S02 - 02c4_537-19-125 - SOW Att - Preliminary Project Risk Assessment.pdf

PDF 1 MB Posted

Attached to
Z1DA--537-19-125 Renovate Electronic Security System (VA-22-00034826)
Solicitation number
36C25222B0016
Issued by

About this file

This document is a project risk assessment form for renovating an electronic security system at the Jesse Brown VA Hospital. The project involves installing robber/panic/duress alarms, motion intrusion alarms, upgrading an access control system and video monitoring system, and installing card readers and door security across campus. It will require measures for infection control, safety, and interim life safety, as the project is classified as a Class III/IV undertaking. Relevant departments, pre-construction activities, and safety precautions are outlined. Upon completion, inspectors from various specialties must approve the reactivation of any spaces before use.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCP 003S-05-25

Appendix D

PROJECT RISK ASSESSMENT (SAFETY, INFECTION CONTROL & ILSM)

Project Title: Project or Work Order Number:

Location: Coordinator:

Start Date: Phone Number:

Type of Project:

Operation and Maintenance Activities Repairs/Renovation Project New Construction Project Lease Other______________________________

Description of project:

Level of NEPA Analysis:

Categorical Exclusion (CATEX) Environmental Assessment Needed (EA) Environmental Impact Statement Needed (EIS)

Other Environmental Permits/Analysis Needed:

PROJECT IMPACTS

Would the proposed activity involve or generate any of the following?

Source Yes No Source Yes No Source Yes No Air Emissions Including GHG’s Liquid Effluent RCRA or CERCLA Sites

Asbestos Petroleum Storage Wetlands

Excess Noise Solid Waste Permit Modification

Utility Modification Hazardous Waste Chemical Use/Storage

Soil Disturbances Biological Resources Aesthetics

Water Treatment Radioactive Waste Water/Well Use

Water Flow Modification Mixed Waste Other:

DETERMINATION

I find the proposed project qualifies as a CATEGORICAL EXCLUSION with no extraordinary circumstances. Specify which CATEX: _____________________________________________________

I find that the proposed project MAY have a significant effect on the environment; therefore, an ENVIRONMENTAL ASSESSMENT will be prepared.

EIS

X Project Engineer

X GEMS Coordinator

X Engineering Chief

pg. 1 of 7 1/31/21

Project Title: Project or Work Order Number:

1. Painting and installation of new wallpaper in business offices and non-patient areas.

2. Painting in a patient room, if closed for painting and less than 3 square feet of wall area is to be patched and painted. Contractor shall replace the air filter for the room’s air conditioning unit upon completion of painting.

3. Installation of a soap dispenser/needle box/paper towel holder in a patient room.

4. Repair of a window blind.

5. Ceiling tile replacement for areas less than ten (10) 2’ x 2’ tiles, if not in business offices and non-patient areas.

6. Ceiling tile replacement for areas less than five (5) 2’ x 2’ tiles in a patient area, if patient is out of the immediate area and clean up can be accomplished before patient returns.

7. Minimal repair of Nurse Call System/TV/Bed/Telephone.

8. Checking or replacing of electric outlet.

9. Replacing a light bulb.

10.

11. Unstopping commode when water on floor requires maintenance to have Housekeeping clean area immediately.

12. Repair of a medical gas outlet. (Front Body)

13. Taking air balance measurement readings.

14. Checking air conditioning unit/system.

15.

equipped unit with minimum 10 ACH, and all air discharged outside. The HEPA unit must continue running 2 hours after completion of job and Housekeeping must clean room before the HEPA unit is removed from room. All work and use of HEPA unit must be documented and copies forwarded to Infection Control and Safety. NOTE: All duct vents to be sealed off during work!

PRE-CONSTRUCTION RISK ASSESSMENT (PCRA) YES N/A

Off Tour Construction Necessary?

Cutting, Burning, or Welding Necessary?

Lead Or Other Hazardous Abatement Necessary?

Legionella Assessment: Will potable water system(s) be affected in any way?

