This solicitation is for a construction contract to renovate patient privacy areas at a Department of Veterans Affairs medical center. Key details include renovating approximately 20,755 square feet of space on the fourth floor of Building 143 to provide private inpatient rooms and bathrooms. The scope of work also involves replacing the existing HVAC system and renovating architectural finishes in the elevator lobby area. The solicitation number is 36C24623R0033 and was issued by VA Veterans Health Administration VISN 6. The response due date and anticipated award date are not provided in this document.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Patient Privacy Phase II, newest first.
File Type Posted
S06 36C24623R0033 0005.pdf PDF
S06 36C24623R0033 0004.pdf PDF
Bldg._143_4th_Floor_Hazardous_Materials_Survey.pdf PDF
143-P62 SANITARY WASTE and VENT RISER DIAGRAM.pdf PDF
143-P58 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143-P57 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143 Sanitary Waste and Vent plan.pdf PDF
S06 36C24623R0033 0003.pdf PDF
Cubicle Curtain Tracks.pdf PDF
Wing-H_Elec..pdf PDF
281300 Physical Access Control.pdf PDF
143-P60 DOMESTIC WATER_FIRE PROTECTION RISER DIA.pdf PDF
28 05 00.pdf PDF
143 Domestic Water Riser.pdf PDF
S05 RFI Solicitation questions for Renovate Patient Privacy Phase II.pdf PDF
143-P33 PARTIAL PLUMBING PLAN 1-4IN equal 1FT.pdf PDF
AMICO Patient Headwalls Submittals_BES RSP.pdf PDF
Access Controls.pdf PDF
143-P21 ZONE H 3RD. FLR. PLUMBING PLAN.pdf PDF
143 Plumbing plans.pdf PDF
Wng H Color Board.pdf PDF
143-P61 SANITARY WASTE and VENT RISER DIAGRAM.pdf PDF
143-P59 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143-P36 PARTIAL PLUMBING PLANS 1-4IN equal 1FT.pdf PDF
10 25 13.pdf PDF
143-P35 PARTIAL PLUMBING PLAN 1-4IN equal 1FT.pdf PDF
143-P55 4TH. FLR. MED GAS PLAN ZONE H.pdf PDF
S06 36C24623R0033 0002.pdf PDF
S04 Site Visit_Reno Patient Privacy Phase II 8-9-2023.pdf PDF
Vol 1B Drawing 8-1-2023.pdf PDF
Vol 2 Drawing 8-1-2023.pdf PDF
Vol 1A Drawing 8-1-2023.pdf PDF
S06 36C24623R0033 0001.pdf PDF
S02 36C24623R0033.docx DOCX document
Vol 61-72_drawings.pdf PDF
Vol 46-60_drawings.pdf PDF
Vol 31-45_drawings.pdf PDF
Vol 1-15_drawings.pdf PDF
Vol 16-30_drawings.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BES DESIGN/BUILD, LLC | 766 MIDDLE STREET, FAIRHOPE, A: 36532 | PHONE: 251.990.5778 | FAX: 251.990.3716

Specifications

Prepared For

RENOVATE FOR PATIENT PRIVACY

WING H/ELEVATOR LOBBY

Salem Veterans Affairs Medical Center

Salem, VA

Contract No. VA246-13-D-0117

Task Order No. 36C24618F0007

Project No. 658-18-101

Submittal Date: September 2019

FINAL CONSTRUCTION DOCUMENTS

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Final Construction Documents September 2019

TABLE OF CONTENTS 00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 10 Table of Contents 00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-17 01 32 16.13 Network Analysis System - Major Projects 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 45 00.10.20

Quality Control For Minor Construction

01 45 29 Testing Laboratory Services 08-17 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 Bituminous Dampproofing 02-16 07 12 00 Built-Up Bituminous Waterproofing 09-11 07 21 13 Thermal Insulation 10-17 07 22 00 Roof and Deck Insulation 02-16 07 71 00 Roof Specialties 10-15 07 72 00 Roof Accessories 10-15 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Final Construction Documents September 2019

TABLE OF CONTENTS 00 01 10-2

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 71 00 Door Hardware 01-16 08 80 00 Glazing 10-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 06-18 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-16 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 07-14 09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15

10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-14

DIVISION 11 – EQUIPMENT (NOT USED)

