10"
6X12
B
8X8
B
10X10
E
6 "
E
6 "
E
6 "
10X10
10"
6"
8"
8"
8" 8"
12"
10X8
8X8 8X6
8X6
8X6
8X6
8X6
8X6 8X6
E
6 "
E
6 " 6X8
6"
E
10"
6"
8" 6X6 6X12
10"
6X6
D
6X6
D
6X6 D
6X6
E
6 "
E
6 "
6X6
6" /
6" / 8" /
10X10
E
8 "
6X10
8" /
B
6X6
B
10X10
C
8X8
C
6X6
B
10X10
D
6X6
E
6 "
6X8
6"
B
6X6
6X6
10X8
C
6X6
C
8X8
6X6 6X6
8X8
8X6
6X6
6X6
10X8
10X10 6X6
E
6 "
E
6 "
E
6 " 8X8
6" / 6" /
B
16X16
16X10
B
16X16
16X10
6X6
B
6X6 B
6X6
E
6 "
E
6 "
D
6X6
10X8
6" /
8" / 6X6
8" /
C
6X6
E
6 "
6" /
E
6 " E
6 "
E
8 "
E
6 "
E
6 "
E
6 "
E
6 "
B
8X8
B
14X14
B
14X14
B
8X8
B
10X10
10 CONNECT TO EXISTING
1/8" = 1'-0"
AHU-1 ELEVATION
MH101
6X8 6"
VAV
1-31
CLOTH. BALANCE EXHAUST AIR TO 100 CFM.
EXHAUST DOWN IN CORNER OF ROOM TO EXHAUST 12" AFF. COVER OPENING WITH 1/2"X1/2" HARDWARE
8 " E
6" /
8" /
6"
14X8
6"
8X4
6"
6"
6"
6"
6"
6"
6"
10X6
8X6
16X6
13 OFFSET AS SHOWN UNDER EXISTING STRUCTURAL.
C
6X6
D
6X6
6"
6"
26 GAUGE METAL OR HEAVIER.
NO FIRE DAMPER IS REQUIRED PER NFPA 90A (2018) PARAGRAPH 5.3.1.1 PROVIDED THAT THE DUCT IS
CORRIDOR
C4-4B
CORRIDOR
WAITING
C4-2B
CORRIDOR
C4-3A
CORRIDOR
C4-3B
ELEVATOR
LOBBY
C4-5
WAITING
C4-2A
PATIENT RM
4H-108
MECH SHAFT
4H-M1
STAIR (NIC)
S-3
4H-137A
PATIENT RM
4H-135
BATH RM
4H-135A
BATH RM
4H-133A
PATIENT RM
4H-133
BATH RM
4H-131A
PATIENT RM
4H-131
BATH RM
4H-130A
PATIENT RM
4H-132
BATH RM
4H-132A
PATIENT RM
4H-128
BATH RM
4H-128A
BATH RM
4H-126A
PATIENT RM
4H-125
BATH RM
4H-125A
BATH RM
4H-124A
PATIENT RM
4H-124
BATH RM
4H-121A
PATIENT RM
4H-115
SVC
BAY/MECH
RM
4H-114
HOUSE
KEEPING
4H-112
PATIENT RM
4H-110
PATIENT RM
4H-106
PATIENT RM
4H-109
BATH RM
4H-108A
BATH RM
4H-109A
BATH RM
4H-107A
BATH RM
4H-106A
BATH RM
4H-122A
4H-111
NEGATIVE
ISOLATION
RM
4H-137
PATIENT RM
4H-130
BARIATRIC
RM
4H-126
PATIENT RM
4H-122
BATH RM
4H-115A
PATIENT RM
4H-107
4H-120
BATH RM
4H-110A
CH4-14
4H-116
4H-136 4H-138 4H-139
4H-141
4H-142
4H-119
4H-129
4H-123
4H-105
4H-113
4H-118
4H-117
4H-140
4H-134
4H-127
4H-119B
PATIENT RM
4H-121
4H-138
4H-102
4H-104
NEGATIVE
BARIATRIC
RM
4H-100
NEGATIVE
ISOLATION
RM
4H-103
ANTE RM
4H-103A
ANTE RM
4H-100A
BATH RM
4H-100B
BATH RM
4H-103B
BATH RM
4H-137B
CH4-18A
CH4-18B
CH4-18C
WAITING
C4-2B
WAITING
C4-2A
FDFDFDFD
FD
FD
FD
FD
FD
FD
FD FD
FD FD
FD
FD
FD
FD
FD
FD
ANTE RM
4H-137A
STATION
NURSE
LINEN
UTILITY
SOILED
UTILITY
CLEAN
EQUIPMENT
STORAGE
STORAGE
MED
NOURISH
ELEC
TLT 1 TLT 2
LINEN
IT TELEMETRY
NURSE MGR
ASSIST
MANAGER
NURSE
STATION
NURSES
CART
CRASH
LOUNGE
LOCKERS
MED GAS
STATION
NURSE
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
VAV
1-1
VAV
1-2
VAV
1-3
VAV
1-4
VAV
1-5
VAV
1-6
VAV
1-7
VAV
1-8
VAV
1-9
VAV
1-10
VAV
1-11
VAV
1-12
VAV
1-13
VAV
1-14
VAV
1-15
VAV
1-16
VAV
1-17VAV
1-18
VAV
1-19
VAV
1-21
VAV
1-22
VAV
1-23
VAV
1-24
VAV
1-25
VAV
1-26
VAV
1-27
VAV
1-28
VAV
1-29
VAV
1-30
AHU
VAV
1-20
VAV
1-31
SNS SMP
MH102
PIPING - WING H
MECHANICAL NEW WORK PLAN
1/8" = 1'-0"
MECHANICAL NEW PIPING PLAN
T
1-1
T 1-2T 1-3
T 1-4
T 1-5
T 1-6
T
1-7
T 1-8
T 1-9
T
1-10
T 1-11
T 1-12
T
1-13
T 1-14
T 1-15
T 1-16
T 1-17
1-18
T 1-19
T
1-20
T
1-21
T 1-22
T 1-23
T
1-24
T 1-25
T 1-26
T
1-27
T 1-28
T
1-29
T
1-30
NOTES
ALL PIPING RUN OUTS TO VAV BOXES SHALL BE 3/4" PIPE, UNLESS OTHERWISE NOTED.
