S02 - 02a1_537-19-125 - SOW CD - Construction Plans IFC 12212021.pdf
PDF 18 MB Posted
- Solicitation number
- 36C25222B0016
About this file
This solicitation is for the renovation of an electronic security system at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is seeking proposals to renovate the security system at the Z1DA--537-19-125 facility, as identified by solicitation number 36C25222B0016. Offerors should provide services for the renovation of the existing electronic security system, including but not limited to upgrades to security cameras, access control systems, intrusion detection systems, and security operations center equipment and infrastructure. Proposals are due by the date specified in the solicitation document. The contract is expected to be awarded by the date listed therein.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.aeworks.com
B
IM
/V J E
S -0
R e n o v a te E le c tr o n ic S e c u ri ty
S y s te m /J e s s e
B ro w n
V A
M e d ic a l C e n te r M a in
C a m p u s
M E
P
.r v t
/2 /2
:2
:4
A M
G001
COVER SHEET RENOVATE ELECTRONIC
SECURITY SYSTEM
820 S. Damen Ave. Chicago, IL 60612
537-19-125
12.21.2021 BK BF
ISSUED FOR BID AND
CONSTRUCTION
JESSE BROWN VA MEDICAL CENTER
RENOVATE ELECTRONIC SECURITY SYSTEM
820 S. DAMEN AVE
CHICAGO, IL 60612
PROJECT DIRECTORY
OWNER:
JESSE BROWN VAMC
820 S. DAMEN AVE
CHICAGO, IL 60612
(312) 569-6974
ARCHITECT/ENGINEER:
AE WORKS, LTD
418 BEAVER STREET
PITTSBURGH, PA 15143
(412) 287-7333
CONSULTING ENGINEER:
SCHEESER BUCKLEY MAYFIELD
1540 CORPORATE WOODS PKWY
UNIONTOWN, OH 44685
(330) 526-2713
VICINITY MAP
JESSE BROWN VAMC SITE
LOCATION MAPSHEET INDEX
GENERAL
G001 COVER SHEET
T000 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
T001 GENERAL NOTES AND DETAILS
T002 GENERAL RISER DIAGRAM AND DETAILS
JESSE BROWN VAMC
TJ101 JESSE BROWN VAMC FIRST FLOOR
TJ102 JESSE BROWN VAMC SECOND FLOOR
TJ103 JESSE BROWN VAMC THIRD FLOOR
TJ104 JESSE BROWN VAMC FOURTH FLOOR
TJ105 JESSE BROWN VAMC FIFTH FLOOR
TJ106 JESSE BROWN VAMC SIXTH FLOOR
TJ107 JESSE BROWN VAMC SEVENTH FLOOR
TJ108 JESSE BROWN VAMC EIGHTH FLOOR
TJ109 JESSE BROWN VAMC NINTH FLOOR
TJ110 JESSE BROWN VAMC TENTH FLOOR
TJ201 JESSE BROWN VAMC PARKING GARAGE & BUILDING 5
TJ301 JESSE BROWN VAMC SCHEDULES
TJ302 JESSE BROWN VAMC SCHEDULES
TJ303 JESSE BROWN VAMC SCHEDULES
OFF CAMPUS BUILDINGS
TA101 AUBURN GRESHAM VA CLINIC
TA201 ADAM BENJAMIN JR. (ABJ) OUTPATIENT CLINIC
TA301 LAKESIDE VA CLINIC
TA401 COMMUNITY RESOURCE AND REFERRAL CENTER (CRRC)
TA501 CHICAGO VETERAN RESOURCE CENTER
TA601 CHICAGO HEIGHTS VET CENTER
TA701 NORTHWEST INDIANA "GARY AREA" VET CENTER
TA801 CHICAGO ADMINISTRATIVE SPACE
CONTACT: YARY LUGO
CHARLES P. COLDMAN IV
CONTACT: HERB BRYCHTA
JESSE BROWN VAMC SITE
CONTACT: MARLON HATHAWAY
# Revisions Date 12/21/2021
ACCOMPANYING SOLICITATION 36C25222B0016
ELECTRICAL SYMBOLS LEGEND
1 KEYED NOTE
REFER TO KEYNOTE SCHEDULE ON DRAWING
J J JUNCTION BOX
PANELBOARD
REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION
PULL BOX
DIMENSIONS AS INDICATED ON DRAWINGS
DUPLEX WALL RECEPTACLE
NEMA 5-20R UNLESS NOTED OTHERWISE
QUADRAPLEX WALL RECEPTACLE
NEMA 5-20R UNLESS NOTED OTHERWISE
WALL DATA OUTLET
TYPE AND CONFIGURATION AS NOTED ON DRAWINGS
GREY SYMBOLS INDICATE ELEMENT EXISTING TO REMAIN
DASHED GREY LINES AROUND EQUIPMENT INDICATE NEC
REQUIRED CLEARANCES
DASHED SYMBOLS INDICATE ELEMENT TO BE DEMOLISHED
ELECTRICAL, COMMUNICATION SYSTEMS, AND SECURITY SYSTEMS GENERAL NOTES
GENERAL
1. THE FOLLOWING NOTES SHALL APPLY TO ALL ELECTRICAL, COMMUNICATIONS SYSTEM, AND SECURITY SYSTEM
REQUIREMENTS ON ALL CONTRACT DOCUMENTS. REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL
INFORMATION.
2. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS OR INSTRUCTIONS FOR CONSTRUCTION SAFETY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ANY WORKMAN'S OR TRANSIENT'S SAFETY, OR FOR THE ADEQUACY OF EQUIPMENT, BUILDING COMPONENTS, WORK AIDS, OR ANY NECESSITY TO WORK ON ENERGIZED ELECTRICAL
COMPONENTS. FURTHER, NO SUPERINTENDENCE IS INCLUDED OR IMPLIED.
3. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST VERSION OF NFPA 70 NATIONAL ELECTRIC CODE (NEC), ALL STATE AND LOCAL CODES UNLESS SPECIFICALLY EXEMPTED BY THE COR, AND THE LATEST VERSIONS OF THE VA DESIGN MANUALS, INCLUDING BUT NOT LIMITED TO THE ELECTRICAL DESIGN MANUAL, TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATIONS SYSTEMS DESIGN MANUAL, AND PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL.
PRIOR TO BID, BRING ANY CONFLICTS OR DISCREPANCIES BETWEEN THE REQUIRED CODES/STANDARDS AND THE DRAWINGS TO THE ATTENTION OF COR, IF NOT ALREADY SPECIFICALLY NOTED IN THE CONTRACT DOCUMENTS.
4. PRIOR TO BID, REVIEW ALL CONTRACT DOCUMENTS, INCLUDING DRAWINGS AND SPECIFICATIONS OF OTHER TRADES.
PROVIDE ALL REQUIRED ELECTRICAL PROVISIONS FOR ANY ITEM(S) REQUIRING ELECTRICAL POWER INDICATED ON THE DRAWINGS OR SPECIFICATIONS, REGARDLESS IF SHOWN ON THE ELECTRICAL DRAWINGS. NEC, VA DESIGN MANUALS, AND OTHER GENERAL REQUIREMENTS NOTED IN THE ELECTRICAL DRAWINGS AND SPECIFICATIONS APPLY TO ALL
ELECTRICAL WORK, TO BE PERFORMED AT NO ADDITIONAL COST TO THE GOVERNMENT.
5. DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO CONVEY THE EXTENT, GENERAL ARRANGEMENT AND LOCATIONS OF THE WORK. BASIC ITEMS SUCH AS ACCESS PANELS, CONDUITS, CABINET SIZES, PENETRATION SLEEVES, PULL BOXES, BACKBOXES AND JUNCTION BOXES MAY NOT BE EXPLICITLY SHOWN. INCLUDE ALL ITEMS WHERE REQUIRED BY CODE, MANUFACTURER AND RELATED SPECIFICATION SECTIONS FOR THE PROPER INSTALLATION OF ALL WORK.
6. PROVIDE ONLY ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT TESTED AND LISTED BY A NATIONALLY
RECOGNIZED TESTING LABORATORY.
7. THE VERBIAGE ON THE DRAWINGS INDICATING TYPES OF MATERIALS TO BE ENCOUNTERED IS INTENDED TO AID THE ELECTRICAL CONTRACTOR IN UNDERSTANDING THE VARIOUS CONDITIONS LIKELY TO BE ENCOUNTERED. CONTRACTOR RETAINS RESPONSIBILITY FOR DETERMINING QUANTITIES OF MATERIALS REQUIRED TO COMPLETE THE PROJECT.