11 73 00 Ceiling Mounted Patient Lift System 01-17

DIVISION 12 – FURNISHINGS (NOT USED)

12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-15

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components 01-14

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 09-15

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Final Construction Documents September 2019

TABLE OF CONTENTS 00 01 10-3

22 13 00 Facility Sanitary and Vent Piping 09-15 22 14 00 Facility Storm Drainage 09-15 22 40 00 Plumbing Fixtures 09-15 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 08-17

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 21 13 Hydronic Piping 08-17 23 22 13 Steam and Condensate Heating Piping 08-17 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 37 00 Air Outlets and Inlets 02-15 23 40 00 HVAC Air Cleaning Devices 02-12 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 82 16 Air Coils 04-11

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 06-15 27 08 00 Commissioning of Communications Systems 11-16 27 15 00 Communications Structured Cabling 01-16 27 52 23 Nurse Call and Code Blue Systems 10-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 00 Fire Detection and Alarm 10-11

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Final Construction Documents September 2019

TABLE OF CONTENTS 00 01 10-4

RENOVATE FOR PATIENT PRIVACY WING H/ELEVATOR LOBBY Salem VA Medical Center Final Construction Documents Septembe r 2019

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specifi cation form a part of the contract.

Drawing No. Title

GENERAL

GI001 TITLE SHEET

GI002 PROJECT INFORMATION

GI003 STANDARD ABBREVATION

GI101 LIFE SAFETY PLAN

STRUCTURAL

SF101 FRAMING PLAN FOR NEW ROOF TOP MECH. EQUIP

SF102 4 TH LEVEL MECHANICAL SUPPORT PLAN

SF103 PATIENT LIFT SYSTEM PLAN

ARCHITECTURAL

AD101 DEMOLITION FLOOR PLAN

AE101 OVERALL NEW FLOOR PLAN

AE102 EQUIPMENT PLAN

AE201 REFLECTED CEILING PLAN

AE401 INTERIOR ELEVATIONS

AE501 WALL - CEILING DETAILS

AE502 ARCHITECTURAL DETAILS

AE503 TRANSITION STRIP AND WALL PROTECTION DETAILS

AE504 CASEWORK

AE505 CASEWORK

AE601 DOOR SCHEDULE AND DOOR FRAME TYPES

AE602 FINISH SCHEDULE

AE603 FINISHES KEY

INTERIORS

IN101 FLOOR FINISH PLAN

PLUMBING

PL001 PLUMBING LEGENDS AND ABBREVIATIONS

00 01 15 - 2

PD101 PLUMBING DEMOLITON PLAN WATER – WING H

PD102 PLUMBING DEMOLITION PLAN DMV & STORM WATER - WING H

PD103 PLUMBING DEMOLITION MED GAS – WING H

PL101 PLUMBING NEW WORK PLAN WATER - WING H

PL102 PLUMBING NEW WORK PLAN DMV & STORM WATER - WING H

PP101 PLUMBING NEW WORK PLAN MED GAS – WING H

PL401 PLUMBING NEW WORK PLAN WATER - ENLARGED PLANS

PL402 PLUMBING NEW WORK PLAN, WATER – ENLARGED PLANS

PL403 PLUMBING NEW WORK PLAN, DWV & STORM WATER – ENLARGED PLANS

PL404 PLUMBING NEW WORK PLAN DWV & STORM WATER – ENLARGED PLANS

PP401 Piping NEW WORK PLAN MED GAS – ENLARGED PLANS

PP402 Piping NEW WORK PLAN MED GAS – E NLARGED PLANS

PL501 PLUMBING DETAILS

PL502 PLUMBING DETAILS

PL510 PLUMBING RISER DIAGRAM - WATER

PL511 PLUMBING RISER DIAGRAM - DWV

PL601 PLUMBING SCHEDULES

MECHANICAL

MH001 MECHANICAL LEGEND AND ABBREVIATIONS

MD101 MECHANICAL DEMOLITION PLAN DUCTWORK – WING H

MD102 MECHANICAL DEMOLITION PIPING PLAN – WING H

MH101 MECHANICAL NEW WORK PLAN – WING H

MH102 MECHANICAL NEW WORK PLAN PIPING – WING H

MH103 MECHANICAL NEW WORK PENTOUSE/ROOF – WING H

MH401 MECHANICAL EQUIPMENT SCHEDULES

MH501 MECHANICAL HVAC DETAILS

MH601 MECHANICAL HVAC CONTROL SCHEMATICS

ELECTRICAL