1 1
3" CHS/R
2" HWS/R
1/2" HWS/R
1/2" HWS/R
1-1/2" HWS/R
1" HWS/R
1-1/4" HWS/R
1" HWS/R
3/4" HWS/R
1-1/2" HWS/R
2-1/2" HWS/R
ROUTE CONDENSATE DRAIN FROM UNIT TO NEAREST FLOOR DRAIN.
T 1-31
1 1/2" LPS/LPR
VERIFY LOCATION AND SIZE.
CONNECT HOT WATER, CHILLED WATER, STEAM AND CONDENSATE PIPES TO EXISTING RISERS. FIELD
T e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
2 4 5
K
L
M
N
O
P
73 61.4
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
SNS SMP
MH103
NOTES
WING H
PENTHOUSE/ROOF PLAN -
MECHANICAL NEW WORK
1/8" = 1'-0"
MECHANICAL NEW ROOF PLAN
DUCT DOWN. SEE MH101 FOR CONTINUATION
EF
RF
CONNECT DUCT TO EXISTING LOUVER WHERE ORIGINAL DUCT WAS REMOVED.
EF
EF
3 BAG-IN/BAG-OUT FILTER RACK ON ROOF
WITH GUY WIRES. COORDINATE WITH EXISTING CONDITIONS.
FAN DISCHARGE SHALL BE UP. EXTEND DUCT FROM DISCHARGE 10 FT ABOVE ROOF. SUPPORT DUCT
16X24 24X24
X
24X24
20X16
PLANS.
COORDINATE STAND/SUPPORT FOR FANS, FILTER AND DUCTS WITH STRUCTURAL AND ARCHITECTURAL
7 FIRE DAMPER IN DUCT AT FLOOR PENETRATION. INSTALL 18"X18" DUCT ACCESS DOOR IN DUCT RISE.
CONNECT TO EXISTING
COORDINATE NEW PENETRATION IN ROOF WITH STRUCTURAL AND ARCHITECTURAL PLANS.
COORDINATE NEW PENETRATION IN FLOOR WITH STRUCTURAL AND ARCHITECTURAL PLANS.
e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
SNS SMP
MH401
SCHEDULES
MECHANICAL EQUIPMENT
SYMBOL
MINIMUM CFM
TOTAL CFM
CAPACITY, BTU/HR
ENT. AIR DB, F
ENT. AIR WB, F
LVG. AIR DB, F
LVG. AIR WB, F
LOCATION
REMARKS
C O
O L
IN
G C
O
IL
AHU-1
AIR CFM
MINIMUM OUTSIDE
CHARACTERISTICS
ELECTRICAL
VELOCITY, FPM
MAX. FACE
DROP, IN. H20
MAX AIR PRESSURE
460V/3PH
4H-114
87.0
1.0
53.5
67.3
83.6
435,100
2.0
10,240
11,790
148,950
41.5
55.0
1.0
14.9
H E
A T
IN
G C
O
IL
CAPACITY, BTU/HR
ENT. AIR DB, F
LVG. AIR DB, F
DROP, IN. H20
MAX AIR PRESSURE
VELOCITY, FPM
MAX. FACE
DROP, FT. H20
MAX WATER PRESS.
HOT WATER GPM
TEMP., F
ENTERING WATER
TEMP., F
LEAVING WATER
PRESSURE, IN. H20
EXTERNAL STATIC
GPM
CHILLED WATER,
TEMP., F
ENTERING WATER
TEMP., F
LEAVING WATER
DROP, FT. H20
MAX WATER PRESS.
AIR HANDLING UNITS
SYMBOL
TYPE
LOCATION
REMARKS
400 505
505 400
PRESSURE
0.3
SEE PLANS
VAV-1-2 VAV-1-1
VAV-1-3
MAXIMUM CFM
MINIMUM CFM
DROP, IN. H20
MAXIMUM BOX PRESSURE
HEATING CFM
MAXIMUM N.C. LEVEL
CAPACITY, BTU/HR
ENT. AIR DB, F
LVG. AIR DB, F
H E
A T
IN
G
15,120
19,090
15,880
TEMP., F
ENTERING WATER
TEMP., F
LEAVING WATER
HOT WATER, GPM 1.5
1.9
1.6
VARIABLE AIR VOLUME BOXES
INDEPENDENT
PRESSURE
INDEPENDENT
PRESSURE
INDEPENDENT
VAV-1-4
30,240
3.0
PRESSURE
INDEPENDENT
VAV-1-5
0.2
PRESSURE
INDEPENDENT
SUPPLY MAX. FAN MOTOR HP
EXHAUST FANS
SYMBOL
TYPE
REMARKS
1.0
INLINE
460 V/ 3 PH
LOCATION
CHARACTERISTICS
ELECTRICAL
SEE PLANS
460 V/ 3 PH
1.0
INLINE
CFM
PRESSURE, IN. H20
EXTERNAL STATIC
MAXIMUM MOTOR HP
DRIVE
0.75
DIRECT
11,297
DIRECT
MAXIMUM TIP SPEED, FPM
MAXIMUM FAN SPEED, RPM
VELOCITY, FPM
MAXIMUM OUTLET
EF-1 RF-1
VAV-1-6
10,780
1.1
PRESSURE
INDEPENDENT
VAV-1-7
13,230
1.3
PRESSURE
INDEPENDENT
VAV-1-8
11,900
1.2
PRESSURE
INDEPENDENT
VAV-1-9
12,100
1.2
PRESSURE
INDEPENDENT
VAV-1-10
11,340
1.1
PRESSURE
INDEPENDENT
VAV-1-11
18,150
1.8
PRESSURE
INDEPENDENT
VAV-1-12
12,100
1.2
PRESSURE
INDEPENDENT
VAV-1-13
10,200
1.0
PRESSURE
INDEPENDENT
VAV-1-14
11,340
1.1
PRESSURE
INDEPENDENT
VAV-1-15
11,720
1.2
PRESSURE
INDEPENDENT
VAV-1-16
12,900
1.3
PRESSURE
INDEPENDENT
VAV-1-17
11,900
1.2
PRESSURE
INDEPENDENT
SYMBOL
TYPE
LOCATION
REMARKS
325 305
350 470
PRESSURE
VAV-1-19VAV-1-18
VAV-1-20
MAXIMUM CFM
MINIMUM CFM
DROP, IN. H20
MAXIMUM BOX PRESSURE
HEATING CFM
MAXIMUM N.C. LEVEL
CAPACITY, BTU/HR
ENT. AIR DB, F
LVG. AIR DB, F
H E
A T
IN
G
12,300
11,530
15,700
TEMP., F
ENTERING WATER
TEMP., F
LEAVING WATER
HOT WATER, GPM 1.2
1.2
1.6
VARIABLE AIR VOLUME BOXES
INDEPENDENT
PRESSURE
INDEPENDENT
PRESSURE
INDEPENDENT
VAV-1-21
12,900
1.3
PRESSURE
INDEPENDENT
VAV-1-22
0.9
PRESSURE
INDEPENDENT
VAV-1-23
0.3
PRESSURE
INDEPENDENT
VAV-1-24
12,700
1.3
PRESSURE
INDEPENDENT
VAV-1-25
11,900
1.2
PRESSURE
INDEPENDENT
VAV-1-26
12,500
1.3
PRESSURE
INDEPENDENT
VAV-1-27
12,500
1.3
PRESSURE
INDEPENDENT
VAV-1-28
11,900
1.2
PRESSURE
INDEPENDENT
VAV-1-29
12,300
1.2
PRESSURE
INDEPENDENT
VAV-1-30
16,650
1.7
PRESSURE
INDEPENDENT
AFTER FILTER, AND DISCHARGE.