8. MAINTAIN WEATHERTIGHT AND WATERPROOF CONDITIONS THROUGHOUT THE BUILDING FOR THE DURATION OF WORK.
DO NOT LEAVE HOLES EXPOSING INTERIOR SPACES TO THE ELEMENTS WHILE NO WORK IS OCCURRING IN THOSE
AREAS.
COORDINATION
1. DUE TO SCALE OF THE DRAWINGS, ALL ELECTRICAL DEVICE SYMBOLS, COMMUNICATIONS DEVICE SYMBOLS, AND SECURITY SYSTEM EQUIPMENT SYMBOLS ARE SHOWN ON DRAWINGS AS CLOSE AS POSSIBLE TO THEIR INTENDED LOCATION. COORDINATE FINAL LOCATIONS WITH FIELD CONDITIONS FOR PROPER INSTALLATION OF ALL EQUIPMENT, DEVICES, CONTROLS, CONDUITS, AND CABLES.
2. COORDINATE CONDITIONS RELATED TO INSTALLATION OF ELECTRICAL, COMMUNICATIONS, AND SECURITY SYSTEMS AND THEIR COMPONENTS WITH ALL TRADES AND SYSTEM INTEGRATORS. COORDINATE ALL INSTALLATION REQUIREMENTS IMPACTING THE PLACEMENT OF SYSTEM COMPONENTS TO THE SATISFACTION OF ALL CONCERNED TRADES. OBTAIN
ANY REQUIRED CLARIFICATIONS AND IMMEDIATELY NOTIFY THE COR OF ANY DISCREPANCIES.
3. PROVIDE ALL ELECTRICAL PROVISIONS FOR INSTALLATIONS REQUIRING COORDINATION WITH OTHER TRADES, INCLUDING BUT NOT LIMITED TO: TEMPLATES, BACK BOXES, AND EQUIPMENT ANCHOR BOLTS FOR MOUNTING PREPARATION, (E.G. PEDESTALS OR OTHER DEVICES REQUIRING MOUNTING ON WALLS, CONCRETE PADS OR OTHER MATERIALS). COORDINATE DELIVERY OF TEMPLATES AND EQUIPMENT WITH ALL AFFECTED CONTRACTORS.
4. COORDINATE WITH COR TO PROVIDE ACCESS HATCHES WHERE EQUIPMENT, PULL BOXES, AND/OR JUNCTION BOXES ARE INSTALLED IN CONCEALED LOCATIONS, AND AN ACCESS HATCH IS NOT ALREADY PRESENT NOR INDICATED FOR INSTALLATION. PROVIDE HATCHES LISTED FOR THE INTENDED APPLICATION AND LOCATED FOR UNIMPEDED SERVICE
ACCESS WITHIN 3 FT OF THE HATCH.
5. PROVIDE INTERFACES FROM AND TO BUILDING FIRE ALARM SYSTEM, INTRUSION ALARM SYSTEM, BUILDING AUTOMATION SYSTEMS, AND ACCESS CONTROLLED DOORS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, APPLICABLE LIFE SAFETY CODES, AND MANUFACTURER RECOMMENDATIONS. COORDINATE WITH THE FIRE ALARM SYSTEM PROVIDER FOR
ALL REQUIRED SYSTEM INTEGRATION REQUIREMENTS.
6. PRIOR TO BID, VERIFY EXISTING CONDITIONS AND DIMENSIONS. ELECTRICAL DRAWINGS SHOW APPROXIMATE LOCATIONS OF EXISTING DEVICES, EQUIPMENT, UTILITIES, STRUCTURES, AND OTHER CONDITIONS. DIMENSIONS SHOWN ON THE ELECTRICAL DRAWINGS ARE FOR INFORMATION PURPOSES ONLY. FIELD CONDITIONS SHALL GOVERN.
7. PRIOR TO PROJECT START, GENERATE A DETAILED METHOD OF PROCEDURE (MOP) DOCUMENT INDICATING EACH STEP IN THE PROJECT AND HOW IT SHALL BE PERFORMED AND PRESENT TO THE COR FOR APPROVAL. FOR THE DURATION OF THE PROJECT, INFORM THE COR OF ANY CHANGES TO THE MOP AND PRESENT A REVISED MOP TO THE COR FOR
REAPPROVAL.
8. PRIOR TO ANY SHUT DOWN, PROVIDE A MINIMUM (21) CALENDAR DAYS WRITTEN NOTICE TO THE COR FOR APPROVAL.
INCLUDE THE FOLLOWING AT MINIMUM: EQUIPMENT LOCATION, EQUIPMENT NAME, AND DURATION OF SHUT DOWN.
9. PRIOR TO PROJECT START, COORDINATE WITH THE COR TO SECURE AND PROTECT THE BUILDING AND/OR WORK AREA WITH FIRE RETARDANT TEMPORARY PLYWOOD PARTITIONS (WITH LOCKING DOORS), ETC. CLOSE ALL EXISTING
OPENINGS AS REQUIRED.
10. PRIOR TO EACH PHASE OF THE PROJECT, COORDINATE ALL WORK WITH THE COR (CONTRACTING OFFICER'S REPRESENTATIVE) AND IDENTIFY ANY WORK REQUIRING COMPLETION OUTSIDE OF NORMAL BUSINESS HOURS.
11. FOR THE DURATION OF THE PROJECT, MAINTAIN CONTINUOUS AND UNINTERRUPTED OPERATION OF AREAS OUTSIDE THE SCOPE OF WORK, EXCEPT WHERE A SHUT DOWN HAS BEEN APPROVED BY THE COR. COORDINATE PROVISIONS FOR
TEMPORARY POWER CONNECTIONS WITH THE COR.
12. FOR THE DURATION OF THE PROJECT, COORDINATE WITH THE COR TO PROVIDE TEMPORARY EXIT SIGNS AND ANY
OTHER REQUIRED SIGNS IF TEMPORARY PARTITIONS IMPEDE THE FLOW OF EGRESS.
13. THE ELECTRICAL CONTRACTOR SHALL COORDINATE CONDUIT PENETRATIONS FOR ROOFTOP EQUIPMENT WITH MECHANICAL AND ROOFING CONTRACTORS. IF PROVISIONS ARE NOT IN PLACE FOR THESE PENETRATIONS THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING THEIR OWN PENETRATIONS AND CONTRACTING THE
ROOF CONTRACTOR FOR SEALING THE ROOF PENETRATIONS.
DEMOLITION
1. EXISTING DEVICES SHOWN ARE DIAGRAMMATIC AND BASED ON FIELD SURVEYS AND/OR RECORD DRAWINGS PROVIDED
BY VA, AND DO NOT REPRESENT THE FULL SCOPE OF DEMOLITION WORK. CONTRACTOR TO REVIEW ALL FIELD
CONDITIONS AND INCLUDE REQUIRED DEMOLITION AND NEW WORK PER FIELD CONDITIONS.
2. REMOVE ALL EXISTING DEVICES AND SYSTEMS BEING REPLACED WITH NEW. REMOVE ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH THE SYSTEMS AND DEVICES BEING REMOVED BACK TO SOURCE UNLESS OTHERWISE NOTED.
3. EXERCISE EXTREME CAUTION WHEN REMOVING OR RELOCATING ANY WIRING AND EQUIPMENT. ENSURE THAT ALL OTHER EXISTING TO REMAIN DEVICES AND EQUIPMENT CONNECTED TO THE SAME CIRCUIT REMAIN OPERATIONAL AND
ACTIVE.
4. DISPOSE OF ANY LAMPS CONTAINING MERCURY AS HAZARDOUS WASTE. COORDINATE APPROPRIATE DISPOSAL
PROCEDURE WITH THE COR.
5. PRIOR TO DEMOLITION, EXAMINE CONDITIONS AND TEST FUNCTIONALITIES OF ALL EXISTING ELECTRICAL EQUIPMENT
IDENTIFIED TO BE REUSED AND/OR RELOCATED, AND PROVIDE REPORT TO COR.
6. DURING DEMOLITION, PATCH AND REPAIR ALL EXISTING TO REMAIN CIRCUITS CUT OFF, USING WIRING METHODS
COMPATIBLE WITH THE EXISTING INSTALLATION.
