36C25222B0016 0005.docx

DOCX document 34 KB Posted

Attached to
Z1DA--537-19-125 Renovate Electronic Security System (VA-22-00034826)
Solicitation number
36C25222B0016
Issued by

About this file

This document is an amendment to a federal solicitation for renovating an electronic security system at a VA medical center. The amendment extends the bid due date to April 27, 2022 at 11:00am and the virtual public bid opening to the same date at 12:00pm. It provides responses to questions from bidders to clarify project scope details such as staffing requirements, working hours, and the number of doors requiring new electric strikes. The amendment also updates drawing T002 and confirms bid bond, performance bond, and payment bond requirements apply. The related federal contract opportunity is for renovating the electronic security system under solicitation number 36C25222B0016 with the Department of Veterans Affairs as the agency.

View the file

Other files

File Type Posted
S06 - T002 - GENERAL RISER DIAGRAM AND DETAILS-revised.pdf PDF
36C25222B0016 0004.docx DOCX document
36C25222B0016 0003_1.docx DOCX document
36C25222B0016 0003.docx DOCX document
36C25222B0016 0002.docx DOCX document
S06 - 281300 - Physical Access Control System.pdf PDF
36C25222B0016 0001.docx DOCX document
S06 - Wage Determination_537-19-125_2.25.2022.pdf PDF
S04 - Site Visit Sign-in Sheet_537-19-125.pdf PDF
S02 - 02b1_537-19-125 - SOW Ex - Campus Floor Plan 1 of 2.pdf PDF
S02 - 02c4_537-19-125 - SOW Att - Preliminary Project Risk Assessment.pdf PDF
36C25222B0016_1.docx DOCX document
Copy of S02 - 02c3_537-19-125 - SOW Att - Subcontractor Payment Summary.xlsx XLSX spreadsheet
S02 - 02a2_537-19-125 - SOW CD - Specifications IFC 12212021_.pdf PDF
S02 - 02c2_537-19-125 - SOW Att - Contractor Production Report.pdf PDF
S02 - 02c1_537-19-125 - SOW Att - Contract Progress Report.pdf PDF
S02 - Wage Determination_537-19-125.pdf PDF
Copy of S02 - 02c5_537-19-125 - SOW Att - Construction Project Tracker_CO.xlsx XLSX spreadsheet
S02 - 02a1_537-19-125 - SOW CD - Construction Plans IFC 12212021.pdf PDF
S02 - 02b1_537-19-125 - SOW Ex - Campus Floor Plan 2 of 2_.pdf PDF
S02 - 02b2_537-19-125 - SOW Ex - Asbestos Survey Report.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 537-22-3-6935-0013 537-19-125 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) Attn: Stacy Hoover 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25222B0016 04-14-2022

X X X April 27, 2022 at 11:00am Local Time

SEE CONTINUATION PAGE FOR DETAILS.

CONTINUE TO MONITOR CONTRACT OPPORTUNITIES AT SAM.GOV FOR ANY AND

ALL CHANGES TO THIS SOLICITATION.

STACY HOOVER

CONTRACTING OFFICER

RENOVATE ELECTRONIC SECURITY SYSTEM PROJECT#537-19-125

JESSE BROWN VA MEDICAL CENTER, CHICAGO, IL

I. The following changes are to be made to the solicitation:

a. Provide VA responses to RFI’s received to date.

b. Provide updated drawing T002 – GENERAL RISER DIAGRAM AND DETAILS

c. Bid Due date/time is hereby extended to April 27, 2022, at 11:00am Local Time. Virtual Public Bid Opening date is hereby extended to April 27, 2022, at 12:00pm (Noon) Local Time. See details below under General Information.

II. The following changes are made on project specifications:

N/A III. The following changes are made on project drawings:

T002 – GENERAL RISER DIAGRAM AND DETAILS

Reflects the change from LP 1502 to LP 4502

IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information:

Q22: 01 00 00 – 3 C. Guards: Will a onsite security guard be required for this project per the specifications?

A22: Guards will not be required.

Q23: It is unclear how many field staff will be required for this project? Per the spec it appears that the CQC can be the super but the SSHO must be independent. Can you confirm who will be required on site while work is being performed?

A23: If Per Spec 1.6 C. is advised by the VA Construction Safety Representative, then:

* Site Safety and Health Officer (SSHO) and

* Superintendent and/or

* Quality Control Manager Per Spec 1.7 (A-C) Prime Contractor

* Designate a minum of one SSHO (or an equally-qualified Designated Representative/alternate) at each project site.

- Will administer the Contractor's safety program and government-accepted Accident Prevention Plan.

- Maintain a presence on the site during construction operations Subcontractor

* Each subcontractor shall esignate a minimum of one Competent Person (CP)

- Administer their individual safety program

- Can have collateral duties as subcontractor's superintendent and/or work crew lead person as well as fill more than one specialized CP role.

- Maintain presence during their construction activities

Q24: Please confirm the normal working hours for this project will be 6:AM to 4:PM rather than a night job? This will make it very difficult to work in areas that have heavy foot traffic.

A24: Per SOW Part 6: 2 (a)

Q25: Can our field staff run two concurrent projects in the same building with similar scope or will two superintendents, CQC’s and SSHO’s be required?

A25: Two superintendents are required.

Q26: The previous job that had bid at Jesse Brown for security upgrades had several hundred doors that were being replaced with new hardware. We are assuming those doors will not need electric strikes since they will be new and ready for connection. The balance of the doors it is assumed, will need electric strikes. We need to know exactly how many additional doors will need electric strikes. It appears that there is only 1 new mag lock required and 3 new doors. Is it possible to include a door schedule for this project?

A26: For the purposes of this bid, assume that new electric strikes are required at all doors identified on this project. Bidders are to perform the required field verification to get additional details on the 3 new doors. New doors are to match existing.

Q27: Is there any fire alarm scope required as part of this bid? Will addressable fire alarm relays be required at all the card access control panels?

A27: Yes. Refer to general plan notes #3 and #4 for location, type and operation requirements.

Q28: Please advise how many locations require fire alarm mag holders or hardware?

A28: The existing fire alarm mag holders are to remain and be reused.

Q29: Conduit raceways for the Access Control and other security wire will be provided and installed by others?

A29: No. The awarded contractor is to provide all raceways and wiring required for the installation of all systems under this project.

Q30: Electronic locking hardware for all card reader doors will be provided and installed by others?

A30: No. All components required for a fully functional system is to be provided by the awarded contractor.

Q31: While we await the forthcoming amendment we would like to submit an item for clarification as it is a costly feature which is only briefly identified in the specifications Section 28 13 00 Paragraph 1.8.E:

E. PACS shall provide Credential Validation and Path Validation per NIST 800-116.

This requirement provides for the system to “reach out” to the government PIV database for user credentials and revoked PIV cards. The basis is that the access control management system will communicate with the government database via the internet to update PIV status at least every 18 hours. In order to perform this action there are a few things required for hardware and software further than described in the project documents. It is our understanding the access control system is stand-alone and will not be connected to the VA Network or internet. To achieve the requirements identified in 1.8.E we will require the PIV Credential Management Server to be on the internet to communicate with the government database. This does not require the entire system to be online, just the server supporting credentialing.

Is it the intent of the government to connect to an external database for PIV Authentication? If yes, what is the means of connecting to the internet? VA Network, stand-alone ISP connection?

A31: The access control system will be connected to the Federal Bridge. Federal bridge will not need to be reached out to at this time, but we will want to be prepared in case it is required with future releases of FIPS 201. The hardware required for the credential and path validation is to be provided under this project per VA Physical Security and Resiliency Design Manual and applicable policies are listed on page 10-14. The software or certificate is not required at this time.

Q32: Are there any Bid Bond and/or Performance Bond requirements for the project?

A32: Yes. Bid Bond is required; see SF1442 Page 1, block 13b. Yes, Performance and Payment Bonds are required; see SF1442 page 1, block 12a. Also see Solicitation page 8, INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS (b), (c) and (d); Solicitation page 22, 52.228-1 BID GUARANTEE; Solicitation page 49, 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS and 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION; Solicitation page 56, VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSED IN OBTAINING BONDS.

Q33: Are there any Liquidated Damages on the project?

A33: No, Liquidated Damages are not included.

V. General Information:

1. REMINDER: VAAR 852.219-77 VA Notice of Limitations on Subcontracting – Certificate of Compliance for Services and Construction is included in this solicitation (see SF1442 pages 53-55); signed certification must accompany bid to be considered for award.

2. NOTE: CHANGE TO VIRTUAL BID OPENING INFORMATION:

a. There will be no in-person public bid opening process; this will be conducted as a public, virtual activity.

b. The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number:

1.) Click here to join the meeting

2.) Meeting Call-in Number: 1-872-701-0185

3.) Phone Conference ID: 364 446 826#

4.) Meeting will be available to be accessed 15 min prior to bid opening.

c. IAW FAR 52.214-5 Submission of Bids and 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Stacy.Hoover2@va.gov AND Contract Specialist, Steven Helm, at Steven.Helm@va.gov on or before the date and time specified for receipt of bids. A hard copy submission is not required. Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999).

Vendor bids are due via email as shown above at 11:00 AM local time on April 27, 2022.

The virtual public bid opening will be held at 12:00 PM (Noon) local time on April 27, 2022, at the link and/or the phone # provided above.

d. Ensure your complete bid including bid bond are provided in your submission. The successful low bidder is required to furnish their original bid bond within five (5) days after notification by the Contracting Officer.

e. It is highly recommended that Bidders allow enough time in submitting their bid to avoid any transmission issues.

3. UPDATED DRAWING T002 – GENERAL RISER DIAGRAM AND DETAILS ATTACHED.

SOLICITATION 36C25222B0016 AMENDMENT 0005

See attached document: S06 - T002 - GENERAL RISER DIAGRAM AND DETAILS-revised.

ACCOMPANYING 36C25222B0016 0005

File details come from the government source that posted it. Updated .