DIRECT DRIVE PLENUM SUPPLY FANS WITH VFD,
LB/HR, TURNING CHILLED WATER COIL, DUAL
HUMIDIFIER SIZED FOR 15 PSIG STEAM AT 261
HEATING COIL, HUMIDIFIER SECTION WITH
SECTIONS: INTAKE, PREFILTER 1 AND 2, HOT WATER
UNIT SHALL CONSIST OF THE FOLLOWING
EACH 7.5 HP.
MOTOR HORSEPOWER IS TOTAL. UNIT HAS 2 FANS.
460 V/ 3 PH
1.5
UTILITY SET
1.5
BELT
EF-2
460 V/ 3 PH
1.5
UTILITY SET
1.5
BELT
EF-3
MAXIMUM dBA
VAV-1-31
0.2
PRESSURE
INDEPENDENT
e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
SNS SMP
MH501
MECHANICAL HVAC DETAILS
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
(TYP.)
UNION CONNECTIONS
WATER SUPPLY
SHUT OFF VALVE
CONNECTION
DRAIN WITH HOSE
MV
MODULATION CONTROL VALVE
(CV OR VAV)
AIR TERMINAL UNIT
REHEAT COIL
CONNECTOR. SEE DETAIL
FLEXIBLE AIR DUCT
DIFFUSER (TYP.)
CLAMPS AND SEALANT (TYP.)
SEE SPECIFICATIONS FOR
SEE NOTE 5
WATER COIL
SELF-VENTING
COIL IS NOT
AIR VENT WHEN
NOT SELF-DRAINING
DRAIN WHEN COIL IS
(TYP.)
TEST PLUG
PIPING INDEPENDENT OF COIL
PIPE HANGER SHALL SUPPORT REDUCER, IF REQUIRED
DRAIN
WATER COIL
SELF-VENTING
COIL IS NOT
AIR VENT WHEN
(TYP.)
TEST PLUG
PIPING INDEPENDENT OF COIL
PIPE HANGER SHALL SUPPORT
WATER COIL
REDUCER, IF REQUIRED
FLOW ELEMENT
IS NOT SELF-DRAINING
DRAIN WHEN COIL
DRAIN
DIMENSIONS CANNOT BE OBTAINED IN THE RETURN PIPING.
THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED MINIMUM UPSTREAM AND DOWNSTREAM 3.
PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR EQUIPMENT.
PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS OR 2.
LARGER.
WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR EACH PIPE SHALL BE 1.
NOTES:
FE
MV
MV
MV
MV
MV
MV
FE
TI
TI
MV
VALVE (TYP.)
CALIBRATED BALANCING
NTS
AIR HANDLING UNIT DRAIN TRAP DETAIL
B9 NTS
B7
NTS
B5
TERMINAL UNIT WATER COILS -
PIPING CONNECTIONS EXHAUST OR RETURN BRANCH DUCTWORK
NTS
C2
NTS
F9
WATER COILS - PIPING CONNECTIONS
NTS
F2
DUCT CONNECTIONS - AIR TERMINAL UNITS
EXHAUST STACK DETAIL
ROOF
FAN
EXHAUST
(AS REQUIRED)
TRANSITION
DRIP LIP
GUY WIRE (4 REQUIRED)
TO EXHAUST STACK
STEEL STRAP SECURED
1" [25mm] GALVANIZED
EXHAUST STACK
WELDED STAINLESS STEEL
JOINT
WELDED
ROOF (TYP.)
WIRE TO
SECURE GUY
COUPLING
WELDED
[15mm]
1/2"
DRAIN,
F.C.
(TYP.)
ROOF
STACK TO
SECURE
[17.8 M/S] OUTLET VELOCITY
SIZE TO MAINTAIN 3500 FPM
BLANK PLATE
NTS
END OF STEAM LINE DRIP TRAP
E7
CONDENSATE
TO DRAIN
MV
AIR VENT
MANUAL
LOAD
TO BUILDING
TRAP ASSEMBLY
INVERTED BUCKET
TEE
WELDED
STE
AM
PI
PE
300mm[12"]
150mm[6"] SCHEDULE 80 STEEL PIPE
25mm [1"] GATE VALVE
WELDED TEE
DIAGRAM
SEE CONTROL
INDICATION TO ECC
TEMPERATURE
S E
N O
T E
SEE NOTE 3
SEE NOTE 2
SEE NOTE 1
INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
[1500mm]. USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER
SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0"
FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT
OR BELOW 0.2"/100' [1.64Pa/m].
DUCT TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT
FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A
BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET (3 METERS).
AS THE BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE
A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE
LENGTH 3'-0" [900mm].
THIS BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM
A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO
MINIMUM OF 3 TIMES THE DIAMETER OF INLET
RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A
5.
4.
3.
2.
1.