7. PRIOR TO CLOSE OUT, REMOVE ALL ABANDONED OR TEMPORARY ELECTRICAL PROVISIONS NO LONGER IN SERVICE FROM THE SCOPE OF WORK, REGARDLESS IF THOSE ITEMS EXISTED PRIOR TO PROJECT START. ELECTRICAL PROVISIONS INCLUDE BUT ARE NOT LIMITED TO: CONDUIT, CONDUCTORS, JUNCTION BOXES, PULL BOXES, DISCONNECTS, STARTERS, VFDS, AND CONTROLS.
8. CONTRACTOR SHALL PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS. COORDINATE WITH THOSE DOCUMENTS FOR
EXACT DIMENSIONS AND LOCATIONS OF FINISHED WORK.
9. CONTRACTOR SHALL CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF DEMOLITION TO
PROTECT EXISTING CONSTRUCTION AND EQUIPMENT SCHEDULED TO REMAIN.
10. PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.
11. PRIOR TO INSTALLATION, COORDINATE CONDUIT ROUTING (PLAN AND ELEVATION) WITH THE EXISTING LIGHTING, CEILING ELEVATION, STRUCTURE, DUCTWORK, PIPING, ETC. REQUIRED FOR THE COMPLETION OF THE PROJECT.
RACEWAYS AND CONDUITS
1. PRIOR TO INSTALLATION, COORDINATE CONDUIT ROUTING (PLAN AND ELEVATION) WITH THE
EXISTING LIGHTING, CEILING ELEVATION, STRUCTURE, DUCTWORK, PIPING, ETC. REQUIRED FOR THE
COMPLETION OF THE PROJECT.
2. DRAWINGS DO NOT INDICATE ALL CONDUITS, PULL BOXES, OR OTHER RACEWAY ITEMS. WHERE
CONDUITS ARE INDICATED, THE ROUTING IS APPROXIMATE. COORDINATE ROUTING AND
INSTALLATION OF ALL CONDUITS WITH OTHER TRADES AND EXISTING CONDITIONS. PROVIDE A
COMPLETE RACEWAY SYSTEM MEETING THE REQUIREMENTS OF THE DRAWINGS AND
SPECIFICATIONS.
3. PROVIDE CONDUITS SIZED AND INSTALLED IN ACCORDANCE WITH THE NEC AND PROJECT
SPECIFICATIONS. PROVIDE 3/4 IN MINIMUM DIAMETER FOR POWER CONDUITS UNLESS OTHERWISE NOTED. PROVIDE 3/4 IN MINIMUM DIAMETER FOR SECURITY SYSTEM CONDUITS UNLESS OTHERWISE
NOTED. PROVIDE 1 IN MINIMUM DIAMETER FOR DATA CONDUITS UNLESS OTHERWISE NOTED.
4. PROVIDE ALL JUNCTION BOXES, PULL BOXES AND OTHER PULL POINTS AS REQUIRED FOR EASE OF
PULLING, WITHOUT EXCEEDING THE MAXIMUM NUMBER OF BENDS PER NEC REQUIREMENTS.
5. ALL JUNCTION BOXES AND OTHER PULL POINTS SHALL BE ACCESSIBLE.
6. PROVIDE FIRESTOPPING FOR ALL PENETRATIONS OF WALLS AND/OR FLOORS IN ACCORDANCE WITH ASTM AND NFPA REQUIREMENTS. ONLY AN APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE
MANUFACTURER MAY INSTALL FIRESTOPPING. PERFORM INSTALLATION IN STRICT ACCORDANCE
WITH THE MANUFACTURER'S DETAILED INSTALLATION PROCEDURES.
7. DO NOT INSTALL CONDUIT IN EXPOSED LOCATIONS, EXCEPT IN CHASES, EXPOSED CEILING AREAS, JANITOR CLOSETS, MECHANICAL ROOMS, ELECTRICAL ROOMS, TELECOM ROOMS, AND WHERE
OTHERWISE NOTED.
8. PROVIDE ALL REQUIRED LINTELS AND SLEEVES. PROVIDE SLEEVES FOR ALL CONDUITS
PENETRATING WALLS. PROVIDE LINK SEALS FOR ALL SLEEVES INSTALLED IN EXTERIOR WALLS.
9. ROUTE NEW CONDUIT HIGH AGAINST STRUCTURE AND OFFSET UP BETWEEN JOISTS TO AVOID DUCT
WORK AND HVAC SYSTEM.
10. PROVIDE TAMPER-RESISTANT INSTALLATION FOR ALL CONDUITS, RACEWAYS, EQUIPMENT, DEVICES, AND APPURTENANCES IN AREAS ACCESSIBLE TO THE GENERAL POPULATION AND/OR SUBJECT TO TAMPERING OR VANDALISM, UTILIZING "TORX WITH PEG" SECURITY-FASTENING DEVICES. INSTALL
CONDUITS AND RACEWAYS EXPOSED TO THE GENERAL POPULATION SUCH THAT TAMPERING OR
REMOVAL IS PREVENTED.
11. PRIOR TO ROUGH-IN, IDENTIFY LOCATIONS OF ALL NEW WORK CORE DRILLS AND OTHER
PENETRATIONS REQUIRED TO PERMIT PASSAGE OF CONDUITS, WHERE EXISTING STRUCTURAL
OPENINGS ARE NOT AVAILABLE. PROVIDE PLAN TO COR AND STRUCTURAL ENGINEER FOR
APPROVAL.
CONDUCTORS AND CABLES
1. THE COMPLETE BRANCH WIRING SYSTEM IS NOT SHOWN ON THE DRAWINGS. AN ABBREVIATED
FORMAT IS USED TO INDICATE WHICH FIXTURES AND/OR DEVICES ARE CONNECTED TO A COMMON CIRCUIT OR SWITCH. THIS IS PROVIDED AS A GUIDE TO THE CONTRACTOR TO ILLUSTRATE CIRCUITS
AND CONTROL INTENT. ACTUAL WIRING MAY DIFFER DUE TO FIELD CONDITIONS.
2. PROVIDE COLORED INSULATION FOR ALL BRANCH CIRCUIT CONDUCTORS PER SPECIFICATION.
3. PROVIDE GROUNDING AND/OR BONDING FOR ALL ELECTRICAL EQUIPMENT PER NEC REQUIREMENTS
AND MANUFACTURER RECOMMENDATIONS, REGARDLESS IF EXPLICITLY SHOWN ON THE CONTRACT
DOCUMENTS.
4. PROVIDE AN INSULATED EQUIPMENT GROUND CONDUCTOR IN ALL RACEWAYS, SIZED PER NEC TABLE
250.122. REFER TO PANELBOARD SCHEDULES FOR ASSOCIATED OVERCURRENT PROTECTION DEVICE
SIZE. CONDUITS MAY NOT BE USED AS AN EQUIPMENT GROUNDING CONDUCTOR.
5. PROVIDE DEDICATED NEUTRAL FOR ALL 120V RECEPTACLE BRANCH CIRCUITS. SHARING OF
NEUTRALS IN BRANCH CIRCUITING IS PROHIBITED UNLESS OTHERWISE NOTED.
6. PROVIDE CONTINUOUS CABLE RUNS UNLESS OTHERWISE NOTED. WHERE SPLICING CABLES IN BOXES IS SO INDICATED, USE O.Z.G. TYPE ""XW"" CABLE TAPS, OR APPROVED EQUAL, AND TAPE EACH
TAP IN APPROVED MANNER.
7. MULTIPLE 1P-20A BRANCH CIRCUITS MAY SHARE A SINGLE CONDUIT, PROVIDED THE CONTRACTOR INCREASES THE SIZE OF THE CONDUIT AND ALL CONDUCTORS (INCLUDING THE GROUND) PER NEC
REQUIREMENTS. NO MORE THAN THREE (3) CIRCUITS MAY SHARE A CONDUIT.
8. PROVIDE CATEGORY 6A UTP PLENUM RATED CABLE FOR ALL INTERIOR CCTV SURVEILLANCE CAMERA CABLING, BUNDLED AND ROUTED THROUGH THE FACILITY AND TERMINATED AT THE APPROPRIATE
COMMUNICATIONS EQUIPMENT RACKS AS INDICATED.
9. PROVIDE CATEGORY 6A CABLE RUNS OF 294 FT MAXIMUM LENGTH FROM PATCH PANEL TO CAMERA
TERMINATION.
