S02 - 02a1_537-19-125 - SOW CD - Construction Plans IFC 12212021.pdf

PDF 18 MB Posted

Attached to
Z1DA--537-19-125 Renovate Electronic Security System (VA-22-00034826)
Solicitation number
36C25222B0016
Issued by

About this file

This solicitation is for the renovation of an electronic security system at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is seeking proposals to renovate the security system at the Z1DA--537-19-125 facility, as identified by solicitation number 36C25222B0016. Offerors should provide services for the renovation of the existing electronic security system, including but not limited to upgrades to security cameras, access control systems, intrusion detection systems, and security operations center equipment and infrastructure. Proposals are due by the date specified in the solicitation document. The contract is expected to be awarded by the date listed therein.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.com

B

IM

/V J E

S -0

R e n o v a te E le c tr o n ic S e c u ri ty

S y s te m /J e s s e

B ro w n

V A

M e d ic a l C e n te r M a in

C a m p u s

M E

P

.r v t

/2 /2

:2

:4

A M

G001

COVER SHEET RENOVATE ELECTRONIC

SECURITY SYSTEM

820 S. Damen Ave. Chicago, IL 60612

537-19-125

12.21.2021 BK BF

ISSUED FOR BID AND

CONSTRUCTION

JESSE BROWN VA MEDICAL CENTER

RENOVATE ELECTRONIC SECURITY SYSTEM

820 S. DAMEN AVE

CHICAGO, IL 60612

PROJECT DIRECTORY

OWNER:

JESSE BROWN VAMC

820 S. DAMEN AVE

CHICAGO, IL 60612

(312) 569-6974

ARCHITECT/ENGINEER:

AE WORKS, LTD

418 BEAVER STREET

PITTSBURGH, PA 15143

(412) 287-7333

CONSULTING ENGINEER:

SCHEESER BUCKLEY MAYFIELD

1540 CORPORATE WOODS PKWY

UNIONTOWN, OH 44685

(330) 526-2713

VICINITY MAP

JESSE BROWN VAMC SITE

LOCATION MAPSHEET INDEX

GENERAL

G001 COVER SHEET

T000 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

T001 GENERAL NOTES AND DETAILS

T002 GENERAL RISER DIAGRAM AND DETAILS

JESSE BROWN VAMC

TJ101 JESSE BROWN VAMC FIRST FLOOR

TJ102 JESSE BROWN VAMC SECOND FLOOR

TJ103 JESSE BROWN VAMC THIRD FLOOR

TJ104 JESSE BROWN VAMC FOURTH FLOOR

TJ105 JESSE BROWN VAMC FIFTH FLOOR

TJ106 JESSE BROWN VAMC SIXTH FLOOR

TJ107 JESSE BROWN VAMC SEVENTH FLOOR

TJ108 JESSE BROWN VAMC EIGHTH FLOOR

TJ109 JESSE BROWN VAMC NINTH FLOOR

TJ110 JESSE BROWN VAMC TENTH FLOOR

TJ201 JESSE BROWN VAMC PARKING GARAGE & BUILDING 5

TJ301 JESSE BROWN VAMC SCHEDULES

TJ302 JESSE BROWN VAMC SCHEDULES

TJ303 JESSE BROWN VAMC SCHEDULES

OFF CAMPUS BUILDINGS

TA101 AUBURN GRESHAM VA CLINIC

TA201 ADAM BENJAMIN JR. (ABJ) OUTPATIENT CLINIC

TA301 LAKESIDE VA CLINIC

TA401 COMMUNITY RESOURCE AND REFERRAL CENTER (CRRC)

TA501 CHICAGO VETERAN RESOURCE CENTER

TA601 CHICAGO HEIGHTS VET CENTER

TA701 NORTHWEST INDIANA "GARY AREA" VET CENTER

TA801 CHICAGO ADMINISTRATIVE SPACE

CONTACT: YARY LUGO

CHARLES P. COLDMAN IV

CONTACT: HERB BRYCHTA

JESSE BROWN VAMC SITE

CONTACT: MARLON HATHAWAY

# Revisions Date 12/21/2021

ACCOMPANYING SOLICITATION 36C25222B0016

ELECTRICAL SYMBOLS LEGEND

1 KEYED NOTE

REFER TO KEYNOTE SCHEDULE ON DRAWING

J J JUNCTION BOX

PANELBOARD

REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION

PULL BOX

DIMENSIONS AS INDICATED ON DRAWINGS

DUPLEX WALL RECEPTACLE

NEMA 5-20R UNLESS NOTED OTHERWISE

QUADRAPLEX WALL RECEPTACLE

NEMA 5-20R UNLESS NOTED OTHERWISE

WALL DATA OUTLET

TYPE AND CONFIGURATION AS NOTED ON DRAWINGS

GREY SYMBOLS INDICATE ELEMENT EXISTING TO REMAIN

DASHED GREY LINES AROUND EQUIPMENT INDICATE NEC

REQUIRED CLEARANCES

DASHED SYMBOLS INDICATE ELEMENT TO BE DEMOLISHED

ELECTRICAL, COMMUNICATION SYSTEMS, AND SECURITY SYSTEMS GENERAL NOTES

GENERAL

1. THE FOLLOWING NOTES SHALL APPLY TO ALL ELECTRICAL, COMMUNICATIONS SYSTEM, AND SECURITY SYSTEM

REQUIREMENTS ON ALL CONTRACT DOCUMENTS. REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL

INFORMATION.

2. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS OR INSTRUCTIONS FOR CONSTRUCTION SAFETY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ANY WORKMAN'S OR TRANSIENT'S SAFETY, OR FOR THE ADEQUACY OF EQUIPMENT, BUILDING COMPONENTS, WORK AIDS, OR ANY NECESSITY TO WORK ON ENERGIZED ELECTRICAL

COMPONENTS. FURTHER, NO SUPERINTENDENCE IS INCLUDED OR IMPLIED.

3. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST VERSION OF NFPA 70 NATIONAL ELECTRIC CODE (NEC), ALL STATE AND LOCAL CODES UNLESS SPECIFICALLY EXEMPTED BY THE COR, AND THE LATEST VERSIONS OF THE VA DESIGN MANUALS, INCLUDING BUT NOT LIMITED TO THE ELECTRICAL DESIGN MANUAL, TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATIONS SYSTEMS DESIGN MANUAL, AND PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL.

PRIOR TO BID, BRING ANY CONFLICTS OR DISCREPANCIES BETWEEN THE REQUIRED CODES/STANDARDS AND THE DRAWINGS TO THE ATTENTION OF COR, IF NOT ALREADY SPECIFICALLY NOTED IN THE CONTRACT DOCUMENTS.

4. PRIOR TO BID, REVIEW ALL CONTRACT DOCUMENTS, INCLUDING DRAWINGS AND SPECIFICATIONS OF OTHER TRADES.

PROVIDE ALL REQUIRED ELECTRICAL PROVISIONS FOR ANY ITEM(S) REQUIRING ELECTRICAL POWER INDICATED ON THE DRAWINGS OR SPECIFICATIONS, REGARDLESS IF SHOWN ON THE ELECTRICAL DRAWINGS. NEC, VA DESIGN MANUALS, AND OTHER GENERAL REQUIREMENTS NOTED IN THE ELECTRICAL DRAWINGS AND SPECIFICATIONS APPLY TO ALL

ELECTRICAL WORK, TO BE PERFORMED AT NO ADDITIONAL COST TO THE GOVERNMENT.

5. DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO CONVEY THE EXTENT, GENERAL ARRANGEMENT AND LOCATIONS OF THE WORK. BASIC ITEMS SUCH AS ACCESS PANELS, CONDUITS, CABINET SIZES, PENETRATION SLEEVES, PULL BOXES, BACKBOXES AND JUNCTION BOXES MAY NOT BE EXPLICITLY SHOWN. INCLUDE ALL ITEMS WHERE REQUIRED BY CODE, MANUFACTURER AND RELATED SPECIFICATION SECTIONS FOR THE PROPER INSTALLATION OF ALL WORK.

6. PROVIDE ONLY ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT TESTED AND LISTED BY A NATIONALLY

RECOGNIZED TESTING LABORATORY.

7. THE VERBIAGE ON THE DRAWINGS INDICATING TYPES OF MATERIALS TO BE ENCOUNTERED IS INTENDED TO AID THE ELECTRICAL CONTRACTOR IN UNDERSTANDING THE VARIOUS CONDITIONS LIKELY TO BE ENCOUNTERED. CONTRACTOR RETAINS RESPONSIBILITY FOR DETERMINING QUANTITIES OF MATERIALS REQUIRED TO COMPLETE THE PROJECT.