NOTE:
A S
R
Q U
IR
E D
M
IN
DRAW THRU
BLOW THRU
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
TYPE M UNLESS NOTE BELOW IS MET
PIPING SHALL BE RIGID COPPER TYPE L OR
SIZE AS THE NIPPLE ON THE DRAIN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME
TOWARD DRAIN
PITCH DOWN
CLEAN OUT
FLOOR SINK
PAN
DRAIN
FITTING
DIELECTRIC
B A1
2" PLUS X
1" MINIMUM
METALS ARE TO BE CONNECTED.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR
BARRIERS.
AND IS INDOORS AND DOES NOT PASS THROUGH RATED
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA
NOTE:
MAIN EXHAUST OR RETURN
FLOW
AIR
FLOW
AIR
AT EACH BRANCH DUCT
PROVIDE VOLUME DAMPER
BRANCH DUCT
VD
W
1/4W OR 4" MIN.
FROM STRUCTURE
SAME AS DIFFUSER
INLET: 5'-0" MAX
FLEXIBLE DUCT SIZE
LENGTH.
12"
CEILING
SUPPORT SADDLE
VOLUME DAMPER W/
LOCKING QUADSADDLE
SHEET METAL
CONICAL OUTLET
BRANCH DUCT
FOR CHANGE OF
DIRECTION GREATER
USE RIGID ELBOWS
[300mm]
AND SEALANT (TYP.)
SEE SPECIFICATIONS FOR CLAMPS
LAY-IN CLG.
REGISTER IN
DIFFUSER OR
TYPICAL
SEE SPECIFICATIONS
THERMAL INSULATION
NTS
E5
FLEXIBLE AIR DUCT CONNECTOR
SINGLE COIL
DOUBLE COIL
PLAN VIEW
e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Revisions: Date
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of 71
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
SALEM VA MEDICAL CENTER
2019.08.26
658-18-101
LOBBY
PRIVACY WING H/ELEVATOR
RENOVATE FOR PATIENT
SNS SMP
MH601
SCHEMATICS
MECHANICAL HVAC CONTROL
DP-1
DP-2
TS-3
TS-6
C O
O L
TS-8
SA
RA
TS-4
MOTOR (ON/OFF) - STARTER AUXILIARY CONTACT
DIFFERENTIAL PRESSURE SENSOR/SWITCH
DIFFERENTIAL PRESSURE SENSOR/SWITCH
ACROSS FAN
DP-2
ACROSS FILTER
DP-1
CONTROL DIAGRAM LEGEND:
INSTRUCTIONS AND NFPA REQUIREMENTS.
INTO THE ALARM SYSTEM BY THE CONTRACTOR PER FIRE DEPARTMENT
DETECTORS FIRE/SMOKE DAMPERS AND/OR SMOKE DAMPERS SHALL BE TIED
8. FIRE ALARM SYSTEMS SHALL BE WIRED BY CONTRACTOR. DUCT SMOKE
ALL DEVICES NEW UNLESS NOTED OTHERWISE.
3. PROVIDE ALL SENSORS, ACTUATORS, DETECTORS SHOWN IN DIAGRAMS.
CONTROLS.
5. CONTRACTOR SHALL PROGRAM THE SEQUENCE OF OPERATIONS FOR
7. ALL CONTROL AND ELECTRICAL WIRING SHALL BE FIRE AND PLENUM RATED.
INDICATED. CONTROLS ARE TO BE FURNISHED BY THE CONTRACTOR.
4. WIRE CONTROLS TO DIRECT DIGITAL CONTROL (DDC) PANELS AS
6. REFER TO SPECIFICATIONS FOR COMPLETE REQUIREMENTS.
GENERAL NOTES:
OUTSIDE AMBIENT AIR TEMPERATURE SENSOR
SUPPLY AIR TEMPERATURE SENSOR
SPACE TEMPERATURE SENSOR
LOW LIMIT AIR TEMPERATURE SENSOR
TEMPERATURE SENSOR
TS-6
TS-7
TS-8
TS-3
TS-2
OUTSIDE AIR TEMPERATURE SENSOR
MOTORIZED DAMPER
TS-1
VARIABLE FREQUENCY DRIVEVFD
SMOKE DETECTORSD
ANALOG OUTPUTS:
ANALOG INPUTS:
CONTROL WIRING SIGNALS
MINIMUM.
A/D CONVERSION RESOLUTION
4-20 mA OR 1-5 VDC WITH 12-BIT
MINIMUM.
CONVERSION RESOLUTION
0-10 VDC WITH 8-BIT D/A
AIR HUMIDITY SENSORHS-1
RETURN AIR TEMPERATURE SENSORTS-4
HS-1
SD
CV-1
CHILLED WATER CONTROL VALVE (2-WAY)CV-1
SA
AV-1
H W C
O
IL
CV-2
TS-7
VFD
NTS
P R
E F
IL
T E
R
F
IL
T E
R
MD-1
SUPPLY AIRSA
EXHAUST AIREA
RETURN AIRRA
DUCT STATIC PRESSURE SENSORDS-1
AIR VALVE ACTUATORAV-1
NTS
TS-7
MIN OA
DSP DUCT STATIC PRESSURE
HOT WATER CONTROL VALVE (2-WAY)CV-2
CV-3
DUCT TEMPERATURE SENSOR
SYMBOL
ITEM
DESCRIPTION
SMOKE DAMPER
VOLUME DAMPER
VARIABLE FREQUENCY DRIVE
S
C
STEAM COIL
C
C
COOLING COIL
FAN
T
FZ
FREEZESTAT
2-WAY CONTROL VALVE
DA
DAMPER ACTUATOR
T-5
AIIR FILTER
3-WAY CONTROL VALVE
DPS
STATIC PRESSURE SWITCH
SPT
STATIC PRESSURE TRANSMITTER
CO2 SENSOR
SMOKE DETECTOR
TS
SD
CONTROLS SYMBOL LEGEND
SPACE TEMPERATURE SENSOR
SYMBOL
ITEM
DESCRIPTION
VFD
CO2
SD
MOTOR STARTERMS
EXHAUST FAN
MS
(TYP.)
(TYP.)NTS
(TYP.)NTS
TS-3
TS-6
P R
E H
E A
T
CV-2
DP-1
F
IL
T E
R
CV-3
AFMS-1
MD-2
MAX OA
AFMS-2
RELIEF AIR
MD-3 MD-4
MS
MS
MD
STEAM CONTROL VALVE (2-WAY)
CAMPUS WIDE ENERGY CONTROL MANAGEMENT SYSTEM (ECMS).