E001 ELECTRICAL NOTES & LEGEND

ED101 LIGHTING DEMOLITION PLAN – WING H

ED102 POWER DEMOLITION PLAN - WING H

ED103 COMMUNICATIONS DEMOLITION PLAN - WING H

ED104 NURSE CALL/CODE BLUE DEMOLITION PLAN – WING H

EL101 LIGHTING NEW WORK PLAN - WING H

EL501 LIGHTING SCHEDULE AND DETAILS

00 01 15 - 3

EP101 POWER NEW WORK PLAN - WING H

EP102 HVAC POWER NEW WORK PLAN – WING H

EP103 PENTHOUSE HVAC POWER NEW WORK PLAN - WING H

EP201 PATIENT ROOM ELECTRICAL HEADWALL ELEVATIONS

EP501 ELECTRICAL DETAILS

EP601 PANEL SCHEDULES

EP602 PANEL SCHEDULES & RISER DIAGRAM

ET101 DATA/COMM NEW WORK PLAN - WING H

ET501 DATA/COMM DETAILS

EY101 NURSE CALL/CODE BLUE DETAILS

EY501 NURSE CALL/CODE BLUE NEW WORK PLAN - WING H

FIRE PROTECTION

FAD101 FIRE ALARM DEMOLITION PLAN

FA101 FIRE ALARM PLAN

FXD101 FIRE SUPPRESSION DEMOLITION PLAN

FX101 FIRE SUPPRESSION PLAN

- - - END - - -

Renovate for Patient Privacy - Wing H/Elevator Lobby Salem VA Medical Center Final Construction Documents Septemb er 2019 i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 LAYOUT OF WORK

1.13 AS-BUILT DRAWINGS

1.14 USE OF ROADWAYS

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.16 TEMPORARY USE OF EXISTING ELEVATORS

1.17 TEMPORARY TOILETS

1.18 AVAILABILITY AND USE OF UTILITY SERVICES

1.19 NEW TELEPHONE EQUIPMENT

1.20 TESTS

1.21 INSTRUCTIONS

Renovate for Patient Privacy - Wing H/Elevator Lobby Salem VA Medical Center ii

1.22 GOVERNMENT-FURNISHED PROPERTY

1.23 RELOCATED EQUIPMENT

1.24 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT

1.25 CONSTRUCTION SIGN

1.26 SAFETY SIGN

1.27 CONSTRUCTION DOCUMENTS

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for bui lding operations, including demolition and removal of existing struct ures, and furnish labor and materials and perform work for Renovate f or Patient Privacy, Wing H/Elevator Lobby as required by drawings and specifications.

B. Offices of BES Design Build, as Architect-Engineers, will rend er certain technical services during construction. Suc h services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Gov ernment without affirmations by Contracting Officer or his duly aut horized representative.

C. Before placement and installation of work subjec t to tests by testing laboratory retained by the Contractor, the Contract or shall notify the

Contracting Officer’s Representative (COR) in suffi cient time to enable the COR to be present at the site in time for witne ssing of such required tests and inspections. Such prior notice s hall be not less than three (3) work days unless otherwise designate d by the Contracting

Officer’s Representative.

D. All employees of general contractor and subcontr actors shall comply with VA security management program and obtain perm ission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, Project Name: Renovate for Patient Privacy, Wing H/ Elevator

Lobby, and Project Number: 658-18-101. Project Scop e of Work: Project completely renovates approximately 20,755 SF of Bui lding 143, 4 th Floor, RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -2

Wing H, to include the central nursing and support areas and

Elevator/Center Core Area. Project will provide pri vate inpatient rooms and adjoining bathrooms to meet the demands for inp atient beds and the privacy gap. The existing HVAC system will be repla ced. Renovation of the Elevator/Center Core Area shall include a renov ation of all architectural finishes to include, but not limited to walls, wall protection, flooring, ceiling tile and ceiling grid .