8. MAINTAIN WEATHERTIGHT AND WATERPROOF CONDITIONS THROUGHOUT THE BUILDING FOR THE DURATION OF WORK.

DO NOT LEAVE HOLES EXPOSING INTERIOR SPACES TO THE ELEMENTS WHILE NO WORK IS OCCURRING IN THOSE

AREAS.

COORDINATION

1. DUE TO SCALE OF THE DRAWINGS, ALL ELECTRICAL DEVICE SYMBOLS, COMMUNICATIONS DEVICE SYMBOLS, AND SECURITY SYSTEM EQUIPMENT SYMBOLS ARE SHOWN ON DRAWINGS AS CLOSE AS POSSIBLE TO THEIR INTENDED LOCATION. COORDINATE FINAL LOCATIONS WITH FIELD CONDITIONS FOR PROPER INSTALLATION OF ALL EQUIPMENT, DEVICES, CONTROLS, CONDUITS, AND CABLES.

2. COORDINATE CONDITIONS RELATED TO INSTALLATION OF ELECTRICAL, COMMUNICATIONS, AND SECURITY SYSTEMS AND THEIR COMPONENTS WITH ALL TRADES AND SYSTEM INTEGRATORS. COORDINATE ALL INSTALLATION REQUIREMENTS IMPACTING THE PLACEMENT OF SYSTEM COMPONENTS TO THE SATISFACTION OF ALL CONCERNED TRADES. OBTAIN

ANY REQUIRED CLARIFICATIONS AND IMMEDIATELY NOTIFY THE COR OF ANY DISCREPANCIES.

3. PROVIDE ALL ELECTRICAL PROVISIONS FOR INSTALLATIONS REQUIRING COORDINATION WITH OTHER TRADES, INCLUDING BUT NOT LIMITED TO: TEMPLATES, BACK BOXES, AND EQUIPMENT ANCHOR BOLTS FOR MOUNTING PREPARATION, (E.G. PEDESTALS OR OTHER DEVICES REQUIRING MOUNTING ON WALLS, CONCRETE PADS OR OTHER MATERIALS). COORDINATE DELIVERY OF TEMPLATES AND EQUIPMENT WITH ALL AFFECTED CONTRACTORS.

4. COORDINATE WITH COR TO PROVIDE ACCESS HATCHES WHERE EQUIPMENT, PULL BOXES, AND/OR JUNCTION BOXES ARE INSTALLED IN CONCEALED LOCATIONS, AND AN ACCESS HATCH IS NOT ALREADY PRESENT NOR INDICATED FOR INSTALLATION. PROVIDE HATCHES LISTED FOR THE INTENDED APPLICATION AND LOCATED FOR UNIMPEDED SERVICE

ACCESS WITHIN 3 FT OF THE HATCH.

5. PROVIDE INTERFACES FROM AND TO BUILDING FIRE ALARM SYSTEM, INTRUSION ALARM SYSTEM, BUILDING AUTOMATION SYSTEMS, AND ACCESS CONTROLLED DOORS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, APPLICABLE LIFE SAFETY CODES, AND MANUFACTURER RECOMMENDATIONS. COORDINATE WITH THE FIRE ALARM SYSTEM PROVIDER FOR

ALL REQUIRED SYSTEM INTEGRATION REQUIREMENTS.

6. PRIOR TO BID, VERIFY EXISTING CONDITIONS AND DIMENSIONS. ELECTRICAL DRAWINGS SHOW APPROXIMATE LOCATIONS OF EXISTING DEVICES, EQUIPMENT, UTILITIES, STRUCTURES, AND OTHER CONDITIONS. DIMENSIONS SHOWN ON THE ELECTRICAL DRAWINGS ARE FOR INFORMATION PURPOSES ONLY. FIELD CONDITIONS SHALL GOVERN.

7. PRIOR TO PROJECT START, GENERATE A DETAILED METHOD OF PROCEDURE (MOP) DOCUMENT INDICATING EACH STEP IN THE PROJECT AND HOW IT SHALL BE PERFORMED AND PRESENT TO THE COR FOR APPROVAL. FOR THE DURATION OF THE PROJECT, INFORM THE COR OF ANY CHANGES TO THE MOP AND PRESENT A REVISED MOP TO THE COR FOR

REAPPROVAL.

8. PRIOR TO ANY SHUT DOWN, PROVIDE A MINIMUM (21) CALENDAR DAYS WRITTEN NOTICE TO THE COR FOR APPROVAL.

INCLUDE THE FOLLOWING AT MINIMUM: EQUIPMENT LOCATION, EQUIPMENT NAME, AND DURATION OF SHUT DOWN.

9. PRIOR TO PROJECT START, COORDINATE WITH THE COR TO SECURE AND PROTECT THE BUILDING AND/OR WORK AREA WITH FIRE RETARDANT TEMPORARY PLYWOOD PARTITIONS (WITH LOCKING DOORS), ETC. CLOSE ALL EXISTING

OPENINGS AS REQUIRED.

10. PRIOR TO EACH PHASE OF THE PROJECT, COORDINATE ALL WORK WITH THE COR (CONTRACTING OFFICER'S REPRESENTATIVE) AND IDENTIFY ANY WORK REQUIRING COMPLETION OUTSIDE OF NORMAL BUSINESS HOURS.

11. FOR THE DURATION OF THE PROJECT, MAINTAIN CONTINUOUS AND UNINTERRUPTED OPERATION OF AREAS OUTSIDE THE SCOPE OF WORK, EXCEPT WHERE A SHUT DOWN HAS BEEN APPROVED BY THE COR. COORDINATE PROVISIONS FOR

TEMPORARY POWER CONNECTIONS WITH THE COR.

12. FOR THE DURATION OF THE PROJECT, COORDINATE WITH THE COR TO PROVIDE TEMPORARY EXIT SIGNS AND ANY

OTHER REQUIRED SIGNS IF TEMPORARY PARTITIONS IMPEDE THE FLOW OF EGRESS.

13. THE ELECTRICAL CONTRACTOR SHALL COORDINATE CONDUIT PENETRATIONS FOR ROOFTOP EQUIPMENT WITH MECHANICAL AND ROOFING CONTRACTORS. IF PROVISIONS ARE NOT IN PLACE FOR THESE PENETRATIONS THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING THEIR OWN PENETRATIONS AND CONTRACTING THE

ROOF CONTRACTOR FOR SEALING THE ROOF PENETRATIONS.

DEMOLITION

1. EXISTING DEVICES SHOWN ARE DIAGRAMMATIC AND BASED ON FIELD SURVEYS AND/OR RECORD DRAWINGS PROVIDED

BY VA, AND DO NOT REPRESENT THE FULL SCOPE OF DEMOLITION WORK. CONTRACTOR TO REVIEW ALL FIELD

CONDITIONS AND INCLUDE REQUIRED DEMOLITION AND NEW WORK PER FIELD CONDITIONS.

2. REMOVE ALL EXISTING DEVICES AND SYSTEMS BEING REPLACED WITH NEW. REMOVE ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH THE SYSTEMS AND DEVICES BEING REMOVED BACK TO SOURCE UNLESS OTHERWISE NOTED.

3. EXERCISE EXTREME CAUTION WHEN REMOVING OR RELOCATING ANY WIRING AND EQUIPMENT. ENSURE THAT ALL OTHER EXISTING TO REMAIN DEVICES AND EQUIPMENT CONNECTED TO THE SAME CIRCUIT REMAIN OPERATIONAL AND

ACTIVE.

4. DISPOSE OF ANY LAMPS CONTAINING MERCURY AS HAZARDOUS WASTE. COORDINATE APPROPRIATE DISPOSAL

PROCEDURE WITH THE COR.

5. PRIOR TO DEMOLITION, EXAMINE CONDITIONS AND TEST FUNCTIONALITIES OF ALL EXISTING ELECTRICAL EQUIPMENT

IDENTIFIED TO BE REUSED AND/OR RELOCATED, AND PROVIDE REPORT TO COR.

6. DURING DEMOLITION, PATCH AND REPAIR ALL EXISTING TO REMAIN CIRCUITS CUT OFF, USING WIRING METHODS

COMPATIBLE WITH THE EXISTING INSTALLATION.