10. THE BUILDING WEB BASED DDC SYSTEM SHALL BE INTEGRATED WITH THE
9. LOCATE TEMPERATURE AND HUMIDITY SENSORS ON WALL 48" AFF.
NEUTRAL PRESSURE COMPARED TO THE CORRIDOR.
SWITCH THAT ALLOWS SETTING THE ROOM TO A POSITIVE, NEGATIVE OR
THE ROOM PRESSURIZATION MONITOR PANEL CONTAINS A 3-POSITION KEY
WILL BE INITIATED, AS WELL AS A SOFTWARE ALARM TO THE DDC SYSTEM.
PRESSURE IS OUTSIDE OF THE PRESET ALARM LIMITS, A LOCAL ALARM
CORRIDOR AND REPORT THAT VALUE TO THE DDC SYSTEM. IF THE ROOM
MONITOR THE ROOM PRESSURIZATION LEVEL AS COMPARED TO THE
A HALLWAY MOUNTED ROOM PRESSURIZATION MONITOR PANEL WILL
ROOM PRESSURIZATION MONITORING
OWNER.
FANS FOR EQUAL RUN TIME. COORDINATE DESIRED RUNTIME WITH
REDUNDANCY. THE DDC SYSTEM SHALL SET A SCHEDULE TO ALTERNATE
SIGNAL WILL BE SENT TO THE DDC SYSTEM. THE SYSTEM HAS 2 FANS FOR
LIGHT WILL BE ENERGIZED AT THE AIR FILTER SENSOR AND AN ALARM
IF THE HEPA FILTER PRESSURE DROP EXCEEDS THE SETPOINT, AN ALARM
MONITOR THE EXHAUST FAN STATUS AND HEPA FILTER PRESSURE DROP.
THE EXHAUST FANS SHALL RUN CONTINUOUSLY. THE DDC SYSTEM SHALL
ISOLATION ROOM EXHAUST FANS
WILL SOUND ROOM PRESSURIZATION MONITOR PANEL.
SETPOINT. IF THE ROOM PRESSURIZATION IS OUT OF RANGE, AN ALARM
FAN WILL MODULATE TO MAINTAIN THE FIXED EXHAUST AIR FLOW
TO MAINTAIN ROOM TEMPERATURE SETPOINT. THE BATHROOM EXHAUST
MONITOR PANEL. THE SUPPLY AIR TERMINAL UNIT REHEAT WILL MODULATE
NEGATIVE OR NEUTRAL PRESSURIZATION AT THE ROOM PRESSURIZATION
THE AIRFLOW DIFFERENTIAL, BASED ON WHETHER THE ROOM IS SET FOR
SUPPLY AIR TERMINAL AND THE PATIENT ROOM EXHAUST FAN TO MAINTAIN
THE ROOM PRESSURE CONTROLLER MODULATES THE CONSTANT VOLUME
OCCUPIED MODE
THE HVAC SYSTEMS OPERATE CONTINUOUSLY.
THE ISOLATION ROOMS ARE CONSIDERED CONTINUOUSLY OCCUPIED AND
GENERAL
AND RELIEF FANS. SUPPLY FANS SHALL MODULATE AS REQUIRED TO MAINTAIN SET PRESSURE IN THE SUPPLY DUCT.
DETECTOR IN THE SUPPLY DUCT IS ENERGIZED, IT SHALL SEND A SIGNAL TO THE FIRE ALARM AND DE-ENERGIZE THE SUPPLY
STEAM HUMIDIFIER SHALL BE ENERGIZED AS NEEDED TO MAINTAIN HUMIDITY SENSED IN THE RETURN DUCT. IF THE SMOKE
TEMPERATURE SENSOR FAILS THE CHILLED WATER VALVE SHALL CLOSE AND AN ALARM SHALL BE ANNUNCIATED AT THE BAS.
AND THE RETURN DAMPER CLOSE AND THE RELIEF DAMPER OPEN ENERGIZING THE RELIEF FAN. IF THE DISCHARGE AIR
DISCHARGE AIR TEMPERATURE SETPOINT. IF ECONOMIZING IS ENABLED THE MAXIMUM OUTSIDE AIR DAMPER SHALL ALSO OPEN
VENTILATION REQUIREMENT. THE PREHEAT HOT WATER AND CHILLED WATER VALVES SHALL MODULATE TO MAINTAIN THE
THE SUPPLY FAN SHALL RUN CONTINUOUSLY AND THE MINIMUM OUTSIDE AIR DAMPER SHALL OPEN TO MAINTAIN MINIMUM
OCCUPIED:
WITH THE BAS THE CONTROLLER SHALL OPERATE USING DEFAULT MODES AND SETPOINTS.
HEAT/COOL MODES, THE BAS SHALL ALSO SEND THE DISCHARGE AIR TEMPERATURE SETPOINT. IF COMMUNICATION IS LOST
THE BUILDING AUTOMATION SYSTEM (BAS) SHALL SEND THE MORNING WARM-UP/PRE-COOL, OCCUPIED/UNOCCUPIED AND
BUILDING AUTOMATION SYSTEM INTERFACE:
SEQUENCE OF OPERATIONS FOR VARIABLE VOLUME AIR HANDLING UNIT AHU
H U
M
ID
IF
IE
R
S T
E A
M
DSP-1
1. REFER TO SHEET MH001 FOR MECHANICAL LEGEND.
2. REFER TO SHEET MH401 FOR MECHANICAL SCHEDULES.
VAV TERMINAL UNIT
SEQUENCE OF OPERATION FOR ISOLATION ROOMS
EF-ISOLATION ROOMS
EF TYPICAL
AHU
ELECTRICAL LEGEND
ELECTRICAL NOTES
1. MATERIALS, EQUIPMENT, AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF THE AMERICAN SOCIETY FOR TESTING
MATERIALS (ASTM), 2017 NATIONAL ELECTRIC CODE (NEC). THE UNDERWRITERS LABORATORY (UL), THE NATIONAL ELECTRIC MANUFACTURER'S
ASSOCIATION (NEMA), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AND OTHER
NATIONALLY RECOGNIZED AGENCIES AS WELL AS APPLICABLE LOCAL CODES.