B. DEDUCTIVE ALTERNATES

It is the general intent that no work will be perf ormed within the deductive alternative areas other than work describ ed as follows:

• For the proper function of all systems within the c ompleted scope of the work area, and

• For maintaining the proper function of existing sys tems located outside the scope of work area, and

• For required portions of both new and existing syst ems that may pass through the deductive alternate areas.

a. ALTERNATE NO. 1-N: To be determined in conjunction with the Design Development Comment Review.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and admi nistrative security procedures that will remain effective for the entir e duration of the project.

2. The General Contractor is responsible for assuri ng that all sub-contractors working on the project and their employ ees also comply with these regulations.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -3

B. Security Procedures:

1. General Contractor’s employees shall not enter t he project site without appropriate badge. They may also be subjec t to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shal l give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is sepa rate from any notices required for utility shutdown described lat er in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the pr emises in the event of a national emergency. The General Contrac tor may return to the site only with the written approval of the Cont racting Officer.

D. Key Control:

1. The General Contractor shall provide duplicate k eys and lock combinations to the Contracting officers representa tive (COR)for the purpose of security inspections of every area of pr oject including tool boxes and parked machines and take any emergen cy action.

2. The General Contractor shall turn over all perma nent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor /Sub Contractors shall submit an electronic security memorandum desc ribing the approach to following goals and maintaining confide ntiality of

“sensitive information”.

2. The General Contractor is responsible for safeke eping of all drawings, project manual and other project informat ion. This

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -4 information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photograp hs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Re turn the information to the Contracting Officer upon request .

4. These security documents shall not be removed or transmitted from the project site without the written approval of Co ntracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Off icer immediately when there is a loss or compromise of “sensitive in formation”.

7. All electronic information shall be stored in sp ecified location following VA standards and procedures using an Engi neering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and track ed through the

EDMS system.

b. “Sensitive information” including drawings and o ther documents may be attached to e-mail provided all VA encryptio n procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitt ed 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. General contractor and subcontractors shall park in the Salem VAMC’s designated contractor parking lot or on the project site (within construction fencing).

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -5

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (inc luding storage of materials) on Government premises to areas authoriz ed or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harml ess from liability of any nature occasioned by the Contractor's perfor mance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the appr oval of the

Contracting Officer and shall be built with labor a nd materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor a t its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandon ed and need not be removed.

C. The Contractor shall, under regulations prescrib ed by the Contracting

Officer, use only established roadways, or use temp orary roadways constructed by the Contractor when and as authorize d by the Contracting

Officer. When materials are transported in prosecut ing the work, vehicles shall not be loaded beyond the loading cap acity recommended by the manufacturer of the vehicle or prescribed by an y Federal, State, or local law or regulation. When it is necessary to cr oss curbs or sidewalks, the Contractor shall protect them from d amage. The

Contractor shall repair or pay for the repair of an y damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing ma terials shall be as determined by the Contracting Officer’s Representat ive.

E. Workmen are subject to rules of Medical Center a pplicable to their conduct.

F. Execute work so as to interfere as little as pos sible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any e xisting equipment, and with work being done by others. Use of equipmen t and tools that

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -6 transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during co nstruction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other th an assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not m ore than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vaca ted portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and saf ety requirements.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses i n operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim lif e safety measure to be used during the work, and a schedule defining th e duration of the work with milestone subtasks. The work to be outli ned shall include, but not be limited to:

To insure such executions, Contractor shall furnis h the COR/Contracting

Officer’s Representative with a schedule of approxi mate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addit ion, Contractor shall notify the COR/Contracting Officer’s Represen tative two weeks in advance of the proposed date of starting work in ea ch specific area of site, building or portion thereof. Arrange such pha sing dates to insure accomplishment of this work in successive phases mu tually agreeable to

Medical Center Director, COR, and Contractor as fol lows:

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -7

Phase I: Demolition of existing and renovation of W ing J.

Phase II: Demolition and renovation of the South an d Central portions of the Elevator Lobby.

Phase III: Demolition and renovation of the North p ortion of the Elevator Lobby.

H. The building will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Certain areas of the building will be occupied b y Medical Center personnel for various periods.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and pro perty in affected areas of construction against dust and debris, so t hat equipment and affected areas to be used in the Medical Centers op erations will not be hindered. Contractor shall permit access to Depa rtment of

Veterans Affairs personnel and patients through oth er construction areas which serve as routes of access to such affec ted areas and equipment. These routes whether access or egress s hall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and s taff access.