7. PRIOR TO CLOSE OUT, REMOVE ALL ABANDONED OR TEMPORARY ELECTRICAL PROVISIONS NO LONGER IN SERVICE FROM THE SCOPE OF WORK, REGARDLESS IF THOSE ITEMS EXISTED PRIOR TO PROJECT START. ELECTRICAL PROVISIONS INCLUDE BUT ARE NOT LIMITED TO: CONDUIT, CONDUCTORS, JUNCTION BOXES, PULL BOXES, DISCONNECTS, STARTERS, VFDS, AND CONTROLS.

8. CONTRACTOR SHALL PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS. COORDINATE WITH THOSE DOCUMENTS FOR

EXACT DIMENSIONS AND LOCATIONS OF FINISHED WORK.

9. CONTRACTOR SHALL CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF DEMOLITION TO

PROTECT EXISTING CONSTRUCTION AND EQUIPMENT SCHEDULED TO REMAIN.

10. PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.

11. PRIOR TO INSTALLATION, COORDINATE CONDUIT ROUTING (PLAN AND ELEVATION) WITH THE EXISTING LIGHTING, CEILING ELEVATION, STRUCTURE, DUCTWORK, PIPING, ETC. REQUIRED FOR THE COMPLETION OF THE PROJECT.

RACEWAYS AND CONDUITS

1. PRIOR TO INSTALLATION, COORDINATE CONDUIT ROUTING (PLAN AND ELEVATION) WITH THE

EXISTING LIGHTING, CEILING ELEVATION, STRUCTURE, DUCTWORK, PIPING, ETC. REQUIRED FOR THE

COMPLETION OF THE PROJECT.

2. DRAWINGS DO NOT INDICATE ALL CONDUITS, PULL BOXES, OR OTHER RACEWAY ITEMS. WHERE

CONDUITS ARE INDICATED, THE ROUTING IS APPROXIMATE. COORDINATE ROUTING AND

INSTALLATION OF ALL CONDUITS WITH OTHER TRADES AND EXISTING CONDITIONS. PROVIDE A

COMPLETE RACEWAY SYSTEM MEETING THE REQUIREMENTS OF THE DRAWINGS AND

SPECIFICATIONS.

3. PROVIDE CONDUITS SIZED AND INSTALLED IN ACCORDANCE WITH THE NEC AND PROJECT

SPECIFICATIONS. PROVIDE 3/4 IN MINIMUM DIAMETER FOR POWER CONDUITS UNLESS OTHERWISE NOTED. PROVIDE 3/4 IN MINIMUM DIAMETER FOR SECURITY SYSTEM CONDUITS UNLESS OTHERWISE

NOTED. PROVIDE 1 IN MINIMUM DIAMETER FOR DATA CONDUITS UNLESS OTHERWISE NOTED.

4. PROVIDE ALL JUNCTION BOXES, PULL BOXES AND OTHER PULL POINTS AS REQUIRED FOR EASE OF

PULLING, WITHOUT EXCEEDING THE MAXIMUM NUMBER OF BENDS PER NEC REQUIREMENTS.

5. ALL JUNCTION BOXES AND OTHER PULL POINTS SHALL BE ACCESSIBLE.

6. PROVIDE FIRESTOPPING FOR ALL PENETRATIONS OF WALLS AND/OR FLOORS IN ACCORDANCE WITH ASTM AND NFPA REQUIREMENTS. ONLY AN APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE

MANUFACTURER MAY INSTALL FIRESTOPPING. PERFORM INSTALLATION IN STRICT ACCORDANCE

WITH THE MANUFACTURER'S DETAILED INSTALLATION PROCEDURES.

7. DO NOT INSTALL CONDUIT IN EXPOSED LOCATIONS, EXCEPT IN CHASES, EXPOSED CEILING AREAS, JANITOR CLOSETS, MECHANICAL ROOMS, ELECTRICAL ROOMS, TELECOM ROOMS, AND WHERE

OTHERWISE NOTED.

8. PROVIDE ALL REQUIRED LINTELS AND SLEEVES. PROVIDE SLEEVES FOR ALL CONDUITS

PENETRATING WALLS. PROVIDE LINK SEALS FOR ALL SLEEVES INSTALLED IN EXTERIOR WALLS.

9. ROUTE NEW CONDUIT HIGH AGAINST STRUCTURE AND OFFSET UP BETWEEN JOISTS TO AVOID DUCT

WORK AND HVAC SYSTEM.

10. PROVIDE TAMPER-RESISTANT INSTALLATION FOR ALL CONDUITS, RACEWAYS, EQUIPMENT, DEVICES, AND APPURTENANCES IN AREAS ACCESSIBLE TO THE GENERAL POPULATION AND/OR SUBJECT TO TAMPERING OR VANDALISM, UTILIZING "TORX WITH PEG" SECURITY-FASTENING DEVICES. INSTALL

CONDUITS AND RACEWAYS EXPOSED TO THE GENERAL POPULATION SUCH THAT TAMPERING OR

REMOVAL IS PREVENTED.

11. PRIOR TO ROUGH-IN, IDENTIFY LOCATIONS OF ALL NEW WORK CORE DRILLS AND OTHER

PENETRATIONS REQUIRED TO PERMIT PASSAGE OF CONDUITS, WHERE EXISTING STRUCTURAL

OPENINGS ARE NOT AVAILABLE. PROVIDE PLAN TO COR AND STRUCTURAL ENGINEER FOR

APPROVAL.

CONDUCTORS AND CABLES

1. THE COMPLETE BRANCH WIRING SYSTEM IS NOT SHOWN ON THE DRAWINGS. AN ABBREVIATED

FORMAT IS USED TO INDICATE WHICH FIXTURES AND/OR DEVICES ARE CONNECTED TO A COMMON CIRCUIT OR SWITCH. THIS IS PROVIDED AS A GUIDE TO THE CONTRACTOR TO ILLUSTRATE CIRCUITS

AND CONTROL INTENT. ACTUAL WIRING MAY DIFFER DUE TO FIELD CONDITIONS.

2. PROVIDE COLORED INSULATION FOR ALL BRANCH CIRCUIT CONDUCTORS PER SPECIFICATION.

3. PROVIDE GROUNDING AND/OR BONDING FOR ALL ELECTRICAL EQUIPMENT PER NEC REQUIREMENTS

AND MANUFACTURER RECOMMENDATIONS, REGARDLESS IF EXPLICITLY SHOWN ON THE CONTRACT

DOCUMENTS.

4. PROVIDE AN INSULATED EQUIPMENT GROUND CONDUCTOR IN ALL RACEWAYS, SIZED PER NEC TABLE

250.122. REFER TO PANELBOARD SCHEDULES FOR ASSOCIATED OVERCURRENT PROTECTION DEVICE

SIZE. CONDUITS MAY NOT BE USED AS AN EQUIPMENT GROUNDING CONDUCTOR.

5. PROVIDE DEDICATED NEUTRAL FOR ALL 120V RECEPTACLE BRANCH CIRCUITS. SHARING OF

NEUTRALS IN BRANCH CIRCUITING IS PROHIBITED UNLESS OTHERWISE NOTED.

6. PROVIDE CONTINUOUS CABLE RUNS UNLESS OTHERWISE NOTED. WHERE SPLICING CABLES IN BOXES IS SO INDICATED, USE O.Z.G. TYPE ""XW"" CABLE TAPS, OR APPROVED EQUAL, AND TAPE EACH

TAP IN APPROVED MANNER.

7. MULTIPLE 1P-20A BRANCH CIRCUITS MAY SHARE A SINGLE CONDUIT, PROVIDED THE CONTRACTOR INCREASES THE SIZE OF THE CONDUIT AND ALL CONDUCTORS (INCLUDING THE GROUND) PER NEC

REQUIREMENTS. NO MORE THAN THREE (3) CIRCUITS MAY SHARE A CONDUIT.

8. PROVIDE CATEGORY 6A UTP PLENUM RATED CABLE FOR ALL INTERIOR CCTV SURVEILLANCE CAMERA CABLING, BUNDLED AND ROUTED THROUGH THE FACILITY AND TERMINATED AT THE APPROPRIATE

COMMUNICATIONS EQUIPMENT RACKS AS INDICATED.

9. PROVIDE CATEGORY 6A CABLE RUNS OF 294 FT MAXIMUM LENGTH FROM PATCH PANEL TO CAMERA

TERMINATION.

EQUIPMENT AND DEVICES

CALCULATIONS AND STUDIES

COMMUNICATIONS SYSTEMS

1. PROVIDE ALL EQUIPMENT CLEARANCES IN ACCORDANCE WITH NEC REQUIREMENTS. ARRANGE

EQUIPMENT TO FACILITATE UNRESTRICTED ACCESS FOR MAINTENANCE AND SERVICE AROUND ALL

EQUIPMENT, COMPONENTS AND/OR CABLE TERMINATIONS.