2. ANYTHING DRAWN OR SPECIFIED SHALL NOT BE CONSTRUED TO CONFLICT WITH ANY LOCAL, MUNICIPAL OR STATE LAW, REGULATION OR
ORDINANCE WHICH GOVERNS THE INSTALLATION OF ANY ELECTRICAL OR RELATED WORK. ITEMS SHALL NOT BE INSTALLED IN CONFLICT WITH
THE NEC. RESOLVE ANY AND ALL CONFLICTS BEFORE INSTALLATION AT NO ADDITIONAL EXPENSE TO THE OWNER.
3. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED AND LABELED FOR THE QUALIFIED USE. VERIFY CIRCUIT BREAKER INTERRUPT CAPACITY
NEEDED FOR EACH PANEL WITH LOCAL UTILITY. FOR BID PURPOSES, ASSUME 25,000 AIC FOR SERVICE ENTRANCE EQUIPMENT, 14,000 AIC FOR
480/277V EQUIPMENT , AND 10,000 AIC FOR 208/120V EQUIPMENT. BALANCE THE POWER EQUALLY (+/- 10%) ON ALL PHASES.
4. THE SYSTEMS SHOWN ON DRAWINGS SHALL BE PROVIDED TO SERVE ALL FIXTURES, EQUIPMENT, AND AREAS WITHIN THE CONTRACT LIMIT
LINES AS SET FORTH BY THE ARCHITECTURAL SOLUTION FOR THE PROJECT. THE BIDDING AND CONTRACT REQUIREMENTS, GENERAL
REQUIREMENTS, AND GENERAL PROVISIONS SHALL APPLY TO THIS SECTION. SYSTEMS SHALL INCLUDE ALL EQUIPMENT, APPURTENANCES, SAFETY DEVICES, AND CONTROLS NECESSARY FOR THE INTENDED SERVICE.
5. ALL PERMITS AND FEES REQUIRED FOR THE WORK SHALL BE SECURED AND PAID FOR BY THE ELECTRICAL CONTRACTOR AND INCLUDED IN
BID PRICE.
6. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT DOCUMENTS THAT DO NOT CHANGE THE SCOPE OF INSTALLATION OR
NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONAL COST TO THE OWNER. NO OTHER
CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSION OF THE OWNER.
7. BIDDERS SHALL BE LICENSED CONTRACTORS IN ACCORDANCE WITH LOCAL AND STATE LAWS.
8. ALL EQUIPMENT SHALL BE NEW AND UNUSED. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S
RECOMMENDATIONS, EXCEPT WHERE THESE SPECIFICATIONS REQUIRE A HIGHER QUALITY INSTALLATION THAN RECOMMENDED BY THE
MANUFACTURER.
9. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE ON SITE. REPLACE ANY AND ALL
CONTRACTOR-SUPPLIED DEFECTIVE DEVICES, ITEMS OR SYSTEMS AT CONTRACTOR'S OWN EXPENSE BEFORE COMPLETION OF THE PROJECT.
10. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED OR FIELD ERECTED, ALL FACTORY
ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH
INSTALLING MANUFACTURER'S GUARANTEED EQUIPMENT. THIS CONTRACTOR'S GUARANTEE SHALL EXIST FOR A PERIOD OF ONE (1) YEAR
FROM THE DATE OF FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO DEFECTS IN MATERIAL AND TO DEFECTIVE WORKMANSHIP
OF ANY KIND.
11. VERIFY FINAL LOCATIONS FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH THE REQUIREMENTS OF THE ACTUAL EQUIPMENT TO BE
CONNECTED. VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS.
12. SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF ELECTRICAL MATERIALS AND EQUIPMENT FOR EFFICIENT FLOW OF THE
WORK. GIVE PARTICULAR ATTENTION TO LARGE EQUIPMENT REQUIRING POSITIONING PRIOR TO CLOSING-IN THE BUILDING. COORDINATE THE
CUTTING AND PATCHING OF BUILDING COMPONENTS TO ACCOMMODATE INSTALLATION OF ELECTRICAL EQUIPMENT AND MATERIALS.
13. COORDINATE THE INSTALLATION OF ELECTRICAL MATERIALS AND EQUIPMENT ABOVE CEILINGS WITH SUSPENSION SYSTEM, MECHANICAL
EQUIPMENT AND SYSTEMS, AND STRUCTURAL COMPONENTS. COORDINATE ELECTRICAL EQUIPMENT AND MATERIALS INSTALLATION WITH
OTHER BUILDING COMPONENTS.
14. WHERE MOUNTING HEIGHTS ARE NOT DETAILED OR DIMENSIONED, INSTALL ELECTRICAL SERVICES AND OVERHEAD EQUIPMENT TO
PROVIDE THE MAXIMUM HEADROOM POSSIBLE. INSTALL ELECTRICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR REPLACEMENT
OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH MINIMUM OF
INTERFERENCE WITH OTHER INSTALLATIONS.
15. COORDINATE CONNECTION OF ELECTRICAL SYSTEMS WITH EXTERIOR UNDERGROUND AND OVERHEAD UTILITIES AND SERVICES. COMPLY
WITH REQUIREMENTS OF GOVERNING REGULATIONS, FRANCHISED SERVICE COMPANIES, AND CONTROLLING AGENCIES. PROVIDE REQUIRED
CONNECTION FOR EACH SERVICE.
16. DO NOT ENDANGER OR DAMAGE INSTALLED WORK THROUGH PROCEDURES AND PROCESSES OF CUTTING AND PATCHING. ARRANGE FOR
REPAIRS REQUIRED TO RESTORE OTHER WORK, BECAUSE OF DAMAGE CAUSED AS A RESULT OF ELECTRICAL INSTALLATIONS.
17. BIDDERS SHALL THOROUGHLY ACQUAINT THEMSELVES WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. THEY
SHALL EXAMINE ALL SERVICES, EQUIPMENT, SURFACES, ETC., WHICH THIS WORK IS IN ANY WAY DEPENDENT UPON, AND BRING ANY
DISCREPANCIES DETERMINED OR OMISSIONS FOUND IN THE DRAWINGS TO THE OWNER'S ATTENTION BEFORE SUBMITTING BID.
18. VERIFY MECHANICAL EQUIPMENT SWITCH AND CONNECTION REQUIREMENTS, ITEM BY ITEM, WITH THE MECHANICAL CONTRACTOR, BEFORE
WIRING EQUIPMENT. RESOLVE ALL DISCREPANCIES WITHOUT FURTHER COST TO OWNER.