EQUIPMENT AND DEVICES
CALCULATIONS AND STUDIES
COMMUNICATIONS SYSTEMS
1. PROVIDE ALL EQUIPMENT CLEARANCES IN ACCORDANCE WITH NEC REQUIREMENTS. ARRANGE
EQUIPMENT TO FACILITATE UNRESTRICTED ACCESS FOR MAINTENANCE AND SERVICE AROUND ALL
EQUIPMENT, COMPONENTS AND/OR CABLE TERMINATIONS.
2. INSTALL ALL EQUIPMENT AND DEVICES ACCORDING TO MANUFACTURER RECOMMENDATIONS. FIELD MODIFICATIONS NOT EXPLICITLY DIRECTED OR ADVISED BY THE MANUFACTURER ARE PROHIBITED.
3. INSTALL ALL EQUIPMENT EXPOSED TO THE GENERAL POPULATION IN SECURED ENCLOSURES WITH TAMPER SWITCHES. PERFORM INSTALLATION SUCH THAT ALL ENCLOSURES RESIST TAMPERING AND
REMOVAL WITHOUT THE USE OF SPECIALIZED TOOLS.
4. INSTALL VERTICALLY-MOUNTED RECEPTACLES WITH THE GROUND PRONG FACING UP, AND
HORIZONTALLY-MOUNTED RECEPTACLES WITH THE GROUND PRONG FACING LEFT (NEUTRAL FACING
UP).
5. INSTALL RECEPTACLES AND SWITCHES IN A MULTI-GANG TYPE BOX WHERE MORE THAN ONE
OCCURS IN THE SAME LOCATION UNLESS OTHERWISE NOTED.
6. PROVIDE LABELS FOR ALL RECEPTACLES, SWITCHES, MULTI-OUTLET ASSEMBLIES, AND
DISCONNECTS INDICATING THE ASSOCIATED BRANCH CIRCUIT SOURCE PANELBOARD NAME AND
CIRCUIT NUMBER(S).
7. PROVIDE NAMEPLATES FOR ALL ELECTRICAL EQUIPMENT AND POWERED MECHANICAL EQUIPMENT
INDICATING SOURCE PANELBOARD AND CIRCUIT NUMBER(S).
8. PROVIDE A 5-20R GFCI SERVICE RECEPTACLE IN AN ACCESSIBLE LOCATION WITHIN 25 FT OF ALL EQUIPMENT REQUIRING SERVICE, REGARDLESS IF EXPLICITLY SHOWN ON THE DRAWINGS. PROVIDE POWER VIA GENERAL PURPOSE RECEPTACLE CIRCUIT SEPARATE FROM ANY EQUIPMENT POWER, IF
CIRCUIT IS NOT EXPLICITLY INDICATED ON DRAWINGS.
9. CAULK ALL JOINTS BETWEEN METAL FRAMES AND EXISTING CONDITIONS FOR BOTH INTERIOR AND
EXTERIOR INSTALLATIONS.
10. ALL EQUIPMENT ENCLOSURES LOCATED OUTSIDE OR IN ALL AREAS WITH HIGH MOISTURE OR A RELATIVE HUMIDITY OF 75% OR GREATER SHALL BE NEMA 4X STAINLESS STEEL AND RATED FOR
THAT APPLICATION.
11. WHERE INDICATED IN OUTDOOR LOCATIONS, INSTALL DEVICES, COMPONENTS, AND/OR EQUIPMENT
IN ACCORDANCE WITH APPLICABLE MANUFACTURER REQUIREMENTS. ENSURE PROPER OPERATION
WHEN EXPOSED TO TYPICAL ENVIRONMENTAL CONDITIONS, INCLUDING AVERAGE ANNUAL LOWEST
AND HIGHEST TEMPERATURE, ANTICIPATED FOR THE GEOGRAPHIC REGION OF THE FACILITY.
12. PRIOR TO SUBMITTAL, COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL SUBMITTED
EQUIPMENT WITH MANUFACTURER REQUIREMENTS AND RECOMMENDATIONS. COORDINATION ITEMS
INCLUDE BUT ARE NOT LIMITED TO: BRANCH CONDUCTOR AND CONDUIT SIZES, DISCONNECT SIZES, STARTER SIZES, AND OVERCURRENT PROTECTION DEVICES. INFORM COR OF ANY DISCREPANCIES
BETWEEN THE REQUIREMENTS OF SUBMITTED EQUIPMENT AND CONTRACT DOCUMENTS. ADJUST
RELEVANT ELECTRICAL PROVISIONS AS DETERMINED BY COORDINATION AT NO ADDITIONAL COST TO
THE GOVERNMENT.
13. PRIOR TO CLOSEOUT, PROVIDE UPDATED PANEL SCHEDULES FOR ALL PANELBOARDS, SWITCHGEAR, MOTOR CONTROL CENTERS, AND OTHER LOAD CENTERS ALTERED BY THE PROJECT SCOPE OF
WORK. INCLUDE, AT A MINIMUM, LOAD DESCRIPTION AND LOCATIONS FOR EACH BRANCH CIRCUIT, CONNECTED LOAD OF EACH BRANCH CIRCUIT, FEEDER PANEL/SWITCHGEAR NAME, FEEDER
PANEL/SWITCHGEAR ROOM NUMBER, TOTAL CONNECTED LOAD, AND TOTAL DEMAND LOAD. INCLUDE
A TYPED COPY WITH EACH PANELBOARD IN THE SCOPE OF WORK, AND PROVIDE ELECTRONIC
VERSIONS OF PANEL SCHEDULES IN AUTOCAD OR PDF FORMAT TO THE COR AS PART OF CLOSEOUT.
14. RECEPTACLES FOR ALL EQUIPMENT SHALL BE COMPATIBLE WITH PLUGS FOR THE EQUIPMENT. THE ELECTRICAL CONTRACTOR SHALL VERIFY NEMA/IEC CONFIGURATIONS OF PLUGS AND RECEPTACLES
FOR EQUIPMENT IN THE SPACE AND PROVIDE ACCORDINGLY.
1. ALL CALCULATIONS PERFORMED BY THE ENGINEER AND INCLUDED IN THE CONTRACT DOCUMENTS
ARE FOR INFORMATION PURPOSES ONLY. PERFORM OR REPEAT ALL APPLICABLE CALCULATIONS
UNDER FIELD CONDITIONS AND IN ACCORDANCE WITH SUBMITTED EQUIPMENT. IMMEDIATELY
INFORM COR OF DISCREPANCIES BETWEEN DESIGN VALUES AND THOSE CALCULATED BY THE
CONTRACTOR.
2. FIELD-VERIFY FEEDER CIRCUIT VOLTAGE DROP DOES NOT EXCEED 2% OF NOMINAL VOLTAGE AND BRANCH CIRCUIT VOLTAGE DROP DOES NOT EXCEED 3% OF NOMINAL VOLTAGE. INCREASE THE SIZE
OF THE CONDUCTORS AND CONDUIT TO COMPENSATE WHERE VOLTAGE DROP EXCEEDS THESE
THRESHOLDS AT NO ADDITIONAL COST TO THE GOVERNMENT.
1. REFER TO RELATED CONTRACT DOCUMENTS FOR ADDITIONAL INFORMATION AND REQUIREMENTS RELATED TO THE INSTALLATION, PROGRAMMING, TESTING, COMMISSIONING AND CERTIFICATION OF
ALL COMMUNICATIONS SYSTEMS.
2. INSTALL ALL COMMUNICATION SYSTEM WIRING, CABLES, CONDUITS, AND EQUIPMENT IN
ACCORDANCE WITH IEEE, TIA/EIA, NEC, VA DESIGN MANUALS, MANUFACTURER RECOMMENDATIONS
AND/OR REQUIREMENTS, AND GOOD ENGINEERING PRACTICES.
3. PROVIDE COMMUNICATIONS EQUIPMENT WITH TRANSIENT SURGE PROTECTION COMPLYING WITH UL AND NEC REQUIREMENTS, WITH ADDITIONAL TRANSIENT PROTECTION FOR EACH CIRCUIT LEAVING THE BUILDING AT THE POINT OF EXIT. PROVIDE ONLY TRANSIENT PROTECTION DEVICES UL LISTED
UNDER STANDARD #497B (ISOLATED LOOP PROTECTORS).