Electrical Systems HVAC SystemsMedical Gases Steam Systems Security Alarms

The following departments will be involved in this project:

Infection Control Construction Paint Shop Engineering Biomed Safety Patient Safety Carpenter IRM Other

The following projects do not require completion of the Project Risk Assessment form:

CONSTRUCTION ACTIVITIES

Location:

Start Date:

Description of project:

Coordinator:

Phone Number:

Asbestos removal need? YES NO

List other:

Asbestos Assessment:

Conducted by wall or ceiling penetration visual inspection?

Conducted via access panel visual inspection?

Conducted by review of facility diagrams and/or prior removal paperwork?

pg. 2 of 7 1/31/21

Domestic Water

Unstopping sink/commode with no water on floor.

Intermediate jobs that create a moderate amount of pressure maintained in the room via use of HEPA-

Permit Required Confined Space (PRCS) Entry Necessary?

LOCKOUT/TAGOUT OF THE FOLLOWING SYSTEMS NECESSARY:

Does this project involve a Mental Health Unit (bed Tower 7E/W or ED rooms 1470A or 1470B)?

has the Mental Health EOC Team been notified?

pking Line pking Line pking Highlight

Project Title: Project or Work Order Number:

MEASURES TO BE TAKEN FOR ALL PROJECTS

Involve Infection Control Department in planning before construction begins Negative-pressure containment and ventilation shall be used during any dust-producing activity. When exhausting to indoor space, HEPA filtration must be used. Unused doors shall be sealed with tape. Existing air supply and exhaust ducts shall be sealed. HEPA vacuum all surfaces at least once per shift and then prior to completion. Remove containment only after approval of VA COR.

“Sticky” dust mats and carpeting remnants shall be maintained at all construction area entrances & exits to control dust.

Contractors shall thoroughly sweep & mop construction & entrance/exit areas at least daily.

All trash shall be removed from the building at least every shift using tightly-covered containers.

Project coordinator and contractor safety manager (designated competent person) to check site daily & log in project folder.

Appropriate safety and project signage shall be posted.

All doors into the work area are smoke-tight, self-closing and self-locking (where required).

Temporary (solid) partitions separating construction from public areas shall be smoke-tight. Only remove after approval of VA. A temporary plastic sheeting enclosure is required to contain dust while removing temporary walls.

Firefighting equipment shall be in place & accessible. Inspection tags shall remain attached and current.

Ceiling tiles shall be replaced as soon as possible to prevent impairment of sprinklers.

All power equipment shall be UL listed and properly grounded, extension cords protected, and plugged into GFCI receptacle.

Flammable & combustible liquids/gases/solids shall be used properly, and stored in fire-safe containers and cabinets.

No smoking policy shall be enforced.

Smoke detectors disconnected to prevent dust from activating the fire alarm (typically only occurs during demolition). Replace with heat detectors.

Trailers, sheds, and dumpsters shall be no closer than10 feet of buildings.

Gang boxes and tool carts shall be secured at all times when not in use.

If water systems were affected, conduct system flushing and testing.

Upon completion, HEPA vacuum all horizontal surfaces, and then wipe all surfaces with disinfectant, and then damp-mop floors. Then notify EMS for terminal cleaning.

ILSM Assessment This project will require Interim Life Safety Measures if any of the following are checked YES YES NO

Approved exits/means of egress passages will be obstructed Emergency access ways will be obstructed Fire alarm/detection/suppression system(s) will be impaired longer than 4 hours Smoke barrier or vertical shaft will be compromised Removal of any corridor or more than 5% of a room’s ceiling tiles Floors or ceilings will be penetrated during construction Significant renovation of an occupied floor

Are ILSM measures required for this project? ____ YES ____ NO

If HVAC, air exchanges or ventilation systems were affected, conduct system balancing and testing.

pg. 3 of 7 1/31/21

Project Title: Project or Work Order Number:

ILSM Checklist

CONTRACTOR BRIEFINGS & TRAINING N/A INITIALS

Ensuring free and unobstructed access to emergency department/services and for emergency forces.

Ensuring fire alarm, detection, and suppression systems are not impaired; a temporary but equivalent system shall be provided when any fire system is impaired.

Contractor will schedule work to minimize how long the systems are impaired, and shall notify safety section prior to system being impaired.

Ensuring temporary construction partitions are smoke tight and built of noncombustible or limited combustible materials which will not contribute to the development or spread of fire.

Providing additional fire-fighting equipment and use training for personnel.

Developing and enforcing storage, housekeeping, and debris removal practices which reduce the potential (flammable or combustible) fire load of the work area to the lowest possible level.

INFECTION CONTROL MEASURES ARE IN PLACE I/C STAFF HAS VERIFIED

CONTRACTOR BRIEFINGS & TRAINING N/A INITIALS

Met with VA services/sections surrounding construction area to inform them of impacts and precautions to be taken, and to inform them in basic I.C. requirements (see attached).

Met with the contractor project manager, construction crews, and subcontractors to inform them of precautions to be taken, and to educate them in basic I.C. requirements.

Informed the contractor that barriers are not to be removed from work area until completed project is inspected by the Safety and Infection Control Departments, and thoroughly cleaned by Environmental Management Service.

ILSM’S ARE IN PLACE SAFETY STAFF HAS VERIFIED NOTIFICATIONS & TRAINING N/A INITIALS VA Police have been notified of responsibility to conduct a fire watch at least once per shift during non-business hours whenever any portion of the fire alarm, detection, or suppression systems are impaired for more than four hours within a twenty-four hour period.

If exits are obstructed, then personnel in building were trained on alternate routes and exits.

Construction areas will have designated and marked exits, maps delineating new exit pathways are in place.

Staff in the affected area(s) will conduct 2 fire drills within every three month period.

TB RISK ASSESSMENT YES NO

Is there a risk based upon construction site location, patient population, hospital layout, and the defined risk as outlined in the “CDC Guidelines for Preventing the Transmission of Mycobacterium Tuberculosis in Health-Care Setting, (IF SO, SEE COMMENTS BELOW):

Ensure that VHA-required content regarding TB is included in every contract.

Contractor shall provide written certification that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the worksite and been found have negative TB screening reactions. Contractors shall be required to show documentation of negative TB screening reactions for any additional workers who are added after the 90-day requirement before they will be allowed to work on the work site.

Review the Guidelines for Preventing the Transmission of Mycobacterium tuberculosis in Health-Care Settings (MMWR 54-RR17), and select the risk category. (http://www.cdc.gov/mmwr/preview/mmwrhtml/rr5417a1.htm)

INFECTION CONTROL RISK ASSESSMENT

This Project will require Infection Control Measures if any of the following are checked “Yes” YES NO

TYPE A – Inspection and Non-Invasive Activities

TYPE B -- Small scale, short duration activities which create minimal dust, fumes/odors, noise, or vibration

TYPE C -- Will generate a moderate amount of dust, fumes/odors, noise, or vibration

TYPE D -- Major demolition and construction projects.

pg.4 of 7 1/31/21 http://www.cdc.gov/mmwr/preview/mmwrhtml/rr5417a1.htm

Project Title: Project or Work Order Number:

I. LOW Risk Area (affects one or more of the following areas):

Office Areas/Shops Locker Rooms Mechanical Equip Rooms Non-Public Access Areas Equip Store Rooms Boiler/Chiller Plants Other: _________________________________________

II. MODERATE Risk Area (affects one or more of the following areas):

Medical Inpatient Units Outpatient Clinics Respiratory Therapy Canteen, Kitchen Areas Psychiatric Inpatient Physical Therapy Radiology/MRI/CT Nuclear Medicine Endoscopy Cardiology Echocardiograph Other: _____________________

III. HIGH Risk Area (affects one or more of the following areas):

Post-Anesthesia Care Unit Emergency Room CCU’s Laboratories Surgical Units Outpatient Surgery Pharmacy SCM Other: _________________________

IV. HIGHEST Risk Area (affects one or more of the following areas):

Operating Rooms Sterile Supply Surgical Recovery Unit Oncology Endoscopy Cardiac Catheter Lab Surgical Inpatient Area ICU’s Other: ______________________________ Immunocompromised patient areas or negative pressure Isolation Rooms

USING THE FOLLOWING TABLE, IDENTIFY THE PROJECT CLASS A B C D

LOW Risk Area I II II III/IV MODERATE Risk Area I II III IV HIGH Risk Area I II III/IV IV HIGHEST Risk Area II III/IV III/IV IV

Project Classification (I,II, III, or IV) ______

ALL CLASS III AND IV PROJECTS REQUIRE AN INFECTION CONTROL PERMIT

MEASURES DURING CLASS I, & II PROJECTS

See: Listing of Measures to be Taken for All Projects Classifications (page 3)

MEASURES DURING CLASS III & IV PROJECTS MEASURES UPON COMPLETION

Above measures PLUS: • Do not remove barriers from work area until completed project is inspected by the Resident Engineer, Project Manager and Facility Safety Manager /Officer or Contracting Officer Representative.

• Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

• Complete all critical barriers i.e. sheet rock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

• Maintain negative air pressure, 0.01 inches of water gauge, within work site utilizing HEPA equipped air filtration units and continuously monitored with a digital display, recording and alarm instrument, which must be calibrated on installation, maintained with periodic calibration and monitored by the contractor.

• Cover transport receptacles or carts. Tape covering unless solid lid.

• Seal holes, pipes, conduits, and punctures appropriately.

• If exiting to a patient care area, construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the site.

• Walk-off mats are recommended to minimize tracking of heavy dirt and dust from construction areas. Shoe covers may be considered in certain areas.

pg. 5 of 7 1/31/21

Project Title: Project or Work Order Number:

ADDITIONAL SAFETY CONCERNS

Will the project involve the deployment of a crane to deliver equipment over occupied facilities?

Must submit a Lift Safety Plan to the Safety Office for approval a minimum of 3 weeks prior to the arrival of the crane on JBVAMC property. The Lift Safety Plan will include the following information: crane specifications, crane inspection list, and crane staff training record/certification. Contractors shall maintain and present the following items prior to crane start (items can be kept in crane cab): crane certifications, crane registration, fire extinguisher, and crane operating and safety manual.

The following must be completed prior to any construction activities:

• Construct separation walls prior to project start.

• Fire protection systems must remain intact.

• Provide extra fire extinguishers in work areas.

• Maintain exit lights in work area.

• Maintain negative air pressure in construction area (24/7) throughout project duration.

• There cannot be any return air from within the construction area to the rest of the building.

• Redirect egress routes; do not allow egress routes to pass through construction areas.

• Provide and maintain “Construction Area-Do No Enter” signs on doors leading into the construction area.

• Maintain up-to-date daily logs and maintain a current Hot Work Permit.

• Provide and install no-slip mats at doors exiting construction area.

• All debris removal must be by covered cart.

• Maintain a clean and orderly work area.

• Determine how, if at all, this project will affect the departments above, below, and adjacent to this project?

COMMENTS: (Required special PPE will be listed here)

Infection Control

Date Telephone Contracting Officer’s Representative

Date Telephone

Safety Date Telephone

YES NO

pg. 6 of 7 1/31/21

Project Title / Work Name :

Project or Work Order Number:

Jesse Brown Space Reactivation Report (Pre-Occupancy)

Location:____________________ Room Number(s):_______________ Date:___________

Description of work completed:____________________________________________________________ See attached sheet if additional explanation is required

The room/area described above, and/or in the attached PRA, has previously been determined to be unsafe, unsanitary, or unusable by patients and/or staff. It should remain locked and/or with restricted access until the work is complete, the area is terminally cleaned, and all designees below agree to its reopening. By signing below, each person is attesting that they have personally viewed/inspected the area and find it is now suitable for its intended use, safe for patient care.

Did this project involve a Mental Health Unit (bed Tower 7E/W or ED rooms 1470A or 1470B)? If so the Mental Health EOC Team needs to be notified?