19. ALL WIRING SHALL BE IN CONDUIT, 3/4" MINIMUM WITH STEEL COMPRESSION FITTINGS SUPPORTED AT 10'-0" INTERVALS.
20. ALL WIRING SHALL BE THHN/THWN COPPER (NO. 12 AWG MINIMUM) UNLESS OTHERWISE NOTED. WIRE AND CONDUIT SIZES ARE SHOWN ON
THE PANEL SCHEDULE.
21. ALL PANELS, CONTROL DEVICES AND MISCELLANEOUS ELECTRICAL APPARATUS SHALL BE CLEARLY MARKED FOR EASY IDENTIFICATION
AND SAFETY. USE BLACK PLASTIC OR BAKELITE NAME PLATE ENGRAVED WITH WHITE LETTERS 1/4" HIGH FOR NORMAL POWER AND RED
PLASTIC OR BAKELITE NAME PLATE ENGRAVED WITH WHITE LETTERS 1/4" HIGH FOR EMERGENCY POWER. PUNCHED TAPE IS NOT
ACCEPTABLE.
22. PANELS SHALL BE PROVIDED WITH A TYPEWRITTEN DIRECTORY AFFIXED TO INSIDE OF PANEL DOOR WITH A CLEAR PLASTIC SLEEVE. . THE
ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND ARE FOR CIRCUIT ALLOCATION ONLY. DO NOT SCALE DRAWINGS.
23. ELECTRICAL CONTRACTOR SHALL FURNISH RECORD SET OF DRAWINGS WITH ANY DEVIATIONS MARKED IN RED INK.
ELECTRICAL NOTES & LEGEND
E001
RD JP
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLED
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
Revisions: Date:
RENOVATE FOR PATIENT
PRIVACY WING H/ ELEVATOR
LOBBY
SALEM VA MEDICAL CENTER
658-18-101
2019.08.26
GENERAL DEMOLITION NOTES
DEMOLITION NOTES
NOT IN SCOPE
NOT IN SCOPE
NOT
IN
SCOPE
APPROXIMATE LOCATION OF
TEMPORARY 1HR CONSTRUCTION WALL
LIGHTING DEMOLITION PLAN
ED101
WING-H
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLED
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
Revisions: Date:
RENOVATE FOR PATIENT
PRIVACY WING H/ ELEVATOR
LOBBY
SALEM VA MEDICAL CENTER
658-18-101
2019.08.26
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
RD JP
MATCH LINE
NOT IN SCOPE
NOT IN SCOPE
NOT
IN
SCOPE
APPROXIMATE LOCATION OF
TEMPORARY 1HR CONSTRUCTION WALL
DEMOLITION NOTES
POWER DEMOLITION PLAN
ED102
WING H
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLED
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
Revisions: Date:
RENOVATE FOR PATIENT
PRIVACY WING H/ ELEVATOR
LOBBY
SALEM VA MEDICAL CENTER
658-18-101
2019.08.26
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
NOT IN SCOPE
NOT IN SCOPE
NOT
IN
SCOPE
APPROXIMATE LOCATION OF
TEMPORARY 1HR CONSTRUCTION WALL
COMMUNICATIONS
ED103
DEMOLITION PLAN - WING H
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLED
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
Revisions: Date:
RENOVATE FOR PATIENT
PRIVACY WING H/ ELEVATOR
LOBBY
SALEM VA MEDICAL CENTER
658-18-101
2019.08.26
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
RD JP
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
NOT IN SCOPE
NOT IN SCOPE
NOT
IN
SCOPE
APPROXIMATE LOCATION OF
TEMPORARY 1HR CONSTRUCTION WALL
NURSE CALL/CODE BLUE
ED104
DEMOLITION PLAN - WING H
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLED
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
Revisions: Date:
RENOVATE FOR PATIENT
PRIVACY WING H/ ELEVATOR
LOBBY
SALEM VA MEDICAL CENTER
658-18-101
2019.08.26
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
GENERAL NEW WORK NOTES
NEW WORK NOTES
NOT IN SCOPE
NOT IN SCOPE
NOT
IN
SCOPE
4H-108
4H-M1
4H-137A
4H-135
4H-135A
4H-133A
4H-133
4H-131A
4H-131
4H-130A
4H-132
4H-132A
4H-128
4H-128A
4H-126A
4H-125
4H-125A
4H-124A
4H-124
4H-121A
4H-115
4H-114
4H-112
4H-110
4H-106
4H-109
4H-108A
4H-109A
4H-107A
4H-122A
4H-111
4H-137
4H-130
4H-126
4H-122
4H-115A
4H-107
4H-120
CH4-19
4H-110A
CH4-14
4H-116
4H-136
4H-138 4H-139
4H-141
4H-142
4H-119
4H-129
4H-123
4H-105
4H-113
4H-118
4H-117
4H-140
4H-134
4H-127
4H-119B
4H-121
CH4-16
4J-138
4H-102
4H-104
4H-100
4H-103
4H-103A
4H-100A
4H-100B
4H-103B
4H-137B
CH4-17
CH4-15
CH4-20
CH4-18A
CH4-18B
CH4-18C
C4-4B
C4-4A
C4-2B
C4-3A
C4-3B
C4-5
C4-2A
4H-106A
4J-156
LIGHTING NEW WORK PLAN
EL101
WING H
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLED
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
Revisions: Date:
RENOVATE FOR PATIENT
PRIVACY WING H/ ELEVATOR
LOBBY
SALEM VA MEDICAL CENTER
658-18-101
2019.08.26
KEY PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
H
J
RD JP
ROOM # ROOM NAME
4H-100
4H-100A ANTE ROOM
4H-100B
NEGATIVE ISOLATION RM