4. PROVIDE GROUNDING AND SURGE PROTECTION AS REQUIRED TO MINIMIZE DAMAGE DUE TO
LIGHTNING STRIKES, SNEAK CURRENTS AND OTHER TRANSIENT VOLTAGE SPIKES FOR ALL
EQUIPMENT, RACKS, CABINETS, CONDUITS, CABLE SHIELDS, AND COMMUNICATIONS CIRCUITS.
PERFORM ALL WORK IN ACCORDANCE WITH NEC, IEEE, TIA/EIA, AND MANUFACTURER
RECOMMENDATIONS, VA DESIGN MANUALS, AND/OR REQUIREMENTS.
5. PRIOR TO CLOSEOUT, TEST ALL INSTALLED WIRING AND CABLE IN ACCORDANCE WITH
SPECIFICATIONS, AND VERIFY SYSTEM IS FREE FROM GROUNDS, SHORTS, STRAY VOLTAGES, AND
EMI.
SECURITY SYSTEMS
1. REFER TO RELATED CONTRACT DOCUMENTS FOR ADDITIONAL INFORMATION AND REQUIREMENTS
RELATED TO THE INSTALLATION, PROGRAMMING, TESTING, COMMISSIONING AND CERTIFICATION OF
ALL ELECTRONIC SECURITY SYSTEMS.
2. INSTALL ALL SECURITY SYSTEM WIRING, CABLES, CONDUITS, AND EQUIPMENT IN ACCORDANCE WITH
IEEE, TIA/EIA, NEC, MANUFACTURER RECOMMENDATIONS, VA DESIGN MANUALS, AND/OR
REQUIREMENTS, AND GOOD ENGINEERING PRACTICES.
3. PROVIDE CONTROL EQUIPMENT AND EXTERIOR DEVICES WITH TRANSIENT SURGE PROTECTION
COMPLYING WITH UL AND NEC REQUIREMENTS, WITH ADDITIONAL TRANSIENT PROTECTION FOR
EACH CIRCUIT LEAVING THE BUILDING AT THE POINT OF EXIT. PROVIDE ONLY TRANSIENT
PROTECTION DEVICES UL LISTED UNDER STANDARD #497B (ISOLATED LOOP PROTECTORS).
4. PROVIDE GROUNDING AND SURGE PROTECTION AS REQUIRED TO MINIMIZE DAMAGE DUE TO
LIGHTNING STRIKES, SNEAK CURRENTS AND OTHER TRANSIENT VOLTAGE SPIKES FOR ALL
EQUIPMENT, RACKS, CABINETS, CONDUITS, CABLE SHIELDS, AND EXTERIOR CCTV CAMERAS.
PERFORM ALL WORK IN ACCORDANCE WITH NEC, IEEE, TIA/EIA, AND MANUFACTURER
RECOMMENDATIONS, VA DESIGN MANUALS, AND/OR REQUIREMENTS.
5. PRIOR TO CLOSEOUT, TEST ALL INSTALLED WIRING AND CABLE IN ACCORDANCE WITH
SPECIFICATIONS, AND VERIFY SYSTEM IS FREE FROM GROUNDS, SHORTS, STRAY VOLTAGES, AND
EMI.
6. ALL SECURITY SYSTEM CABLING SHALL BE INSTALLED IN DEDICATED CONDUITS. CONDUITS SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH NFPA 70 AND PROJECT SPECIFICATIONS. ALL CONDUITS
SHALL BE A MINIMUM OF 3/4" UNLESS OTHERWISE NOTED.
1. INSTALL NEW ACCESS CONTROL AND INTRUSION DETECTION DEVICES AND ACCESSORIES AT THE
DOORS/ROOMS IDENTIFIED ON THE PLANS AND SCHEDULES.
2. INSTALL NEW WIRING IN CONDUIT FOR THE ACCESS CONTROL AND INTRUSION DETECTION DEVICES
FROM EACH DEVICE LOCATION TO THE ASSOCIATED CONTROL ENCLOSURES.
3. INSTALL NEW ACCESS CONTROL AND INTRUSION DETECTION CONTROL PANELS (WALL MOUNTED
ENCLOSURES) AT THE LOCATIONS IDENTIFIED.
4. REUSE EXISTING POWER AND DATA CONNECTIONS FOR THE NEW ACCESS CONTROL AND INTRUSION DETECTION CONTROL PANELS. WHERE NONE EXISTS, PROVIDE NEW 120V POWER CIRCUIT AND DATA
CONNECTION FROM THE NEAREST ELECTRICAL ROOM AND TELECOM ROOM.
5. REMOVE EXISTING/OLD CARD READERS, ELECTRIC STRIKES, DOOR CONTACTS AND REQUEST TO EXIT, INTRUSION DETECTION DEVICES, AND ASSOCIATED WIRING AND ACCESS CONTROL BOXES (EXISTING MICRO CONTROLLERS “EMCR”) FROM DOORS AND ROOMS CURRENTLY INSTALLED. EXISTING BACKBOX
AND CONDUIT/RACEWAY TO REMAIN AND BE REUSED FOR NEW ACCESS CONTROL AND INTRUSION
DETECTION DEVICE INSTALLATIONS PER THE PLANS AND SCHEDULES.
6. REMOVAL AND DEMOLITION WORK TO OCCUR IN PHASES ORGANIZED BY THE EMCR LOCATIONS OR TELECOM ROOM CURRENTLY HOUSING THE EXISTING ACCESS CONTROL PANELS. ALL OLD EMCR AND
ASSOCIATED WIRING TO BE DEMOLISHED.
7. WHERE INDICATED, PROVIDE NEW DOOR HARDWARE AND/OR NEW DOOR. VERIFY AND MATCH FIRE
RATING OF EXISTING DOOR.
8. PROVIDE CORE DRILLING, TRENCHING, FIREPROOFING, WEATHERPROOFING, AND FINISHING SURFACES
AFFECTED BY THE INSTALLATION OF THE NEW WORK.
9. PROVIDE TRENCHING AND DIRECT BURIED CONDUIT TO EXTERIOR DOORS/GATES AND INSTALLATION
OF ACCESS CONTROL DEVICES AND WIRING.
10. PROVIDE ABOVE AND/OR UNDERGROUND CONDUIT AND WIRING TO JESSIE BROWN VAMC
OUTBUILDINGS AS NOTED ON THE PLANS AND SCHEDULES.
11. ADD ALTERNATE: PROVIDE AN AVIGILON ACCESS CONTROL MANAGER (ACM) APPLIANCE WITH AVIGILON ENTERPRISE PLUS EDITION FOR THE JESSIE BROWN VAMC MAIN CAMPUS BUILDINGS.
12. DEDUCT ALTERNATE: PROVIDE AN AVIGILON ACCESS CONTROL MANAGER (ACM) APPLIANCE WITH
AVIGILON ENTERPRISE EDITION FOR EACH OFF-CAMPUS BUILDING.
13. DEDUCT ALTERNATE: REFER TO THE DEDUCT ALTERNATE SCHEDULE ON THIS SHEET AND PROVIDE
ACCORDINGLY.
14. PROVIDE TESTING AND COMMISSIONING OF THE ENTIRE SYSTEM BY ENGAGING A FACTORY
AUTHORIZED PERSONNEL. PROVIDE FINAL REPORT TO THE VA AND ENGINEER FOR REVIEW.
GENERAL SCOPE OF WORK
1. CONTRACTOR TO REVIEW AND PROVIDE AN UPDATED PHASING PLAN PRIOR TO BEGINNING OF WORK FOR APPROVAL BY THE VA AND ENGINEER. PHASING SHALL PRIORITIZE MINIMAL DOWNTIME OF ACCESS CONTROL AND INTRUSION DETECTION SYSTEMS. NOTIFY THE VA TWO WEEKS IN ADVANCE OF EACH PHASE TASK. BELOW ARE THE RECOMMENDED PHASE TASK BREAKDOWN FOLLOWING THE EXISTING MICRO CONTROLLER (EMCR) LOCATIONS AND DOORS/ROOMS SERVICED. CONTRACTOR MAY FURTHER
BREAKDOWN THE PHASE TASKS TO FACILITATE INSTALLATION AND MINIMIZE DOWNTIME.
2. INSTALLATION OF ACM APPLIANCE AND SOFTWARE. CONFIRM SYSTEM IS LIVE AND OPERATIONAL PRIOR
TO DEMOLITION AND INSTALLATION WORK.
