Vol 1A Drawing 8-1-2023.pdf

PDF 30 MB Posted

Attached to
Renovate Patient Privacy Phase II Federal contract opportunity
Solicitation number
36C24623R0033
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This file describes a federal contract opportunity for renovation services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 is soliciting proposals under solicitation number 36C24623R0033 to renovate patient privacy areas in Phase II of a project. The solicitation seeks contractors to perform renovation work to enhance patient privacy at a VA medical center. Proposals are due by January 8, 2023, and the period of performance is expected to last 12 months upon award. The file includes technical drawings related to the renovation work requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Patient Privacy Phase II, newest first.
File Type Posted
S06 36C24623R0033 0005.pdf PDF
S06 36C24623R0033 0004.pdf PDF
Bldg._143_4th_Floor_Hazardous_Materials_Survey.pdf PDF
143-P62 SANITARY WASTE and VENT RISER DIAGRAM.pdf PDF
143-P58 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143-P57 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143 Sanitary Waste and Vent plan.pdf PDF
S06 36C24623R0033 0003.pdf PDF
Cubicle Curtain Tracks.pdf PDF
Wing-H_Elec..pdf PDF
281300 Physical Access Control.pdf PDF
143-P60 DOMESTIC WATER_FIRE PROTECTION RISER DIA.pdf PDF
28 05 00.pdf PDF
143 Domestic Water Riser.pdf PDF
S05 RFI Solicitation questions for Renovate Patient Privacy Phase II.pdf PDF
143-P33 PARTIAL PLUMBING PLAN 1-4IN equal 1FT.pdf PDF
Wng H Color Board.pdf PDF
143-P61 SANITARY WASTE and VENT RISER DIAGRAM.pdf PDF
143-P59 DOMESTIC WATER RISER DIAGRAM.pdf PDF
143-P36 PARTIAL PLUMBING PLANS 1-4IN equal 1FT.pdf PDF
10 25 13.pdf PDF
143-P35 PARTIAL PLUMBING PLAN 1-4IN equal 1FT.pdf PDF
143-P55 4TH. FLR. MED GAS PLAN ZONE H.pdf PDF
AMICO Patient Headwalls Submittals_BES RSP.pdf PDF
Access Controls.pdf PDF
143-P21 ZONE H 3RD. FLR. PLUMBING PLAN.pdf PDF
143 Plumbing plans.pdf PDF
S06 36C24623R0033 0002.pdf PDF
S04 Site Visit_Reno Patient Privacy Phase II 8-9-2023.pdf PDF
Vol 1B Drawing 8-1-2023.pdf PDF
Vol 2 Drawing 8-1-2023.pdf PDF
S06 36C24623R0033 0001.pdf PDF
S02 36C24623R0033.docx DOCX document
Vol 61-72_drawings.pdf PDF
Vol 46-60_drawings.pdf PDF
Vol 31-45_drawings.pdf PDF
Final CD Spec Book_Wing H.pdf PDF
Vol 16-30_drawings.pdf PDF
Vol 1-15_drawings.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PATIENT RM

4H-108

MECH SHAFT

4H-M1

STAIR (NIC)