Coordinate alteration work in areas occupied by Dep artment of

Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while al terations are performed.

J. When a building and/or construction site is turn ed over to Contractor, Contractor shall accept entire responsibility inclu ding upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specif ied.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -8

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for p re-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility se rvices for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uni nterrupted services.

Where necessary to cut existing water, steam, gases , sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (incl uding telephone), they shall be cut and capped at suitable places whe re shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, se wers or electricity, or fire protection systems and communications syste ms may be interrupted without prior approval of COR. Electric al work shall be accomplished with all affected circuits or equipmen t de-energized.

When an electrical outage cannot be accomplished, w ork on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s p rior knowledge and written approval. Refer to specification Sectio ns 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON W ORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requi rements.

2. Contractor shall submit a request to interrupt a ny such services to

COR, in writing, 48 hours in advance of proposed in terruption.

Request shall state reason, date, exact time of, an d approximate duration of such interruption.

3. Contractor will be advised (in writing) of appro val of request, or of which other date and/or time such interruption w ill cause least inconvenience to operations of Medical Center. Inte rruption time approved by Medical Center may occur at other than Contractor's normal working hours.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -9

4. Major interruptions of any system must be reques ted, in writing, at least 15 calendar days prior to the desired time an d shall be performed as directed by the COR/Contracting Office r’s

Representative.

5. In case of a contract construction emergency, se rvice will be interrupted on approval of COR/Contracting Officer’ s Representative.

Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the c onstruction project, for such items as water, sewer, electricit y, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires , cables, conduits, ducts, pipes and the like, and their hangers or sup ports, which are to be abandoned but are not required to be entirely re moved, shall be sealed, capped or plugged at the main, branch or pa nel they originate from. The lines shall not be capped in finished are as, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or par titions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activit ies with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to p arking and to occupied areas of buildings clear of construction m aterials, debris and standing construction equipment and vehicles. W herever excavation for new utility lines cross existing roa ds, at least one lane must be open to traffic at all times with appr oval.

2. Method and scheduling of required cutting, alter ing and removal of existing roads, walks and entrances must be approve d by the COR.

N. Coordinate the work for this contract with other construction operations as directed by the COR. This includes th e scheduling of traffic and the use of roadways, as specified in Ar ticle, USE OF

ROADWAYS.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -10

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contract or shall make a thorough survey with the Resident Engineer COR of a reas of buildings in which alterations occur and areas which are anticip ated routes of access, and furnish a report, signed by both, to th e Contracting

Officer. This report shall list by rooms and spaces :

1. Existing condition and types of resilient floori ng, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbi ng fixtures and accessories, electrical fixtures, equipment, veneti an blinds, shades, etc., required by drawings to be either reu sed or relocated, or both.

3. Shall note any discrepancies between drawings an d existing conditions at site.

4. Shall designate areas for working space, materia ls storage and routes of access to areas within buildings where al terations occur and which have been agreed upon by Contractor and C OR.

B. Any items required by drawings to be either reus ed or relocated or both, found during this survey to be nonexistent, o r in opinion of COR, to be in such condition that their use is impossibl e or impractical, shall be furnished and/or replaced by Contractor wi th new items in accordance with specifications which will be furnis hed by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under pr ovisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial o r final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furn ish a report on conditions then existing, of resilient flooring, do ors, windows, walls

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -11 and other surfaces as compared with conditions of s ame as noted in first condition survey report:

1. Re-survey report shall also list any damage caus ed by Contractor to such flooring and other surfaces, despite protectio n measures; and, will form basis for determining extent of repair wo rk required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective mea sures:

1. Wherever existing roof surfaces are disturbed th ey shall be protected against water infiltration. In case of le aks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, ma terials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protecti on shall be maintained intact until all work in the area is com pleted.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work remov ed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of t he Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that re main property of the Government shall be removed or dislodged from p resent locations in such a manner as to prevent damage which would b e detrimental to re-installation and reuse. Store such items where d irected by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor Medical Center.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -12

3. Items of portable equipment and furnishings loca ted in rooms and spaces in which work is to be done under this contr act shall remain the property of the Government. When rooms and spac es are vacated by the Department of Veterans Affairs during the alter ation period, such items which are NOT required by drawings and s pecifications to be either relocated or reused will be removed by th e Government in advance of work to avoid interfering with Contracto r's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all st ructures, equipment, and vegetation (such as trees, shrubs, and grass) o n or adjacent to the work site, which is not to be removed and which do not unreasonably interfere with the work required under this contrac t. The Contractor shall only remove trees when specifically authorize d to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract per formance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and p aint the cut with a tree-pruning compound as directed by the Contractin g Officer.