2. INSTALL ALL EQUIPMENT AND DEVICES ACCORDING TO MANUFACTURER RECOMMENDATIONS. FIELD MODIFICATIONS NOT EXPLICITLY DIRECTED OR ADVISED BY THE MANUFACTURER ARE PROHIBITED.

3. INSTALL ALL EQUIPMENT EXPOSED TO THE GENERAL POPULATION IN SECURED ENCLOSURES WITH TAMPER SWITCHES. PERFORM INSTALLATION SUCH THAT ALL ENCLOSURES RESIST TAMPERING AND

REMOVAL WITHOUT THE USE OF SPECIALIZED TOOLS.

4. INSTALL VERTICALLY-MOUNTED RECEPTACLES WITH THE GROUND PRONG FACING UP, AND

HORIZONTALLY-MOUNTED RECEPTACLES WITH THE GROUND PRONG FACING LEFT (NEUTRAL FACING

UP).

5. INSTALL RECEPTACLES AND SWITCHES IN A MULTI-GANG TYPE BOX WHERE MORE THAN ONE

OCCURS IN THE SAME LOCATION UNLESS OTHERWISE NOTED.

6. PROVIDE LABELS FOR ALL RECEPTACLES, SWITCHES, MULTI-OUTLET ASSEMBLIES, AND

DISCONNECTS INDICATING THE ASSOCIATED BRANCH CIRCUIT SOURCE PANELBOARD NAME AND

CIRCUIT NUMBER(S).

7. PROVIDE NAMEPLATES FOR ALL ELECTRICAL EQUIPMENT AND POWERED MECHANICAL EQUIPMENT

INDICATING SOURCE PANELBOARD AND CIRCUIT NUMBER(S).

8. PROVIDE A 5-20R GFCI SERVICE RECEPTACLE IN AN ACCESSIBLE LOCATION WITHIN 25 FT OF ALL EQUIPMENT REQUIRING SERVICE, REGARDLESS IF EXPLICITLY SHOWN ON THE DRAWINGS. PROVIDE POWER VIA GENERAL PURPOSE RECEPTACLE CIRCUIT SEPARATE FROM ANY EQUIPMENT POWER, IF

CIRCUIT IS NOT EXPLICITLY INDICATED ON DRAWINGS.

9. CAULK ALL JOINTS BETWEEN METAL FRAMES AND EXISTING CONDITIONS FOR BOTH INTERIOR AND

EXTERIOR INSTALLATIONS.

10. ALL EQUIPMENT ENCLOSURES LOCATED OUTSIDE OR IN ALL AREAS WITH HIGH MOISTURE OR A RELATIVE HUMIDITY OF 75% OR GREATER SHALL BE NEMA 4X STAINLESS STEEL AND RATED FOR

THAT APPLICATION.

11. WHERE INDICATED IN OUTDOOR LOCATIONS, INSTALL DEVICES, COMPONENTS, AND/OR EQUIPMENT

IN ACCORDANCE WITH APPLICABLE MANUFACTURER REQUIREMENTS. ENSURE PROPER OPERATION

WHEN EXPOSED TO TYPICAL ENVIRONMENTAL CONDITIONS, INCLUDING AVERAGE ANNUAL LOWEST

AND HIGHEST TEMPERATURE, ANTICIPATED FOR THE GEOGRAPHIC REGION OF THE FACILITY.

12. PRIOR TO SUBMITTAL, COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL SUBMITTED

EQUIPMENT WITH MANUFACTURER REQUIREMENTS AND RECOMMENDATIONS. COORDINATION ITEMS

INCLUDE BUT ARE NOT LIMITED TO: BRANCH CONDUCTOR AND CONDUIT SIZES, DISCONNECT SIZES, STARTER SIZES, AND OVERCURRENT PROTECTION DEVICES. INFORM COR OF ANY DISCREPANCIES

BETWEEN THE REQUIREMENTS OF SUBMITTED EQUIPMENT AND CONTRACT DOCUMENTS. ADJUST

RELEVANT ELECTRICAL PROVISIONS AS DETERMINED BY COORDINATION AT NO ADDITIONAL COST TO

THE GOVERNMENT.

13. PRIOR TO CLOSEOUT, PROVIDE UPDATED PANEL SCHEDULES FOR ALL PANELBOARDS, SWITCHGEAR, MOTOR CONTROL CENTERS, AND OTHER LOAD CENTERS ALTERED BY THE PROJECT SCOPE OF

WORK. INCLUDE, AT A MINIMUM, LOAD DESCRIPTION AND LOCATIONS FOR EACH BRANCH CIRCUIT, CONNECTED LOAD OF EACH BRANCH CIRCUIT, FEEDER PANEL/SWITCHGEAR NAME, FEEDER

PANEL/SWITCHGEAR ROOM NUMBER, TOTAL CONNECTED LOAD, AND TOTAL DEMAND LOAD. INCLUDE

A TYPED COPY WITH EACH PANELBOARD IN THE SCOPE OF WORK, AND PROVIDE ELECTRONIC

VERSIONS OF PANEL SCHEDULES IN AUTOCAD OR PDF FORMAT TO THE COR AS PART OF CLOSEOUT.

14. RECEPTACLES FOR ALL EQUIPMENT SHALL BE COMPATIBLE WITH PLUGS FOR THE EQUIPMENT. THE ELECTRICAL CONTRACTOR SHALL VERIFY NEMA/IEC CONFIGURATIONS OF PLUGS AND RECEPTACLES

FOR EQUIPMENT IN THE SPACE AND PROVIDE ACCORDINGLY.

1. ALL CALCULATIONS PERFORMED BY THE ENGINEER AND INCLUDED IN THE CONTRACT DOCUMENTS

ARE FOR INFORMATION PURPOSES ONLY. PERFORM OR REPEAT ALL APPLICABLE CALCULATIONS

UNDER FIELD CONDITIONS AND IN ACCORDANCE WITH SUBMITTED EQUIPMENT. IMMEDIATELY

INFORM COR OF DISCREPANCIES BETWEEN DESIGN VALUES AND THOSE CALCULATED BY THE

CONTRACTOR.

2. FIELD-VERIFY FEEDER CIRCUIT VOLTAGE DROP DOES NOT EXCEED 2% OF NOMINAL VOLTAGE AND BRANCH CIRCUIT VOLTAGE DROP DOES NOT EXCEED 3% OF NOMINAL VOLTAGE. INCREASE THE SIZE

OF THE CONDUCTORS AND CONDUIT TO COMPENSATE WHERE VOLTAGE DROP EXCEEDS THESE

THRESHOLDS AT NO ADDITIONAL COST TO THE GOVERNMENT.

1. REFER TO RELATED CONTRACT DOCUMENTS FOR ADDITIONAL INFORMATION AND REQUIREMENTS RELATED TO THE INSTALLATION, PROGRAMMING, TESTING, COMMISSIONING AND CERTIFICATION OF

ALL COMMUNICATIONS SYSTEMS.

2. INSTALL ALL COMMUNICATION SYSTEM WIRING, CABLES, CONDUITS, AND EQUIPMENT IN

ACCORDANCE WITH IEEE, TIA/EIA, NEC, VA DESIGN MANUALS, MANUFACTURER RECOMMENDATIONS

AND/OR REQUIREMENTS, AND GOOD ENGINEERING PRACTICES.

3. PROVIDE COMMUNICATIONS EQUIPMENT WITH TRANSIENT SURGE PROTECTION COMPLYING WITH UL AND NEC REQUIREMENTS, WITH ADDITIONAL TRANSIENT PROTECTION FOR EACH CIRCUIT LEAVING THE BUILDING AT THE POINT OF EXIT. PROVIDE ONLY TRANSIENT PROTECTION DEVICES UL LISTED

UNDER STANDARD #497B (ISOLATED LOOP PROTECTORS).

4. PROVIDE GROUNDING AND SURGE PROTECTION AS REQUIRED TO MINIMIZE DAMAGE DUE TO

LIGHTNING STRIKES, SNEAK CURRENTS AND OTHER TRANSIENT VOLTAGE SPIKES FOR ALL

EQUIPMENT, RACKS, CABINETS, CONDUITS, CABLE SHIELDS, AND COMMUNICATIONS CIRCUITS.

PERFORM ALL WORK IN ACCORDANCE WITH NEC, IEEE, TIA/EIA, AND MANUFACTURER

RECOMMENDATIONS, VA DESIGN MANUALS, AND/OR REQUIREMENTS.

5. PRIOR TO CLOSEOUT, TEST ALL INSTALLED WIRING AND CABLE IN ACCORDANCE WITH

SPECIFICATIONS, AND VERIFY SYSTEM IS FREE FROM GROUNDS, SHORTS, STRAY VOLTAGES, AND

EMI.

SECURITY SYSTEMS

1. REFER TO RELATED CONTRACT DOCUMENTS FOR ADDITIONAL INFORMATION AND REQUIREMENTS

RELATED TO THE INSTALLATION, PROGRAMMING, TESTING, COMMISSIONING AND CERTIFICATION OF

ALL ELECTRONIC SECURITY SYSTEMS.

2. INSTALL ALL SECURITY SYSTEM WIRING, CABLES, CONDUITS, AND EQUIPMENT IN ACCORDANCE WITH

IEEE, TIA/EIA, NEC, MANUFACTURER RECOMMENDATIONS, VA DESIGN MANUALS, AND/OR

REQUIREMENTS, AND GOOD ENGINEERING PRACTICES.

3. PROVIDE CONTROL EQUIPMENT AND EXTERIOR DEVICES WITH TRANSIENT SURGE PROTECTION

COMPLYING WITH UL AND NEC REQUIREMENTS, WITH ADDITIONAL TRANSIENT PROTECTION FOR

EACH CIRCUIT LEAVING THE BUILDING AT THE POINT OF EXIT. PROVIDE ONLY TRANSIENT

PROTECTION DEVICES UL LISTED UNDER STANDARD #497B (ISOLATED LOOP PROTECTORS).

4. PROVIDE GROUNDING AND SURGE PROTECTION AS REQUIRED TO MINIMIZE DAMAGE DUE TO

LIGHTNING STRIKES, SNEAK CURRENTS AND OTHER TRANSIENT VOLTAGE SPIKES FOR ALL

EQUIPMENT, RACKS, CABINETS, CONDUITS, CABLE SHIELDS, AND EXTERIOR CCTV CAMERAS.

PERFORM ALL WORK IN ACCORDANCE WITH NEC, IEEE, TIA/EIA, AND MANUFACTURER

RECOMMENDATIONS, VA DESIGN MANUALS, AND/OR REQUIREMENTS.

5. PRIOR TO CLOSEOUT, TEST ALL INSTALLED WIRING AND CABLE IN ACCORDANCE WITH

SPECIFICATIONS, AND VERIFY SYSTEM IS FREE FROM GROUNDS, SHORTS, STRAY VOLTAGES, AND

EMI.

6. ALL SECURITY SYSTEM CABLING SHALL BE INSTALLED IN DEDICATED CONDUITS. CONDUITS SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH NFPA 70 AND PROJECT SPECIFICATIONS. ALL CONDUITS

SHALL BE A MINIMUM OF 3/4" UNLESS OTHERWISE NOTED.

1. INSTALL NEW ACCESS CONTROL AND INTRUSION DETECTION DEVICES AND ACCESSORIES AT THE

DOORS/ROOMS IDENTIFIED ON THE PLANS AND SCHEDULES.

2. INSTALL NEW WIRING IN CONDUIT FOR THE ACCESS CONTROL AND INTRUSION DETECTION DEVICES

FROM EACH DEVICE LOCATION TO THE ASSOCIATED CONTROL ENCLOSURES.

3. INSTALL NEW ACCESS CONTROL AND INTRUSION DETECTION CONTROL PANELS (WALL MOUNTED

ENCLOSURES) AT THE LOCATIONS IDENTIFIED.

4. REUSE EXISTING POWER AND DATA CONNECTIONS FOR THE NEW ACCESS CONTROL AND INTRUSION DETECTION CONTROL PANELS. WHERE NONE EXISTS, PROVIDE NEW 120V POWER CIRCUIT AND DATA

CONNECTION FROM THE NEAREST ELECTRICAL ROOM AND TELECOM ROOM.

5. REMOVE EXISTING/OLD CARD READERS, ELECTRIC STRIKES, DOOR CONTACTS AND REQUEST TO EXIT, INTRUSION DETECTION DEVICES, AND ASSOCIATED WIRING AND ACCESS CONTROL BOXES (EXISTING MICRO CONTROLLERS “EMCR”) FROM DOORS AND ROOMS CURRENTLY INSTALLED. EXISTING BACKBOX

AND CONDUIT/RACEWAY TO REMAIN AND BE REUSED FOR NEW ACCESS CONTROL AND INTRUSION

DETECTION DEVICE INSTALLATIONS PER THE PLANS AND SCHEDULES.

6. REMOVAL AND DEMOLITION WORK TO OCCUR IN PHASES ORGANIZED BY THE EMCR LOCATIONS OR TELECOM ROOM CURRENTLY HOUSING THE EXISTING ACCESS CONTROL PANELS. ALL OLD EMCR AND

ASSOCIATED WIRING TO BE DEMOLISHED.

7. WHERE INDICATED, PROVIDE NEW DOOR HARDWARE AND/OR NEW DOOR. VERIFY AND MATCH FIRE

RATING OF EXISTING DOOR.

8. PROVIDE CORE DRILLING, TRENCHING, FIREPROOFING, WEATHERPROOFING, AND FINISHING SURFACES

AFFECTED BY THE INSTALLATION OF THE NEW WORK.

9. PROVIDE TRENCHING AND DIRECT BURIED CONDUIT TO EXTERIOR DOORS/GATES AND INSTALLATION

OF ACCESS CONTROL DEVICES AND WIRING.

10. PROVIDE ABOVE AND/OR UNDERGROUND CONDUIT AND WIRING TO JESSIE BROWN VAMC

OUTBUILDINGS AS NOTED ON THE PLANS AND SCHEDULES.

11. ADD ALTERNATE: PROVIDE AN AVIGILON ACCESS CONTROL MANAGER (ACM) APPLIANCE WITH AVIGILON ENTERPRISE PLUS EDITION FOR THE JESSIE BROWN VAMC MAIN CAMPUS BUILDINGS.

12. DEDUCT ALTERNATE: PROVIDE AN AVIGILON ACCESS CONTROL MANAGER (ACM) APPLIANCE WITH

AVIGILON ENTERPRISE EDITION FOR EACH OFF-CAMPUS BUILDING.

13. DEDUCT ALTERNATE: REFER TO THE DEDUCT ALTERNATE SCHEDULE ON THIS SHEET AND PROVIDE

ACCORDINGLY.

14. PROVIDE TESTING AND COMMISSIONING OF THE ENTIRE SYSTEM BY ENGAGING A FACTORY

AUTHORIZED PERSONNEL. PROVIDE FINAL REPORT TO THE VA AND ENGINEER FOR REVIEW.

GENERAL SCOPE OF WORK

1. CONTRACTOR TO REVIEW AND PROVIDE AN UPDATED PHASING PLAN PRIOR TO BEGINNING OF WORK FOR APPROVAL BY THE VA AND ENGINEER. PHASING SHALL PRIORITIZE MINIMAL DOWNTIME OF ACCESS CONTROL AND INTRUSION DETECTION SYSTEMS. NOTIFY THE VA TWO WEEKS IN ADVANCE OF EACH PHASE TASK. BELOW ARE THE RECOMMENDED PHASE TASK BREAKDOWN FOLLOWING THE EXISTING MICRO CONTROLLER (EMCR) LOCATIONS AND DOORS/ROOMS SERVICED. CONTRACTOR MAY FURTHER

BREAKDOWN THE PHASE TASKS TO FACILITATE INSTALLATION AND MINIMIZE DOWNTIME.

2. INSTALLATION OF ACM APPLIANCE AND SOFTWARE. CONFIRM SYSTEM IS LIVE AND OPERATIONAL PRIOR

TO DEMOLITION AND INSTALLATION WORK.

- EMCR 3 – TAYLOR PHARMACY

- EMCR 3 – TAYLOR ALL FLOORS

- EMCR 3 – OGDON ALL FLOORS

- EMCR 3 – ATRIUM

- EMCR 2 – DAMEN 1B – FIRST FLOOR

- EMCR 2 – DAMEN 1B – REMAINING FLOORS

- EMCR 4 – DAMEN 1A – FIRST FLOOR

- EMCR 4 – DAMEN 1A – REMAINING FLOORS

- EMCR 1 – BED TOWER – FIRST FLOOR

- EMCR 5 – BED TOWER – SECOND FLOOR

- ROOM 36T1 – BED TOWER – THIRD FLOOR

- EMCR 10 – BED TOWER FOURTH FLOOR

- EMCR 12 – BED TOWER FIFTH FLOOR

- EMCR 15 – BED TOWER SIXTH FLOOR

- EMCR 16 – BED TOWER SEVENTH FLOOR

- TEMP BLDG AND BUILDINGS 5, 6, 15, 18, 21, 26, AND 27

- PARKING GARAGE

RECOMMENDED PHASING OF WORK

JESSE BROWN VAMC MAIN CAMPUS ONLY

A. ALL ROOM NAMES AND NUMBERS TO BE VERIFIED PRIOR TO OFFICIAL IDENTIFICATION.

B. NAMING CONVENTION THAT INCLUDES LOWERCASE LETTERS FOLLOWING DOOR/ROOM TAGS ARE NOT PART OF THE OFFICIAL

IDENTIFICATION. LOWERCASE LETTERS FOLLOWING DOOR/ROOM TAGS ARE INCLUDED FOR IDENTIFICATION PURPOSES ON THIS

SET OF DRAWINGS ONLY.

C. LOCATIONS MARKED WITH 'YES' FOR 'EXISTING CARD READER' ARE TO HAVE THEIR CURRENT CARD READERS REPLACED WITH NEW. BACKBOXES AND CONDUIT AT THESE LOCATIONS ARE TO BE REUSED. REPLACE EXISTING WIRING WITH NEW.

D. 'DEDUCT ALTERNATE' TAG LOCATIONS HAVE THE POSSIBILITY OF ALREADY HAVING BEEN UPGRADED TO NEW DEVICES BY THE TIME THIS PROJECT IS EXPECTED TO BEGIN. DEVICES AT THESE LOCATIONS WILL NEED TO BE FIELD VERIFIED AND REPLACED IF THE DEVICES ARE INCOMPATIBLE WITH THE NEW ACCESS CONTROL SYSTEM BEING INSTALLED. IF THE DEVICES ARE COMPATIBLE

WITH THE NEW ACCESS CONTROL SYSTEM, NO REPLACEMENT WILL BE REQUIRED.

GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.com

B

IM

/V J E

S -0

R e n o v a te E le c tr o n ic S e c u ri ty

S y s te m /J e s s e

B ro w n

V A

M e d ic a l C e n te r M a in

C a m p u s

M E

P

.r v t

/1 /2

:3

:2

P M

T000

GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS

RENOVATE ELECTRONIC

SECURITY SYSTEM

820 S. Damen Ave. Chicago, IL 60612

537-19-125

12.21.2021 BK BF

ISSUED FOR BID AND

CONSTRUCTION

RH ROOF HATCH

RM ROOM

RN REMOVE AND REPLACE WITH NEW

RR REMOVE AND REPLACE

RS RAPID START

RV RELIEF VALVE

RWC RAIN WATER CONDUCTOR

S STAIR

SA SUPPLY AIR

SAN SANITARY SEWER ABOVE

GROUND

SAN-BXR SANITARY SEWER - BURIED

EXISTING TO REMAIN

SAN-XR SANITARY SEWER ABOVE

GROUND - EXISTING TO REMAIN

SCHED SCHEDULE

SD SMOKE DAMPER OR SMOKE

DETECTOR

SDISP SOAP DISPENSER

SF SQUARE FOOT

SHT SHEET

SHT MTL SHEET METAL

SHTG SHEATHING

SIM SIMILAR

SM SURFACE MOUNTED

SNC SANITARY NAPKIN CABINET

SND SANITARY NAPKIN DISPOSER

SP STANDPIPE OR STATIC PRESSURE

SPC SPECIMEN PASS-THRU CABINET

SPEC SPECIFICATIONS

SPS STATIC PRESSURE SENSOR

SR SERVICE RECEPTOR

ST PR STATIC PRESSURE

ST STL STAINLESS STEEL

STD STANDARD

STER STERILIZER

STL STEEL

STOR STORAGE

STR STRAINER

STRUCT STRUCTURAL

SUSP SUSPENDED

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

SYM SYMMETRICAL TOP

T TELECOMMUNICATIONS

TA THROWAWAY

TAN TANGENT

TC TELECOMMUNICATIONS

CONTRACTOR

TCV TEMPERATURE CONTROL VALVE

TDV TRIPLE DUTY VALVE

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

TG TONGUE & GROOVE

TH THERMOMETER

THRES THRESHOLD

TR TEMPERATURE RISE

TRANS TRANSITION

TSTAT THERMOSTAT

TV TURNING VANES OR TELEVISION

TYP TYPICAL

XFMR TRANSFORMER

UC UNDER CABINET OR UNDER CUT

UFD UNDER FLOOR DUCT

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORIES

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER

SUPPLY

UTIL UTILITY

V VOLT

VAPD VA POLICE DEPARTMENT

VD VOLUME DAMPER

VENT VENTILATION

VERT VERTICAL

VFS VENTURI FLOW STATION

VIF VERIFY IN FIELD

VL VENT LINE

VP VANDAL PROOF

VR VAPOR RETARDER

VS VENT STACK

VTR VENT THROUGH ROOF

W WATT

W/ WITH

W/O WITHOUT

WB WET BULB

WC WALL COVERING

WCL WATER CLOSET

WD WOOD

WF WIDE FLANGE

WFMD WATER FLOW MEASURING DEVICE

WG WALL GUARD OR WATER GAUGE

WHCH WHEEL CHAIR

WIN WINDOW

WMS WIRE MESH SCREEN

WP WEATHERPROOF

WPS WALL PROTECTION SYSTEM

WSCT WAINSCOT

WT WINDOW TREATMENT

WTD WATER TEMPERATURE DROP

WWF WELDED WIRE FABRIC

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LB POUND

LDB LEAVING DRY BULB

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LIN LINEAR

LOC LOCATION OR LOCATE

LPT LOW POINT

LSDC LINEAR SUPPLY DIFFUSER

CEILING

LT LIGHT

LTG LIGHTING

LV LOW VOLTAGE

LVR LOUVER

LWB LEAVING WET BULB

LWC LINEAR WOOD CEILING

LWT LEAVING WATER TEMPERATURE

MAN MANUAL

MAT MIXED AIR TEMPERATURE

MATL MATERIAL

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH ONE THOUSAND BTU / HOUR

MC MECHANICAL CONTRACTOR

MC METAL CLAD CABLE

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MED MEDICINE

MEMB MEMBRANE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MO MASONRY OPENING

MOD MOTOR OPERATED DAMPER

MONO MONOLITHIC

MTD MOUNTED

MTG HT MOUNTING HEIGHT

MTL METAL

MTLH METAL HALIDE

MTR MOTOR

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

N/A NOT APPLICABLE

NAC NETWORK APPLIANCE CABINET

NEC NATIONAL ELECTRIC CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER ASSOCIATION

NL NIGHT LIGHT

NO NUMBER OR NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

O OXYGEN

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OPER OPERATED

OPNG OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

PB PULL BOX

PC PLUMBING CONTRACTOR

PD PUMP DISCHARGE

PG PRESSURE GAUGE WITH COCK

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRD PRESSURE DIFFERENTIAL VALVE

PRELIM PRELIMINARY

PRT PRESSURE TAP

PRV PRESSURE REDUCING VALVE

PT PAINT OR POTENTIAL

TRANSFORMER

RO ROUGH OPENING

QT QUARRY TILE

R RECEPTION

RA RETURN AIR / RELIEF AIR

RB RUBBER BASE

RC REMOVE COMPLETELY

RD ROOF DRAIN

RE RELOCATE EXISTING

REC RECESSED

RECPT RECEPTACLE

REF REFERENCE

REFL REFLECTOR

REG REGISTER

REINF REINFORCING

REM REMOVE

REQD REQUIRED

RET RETURN

REV REVISE

REX REMOVE EXISTING

RF RESILIENT FLOOR

RFI REQUEST FOR INFORMATION

RGS RIGID GALVANIZED STEEL

CONDUIT

EF EXHAUST FAN

EIFS EXTERIOR INSULATION AND

FINISHING SYSTEM

EJ EXPANSION JOINT

EL ELEVATOR LOBBY

ELEC ELECTRICAL

ELEC CAB ELECTRICAL CABINET

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

ENTR ENTRANCE

EO ELECTRICAL OUTLET

EQ EQUAL

EQUIP EQUIPMENT

ETR EXISTING TO REMAIN

EWB ENTERING WET BULB

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXHAUST AIR

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

XP EXPLOSION PROOF

F/S FIRE / SMOKE DAMPER

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FAT FINAL AIR TEMPERATURE

FATP FIRE ALARM TRANSPONDER

PANEL

FB FIRE BLANKET

FC FLEXIBLE CONNECTION OR

FOOTCANDLE

FD FLOOR DRAIN OR FIRE DAMPER

FDN FOUNDATION

FDV FIRE DEPARTMENT VALVE

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FH FIRE HOSE

FHC FIRE HOSE CABINET

FHP FULL HEIGHT PARTITION

FHV FIRE HOSE VALVE

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLA FULL LOAD AMPERES

FLASH FLASHING

FLEX FLEXIBLE

FLG FLANGE

FLG C FLANGE CONNECTION

FLR FLOOR

FLUOR FLUORESCENT

FP FIRE PROOFING

FRMG FRAMING

FS FLOOR SINK

FSTOP FIRESTOPPING

FT FOOT / FEET

FT HD FEET OF HEAD

FTC FOOTCANDLES

FTG FOOTING

FUR FURRING

G GAS OR ELECTRICAL GROUND

GA GAUGE

GAL GALLONS

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENERATOR

GENL GENERAL

GFCI GROUND FAULT CIRCUIT

INTERRUPTOR

GL GLASS

GLV GLOBE VALVE

GND GROUND

GPM GALLONS PER MINUTE

GR GRADE

GRAP GENERATOR REMOTE

ANNUNCIATOR PANEL

GRD BM GRADE BEAM

GV GATE VALVE

GWB GYPSUM BOARD

H HIGH

HB HOSE BIB

HC HEATING CONTRACTOR

HDCP HANDICAP

HDR HEADER

HDW HARDWARE

HID HIGH INTENSITY DISCHARGE

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HORSE POWER

HPD HIGH PRESSURE DRIP

HPF HIGH POWER FACTOR

HR HANDRAIL

HSKP HOUSEKEEPING

HT HEIGHT

HTG HEATING

HTR HEATER

HV HIGH VELOCITY

HVAC HEATING, VENTILATING, AIR

CONDITIONING

HW HOT WATER

HWD HARD WOOD

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HWS&R HOT WATER SUPPLY AND RETURN

HZ HERTZ

ID INSIDE DIAMETER

IER INVERTED ECCENTRIC REDUCER

IG ISOLATED GROUND

IME INSULATED METAL ENCLOSURE

IN INCH

INCAND INCANDESCENT

INCL INCLUDED

INSUL INSULATION

INT INTERIOR

INTERL INTERLOCK

INV INVERT

ISO ISOLATION

IVS ISOLATED VALVE STATION

J-BOX JUNCTION BOX

JST JOIST

JT JOINT

KO KNOCK OUT

kVA KILOVOLT AMPERE kVAR KILOVAR (REACTANCE) kW KILOWATT kWH KILOWATT HOUR METER

& AND

A AIR (CLINICAL)

AAP ALARM ANNUNCIATOR PANEL

AAV AUTOMATIC AIR VENT

AB ANCHOR BOLT

ABV ABOVE

ACC DR ACCESS DOOR

ACFL ACCESS FLOOR

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICAN DISABILITIES ACT

ADD ADDENDUM

ADDL ADDITIONAL

ADJ ADJUSTABLE

ADMIN ADMINISTRATION

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AFMD AIR FLOW MEASURING DEVICE

AHU AIR HANDLING UNIT

AL ALIGN

ALT ALTERNATE

ALUM ALUMINUM

AMP AMPERE

AP ACCESS PANEL

APC ARCHITECTURAL PRECAST

CONCRETE

APPROX APPROXIMATE

ARAP ASYMMETRIC

ARCH ATS REMOTE ANNUNCIATOR

PANEL

ATC AUTOMATIC TEMPERATURE

CONTROL

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AWT AVERAGE WATER TEMPERATURE

BAT BATTERY

BC BALANCING COCK OR BARE

COPPER

BDD BACKDRAFT DAMPER

BFC BELOW FINISH CEILING

BFE BOTTOM FOOTING ELEVATION

BFG BELOW FINISHED GRADE

BG BUMPER GUARD

BLDG BUILDING

BLKG BLOCKING

BLT BORROWED LIGHT

BLW BELOW

BM BEAM

BO BY OWNER

BOF BY OWNER FUTURE

BOT BOTTOM

BRG BEARING

BRK BREAK

BRKR BREAKER

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOFING

C CONDUIT

CAB CABINET

CANTL CANTILEVER

CAP CAPACITY

CATV CABLE TELEVISION

CCT CUBICLE CURTAIN TRACK

CCTV CLOSED CIRCUIT TELEVISION

CFH CUBIC FEET / HOUR

CFM CUBIC FEET / MINUTE

CH CHANNEL

CHK V CHECK VALVE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CHWS&R CHILLED WATER SUPPLY AND

RETURN

CJ CONTROL JOINT

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CL CENTERLINE

CLG CEILING

CLG MTD CEILING MOUNTED

CLR CLR

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUE / CONTINUOUS

CONTR CONTRACTOR

CONV CONVECTOR

COORD COORDINATE

CORR CORRIDOR

CPT CARPET OR CONTROL POWER

TRANSFORMER

CT CERAMIC TILE

CTR CENTER

CU COPPER

CV CONTROL VALVE

CW COLD WATER

D DEPTH OR DEEP

DB DRY BULB

dB DECIBEL

DCW DOMESTIC COLD WATER

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAILS

DF DRINKING FOUNTAIN

DHW DOMESTIC HOT WATER

DIA DIAMETER

DIAG DIAGONAL OR DIAGRAM

DIFF DIFFUSER

DIM DIMENSION

DISC DISCONNECT

DISCH DISCHARGE

DISP DISPENSER

DIST DISTRIBUTION

DIV DIVISION

DL DOWN LIGHT

DN DOWN

DP DISTRIBUTION PANEL

DPR DAMPER

DR DRAIN

DS DOWNSPOUT

DWG DRAWING

DX DIRECT EXPANSION

E ELECTRICAL

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EDB ENTERING DRY BULB

ABBREVIATION LEGEND

ACCESS CONTROL SCHEDULE - JESSE BROWN - DEDUCT ALTERNATES

DOOR TAG

NEW DEVICES TO BE INSTALLED

EXISTING

CARD

READER COMMENTS

CARD READER W/

PIN DOOR CONTACT

ELECTRIC

STRIKE

REQUEST TO

EXIT

AUDIBLE &

REMOTE

ALARM

D1280a - 2 - - - -

D1299a 1 1 1 1 - -

D1302C 1 1 1 1 - -

D1510a 1 1 1 1 - -

D1640a 1 1 - - - -

D2492A 1 1 1 1 - -

D2505a 1 2 1 1 - - DOUBLE DOOR

D2505b 1 1 1 1 - -

DC2501 2 4 2 - - YES TWO SETS OF

DOUBLE DOORS

D3227a 1 2 1 1 1 YES DOUBLE DOOR

D3229a 1 2 1 1 1 YES DOUBLE DOOR

DC4304 1 1 1 1 - -

D6256 1 1 1 1 - -

D6259 1 1 1 1 - -

D6261 1 1 1 1 - -

D6283 1 1 1 1 - -

D6285 1 1 1 1 - -

D7211a 1 1 1 1 - -

D7215 1 1 1 1 - -

D7221 1 1 1 1 - -

D7225 1 1 1 1 - -

D7467b 1 2 1 1 1 - DOUBLE DOOR

NOTES:

1. LABEL SHALL BE DISPLAYED ON ALL SWITCHBOARDS,

PANELBOARDS, TRANSFER SWITCHES AND PULLBOXES

(MULTIPLE VOLTAGES)

2. NAMEPLATE SHALL BE WHITE LETTERING ON BLACK MICARTA

3. IF ONLY ONE VOLTAGE IS PRESENT, LABEL SHALL INDICATE

ONLY THAT RESPECTIVE VOLTAGE

2" H

IG

H

4" WIDE

VOLTAGE

208Y / 120V

PHASE A BLACK

PHASE B RED

PHASE C BLUE

NEUTRAL WHITE

VOLTAGE

480Y / 277V

PHASE A BROWN

PHASE B ORANGE

PHASE C YELLOW

NEUTRAL GRAY

3 1A

A

SECTION A-A

FLOOR OR WALL ASSEMBLY -- MIN 4-1/2 IN. THICK REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT (100-150 PCF) CONCRETE. WALL MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED CONCRETE BLOCKS *. MAX DIAM OF OPENING IS 12 IN. SEE CONCRETE BLOCKS (CAZT) CATEGORY IN THE FIRE RESISTANCE DIRECTORY FOR NAMES OF

MANUFACTURERS.