S-3

ANTE RM

4H-137A

PATIENT RM

4H-135

BATH RM

4H-135A

BATH RM

4H-133A

PATIENT RM

4H-133

BATH RM

4H-131A

PATIENT RM

4H-131

BATH RM

4H-130A

PATIENT RM

4H-132

BATH RM

4H-132A

PATIENT RM

4H-128

BATH RM

4H-128A

BATH RM

4H-126A

PATIENT RM

4H-125

BATH RM

4H-125A

BATH RM

4H-124A

PATIENT RM

4H-124

BATH RM

4H-121A

PATIENT RM

4H-115

SVC

BAY/MECH

RM

4H-114

HOUSE

KEEPING

4H-112

PATIENT RM

4H-110

PATIENT RM

4H-106

PATIENT RM

4H-109

BATH RM

4H-108A

BATH RM

4H-109A

BATH RM

4H-107A

BATH RM

4H-106A

BATH RM

4H-122A

STOR

4H-111

NEGATIVE

ISOLATION

RM

4H-137

PATIENT RM

4H-130

BARIATRIC

RM

4H-126

PATIENT RM

4H-122

BATH RM

4H-115A

PATIENT RM

4H-107

CART /

STRETCHER

ALCOVE

4H-120

CORRIDOR

CH4-19

BATH RM

4H-110A

NURSE

STATION

CH4-14

EXIST

ELECT

4H-116

UTILITY

SOILED

4H-136

UTILITY

CLEAN

4H-138

STORAGE

EQUIPMENT

4H-139

PHARMACY

4H-141

FLEX SPACE

4H-142

LOUNGE

4H-119

TLT 1

4H-129

TELEM

4H-123

ASST NURSE

MANAGER

4H-105

NURSE

MANAGER

4H-113

NOURISH

4H-118

MED

4H-117

LINEN

4H-140

MED GAS

4H-134

TLT 2

4H-127

LOCKERS

4H-119B

PATIENT RM

4H-121

CORRIDOR

CH4-16

CRASH

MOBILE

CARTS X-RAY

4H-138

IT

4H-102

LINEN

4H-104

NEGATIVE

BARIATRIC

RM

4H-100

NEGATIVE

ISOLATION

RM

4H-103

ANTE RM

4H-103A

ANTE RM

4H-100A

BATH RM

4H-100B

BATH RM

4H-103B

BATH RM

4H-137B

CORRIDOR

CH4-17

CORRIDOR

CH4-15

CORRIDOR

CH4-20

NURSE

STATION

CH4-18A

NURSE

STATION

CH4-18B

NURSE

STATION

CH4-18C

CORRIDOR

C4-4B

CORRIDOR

C4-4A

WAITING

C4-2B

CORRIDOR

C4-3A

CORRIDOR

C4-3B

ELEVATOR

LOBBY

C4-5

WAITING

C4-2A

HEALTH CARE SLEEPING DEPARTMENT

FULLY SPRINKLERED

1HR1HR1HR

H

R

H

R

H R

H

R

H R

H

R

H R

2HR2HR

H

R

H R

H

R

H R

H

R

H R

2HR

2HR

H

R

H R

H

R

H R

H

R

H R

H

R

H R

2HR2HR2HR

H

R

H R

H

R

H R

H

R

H R

H

R

H R

2HR 2HR 2HR

H

R

H R

2HR2HR2HR2HR2HR2HR2HR2HR2HR

H

R

H R

2HR 2HR 2HR 2HR 2HR 2HR 2HR 2HR 2HR

H

R

H

R

H

R

2HR

H

R

2HR

H

R

S P

S P

SP

S P

S P

SP

S P

S P

S P

S P

S P

S P

S P

HEALTH CARE - BUSINESS USE

FULLY SPRINKLERED

3.9'

EXIT 2

F

S B

F

S B

F

S B

F

S B

1FSB

F

S

B

F

S

B

1FSB 1FSB 1FSB

H

R

2HR 2HR 2HR 2HR 2HR

H

R

H

R

H R

2HR 2HR 2HR 2HR 2HR 2HR

H

R

H R

2HR2HR2HR2HR2HR2HR

1HR 1HR

H

R

H R

H

R

1HR1HR

H

R

H R

H

R

SPSP

S P

S P

SP SP

S P

S P

H

R

2HR

H

R

2HR

1HR 1HR 1HR

H

R

H R

1HR1HR1HR

H

R

H R

3.75'

EXIT 1

12013689

3.75'

3.75'

1506801

F

S B

F

S B

F

S B

1FSB 1FSB 1FSB

F

S B

1FSB

F

S

B

F

S

B

F

S B

F

S B

F

S B

F

S B

F

S B

1HR 1HR

1HR

H

R

H R

H

R

1HR1HR1HR1HR

1HR1HR

H

R

1HR1HR

1HR 1HR

H

R

H R

H

R

1HR1HR

H

R

H R

H

R

OCCUPANTSOCCUPANT TYPE

LEVEL POPULATION

= 46BUSINESS

Total = 161

CAPACITY

OCCUPANTS

USING EXITS

TAG NUMBER

EXIT 1 150 115

CAPACITY

OCCUPANTS

USING EXITS

TAG NUMBER CAPACITY

OCCUPANTS

USING EXITS

TAG NUMBER

EXIT 2 156 46

Total = 161

= 115HEALTH CARE SLEEPING

o n e e i g h t h i n c o e f o t t h r e e i n c h e s o t o n e a d a l f i n c h e s o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Revisions Date