B. The Contractor shall protect from damage all exi sting improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any dam age to those facilities, including those that are the property o f a third party, resulting from failure to comply with the requireme nts of this contract or failure to exercise reasonable care in performin g the work. If the

Contractor fails or refuses to repair the damage pr omptly, the

Contracting Officer may have the necessary work per formed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENT AL CONTROLS, for additional requirements on protecting vegetation, s oils and the environment. Refer to Articles, "Alterations", "Res toration", and

"Operations and Storage Areas" for additional instr uctions concerning repair of damage to structures and site improvement s.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -13

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair ex isting work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, an d do not disturb any ducts, plumbing, steam, gas, or electric work witho ut approval of the

COR. Existing work to be altered or extended and th at is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restor ing work, shall conform in type and quality to that of original exi sting construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work comple te and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work , shall be patched, repaired, reinstalled, or replaced with new work, a nd refinished and left in as good condition as existed before commenc ing work.

C. At Contractor's own expense, Contractor shall im mediately restore to service and repair any damage caused by Contractor' s workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications sy stems (including telephone) which are not scheduled for discontinuan ce or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered b y adjustment to contract time and price in accordance with clause e ntitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING S ITE CONDITIONS" (FAR

52.236-2).

1.11 PHYSICAL DATA

A. Data and information furnished or referred to be low is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(FAR 52.236-4)

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -14

D. Government does not guarantee that other materia ls will not be encountered nor that proportions, conditions or cha racter of several materials will not vary from those indicated by exp lorations. Bidders are expected to examine site of work and logs of bo rings; and, after investigation, decide for themselves character of m aterials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.12 LAYOUT OF WORK

A. The Contractor shall lay out the work from Gover nment established base lines and bench marks, indicated on the drawings, a nd shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expen se, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor sha ll be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contra ctor shall also be responsible for maintaining and preserving all stak es and other marks established by the Contracting Officer until author ized to remove them.

If such marks are destroyed by the Contractor or th rough Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the repl acement from any amounts due or to become due to the Contractor.

1.13 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of t he project, to include all contract changes, modifications and cla rifications.

B. All variations shall be shown in the same genera l detail as used in the contract drawings. To insure compliance, as-built d rawings shall be made available for the Resident Engineer's and/or t he COR’s review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -15

D. Paragraphs A, B, & C shall also apply to all sho p drawings.

1.14 USE OF ROADWAYS

A. For hauling, use only established public roads a nd roads on Medical

Center property and, when authorized by the COR, su ch temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performe d by the Contractor at Contractor's expense. When necessary to cross cu rbing, sidewalks, or similar construction, they must be protected by wel l-constructed bridges.

B. When new permanent roads are to be a part of thi s contract, Contractor may construct them immediately for use to facilitat e building operations. These roads may be used by all who have business thereon within zone of building operations.

C. When certain buildings (or parts of certain buil dings) are required to be completed in advance of general date of completi on, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical e quipment to provide heat, ventilation, plumbing, light and power will b e permitted subject to written approval and compliance with the followi ng provisions:

1. Permission to use each unit or system must be gi ven COR in writing.

If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment s hall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. tran sformers, relays, circuit breakers, fuses, conductors, motor controll ers and their overload elements shall be properly sized, coordina ted and adjusted.

Installation of temporary electrical equipment or d evices shall be in accordance with NFPA 70, National Electrical Cod e, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -16 each item of equipment shall be verified to be corr ect and it shall be determined that motors are not overloaded. The e lectrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuu m cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, an d aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for prehea t coils shall function properly and all safety controls shall fun ction to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elemen ts shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distributi on system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

Boilers, pumps, feedwater heaters and auxiliary equ ipment must be operated as a complete system and be fully maintain ed by operating personnel. Boiler water must be given complete and continuous chemical treatment.