4H-102 IT ROOM
LINEN
ASST NURSE MANAGER
PATIENT ROOM
BATH ROOM
PATIENT RM
BATH RM
PATIENT RM
BATH RM
PATIENT RM
BATH RM
PATIENT RM
BATH RM
CRASH CART
HOUSE KEEPING
NURSE MANAGER
EXIST MECH RM/SVC BAY
MED
NOURISH
LOUNGE
LOCKERS
CART / STRETCHER ALCOVE
PATIENT RM
BATH RM
PATIENT RM
BATH RM
CRASH MOBILE CARTS X-RAY
STORAGE EQUIPMENT
NEGATIVE BARIATRIC RM
ANTE RM
BATH RM
WAITING
WAITING
CORRIDOR
ELEVATOR LOBBY
NEW WORK AREA SCHEDULE -WING H/ELEVATOR LOBBY
4H-103
4H-103A
4H-103B
4H-104
4H-105
4H-106
4H-106A
ANTE RM
BATH RM
NEGATIVE ISOLATION RM
BATH RM
4H-107
4H-107A
4H-108
4H-108A
4H-109
4H-109A
4H-110
4H-110A
4H-111
4H-112
4H-113
4H-114
PATIENT RM
BATH RM
4H-115
4H-115A
4H-116
4H-117
4H-118
EXIST ELECT
4H-119
4H-119B
4H-120
PATIENT RM
BATH RM
PATIENT RM
BATH RM
4H-121
4H-121A
4H-122
4H-122A
TELEM4H-123
PATIENT RM
BATH RM
PATIENT RM
BATH RM
PATIENT RM
BATH RM
4H-124
4H-124A
4H-125
4H-125A
4H-126
4H-126A
4H-127
4H-128
4H-128A
4H-129
PATIENT RM
BATH RM
TLT 2
TLT 1
PATIENT ROOM
BATH ROOM
PATIENT RM
BATH RM
PATIENT RM
BATH RM
PATIENT RM
BATH RM
PATIENT RM
BATH RM
4H-130
4H-130A
4H-131
4H-131A
4H-132
4H-132A
4H-133
4H-133A
4H-135
4H-135A
MED GAS4H-134
SOILED UTILITY4H-136
4H-137
4H-137A
4H-138
4H-138
CLEAN UTILITY
4H-137B
4H-139
LINEN4H-140
PHARMACY4H-141
CRASH CART4H-142
CH4-14
CH4-15
CH4-16
CH4-17
CH4-18A
CH4-18B
CH4-18C
CH4-19
CH4-20 CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
NURSE STATION
NURSE STATION
NURSE STATION
NURSE STATION
CORRIDOR
CH4-2A
CH4-2B
CH4-3A
CH4-3B
CH4-4A
CH4-4B
CH4-5
CORRIDOR
NOT TO SCALE
EMERGENCY LIGHTING CONTROL UNIT WIRING DETAIL
NOT TO SCALE
DIGITAL DIMMING LIGHTING CONTROL W/ EMERGENCY WIRING DETAIL
DIGITAL OCCUPANCY
SENSOR (WALL OR
CEILING AS INDICATED ON
PLANS
BASIS OF DESIGN WATTSTOPPER
BASIS OF DESIGN WATTSTOPPER
SEQUENCE OF OPERATION FOR ROOMS WITH OCCUPANCY SENSORS
ROOM
STATUS
OCCUPANCY
SENSOR STATUS LIGHTING FIXTURE LIGHT LEVEL STATUS
UNOCCUPIED
INACTIVE
( NO PERSON SENSED )
OCCUPIED
BUTTON STATUS
NO BUTTON ACTIVATED
DIMMER SWITCH
ALL LIGHT FIXTURES OFF. ALL SCENES INACTIVE.
UNOCCUPIED
INACTIVE ( NO PERSON
SENSED FOR 5 MINUTES )
ACTIVATED
( PERSON(S) SENSED )
ALL LIGHT FIXTURES OFF.
ALL LIGHT FIXTURES ON @ PRESET LIGHT LEVEL OF 50% +/-
USER CAN ADJUST LIGHTING TO DESIRED LEVELS
DIGITAL OCCUPANCY
SENSOR (WALL OR
CEILING AS INDICATED ON
PLANS
NOT TO SCALE
DIGITAL LIGHTING CONTROL WIRING DETAIL
BASIS OF DESIGN WATTSTOPPER
NOT TO SCALE
HEADWALL LIGHTING CONTROL WIRING DETAIL
BASIS OF DESIGN WATTSTOPPER
DIGITAL OCCUPANCY
SENSOR (WALL OR
CEILING AS INDICATED ON
PLANS
NOT TO SCALE
DIGITAL DIMMING LIGHTING CONTROL WIRING DETAIL
BASIS OF DESIGN WATTSTOPPER
DIGITAL OCCUPANCY
SENSOR (WALL OR
CEILING AS INDICATED ON
PLANS
NOT TO SCALE
DIGITAL DIMMING LIGHTING CONTROL W/ EMERGENCY WIRING DETAIL
LIGHTING DETAILS
EL501
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
CONSTRUCTION DOCUMENTS
FULLY SPRINKLED
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
Revisions: Date:
RENOVATE FOR PATIENT
PRIVACY WING H/ ELEVATOR
LOBBY
SALEM VA MEDICAL CENTER
658-18-101
2019.08.26
RD JP
AND SCHEDULE
GENERAL NEW WORK NOTESNEW WORK NOTES
NOT IN SCOPE
NOT IN SCOPE
NOT
IN
SCOPE
4H-108
4H-M1
4H-137A
4H-135
4H-135A
4H-133A
4H-133
4H-131A
4H-131
4H-130A
4H-132
4H-132A
4H-128
4H-128A
4H-126A
4H-125
4H-125A
4H-124A
4H-124
4H-121A
4H-115
4H-114
4H-112
4H-110
4H-106
4H-109
4H-108A
4H-109A
4H-107A
4H-122A
4H-111
4H-137
4H-130
4H-126
4H-122
4H-115A
4H-107
4H-120
CH4-19
4H-110A
CH4-14
4H-116
4H-136 4H-138
4H-139
4H-141
4H-142 4H-119
4H-129
4H-123
4H-105
4H-113
4H-118
4H-117
4H-140
4H-134
4H-127
4H-119B
4H-121
CH4-16
4J-138
4H-102
4H-104
4H-100
4H-103
4H-103A
4H-100A
4H-100B
4H-103B
4H-137B
CH4-17
CH4-15
CH4-20
CH4-18A
CH4-18B
CH4-18C
C4-4B
C4-4A
C4-2B
C4-3A
C4-3B
C4-5
C4-2A
4H-106A
4J-156
4J-156
ROOM 4H-139 SOUTH WALL ELEVATION
ROOM 4H-139 SOUTH WALL ELEVATION
ROOM 4H-139 EAST WALL ELEVATION
20A, 120V, DECORA
STYLE, DUPLEX
RECEPTACLE (TYPICAL)
NO SCALE
NO SCALENO SCALE
TYP
POWER NEW WORK PLAN
EP101
WING H
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
This is the start of the file's text. The full file is on GovTribe.