- EMCR 3 – TAYLOR PHARMACY
- EMCR 3 – TAYLOR ALL FLOORS
- EMCR 3 – OGDON ALL FLOORS
- EMCR 3 – ATRIUM
- EMCR 2 – DAMEN 1B – FIRST FLOOR
- EMCR 2 – DAMEN 1B – REMAINING FLOORS
- EMCR 4 – DAMEN 1A – FIRST FLOOR
- EMCR 4 – DAMEN 1A – REMAINING FLOORS
- EMCR 1 – BED TOWER – FIRST FLOOR
- EMCR 5 – BED TOWER – SECOND FLOOR
- ROOM 36T1 – BED TOWER – THIRD FLOOR
- EMCR 10 – BED TOWER FOURTH FLOOR
- EMCR 12 – BED TOWER FIFTH FLOOR
- EMCR 15 – BED TOWER SIXTH FLOOR
- EMCR 16 – BED TOWER SEVENTH FLOOR
- TEMP BLDG AND BUILDINGS 5, 6, 15, 18, 21, 26, AND 27
- PARKING GARAGE
RECOMMENDED PHASING OF WORK
JESSE BROWN VAMC MAIN CAMPUS ONLY
A. ALL ROOM NAMES AND NUMBERS TO BE VERIFIED PRIOR TO OFFICIAL IDENTIFICATION.
B. NAMING CONVENTION THAT INCLUDES LOWERCASE LETTERS FOLLOWING DOOR/ROOM TAGS ARE NOT PART OF THE OFFICIAL
IDENTIFICATION. LOWERCASE LETTERS FOLLOWING DOOR/ROOM TAGS ARE INCLUDED FOR IDENTIFICATION PURPOSES ON THIS
SET OF DRAWINGS ONLY.
C. LOCATIONS MARKED WITH 'YES' FOR 'EXISTING CARD READER' ARE TO HAVE THEIR CURRENT CARD READERS REPLACED WITH NEW. BACKBOXES AND CONDUIT AT THESE LOCATIONS ARE TO BE REUSED. REPLACE EXISTING WIRING WITH NEW.
D. 'DEDUCT ALTERNATE' TAG LOCATIONS HAVE THE POSSIBILITY OF ALREADY HAVING BEEN UPGRADED TO NEW DEVICES BY THE TIME THIS PROJECT IS EXPECTED TO BEGIN. DEVICES AT THESE LOCATIONS WILL NEED TO BE FIELD VERIFIED AND REPLACED IF THE DEVICES ARE INCOMPATIBLE WITH THE NEW ACCESS CONTROL SYSTEM BEING INSTALLED. IF THE DEVICES ARE COMPATIBLE
WITH THE NEW ACCESS CONTROL SYSTEM, NO REPLACEMENT WILL BE REQUIRED.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.aeworks.com
B
IM
/V J E
S -0
R e n o v a te E le c tr o n ic S e c u ri ty
S y s te m /J e s s e
B ro w n
V A
M e d ic a l C e n te r M a in
C a m p u s
M E
P
.r v t
/1 /2
:3
:2
P M
T000
GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
RENOVATE ELECTRONIC
SECURITY SYSTEM
820 S. Damen Ave. Chicago, IL 60612
537-19-125
12.21.2021 BK BF
ISSUED FOR BID AND
CONSTRUCTION
RH ROOF HATCH
RM ROOM
RN REMOVE AND REPLACE WITH NEW
RR REMOVE AND REPLACE
RS RAPID START
RV RELIEF VALVE
RWC RAIN WATER CONDUCTOR
S STAIR
SA SUPPLY AIR
SAN SANITARY SEWER ABOVE
GROUND
SAN-BXR SANITARY SEWER - BURIED
EXISTING TO REMAIN
SAN-XR SANITARY SEWER ABOVE
GROUND - EXISTING TO REMAIN
SCHED SCHEDULE
SD SMOKE DAMPER OR SMOKE
DETECTOR
SDISP SOAP DISPENSER
SF SQUARE FOOT
SHT SHEET
SHT MTL SHEET METAL
SHTG SHEATHING
SIM SIMILAR
SM SURFACE MOUNTED
SNC SANITARY NAPKIN CABINET
SND SANITARY NAPKIN DISPOSER
SP STANDPIPE OR STATIC PRESSURE
SPC SPECIMEN PASS-THRU CABINET
SPEC SPECIFICATIONS
SPS STATIC PRESSURE SENSOR
SR SERVICE RECEPTOR
ST PR STATIC PRESSURE
ST STL STAINLESS STEEL
STD STANDARD
STER STERILIZER
STL STEEL
STOR STORAGE
STR STRAINER
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
SYM SYMMETRICAL TOP
T TELECOMMUNICATIONS
TA THROWAWAY
TAN TANGENT
TC TELECOMMUNICATIONS
CONTRACTOR
TCV TEMPERATURE CONTROL VALVE
TDV TRIPLE DUTY VALVE
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TG TONGUE & GROOVE
TH THERMOMETER
THRES THRESHOLD
TR TEMPERATURE RISE
TRANS TRANSITION
TSTAT THERMOSTAT
TV TURNING VANES OR TELEVISION
TYP TYPICAL
XFMR TRANSFORMER
UC UNDER CABINET OR UNDER CUT
UFD UNDER FLOOR DUCT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER
SUPPLY
UTIL UTILITY
V VOLT
VAPD VA POLICE DEPARTMENT
VD VOLUME DAMPER
VENT VENTILATION
VERT VERTICAL
VFS VENTURI FLOW STATION
VIF VERIFY IN FIELD
VL VENT LINE
VP VANDAL PROOF
VR VAPOR RETARDER
VS VENT STACK
VTR VENT THROUGH ROOF
W WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WALL COVERING
WCL WATER CLOSET
WD WOOD
WF WIDE FLANGE
WFMD WATER FLOW MEASURING DEVICE
WG WALL GUARD OR WATER GAUGE
WHCH WHEEL CHAIR
WIN WINDOW
WMS WIRE MESH SCREEN
WP WEATHERPROOF
WPS WALL PROTECTION SYSTEM
WSCT WAINSCOT
WT WINDOW TREATMENT
WTD WATER TEMPERATURE DROP
WWF WELDED WIRE FABRIC
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LB POUND
LDB LEAVING DRY BULB
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LIN LINEAR
LOC LOCATION OR LOCATE
LPT LOW POINT
LSDC LINEAR SUPPLY DIFFUSER
CEILING
LT LIGHT
LTG LIGHTING
LV LOW VOLTAGE
LVR LOUVER
LWB LEAVING WET BULB
LWC LINEAR WOOD CEILING
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MAT MIXED AIR TEMPERATURE
MATL MATERIAL
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH ONE THOUSAND BTU / HOUR
MC MECHANICAL CONTRACTOR
MC METAL CLAD CABLE
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MED MEDICINE
MEMB MEMBRANE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MO MASONRY OPENING
MOD MOTOR OPERATED DAMPER
MONO MONOLITHIC
MTD MOUNTED
MTG HT MOUNTING HEIGHT
MTL METAL
MTLH METAL HALIDE
MTR MOTOR
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
N/A NOT APPLICABLE
NAC NETWORK APPLIANCE CABINET
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER ASSOCIATION
NL NIGHT LIGHT
NO NUMBER OR NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OPER OPERATED
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
PB PULL BOX
PC PLUMBING CONTRACTOR
PD PUMP DISCHARGE
PG PRESSURE GAUGE WITH COCK
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRD PRESSURE DIFFERENTIAL VALVE
PRELIM PRELIMINARY
PRT PRESSURE TAP
PRV PRESSURE REDUCING VALVE
PT PAINT OR POTENTIAL
TRANSFORMER
RO ROUGH OPENING
QT QUARRY TILE
R RECEPTION
RA RETURN AIR / RELIEF AIR
RB RUBBER BASE
RC REMOVE COMPLETELY
RD ROOF DRAIN
RE RELOCATE EXISTING
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFL REFLECTOR
REG REGISTER
REINF REINFORCING
REM REMOVE
REQD REQUIRED
RET RETURN
REV REVISE
REX REMOVE EXISTING
RF RESILIENT FLOOR
RFI REQUEST FOR INFORMATION
RGS RIGID GALVANIZED STEEL
CONDUIT
EF EXHAUST FAN
EIFS EXTERIOR INSULATION AND
FINISHING SYSTEM
EJ EXPANSION JOINT
EL ELEVATOR LOBBY
ELEC ELECTRICAL
ELEC CAB ELECTRICAL CABINET
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENTR ENTRANCE