THROUGH PENETRANTS -- ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED WITHIN THE FIRESTOP SYSTEM. PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

THE ANNULAR SPACE SHALL BE 0 IN. (POINT CONTACT) TO MAX 1-1/4 IN. THE FOLLOWING TYPES AND SIZES OF

METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:

A. STEEL PIPE -- NOM 10 IN. DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.

B. IRON PIPE -- NOM 10 IN. DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.

C. CONDUIT -- NOM 4 IN. DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR STEEL CONDUIT.

D. COPPER TUBING -- NOM 4 IN. DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING.

E. COPPER PIPE -- NOM 4 IN. DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.

PACKING MATERIAL -- MIN 3 IN. THICKNESS OF MIN 4 PCF MINERAL WOOL BATT INSULATION FOR NOM 4 IN. DIAM (AND SMALLER) PIPES, CONDUITS OR TUBINGS AND A MIN 4 IN. THICKNESS OF MIN 4 PCF MINERAL WOOL BATT INSULATION FOR PIPE GREATER THAN NOM 4 IN. DIAM, FIRMLY PACKED INTO OPENING AS A PERMANENT FORM.

PACKING MATERIAL TO BE RECESSED FROM TOP SURFACE OF FLOOR OR FROM BOTH SURFACES OF WALL AS

REQUIRED TO ACCOMMODATE THE REQUIRED THICKNESS OF FILL MATERIAL.

FILL, VOID OR CAVITY MATERIAL* -- SEALANT -- MIN 1/2 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH WITH THE TOP SURFACE OF FLOOR OR BOTH SURFACES OF WALL. AT THE POINT OF CONTACT LOCATION BETWEEN PIPE AND CONCRETE, A MIN 1/2 IN. DIAM. BEAD OF FILL MATERIAL SHALL BE APPLIED AT THE CONCRETE/PIPE INTERFACE ON THE TOP SURFACE OF FLOOR AND ON BOTH SURFACES OF WALL. W RATING

APPLIES ONLY WHEN CP601S OR CP604 SEALANT IS USED.

HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC -- CP601S, CP604, CP606 OR FS-ONE SEALANT

*BEARING THE UL CLASSIFICATION MARK

3 3

2 1B

1A

D

D

SECTION D-D

WALL ASSEMBLY -- THE 1 OR 2 HR FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES WALL AND PARTITION DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION FEATURES:

A. STUDS -- WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. LUMBER SPACED 16 IN. OC. STEEL STUDS TO BE MIN 2-1/2 IN. WIDE AND SPACED MAX 24 IN. OC. WHEN STEEL STUDS ARE USED AND THE DIAM OF OPENING EXCEEDS THE WIDTH OF STUD CAVITY, THE OPENING SHALL BE FRAMED ON ALL SIDES USING LENGTHS OF STEEL STUD INSTALLED BETWEEN

THE VERTICAL STUDS AND SCREW-ATTACHED TO THE STEEL STUDS AT EACH END. THE FRAMED OPENING IN THE WALL SHALL BE 4 TO 6 IN. WIDER AND 4 TO 6 IN. HIGHER THAN THE DIAM OF THE PENETRATING ITEM SUCH THAT, WHEN THE PENETRATING ITEM IS INSTALLED IN THE OPENING, A 2 TO 3 IN. CLEARANCE IS PRESENT BETWEEN THE

PENETRATING ITEM AND THE FRAMING ON ALL FOUR SIDES.

B. GYPSUM BOARD* -- 5/8 IN. THICK, 4 FT WIDE WITH SQUARE OR TAPERED EDGES. THE GYPSUM BOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE

INDIVIDUAL U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX DIAM OF OPENING IS 32-1/4 IN.

FOR STEEL STUD WALLS. MAX DIAM OF OPENING IS 14-1/2 IN. FOR WOOD STUD WALLS.

THE F RATING OF THE FIRESTOP SYSTEM IS EQUAL TO THE FIRE RATING OF THE WALL ASSEMBLY.

THROUGH-PENETRANTS -- ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED EITHER CONCENTRICALLY OR ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE SHALL BE MIN 0 IN. TO MAX 2-1/4 IN. PIPE MAY BE INSTALLED WITH CONTINUOUS POINT CONTACT. PIPE, CONDUIT OR TUBING MAY BE INSTALLED AT AN ANGLE NOT GREATER THAN 45 DEGREES FROM PERPENDICULAR. PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:

A. STEEL PIPE -- NOM 30 IN DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.

B. IRON PIPE -- NOM 30 IN. DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.

C. CONDUIT -- NOM 4 IN DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR 6 IN. DIAM STEEL CONDUIT.

D. COPPER TUBING -- NOM 6 IN. DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING.

E. COPPER PIPE -- NOM 6 IN. DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.

FILL, VOID OR CAVITY MATERIAL* -- SEALANT -- MIN 5/8 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH WITH BOTH SURFACES OF WALL. AT THE POINT OR CONTINUOUS CONTACT LOCATIONS BETWEEN PIPE AND WALL, A MIN 1/2 IN. DIAM BEAD OF FILL MATERIAL SHALL BE APPLIED AT THE PIPE WALL INTERFACE ON BOTH

SURFACES OF WALL .

HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC -- FS-ONE SEALANT

*BEARING THE UL CLASSIFICATION MARK

NYLON BUSHING

1 1/4" EMT CONDUIT

SUSPENDED CEILING

1 1/4" EMT CONDUIT

EMT COMPRESSION FITTING

4" x 4" x 2.25"

JUNCTION BOX

MUD RING

COVER PLATE

TYP. "8P8C" JACKS

8" M

IN

A .F

.F . O

R A

S N

O T

E D

WALL SLEEVE

SEAL ALL PENETRATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.aeworks.com

B

IM

/V J E

S -0

R e n o v a te E le c tr o n ic S e c u ri ty

S y s te m /J e s s e

B ro w n

V A

M e d ic a l C e n te r M a in

C a m p u s

M E

P

.r v t

/1 /2

:3

:3

P M

T001

GENERAL NOTES AND DETAILS RENOVATE ELECTRONIC

SECURITY SYSTEM

820 S. Damen Ave. Chicago, IL 60612

537-19-125

12.21.2021 BK BF

ISSUED FOR BID AND

CONSTRUCTION

NOT TO SCALE

BRANCH WIRING IDENTIFICATION

NOT TO SCALE

CONDUIT THROUGH CONCRETE WALL - FLOOR ASSEMBLY

NOT TO SCALE

CONDUIT THROUGH FIRE RATED DRYWALL PARTITION

NOT TO SCALE

ROUGH-IN DETAIL

NOT TO SCALE

WALL SLEEVE

DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT

PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO SPECIFIC VAMC

POLICIES OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.

A. EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES

• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF

FEASIBLE SEAL OFF ADJACENT AIR INTAKES.

• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND REPLACE AS

NEEDED TO AVOID BUILDUP OF PARTICULATE.

• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN

STAIRWELLS AND CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.

B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES

DUST AND DEBRIS CONTROL

• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT DURATION PROJECTS GENERATING MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-RATED BARRIER WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING. SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR CONTAINMENT. LARGE DUST PROJECTS NEED AN ENTRY VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. CONTRACTOR PERSONNEL SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE

OF INSECTS AND FLIES, WET CEILING TILE, ETC.

• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHOULD BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHOULD DIRECT PEDESTRIAN

TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITH PRIOR APPROVAL OF THE VAMC.

• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION

DEBRIS.

• CEILINGS THAT ARE REMOVED/MOIFIED TO ALLOW CONSTRUCITON OF ICRA BARRIERS SHOULD BE REINSTALLED TO

PRE-CONSTRUCTION CONDITIONS.

VENTILATION AND ENVIRONMENTAL CONTROLS

• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR;

FILTERS SHOULD BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST

FLOW FROM CLEAN TO DIRTY AREAS.

• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST MUST BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHOULD BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED DAILY.

• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON PROVIDING FOR THE

ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE THROUGHOUT THE PROJECT.

• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE OF THE

PARTITION.

CONTAMINATION OF PATIENT ROOMS

• WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORK (E.G. COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHOULD BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA). ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

• CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS AND SWEPT OR HEPA-VACUUMED DAILY FOR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED.

WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING OF HEAVY DIRT AND

DUST FROM CONSTRUCTION AREAS.

NOTES:

1. ENSURE RENOVATED AREA IS COMPLETELY SEALED OFF FROM SURROUNDING AREAS.

2. MAINTAIN MEANS OF EGRESS AT STAIR TOWERS DURING…

This is the start of the file's text. The full file is on GovTribe.