Corporate Office:

766 Middle St, Fairhope, AL 36532

Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location

Sheet of

CONSTRUCTION DOCUMENT SUBMISSION

FULLY SPRINKLERED

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy Engineer

Professional Seal

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

SALEM VA MEDICAL CENTER

2019.12.13

658-18-101

RENOVATE FOR PATIENT

PRIVACY - WING H

THESE DRAWINGS ARE

NOT TO BE USED FOR

CONSTRUCTION,

BIDDING, RECORDATION,

CONVEYANCE, SALES,

OR AS THE BASIS FOR

THE ISSUANCE OF A

PERMIT

11720 BELTSVILLE DR, SUITE 520

CALVERTON, MARYLAND 20705

POC: KEN JONES, 443-388-7351

KJONES@CBDG-AE.COM

JAS LBR

GI101

LIFE SAFETY PLAN

BUILDING CONSTRUCTION (EXISTING) - TYPE II (222)

MAXIMUM SMOKE COMPARTMENT AREA ALLOWED - 22,500 SQUARE FEET

ZONE H SMOKE COMPARTMENT 6,802 SQUARE FEET

MAXIMUM TRAVEL DISTANCE ALLOWED - 200 FEET

MAXIMUM COMMON PATH OF TRAVEL ALLOWED - 100 FEET

MAXIMUM DEAD-END CORRIDOR ALLOWED - 30 FEET

COMPARTMENTATION REQUIREMENTS:

SMOKE COMPARTMENT SEPARATIONS - 1 HOUR RATED FIRE/SMOKE

BARRIERS

NEW CORRIDOR WALLS CONSTRUCTED PER NFPA 101, 18.3.6.2 TO RESIST

THE PASSAGE OF SMOKE

HAZARDOUS ROOMS 50 TO 100 SQUARE FEET - SMOKE PARTITION

SEPARATION REQUIRED

HAZARDOUS ROOMS GREATER THAN 100 SQUARE FEET- 1-HOUR RATED

FIRE BARRIER REQUIRED

LEGEND

2 HOUR FIRE RATED BARRIER

FIRE EXTINGUISHER

EXIT SIGN

DIRECTION OF CHEVRON

DIRECTION OF ILLUMINATION

2HR 2HR 2HR

1HR 1HR 1HR

1 HOUR FIRE RATED BARRIER

EXITEX

STANDPIPE HOSE CONNECTION

PATH OF EGRESS

SP SP SP

SMOKE PARTITION

1FSB 1FSB 1FSB

1 HOUR FIRE RATED SMOKE BARRIER

STORAGE LESS THAN 50 SQUARE

FEET WITH NO DIRECT SUPERVISION.

AREA SMOKE DETECTION REQUIRED.

KEY PLAN

PLAN

NORTH

H

SCALE: 1/8" = 1'-0"

0 4' 8' 16'

1/8" = 1'-0"

LIFE SAFETY PLAN

KEYED NOTES

WAITING AREA OPEN TO CORRIDOR. SMOKE DETECTION REQUIRED.

INDICATES EXISTING AREA

OUTSIDE OF PROJECT WORK AREA.

12/13/2019

2 4 5

K

L

M

N

O

P

73 61.4

EXISTING

STRUCTURAL

COLUMNS, TYP.

(EX) W27X114

(EX) W24X84

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W24X84

(EX) W14X34(EX) W14X34

(EX) W14X22

(EX) W16X26

(EX) W16X26 (EX) W16X26 (EX) W16X26

(EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114(EX) W14X30(EX) W21X44(EX) W24X55

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W16X26

(EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W33X118

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W14X30

(EX) W27X114

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114

(EX) W14X34

(EX) W33X130

(E X

W

X

(E X

W

X

(EX) W16X26

(EX) W16X26 (EX) W16X26 (EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114 (EX) W14X34

(EX) W27X114

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W8X10

PROVIDE STEEL ANGLES @ EACH

SIDE OF NEW OPENINGS CUT IN

EXISTING DECK FOR MECHANICAL

DUCTWORK.

PROVIDE STEEL ANGLES @

EACH SIDE OF NEW

OPENINGS CUT IN EXISTING

DECK FOR MECHANICAL

DUCTWORK.

SF-101

SF-101

L4x4x1/4 STEEL ANGLE @

EACH SIDE OF NEW

OPENING CUT IN DECKPLAN VIEW

EXISTING CONCRETE DECK

COORD.

OPENING

W/ TRADE

EXISTING STEEL WIDE

FLANGE BEAM

3/16

TYP.

LEVEL 5

1160.91

3/16

TYP.

L4x4x1/4 STEEL ANGLE @

EACH SIDE OF NEW

OPENING CUT IN DECK

EXISTING STEEL WIDE

FLANGE BEAM

EXISTING CONCRETE DECK

NEW OPENING

CUT IN DECK.

COORD. W/ TRADE

HSS STEEL POST @ RTU

SUPPORT TO OCCUR @

EXISTING BEAMS

10"x10"x1/2" STEEL BASE

PLATE W/ (4) 5/8" Ø

ANCHORS DRILLED &

EPOXIED MIN. 3" INTO

EXISTING DECK W/ HILTI

RE-500

L

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W14X34 (EX) W33X130

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

HSS4X4X3/8

HSS4X4X3/8

HSS4X4X3/8

HSS4X4X3/8

H S

S X

X

/8

HSS4x4x1/4 POSTS @

MECHANICAL SUPPORT FRAME,

TYP. ENSURE POSTS ARE

INSTALLED ABOVE EXISTING

STEEL BEAMS"S

"S

COORDINATE SPACING "S" OF

POSTS W/ MECHANICAL

DRAWINGS FOR EQUIPMENT

ATTACHMENT LOCATIONS

NEW OPENING IN ROOF

DECK. PROVIDE L4x4x1/4

@ EACH SIDE OF NEW

OPENING

SF-101

M

N

(EX) W21X44(EX) W24X55

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W33X118

(E X

W

X

4(EX) W8X10

SF-101

H S

S X

X

/8

H S

S X

X

/8

HSS4X4X3/8

HSS4X4X3/8 HSS4X4X3/8 HSS4X4X3/8 HSS4X4X3/8

HSS4X4X3/8HSS4X4X3/8HSS4X4X3/8HSS4X4X3/8

HSS4x4x1/4 POSTS @

MECHANICAL SUPPORT FRAME,

TYP. ENSURE POSTS ARE

INSTALLED ABOVE EXISTING

STEEL BEAMS

HSS4X4X3/8HSS4X4X3/8

HSS4X4X3/8 HSS4X4X3/8

COORDINATE SPACING "S" OF

POSTS W/ MECHANICAL

DRAWINGS FOR EQUIPMENT

ATTACHMENT LOCATIONS

"S

"S

NEW OPENING IN ROOF

DECK. PROVIDE L4x4x1/4

@ EACH SIDE OF NEW

OPENING

SF-101

H

J

NIC

KEY PLAN

PLAN

NORTH

DESIGN/BUILD

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Corporate Office:

766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy Engineer

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

/3

/2

:2 :2

A

M

Sheet of

Professional Seal

SF-101

FRAMING PLAN FOR NEW

ROOF TOP MECH. EQUIP.

RENOVATE FOR PATIENT

PRIVACY - WING H/ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

RD SD

1/8" = 1'-0"1 STRUCTURE FOR NEW ROOF TOP MECHANICAL LAYOUT

DESIGN CRITERIA

1. REFERENCE CODE

a. UFC 3 301 01 "STRUCTURAL DESIGN"

b. 2015 INTERNATIONAL BUILDING CODE

2. BUILDING DESIGN LOADS

a. LIVE LOAD INFORMATION

1. FLOOR LOADS & FUTURER FLOORS: 100 PSF

2. MECHANICAL/ELECTRICAL: 150 PSF

3. FLOOR CONCENTRATED LOADS: 2000 lbs./2.5 SQ. FT.

4. ROOF LIVE LOAD: 20 PSF

b. DEAD LOAD INFORMATION

1. FLOOR DEAD LOAD: WEIGHT OF MATERIALS

2. ROOF DEAD LOAD: WEIGHT OF MATERIALS

c. EQUIPMENT & LIFT LOADS:

1. BASED ON THE MANUFACTURERS DATA OR AS INTERPRETED BY THE

IBC.

d. RISK CATEGORY: IV

e. SEISMIC DESIGN INFORMATION

1. SEISMIC IMPORTANCE FACTOR (Ie) = 1.5

2. SEISMIC DESIGN CATEGORY = C

3. 0.2 SECOND SPECTRAL RESPONSE ACCELERATION (SS) = 0.216

4. 1 SECOND SPECTRAL RESPONSE ACCELERATION (S1) = 0.124

5. 0.2 SECOND DESIGN SPECTRAL RESPONSE ACCELERATION (SDS) = 0.21

6. 1 SECOND DESIGN SPECTRAL RESPONSE ACCELERATION (SD1) = 0.103

7. SITE CLASS = C

8. SEISMIC FORCE RESISTING SYSTEM: NOT AFFECTED BY LIFT

EQUIPMENT

GENERAL

1. THE INTENT OF THESE DRAWINGS IS TO SHOW ALL ITEMS NECESSARY TO COMPLETE

THE STRUCTURE. FOR ITEMS, METHODS, AND/OR MATERIALS NOT SHOWN, THE

MINIMUM REQUIREMENTS OF THE REFERENCE CODE SHALL GOVERN. ALL WORK AND

CONSTRUCTION SHALL COMPLY WITH ALL OTHER APPLICABLE BUILDING CODES,

REGULATIONS, AND SAFETY REQUIREMENTS.

2. THROUGHOUT THESE DRAWINGS, THE TERM ENGINEER REFERS TO THE ENGINEER OF

RECORD FOR THIS PROJECT. OTHER ENGINEERING DISCIPLINES WILL BE EXPLICITLY

DESCRIBED. THE TERM ARCHITECT REFERS TO THE ARCHITECT OF RECORD FOR THIS

PROJECT.

3. METHODS, MEANS, AND MATERIALS ARE EXPLICITLY CALLED OUT IN THESE NOTES.

ANY DEVIATION OR PROPOSED CHANGE IS TO BE COMMUNICATED IMMEDIATELY TO

THE ENGINEER. NO DEVIATION OR CHANGE IS ACCEPTABLE WITHOUT WRITTEN

APPROVAL BY THE VETERANS AFFAIRS.

4. IT SHALL BE THE CONTRACTOR’S SOLE RESPONSIBILITY TO DESIGN AND PROVIDE

ADEQUATE SHORING, BRACING, AND FORMWORK, ETC. AS REQUIRED FOR THE

PROTECTION OF LIFE AND PROPERTY DURING THE CONSTRUCTION OF THE BUILDING.

MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES DURING

CONSTRUCTION SHALL BE MAINTAINED PER ASCE STANDARD NO. 37-02 "DESIGN

LOADS ON STRUCTURES DURING CONSTRUCTION".

5. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS WITH THE

ARCHITECTURAL, CIVIL, ELECTRICAL, AND MECHANICAL DRAWINGS BEFORE

PREPARING SHOP DRAWINGS, FABRICATION, OR CONSTRUCTION. SEE

ARCHITECTURAL, CIVIL, ELECTRICAL, AND MECHANICAL DRAWINGS FOR SIZE AND

LOCATIONS OF PIPES, SLEEVES, PITS, VENTS, DUCTS, ROOF OPENINGS, TRENCHES,

EQUIPMENT PADS, MISCELLANEOUS IRON, AND/OR ANY DETAILS NOT SHOWN ON THE

STRUCTURAL DRAWINGS.

6. ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT DOCUMENTS. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL

DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY

DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE

VETERANS AFFAIRS PRIOR TO START OF CONSTRUCTION SO THAT A CLARIFICATION

CAN BE ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT

DOCUMENT OR ANY CODE REQUIREMENTS SHALL BE CORRECTED BY THE

CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE OWNER,

ARCHITECT, OR ENGINEER

7. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL

NOTES, SPECIFICATIONS, AND TYPICAL DETAILS. WHERE NO NOTE OR DETAIL IS GIVEN,

CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK.

8. ALL CONTRACTOR DESIGNED ELEMENTS SHALL BE DESIGNED BY A LICENSED

PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE FACILITY IS

LOCATED. CONTRACTOR SHALL SUBMIT CALCULATIONS CERTIFYING THAT ELEMENTS

ARE DESIGNED FOR THE UNFACTORED LOADS STATED.

9. SHOP DRAWINGS PREPARED BY SUPPLIERS AND SUBCONTRACTORS SHALL BE

REVIEWED BY THE GENERAL CONTRACTOR PRIOR TO SUBMITTING TO THE ENGINEER.

10. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS SHOWING SIZE, METHOD OF

ANCHORAGE, AND WEIGHT OF ALL EQUIPMENT THAT IS TO BE SUPPORTED BY THE

STRUCTURE FOR REVIEW BY THE ENGINEER. THIS IS TO DETERMINE ADEQUACY OF

THE STRUCTURE PRIOR TO ORDERING.

11. SHOP DRAWINGS AND SUBMITTALS:

A. AT A MINIMUM, SUBMIT THE FOLLOWING ITEMS FOR REVIEW BY THE ENGINEER.

1. MATERIAL CERTIFICATES FOR STRUCTURAL STEEL

2. PRODUCT SUBMITTAL FOR EPOXY ANCHORS

3. STRUCTURAL PRODUCT DATA SUBMITTALS

4. ADDITIONAL SUBMITTALS MAY BE REQUIRED IN THE STATEMENT OF

SPECIAL INSPECTIONS AND SPECIFICATIONS.

12. SHOP DRAWINGS AND OTHER ITEMS SHALL BE SUBMITTED TO THE ENGINEER FOR

REVIEW PRIOR TO FABRICATION. ALL CONTRACTOR SHOP DRAWINGS SHALL BE

REVIEWED BY THE GENERAL CONTRACTOR BEFORE SUBMITTAL AND STAMPED

"APPROVED BY CONTRACTOR". THE ENGINEER'S REVIEW IS INTENDED TO REVIEW FOR

CONFORMANCE WITH THE DESIGN CONCEPT AND GENERAL COMPLIANCE WITH THE

RELEVANT CONTRACT DOCUMENTS. THE ENGINEER'S REVIEW DOES NOT RELIEVE THE

CONTRACTOR OF THE SOLE RESPONSIBILITY TO REVIEW, CHECK, AND COORDINATE

THE SHOP DRAWINGS PRIOR TO SUBMISSION. THE CONTRACTOR REMAINS SOLELY

RESPONSIBLE FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF

SHOP DRAWINGS AS THEY PERTAIN TO MEMBER SIZES, DETAILS, DIMENSIONS, ETC.

REPRODUCTIONS OF CONTRACT DOCUMENTS SHALL NOT BE USED TO PREPARE

SHOP DRAWINGS. SHOP DRAWINGS AND SUBMITTALS SHALL BE SUBMITTED

"CONTRACTOR APPROVED".

13. WHERE A PROPRIETARY MANUFACTURER IS STATED, A PRODUCT THAT PROVIDES THE

EQUIVELANT OR BETTER PERFORMANCE MAY BE USED PROVIDED IT MEETS

NECESSARY APPROVAL CODES.

STRUCTURAL STEEL

1. ALL DESIGN, FABRICATION AND ERECTION SHALL CONFORM TO THE AISC STEEL

CONSTRUCTION MANUAL. WELDING SHALL CONFORM TO THE LATEST AWS AND AISC

SPECIFICATIONS.

2. WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE BEST PRACTICE AND WITHIN THE

TOLERANCES SPECIFIED IN THE AISC SPECIFICATION FOR STRUCTURAL STEEL.

3. IT IS SPECIFICALLY NOTED THAT BURNED HOLES ARE NOT ACCEPTABLE UNLESS

SPECIAL PERMISSION IS GIVEN BY ENGINEER.

4. ALL SHOP FABRICATED WORK SHALL BE DONE IN A SHOP APPROVED BY THE

GOVERNING AGENCY. FABRICATOR SHALL SUBMIT PROGRAM OF WELDING

INSPECTION TO ENGINEER FOR APPROVAL.

5. ALL STRUCTURAL STEEL SHALL BE AS FOLLOWS UNLESS NOTED OTHERWISE:

a. CONNECTION PL AND MISC STEEL ASTM A36

b. ANGLE ASTM A36

c. THREADED ROD ASTM A36

6. ALL HIGH STRENGTH BOLTS SHALL BE ASTM A325-N TYPE UNLESS OTHERWISE NOTED.

7. ALL BOLTS USED FOR ERECTION SHALL BE ASTM A325 TYPE WITH THREADS

EXCLUDED FROM SHEAR PLANES.

8. ALL PLAIN ANCHORS SHALL BE A36. ALL ANCHOR BOLTS SHALL COMPLY WITH ASTM

F1554. 3" MINIMUM CONCRETE COVER WILL BE PLACED AROUND ALL ANCHOR BOLTS

EXPOSED TO WEATHER, UNLESS OTHERWISE NOTED.

9. SUBMIT CONTRACTOR SHOP DRAWINGS STAMPED "APPROVED BY CONTRACTOR" FOR

THE FABRICATION AND ERECTION OF ALL ASSEMBLIES OF STRUCTURAL STEEL WORK.

INCLUDE PLANS AND ELEVATIONS AT NOT LESS THAN 1/8" TO 1'-0" SCALE AND INCLUDE

DETAILS OF SECTIONS AT NOT LESS THAN 1" TO 1'-0" SCALE.

10. NO FINISH FABRICATION SHALL BE COMMENCED, OR MATERIAL DELIVERED TO THE

JOB UNTIL THE VETERANS AFFAIRS HAS REVIEWED AND APPROVED THE SHOP

DRAWINGS.

11. ALL STRUCTURAL STEEL SHALL BE PAINTED WITH ONE SHOP COAT OF ZINC

CHROMATE PRIMER OR EQUAL. AFTER ERECTION, FIELD CONNECTIONS SHALL BE

TOUCHED UP. DO NOT PAINT PORTION OF STEEL TO BE EMBEDDED IN CONCRETE,

HEADED ANCHOR STUDS, FRAYING SURFACES, OR AREAS TO RECEIVE FIRE

PROOFING. EXPOSED STEEL MEMBERS ARE SPECIFIED TO BE HOT-DIPPED

GALVANIZED OR STAINLESS STEEL.

3/4" = 1'-0"4 NEW OPENING IN EXISTING DECK

1/4" = 1'-0"2 NEW ROOF TOP MECHANICAL FAN FRAME @ GRID 5

1/4" = 1'-0"3 NEW ROOFTOP MECHANICAL FAN FRAME @ GRID 3

Revisions: Date:

K

L

M

N

O

P

73 61.4

EXISTING

STRUCTURAL

COLUMNS, TYP.

(EX) W27X114

(EX) W24X84

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W24X84

(EX) W14X34(EX) W14X34

(EX) W14X22

(EX) W16X26 (EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114(EX) W14X30(EX) W14X30(EX) W14X22

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W16X26

(EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W33X118

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W14X30

(EX) W27X114

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114

(EX) W14X34

(EX) W33X130

(E X

W

X

(E X

W

X

(EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114 (EX) W14X34

(EX) W27X114

(E X

W

X

(E X

W

X

(E X

W

X

NEW AHU

(E X

W

X

(EX) W14X22

NEW AIR HANDLER

UNIT (< 5,000#). REFER

TO MECHANICAL

DRAWINGS

H

J

NIC

KEY PLAN

PLAN

NORTH

DESIGN/BUILD

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Corporate Office:

766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy Engineer

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

/3

/2

:2 :2

A

M

Sheet of

Professional Seal

SF-102

4th LEVEL MECHANICAL

SUPPORT PLAN

RENOVATE FOR PATIENT

PRIVACY - WING H/ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

RD SD

1/8" = 1'-0"

4th LEVEL MECHANICAL SUPPORT PLAN

I

J

K

L

M

N

O

P

8 98.2

3 61.4

PATIENT LIFT SYSTEM TRACK.

SHOWN FOR REFERENCE

ONLY. REFER TO 2/SF102 FOR

ATTACHMENT, TYP.

EXISTING

STRUCTURAL

COLUMNS, TYP.

(EX) W27X114

(EX) W24X84

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W24X84

(EX) W14X34(EX) W14X34

(EX) W14X22

(EX) W16X26

(EX) W16X26 (EX) W16X26 (EX) W16X26

(EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114(EX) W14X30(EX) W21X44(EX) W24X55

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W16X26

(EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W33X118

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W14X30

(EX) W27X114

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114

(EX) W14X34

(EX) W33X130

(E X

W

X

(E X

W

X

(EX) W16X26

(EX) W16X26 (EX) W16X26 (EX) W16X26

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W27X114 (EX) W14X34

(EX) W27X114

(E X

W

X

(E X

W

X

(E X

W

X

(E X

W

X

(EX) W8X10

NEW AHU

(1) 5/8" Ø BOLT

L3x3x1/4 VERTICAL

STEEL ANGLE

L3x3x1/4 x 0'-6" LONG. DRILL &

EPOXY INTO EXISTING CONCRETE

DECK W/ (2) 1/2" Ø ANCHORS W/

2-3/4" EFFECTIVE EMBEDMENT, TYP.

@ BRACE & VERTICAL SUPPORT

ATTACHMENTS. SEE NOTES BELOW

FOR ANCHOR & EPOXY TYPE.

(1) 5/8" Ø BOLT

PROVIDE L3x3x1/4 x 0'-6" LONG MIN.

FOR ATTACHMENT TO TRACK CLIP.

ADJUST ANGLE LENGTH AS NEEDED

FOR ATTACHMENT PER

MANUFACTURER REQUIREMENTS

LIFT SYSTEM TRACK CLAMP &

TRACK CONNECTION BY

OTHERS

L3x3x1/4 STEEL

BRACE ANGLE

LIFT SYSTEM CONTROL BOX

BY OTHERS

V .I

.F

/2

V

.I .F

EXISTING CONCRETE

TOPPING OVER METAL

ROOF DECK

CEILING FINISH

NOTE:

1. PLACE SUPPORTS SHOWN IN THIS DETAIL EVERY 3' - 0" OF TRACK

LENGTH & AT ALL TRACK BENDS & CORNERS.

2. EPOXY ANCHORS TO BE HILTI HAS-V-36 (ASTM F1554 Gr. 36)

3. EPOXY SHALL BE HILTI HY-200+, INSTALLED IN ACCORDANCE W/

MANUFACTURER'S RECCOMENDATIONS, U.N.O.

4. PROVIDE ANGLE BRACES ALTERNATING IN THE TWO ORTHOGANAL

DIRECTIONS @ EACH VERTICAL LEG.

EQ EQ

1/2"

E Q

E Q

/2

E Q

E Q

1/4

LEVEL 5

1160.91

9'-0" A.F.F.

1154.91

IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO VERIFY EMBEDDED

UTILITIES & REINFORCING LOCATIONS

PRIOR TO DRILLING TO AVOID DAMAGING

/4

PROVIDE BRACING @

TRACK ENDS & AT

EVERY 3' - 0" OF

TRACK LENGTH

LIFT SYSTEM TRACK

LAYOUT BY OTHERS

ALTERNATE BRACE

DIRECTION. PROVIDE @

MIN. (3) BRACES IN EACH

ORTHOGONAL DIRECTION

DIAGONAL BRACE

ANGLE, TYP.

PROVIDE BRACING @

ALL TRACK BENDS,

TYP.

O .C

M

A X

CONFIRM BRACING MAXIMUM

SPACING REQUIREMENTS W/

FIELD CONDITIONS &

MANUFACTURER SPECIFICATIONS

H

J

NIC

KEY PLAN

PLAN

NORTH

DESIGN/BUILD

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Corporate Office:

766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy Engineer

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

/3

/2

:2 :2

A

M

Sheet of

Professional Seal

SF-103

PATIENT LIFT SYSTEM PLAN

RENOVATE FOR PATIENT

PRIVACY - WING H/ELEVATOR

LOBBY

SALEM VA MEDICAL CENTER

658-18-101

2019.08.26

RD SD

1/8" = 1'-0"1 PATIENT LIFT SYSTEM PLAN

3/4" = 1'-0"2 PATIENT LIFT SYSTEM TRACK ATTACHMENT

1/2" = 1'-0"3 TYPICAL TRACK ATTACHMENT PLAN VIEW

Vol 1 Drawing 8-1-2023
4_Corrected_Final_Design_Submi_Wing_H_Full_PDF_18188535

File details come from the government source that posted it. Updated .