EO ELECTRICAL OUTLET
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWB ENTERING WET BULB
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXHAUST AIR
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
XP EXPLOSION PROOF
F/S FIRE / SMOKE DAMPER
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FAT FINAL AIR TEMPERATURE
FATP FIRE ALARM TRANSPONDER
PANEL
FB FIRE BLANKET
FC FLEXIBLE CONNECTION OR
FOOTCANDLE
FD FLOOR DRAIN OR FIRE DAMPER
FDN FOUNDATION
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HOSE
FHC FIRE HOSE CABINET
FHP FULL HEIGHT PARTITION
FHV FIRE HOSE VALVE
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLA FULL LOAD AMPERES
FLASH FLASHING
FLEX FLEXIBLE
FLG FLANGE
FLG C FLANGE CONNECTION
FLR FLOOR
FLUOR FLUORESCENT
FP FIRE PROOFING
FRMG FRAMING
FS FLOOR SINK
FSTOP FIRESTOPPING
FT FOOT / FEET
FT HD FEET OF HEAD
FTC FOOTCANDLES
FTG FOOTING
FUR FURRING
G GAS OR ELECTRICAL GROUND
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERATOR
GENL GENERAL
GFCI GROUND FAULT CIRCUIT
INTERRUPTOR
GL GLASS
GLV GLOBE VALVE
GND GROUND
GPM GALLONS PER MINUTE
GR GRADE
GRAP GENERATOR REMOTE
ANNUNCIATOR PANEL
GRD BM GRADE BEAM
GV GATE VALVE
GWB GYPSUM BOARD
H HIGH
HB HOSE BIB
HC HEATING CONTRACTOR
HDCP HANDICAP
HDR HEADER
HDW HARDWARE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER
HPD HIGH PRESSURE DRIP
HPF HIGH POWER FACTOR
HR HANDRAIL
HSKP HOUSEKEEPING
HT HEIGHT
HTG HEATING
HTR HEATER
HV HIGH VELOCITY
HVAC HEATING, VENTILATING, AIR
CONDITIONING
HW HOT WATER
HWD HARD WOOD
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWS&R HOT WATER SUPPLY AND RETURN
HZ HERTZ
ID INSIDE DIAMETER
IER INVERTED ECCENTRIC REDUCER
IG ISOLATED GROUND
IME INSULATED METAL ENCLOSURE
IN INCH
INCAND INCANDESCENT
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INTERL INTERLOCK
INV INVERT
ISO ISOLATION
IVS ISOLATED VALVE STATION
J-BOX JUNCTION BOX
JST JOIST
JT JOINT
KO KNOCK OUT
kVA KILOVOLT AMPERE kVAR KILOVAR (REACTANCE) kW KILOWATT kWH KILOWATT HOUR METER
& AND
A AIR (CLINICAL)
AAP ALARM ANNUNCIATOR PANEL
AAV AUTOMATIC AIR VENT
AB ANCHOR BOLT
ABV ABOVE
ACC DR ACCESS DOOR
ACFL ACCESS FLOOR
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICAN DISABILITIES ACT
ADD ADDENDUM
ADDL ADDITIONAL
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AFMD AIR FLOW MEASURING DEVICE
AHU AIR HANDLING UNIT
AL ALIGN
ALT ALTERNATE
ALUM ALUMINUM
AMP AMPERE
AP ACCESS PANEL
APC ARCHITECTURAL PRECAST
CONCRETE
APPROX APPROXIMATE
ARAP ASYMMETRIC
ARCH ATS REMOTE ANNUNCIATOR
PANEL
ATC AUTOMATIC TEMPERATURE
CONTROL
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AWT AVERAGE WATER TEMPERATURE
BAT BATTERY
BC BALANCING COCK OR BARE
COPPER
BDD BACKDRAFT DAMPER
BFC BELOW FINISH CEILING
BFE BOTTOM FOOTING ELEVATION
BFG BELOW FINISHED GRADE
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT BORROWED LIGHT
BLW BELOW
BM BEAM
BO BY OWNER
BOF BY OWNER FUTURE
BOT BOTTOM
BRG BEARING
BRK BREAK
BRKR BREAKER
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
C CONDUIT
CAB CABINET
CANTL CANTILEVER
CAP CAPACITY
CATV CABLE TELEVISION
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CFH CUBIC FEET / HOUR
CFM CUBIC FEET / MINUTE
CH CHANNEL
CHK V CHECK VALVE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CHWS&R CHILLED WATER SUPPLY AND
RETURN
CJ CONTROL JOINT
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CL CENTERLINE
CLG CEILING
CLG MTD CEILING MOUNTED
CLR CLR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE / CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET OR CONTROL POWER
TRANSFORMER
CT CERAMIC TILE
CTR CENTER
CU COPPER
CV CONTROL VALVE
CW COLD WATER
D DEPTH OR DEEP
DB DRY BULB
dB DECIBEL
DCW DOMESTIC COLD WATER
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAILS
DF DRINKING FOUNTAIN
DHW DOMESTIC HOT WATER
DIA DIAMETER
DIAG DIAGONAL OR DIAGRAM
DIFF DIFFUSER
DIM DIMENSION
DISC DISCONNECT
DISCH DISCHARGE
DISP DISPENSER
DIST DISTRIBUTION
DIV DIVISION
DL DOWN LIGHT
DN DOWN
DP DISTRIBUTION PANEL
DPR DAMPER
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
DX DIRECT EXPANSION
E ELECTRICAL
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EDB ENTERING DRY BULB
ABBREVIATION LEGEND
ACCESS CONTROL SCHEDULE - JESSE BROWN - DEDUCT ALTERNATES
DOOR TAG
NEW DEVICES TO BE INSTALLED
EXISTING
CARD
READER COMMENTS
CARD READER W/
PIN DOOR CONTACT
ELECTRIC
STRIKE
REQUEST TO
EXIT
AUDIBLE &
REMOTE
ALARM
D1280a - 2 - - - -
D1299a 1 1 1 1 - -
D1302C 1 1 1 1 - -
D1510a 1 1 1 1 - -
D1640a 1 1 - - - -
D2492A 1 1 1 1 - -
D2505a 1 2 1 1 - - DOUBLE DOOR
D2505b 1 1 1 1 - -
DC2501 2 4 2 - - YES TWO SETS OF
DOUBLE DOORS
D3227a 1 2 1 1 1 YES DOUBLE DOOR
D3229a 1 2 1 1 1 YES DOUBLE DOOR
DC4304 1 1 1 1 - -
D6256 1 1 1 1 - -
D6259 1 1 1 1 - -
D6261 1 1 1 1 - -
D6283 1 1 1 1 - -
D6285 1 1 1 1 - -
D7211a 1 1 1 1 - -
D7215 1 1 1 1 - -
D7221 1 1 1 1 - -
D7225 1 1 1 1 - -
D7467b 1 2 1 1 1 - DOUBLE DOOR
NOTES:
1. LABEL SHALL BE DISPLAYED ON ALL SWITCHBOARDS,
PANELBOARDS, TRANSFER SWITCHES AND PULLBOXES
(MULTIPLE VOLTAGES)
2. NAMEPLATE SHALL BE WHITE LETTERING ON BLACK MICARTA
3. IF ONLY ONE VOLTAGE IS PRESENT, LABEL SHALL INDICATE
ONLY THAT RESPECTIVE VOLTAGE
2" H
IG
H
4" WIDE
VOLTAGE
208Y / 120V
PHASE A BLACK
PHASE B RED
PHASE C BLUE
NEUTRAL WHITE
VOLTAGE
480Y / 277V
PHASE A BROWN
PHASE B ORANGE
PHASE C YELLOW
NEUTRAL GRAY
3 1A
A
SECTION A-A
FLOOR OR WALL ASSEMBLY -- MIN 4-1/2 IN. THICK REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT (100-150 PCF) CONCRETE. WALL MAY ALSO BE CONSTRUCTED OF ANY UL CLASSIFIED CONCRETE BLOCKS *. MAX DIAM OF OPENING IS 12 IN. SEE CONCRETE BLOCKS (CAZT) CATEGORY IN THE FIRE RESISTANCE DIRECTORY FOR NAMES OF
MANUFACTURERS.
THROUGH PENETRANTS -- ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED WITHIN THE FIRESTOP SYSTEM. PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.