B. Prior to final inspection, the equipment or part s used which show wear and tear beyond normal, shall be replaced with iden tical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear du e to prolonged use will be repaired replaced by the contractor at the contr actor’s expense.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -17

1.16 TEMPORARY USE OF EXISTING ELEVATORS

A. Contractor may be allowed the use of existing el evators. Outside type hoist will be used by Contractor for transporting m aterials and equipment. Temporary elevator use must be coordinat ed with and approved by the COR.

1.17 TEMPORARY TOILETS

A. Contractor may have for use of Contractor's work men, such toilet accommodations as may be assigned to Contractor by Medical Center.

Contractor shall keep such places clean and be resp onsible for any damage done thereto by Contractor's workmen. Failur e to maintain satisfactory condition in toilets will deprive Cont ractor of the privilege to use such toilets.

1.18 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably require d amounts of utilities available to the Contractor from existing outlets a nd supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevail ing rates charged to the Government. The Contractor shall carefully cons erve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Con tracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to meas ure the amount of electricity used for the purpose of determining cha rges. Before final acceptance of the work by the Government, the Contr actor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the inf rastructure as required.

C. Contractor shall install meters at Contractor's expense and furnish the

Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Heat: Furnish temporary heat necessary to preven t injury to work and materials through dampness and cold. Use of open sa lamanders or any

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -18 temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Mainta in minimum temperatures as specified for various materials:

1. Obtain heat by connecting to Medical Center Ceme tery heating distribution system.

a. Steam is available at no cost to Contractor.

E. Electricity (for Construction and Testing): Furn ish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisti ng devices, electrical welding devices and any electrical heati ng devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

F. Water (for Construction and Testing): Furnish te mporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no co st to the

Contractor.

2. Maintain connections, pipe, fittings and fixture s and conserve water-use so none is wasted. Failure to stop leakag e or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.

G. Fuel: Natural and LP gas and burner fuel oil req uired for boiler cleaning, normal initial boiler-burner setup and ad justing, and for performing the specified boiler tests will be furni shed by the

Government. Fuel required for prolonged boiler-burn er setup, adjustments, or modifications due to improper desig n or operation of boiler, burner, or control devices shall be furnish ed and paid by the

Contractor at Contractor's expense.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -19

1.19 NEW TELEPHONE EQUIPMENT

The contractor shall coordinate with the work of i nstallation of telephone equipment by others. This work shall be c ompleted before the building is turned over to VA.

1.20 TESTS

A. As per specification section 23 05 93 the contra ctor shall provide a written testing and commissioning plan complete wit h component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such s ystems before requesting final tests. Final test will not be cond ucted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Con tracting Officer.

Contractor shall furnish all labor, materials, equi pment, instruments, and forms, to conduct and record such tests.

D. Mechanical and electrical systems shall be balan ced, controlled and coordinated. A system is defined as the entire syst em which must be coordinated to work together during normal operatio n to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provide s comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, contr ols and electricity, etc. Another example of a system which involves sev eral components of different disciplines is a boiler installation. Eff icient and acceptable boiler operation depends upon the coordi nation and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

RENOVATE FOR PATIENT PRIVACY – WING H/Elevator Lobby Salem VA Medical Center

Design Development May 2019

01 00 00 -20

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be complete d within a reasonably period of time during which operating an d environmental conditions remain reasonably constant and are typic al of the design conditions.

F. Individual test result of any component, where r equired, will only be accepted when submitted with the test results of re lated components and of the entire system.

1.21 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operati ng manuals (hard copies and electronic) and verbal instructions when requir ed by the various sections of the specifications and as hereinafter s pecified.

B. Manuals: Maintenance and operating manuals and o ne compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the Resident Engine er and/or the COR coincidental with the delivery of the equipment to the job site.

Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in c ontinuous operation for long periods of time and dismantling and reasse mbling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-re ferenced to diagrams and illustrations. Illustrations shall include "exp loded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of e ach piece of equipment, component, accessory and control shall b e clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution sh all be clearly set forth. Manuals must reference the exact model, styl e and size of the piece of equipment and system being furnished. Manu als referencing equipment similar to but of a different model, styl e, and size than that furnished will not be accepted.

C. Instructions: Contractor shall provide qualified , factory-trained…