_______________________________________ Approve / Disapprove Mental Health Service Chief Date

Area Nurse Manager or Service/Section Chief Date Approve / Disapprove

Patient Safety Date Approve / Disapprove

Chief, Occupational Safety & Health Service Date Approve / Disapprove

Chief, Environmental Management Service Date Approve / Disapprove

Chief, Engineering Service Date Approve / Disapprove

Infection Control Date Approve / Disapprove

Medical Center Director Date Approve / Disapprove

pg. 7 of 7 1/31/21

PROJECT RISK ASSESSMENT (SAFETY, INFECTION CONTROL & ILSM)
Untitled
Text1:
Text2:
Text4: III/IV
Text5:
Text6:
Text7:
Text8:
Text19: (i) Repair, replacement, and new installation of primary or secondary electrical distribution systems 38 C.F.R. 26.6(b) - Categorical exclusions
Check Box20: Off
Check Box21: Yes
Check Box22: Off
Check Box23: Off
Check Box24: Off
Text25:
Check Box26: Yes
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Yes
Check Box38: Off
Check Box39: Yes
Check Box40: Yes
Check Box41: Yes
Check Box42: Yes
Check Box43: Yes
Check Box44: Yes
Check Box45: Yes
Check Box46: Yes
Check Box47: Off
Check Box48: Yes
Check Box49: Off
Check Box50: Off
Check Box51: Off
Check Box52: Off
Check Box53: Yes
Check Box54: Off
Check Box55: Yes
Check Box56: Yes
Check Box57: Yes
Check Box58: Yes
Check Box59: Off
Check Box60: Yes
Check Box61: Off
Check Box62: Yes
Check Box63: Off
Check Box64: Yes
Check Box65: Off
Check Box66: Yes
Check Box67: Off
Check Box68: Yes
Check Box69: Off
Check Box70: Yes
Check Box71: Yes
Check Box72: Off
Check Box73: Off
Check Box74: Off
Check Box75: Off
Check Box76: Yes
Check Box77: Yes
Check Box78: Off
Check Box79: Yes
Check Box80: Off
Check Box81: Yes
Check Box82: Off
Check Box83: Yes
Check Box90: Yes
Check Box91: Yes
Check Box92: Yes
Check Box93: Yes
Check Box94: Off
Check Box95: Off
Check Box96: Yes
Check Box97: Yes
Check Box98: Yes
Check Box99: Off
Check Box100: Off
Check Box101: Yes
Check Box102: Off
Check Box103: Yes
Check Box104: Off
Check Box105: Yes
Check Box106: Off
Check Box107: Yes
Check Box108: Off
Check Box109: Yes
Check Box110: Off
Check Box111: Yes
Check Box112: Off
Check Box113: Yes
Check Box114: Off
Check Box115: Yes
Text116:
Text117:
Text118:
Text119:
Text120:
Text121:
Text122:
Text123:
Text124:
Text125:
Text126:
Text127:
Text128:
Text129:
Text130:
Text131:
Text132:
Text133:
Text134:
Text135:
Text136:
Text137:
Text138:
Text139:
Text140:
Text141:
Check Box142: Yes
Check Box143: Off
Check Box145: Yes
Check Box146: Off
Check Box147: Off
Check Box148: Yes
Check Box149: Off
Check Box150: Yes
Check Box151: Yes
Check Box152: Yes
Check Box153: Yes
Check Box154: Yes
Check Box155: Yes
Check Box156: Yes
Check Box157: Off
Check Box158: Yes
Check Box159: Yes
Check Box160: Yes
Check Box161: Yes
Check Box162: Yes
Check Box163: Yes
Check Box164: Yes
Check Box165: Yes
Check Box166: Yes
Check Box167: Yes
Check Box168: Yes
Check Box169: Yes
Check Box170: Off
Check Box171: Yes
Check Box172: Yes
Check Box173: Off
Check Box174: Yes
Check Box175: Yes
Check Box176: Yes
Check Box177: Yes
Check Box178: Yes
Check Box179: Yes
Check Box180: Yes
Check Box181: Yes
Check Box182: Yes
Check Box183: Yes
Check Box184: Yes
Check Box185: Yes
Check Box186: Yes
Check Box187: Yes
Check Box188: Yes
Check Box189: Off
Text13: Renovate Electronic Security System
Text16: 537-19-125
Text9:
Text11:
Text14: Jesse Brown VA Hospital
Text15:
Text17: Charles Coldman
Text18: 328-569-5919 / 773-968-5445
Text3: * Campus Wide

* Installation of Robber/Panic/Duress Alarms

* Installation of Motion Intrusion Alarms

* Installation of new access control system software

* Upgrade of video monitoring system

* Installation of card readers, card access, door security

Check Box144: Yes
Text12:
Check Box1: Off
Check Box2: Off
Check Box3: Yes
Check Box4: Off
Check Box5: Yes
Check Box6: Off
Check Box19: Yes
Check Box25: Off
Check Box84: Yes
Check Box85: Off
Check Box86: Off
Check Box87: Off
PROJECT IMPACTS:
Would the proposed activity involve or generate any of the following:
DETERMINATION:
LockOutTagOut of the following systems will be necessary:
The following departments will be involved in this projectRow1:
Other:
Involve Infection Control Department in planning before construction begins:
Negativepressure containment and ventilation shall be used during any dustproducing activity When exhausting to indoor space HEPA filtration must be used Unused doors shall be sealed with tape Existing air supply and exhaust ducts shall be sealed HEPA vacuum all surfaces at least once per shift and then prior to completion Remove containment only after approval of VA COR:
Sticky dust mats and carpeting remnants shall be maintained at all construction area entrances exits to control dust:
Project coordinator and contractor safety manager designated competent person to check site daily log in project folder:
Appropriate safety and project signage shall be posted:
All doors into the work area are smoketight selfclosing and selflocking where required:
Temporary solid partitions separating construction from public areas shall be smoketight Only remove after approval of VA A temporary plastic sheeting enclosure is required to contain dust while removing temporary walls:
Ceiling tiles shall be replaced as soon as possible to prevent impairment of sprinklers:
All power equipment shall be UL listed and properly grounded extension cords protected and plugged into GFCI receptacle:
Flammable combustible liquidsgasessolids shall be used properly and stored in firesafe containers and cabinets:
No smoking policy shall be enforced:
Trailers sheds and dumpsters shall be no closer than10 feet of buildings:
Gang boxes and tool carts shall be secured at all times when not in use:
If water systems were affected conduct system flushing and testing:
CONTRACTOR BRIEFINGS TRAINING:
BoilerChiller Plants:
PostAnesthesia Care Unit Outpatient Surgery:
MODERATE Risk Area:
HIGH Risk Area:
HIGHEST Risk Area:
See Listing of Measures to be Taken for All Projects Classifications page 3:
The following must be completed prior to any construction activities:
COMMENTS Required special PPE will be listed hereRow1:
COMMENTS Required special PPE will be listed hereRow2:
COMMENTS Required special PPE will be listed hereRow3:
COMMENTS Required special PPE will be listed hereRow4:
COMMENTS Required special PPE will be listed hereRow5:
COMMENTS Required special PPE will be listed hereRow6:
Contracting Officers Representative:
Date:
Telephone:
Infection Control:
Date_2:
Telephone_2:
Safety:
Date_3:
Telephone_3:
Jesse Brown Space Reactivation Report PreOccupancy:
Location:
Room Numbers:
Date_4:
See attached sheet if additional explanation is required:
Area Nurse Manager or ServiceSection Chief:
Patient Safety:
Chief Occupational Safety Health Service:
Chief Environmental Management Service:
Chief Engineering Service:
Infection Control_2:
Medical Center Director:
Date_5:
Date_6:
Date_7:
Date_8:
Date_9:
Date_10:
Date_11:
Check Box10: Yes
Check Box11: Off
2021-12-15T14:06:45-0600
CHARLES COLDMAN
2021-12-16T11:28:49-0600
JUSTIN JAY MACADANGDANG

File details come from the government source that posted it. Updated .