THE ANNULAR SPACE SHALL BE 0 IN. (POINT CONTACT) TO MAX 1-1/4 IN. THE FOLLOWING TYPES AND SIZES OF
METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:
A. STEEL PIPE -- NOM 10 IN. DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.
B. IRON PIPE -- NOM 10 IN. DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.
C. CONDUIT -- NOM 4 IN. DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR STEEL CONDUIT.
D. COPPER TUBING -- NOM 4 IN. DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING.
E. COPPER PIPE -- NOM 4 IN. DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.
PACKING MATERIAL -- MIN 3 IN. THICKNESS OF MIN 4 PCF MINERAL WOOL BATT INSULATION FOR NOM 4 IN. DIAM (AND SMALLER) PIPES, CONDUITS OR TUBINGS AND A MIN 4 IN. THICKNESS OF MIN 4 PCF MINERAL WOOL BATT INSULATION FOR PIPE GREATER THAN NOM 4 IN. DIAM, FIRMLY PACKED INTO OPENING AS A PERMANENT FORM.
PACKING MATERIAL TO BE RECESSED FROM TOP SURFACE OF FLOOR OR FROM BOTH SURFACES OF WALL AS
REQUIRED TO ACCOMMODATE THE REQUIRED THICKNESS OF FILL MATERIAL.
FILL, VOID OR CAVITY MATERIAL* -- SEALANT -- MIN 1/2 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH WITH THE TOP SURFACE OF FLOOR OR BOTH SURFACES OF WALL. AT THE POINT OF CONTACT LOCATION BETWEEN PIPE AND CONCRETE, A MIN 1/2 IN. DIAM. BEAD OF FILL MATERIAL SHALL BE APPLIED AT THE CONCRETE/PIPE INTERFACE ON THE TOP SURFACE OF FLOOR AND ON BOTH SURFACES OF WALL. W RATING
APPLIES ONLY WHEN CP601S OR CP604 SEALANT IS USED.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC -- CP601S, CP604, CP606 OR FS-ONE SEALANT
*BEARING THE UL CLASSIFICATION MARK
3 3
2 1B
1A
D
D
SECTION D-D
WALL ASSEMBLY -- THE 1 OR 2 HR FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES WALL AND PARTITION DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION FEATURES:
A. STUDS -- WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. LUMBER SPACED 16 IN. OC. STEEL STUDS TO BE MIN 2-1/2 IN. WIDE AND SPACED MAX 24 IN. OC. WHEN STEEL STUDS ARE USED AND THE DIAM OF OPENING EXCEEDS THE WIDTH OF STUD CAVITY, THE OPENING SHALL BE FRAMED ON ALL SIDES USING LENGTHS OF STEEL STUD INSTALLED BETWEEN
THE VERTICAL STUDS AND SCREW-ATTACHED TO THE STEEL STUDS AT EACH END. THE FRAMED OPENING IN THE WALL SHALL BE 4 TO 6 IN. WIDER AND 4 TO 6 IN. HIGHER THAN THE DIAM OF THE PENETRATING ITEM SUCH THAT, WHEN THE PENETRATING ITEM IS INSTALLED IN THE OPENING, A 2 TO 3 IN. CLEARANCE IS PRESENT BETWEEN THE
PENETRATING ITEM AND THE FRAMING ON ALL FOUR SIDES.
B. GYPSUM BOARD* -- 5/8 IN. THICK, 4 FT WIDE WITH SQUARE OR TAPERED EDGES. THE GYPSUM BOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE
INDIVIDUAL U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX DIAM OF OPENING IS 32-1/4 IN.
FOR STEEL STUD WALLS. MAX DIAM OF OPENING IS 14-1/2 IN. FOR WOOD STUD WALLS.
THE F RATING OF THE FIRESTOP SYSTEM IS EQUAL TO THE FIRE RATING OF THE WALL ASSEMBLY.
THROUGH-PENETRANTS -- ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED EITHER CONCENTRICALLY OR ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE SHALL BE MIN 0 IN. TO MAX 2-1/4 IN. PIPE MAY BE INSTALLED WITH CONTINUOUS POINT CONTACT. PIPE, CONDUIT OR TUBING MAY BE INSTALLED AT AN ANGLE NOT GREATER THAN 45 DEGREES FROM PERPENDICULAR. PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:
A. STEEL PIPE -- NOM 30 IN DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.
B. IRON PIPE -- NOM 30 IN. DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.
C. CONDUIT -- NOM 4 IN DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR 6 IN. DIAM STEEL CONDUIT.
D. COPPER TUBING -- NOM 6 IN. DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING.
E. COPPER PIPE -- NOM 6 IN. DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.
FILL, VOID OR CAVITY MATERIAL* -- SEALANT -- MIN 5/8 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH WITH BOTH SURFACES OF WALL. AT THE POINT OR CONTINUOUS CONTACT LOCATIONS BETWEEN PIPE AND WALL, A MIN 1/2 IN. DIAM BEAD OF FILL MATERIAL SHALL BE APPLIED AT THE PIPE WALL INTERFACE ON BOTH
SURFACES OF WALL .
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC -- FS-ONE SEALANT
*BEARING THE UL CLASSIFICATION MARK
NYLON BUSHING
1 1/4" EMT CONDUIT
SUSPENDED CEILING
1 1/4" EMT CONDUIT
EMT COMPRESSION FITTING
4" x 4" x 2.25"
JUNCTION BOX
MUD RING
COVER PLATE
TYP. "8P8C" JACKS
8" M
IN
A .F
.F . O
R A
S N
O T
E D
WALL SLEEVE
SEAL ALL PENETRATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.aeworks.com
B
IM
/V J E
S -0
R e n o v a te E le c tr o n ic S e c u ri ty
S y s te m /J e s s e
B ro w n
V A
M e d ic a l C e n te r M a in
C a m p u s
M E
P
.r v t
/1 /2
:3
:3
P M
T001
GENERAL NOTES AND DETAILS RENOVATE ELECTRONIC
SECURITY SYSTEM
820 S. Damen Ave. Chicago, IL 60612
537-19-125
12.21.2021 BK BF
ISSUED FOR BID AND
CONSTRUCTION
NOT TO SCALE
BRANCH WIRING IDENTIFICATION
NOT TO SCALE
CONDUIT THROUGH CONCRETE WALL - FLOOR ASSEMBLY
NOT TO SCALE
CONDUIT THROUGH FIRE RATED DRYWALL PARTITION
NOT TO SCALE
ROUGH-IN DETAIL
NOT TO SCALE
WALL SLEEVE
DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT
PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO SPECIFIC VAMC
POLICIES OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.
A. EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF
FEASIBLE SEAL OFF ADJACENT AIR INTAKES.
• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND REPLACE AS
NEEDED TO AVOID BUILDUP OF PARTICULATE.
• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN
STAIRWELLS AND CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.
B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
DUST AND DEBRIS CONTROL
• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT DURATION PROJECTS GENERATING MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-RATED BARRIER WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING. SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR CONTAINMENT. LARGE DUST PROJECTS NEED AN ENTRY VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. CONTRACTOR PERSONNEL SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY PRESENCE
OF INSECTS AND FLIES, WET CEILING TILE, ETC.
• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHOULD BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHOULD DIRECT PEDESTRIAN
TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITH PRIOR APPROVAL OF THE VAMC.
• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION
DEBRIS.
• CEILINGS THAT ARE REMOVED/MOIFIED TO ALLOW CONSTRUCITON OF ICRA BARRIERS SHOULD BE REINSTALLED TO
PRE-CONSTRUCTION CONDITIONS.
VENTILATION AND ENVIRONMENTAL CONTROLS
• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR;
FILTERS SHOULD BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST
FLOW FROM CLEAN TO DIRTY AREAS.
• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST MUST BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHOULD BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED DAILY.
• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON PROVIDING FOR THE
ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE THROUGHOUT THE PROJECT.
• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE OF THE
PARTITION.
CONTAMINATION OF PATIENT ROOMS
• WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORK (E.G. COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHOULD BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA). ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
• CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS AND SWEPT OR HEPA-VACUUMED DAILY FOR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED.
WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING OF HEAVY DIRT AND
DUST FROM CONSTRUCTION AREAS.
NOTES:
1. ENSURE RENOVATED AREA IS COMPLETELY SEALED OFF FROM SURROUNDING AREAS.
2. MAINTAIN MEANS OF EGRESS AT STAIR TOWERS DURING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .