s0100 Check Points.pdf

PDF 52 KB Posted

Attached to
1305M223QNMAN0129 - NOAA's Ship Oregon II Drydock FY 2024
Solicitation number
1305M223QNMAN0129
Issued by

About this file

This document outlines standard specifications for conducting check points on federal contracts. The specifications require contractors to notify the designated NOAA representative at least four hours, but no more than one day, before commencing any work following a check point. For subcontractors located more than 50 miles away, notification must be provided 48 to 72 hours in advance. The contractor's designated point of contact must be present at all check point operations, tests, or inspections. Partial check points are allowed when work cannot be fully completed, and the results of all check points and tests must be submitted to NOAA and the Ship's Repair Officer within 24 hours in legible duplicate copies. Contractors must also submit lists of authorized representatives qualified to witness or perform various check point types and tests.

The related federal contract opportunity is a solicitation for drydocking services for NOAA's Ship Oregon II in fiscal year 2024. The solicitation package includes a statement of work, past performance evaluation forms, additional drawings and references, and a pricing schedule. The soliciting agency is the Department of Commerce's National Oceanic and Atmospheric Administration.

View the file

Other files

File Type Posted
ATTACHMENT D5 Pricing Schedule O2 DD FY24_Updated.xlsx XLSX spreadsheet
Amendment_0002_1305M223QNMAN0129_Signed.pdf PDF
MRG Pic_2.jpg JPG image
R2_NONE_OT-S22-0-2-1_RevNONE_Sht1 OF 1_N_A_OT-S22-0-2-1.pdf PDF
AMC-581-1A-Inspection and Preservation of Ground Tackle (4 sheets).pdf PDF
R2-S92-0-3 Rev K 1989 Ships Service Switch Gear Wiring Diagram_Update.PDF PDF
FY23 Oregon II Life Raft-Immersion Suit _ Life Jacket Inspection Reports.pdf PDF
Oregon II MRG List of Materials_Update.pdf PDF
MRG Pic_1.jpg JPG image
Cooper_Bearing_Manual_2_Update.jpg JPG image
Cooper_Bearing_Manual_1_Update.jpg JPG image
MRG Pic_3.jpg JPG image
Amendment_0001_1305M223QNMAN0129_Signed.pdf PDF
Oregon II MRG List of Materials.pdf PDF
Oregon II Hydraulic Hose List (2)_Update.xlsx XLSX spreadsheet
OT-S48-1-1 (2)_Update.pdf PDF
FY23 Oregon II Register of Lifting Appliance_Update.pdf PDF
R2_NONE_OT-S17-1-3-1_RevNONE_Sht1 OF 1_N_A_OT-S17-1-3-1 (2)_Update.pdf PDF
OT-S48-3-3 Firemain and Sea Service System_Update.pdf PDF
AMC-300-1_Overhaul_of_Electrical_Rotating_Machinery_(10_pages) (1) (2).pdf PDF
0606- Standards for Lifting Appliances on NOAA Ships.doc DOC document
OT-S43-1-1.pdf PDF
FY21 Oregon II Annual Fire Inspection Report.pdf PDF
OT-S11-1-1(P) (1).pdf PDF
ATTACHMENT D2 Past Performance Information Form.docx DOCX document
OT-S11-1-1.pdf PDF
OT-S11-6-1 (1).pdf PDF
R2_NONE_S41-5-5_RevNONE_Sht6_N_OT-S41-5-5-6 (1).pdf PDF
OT-S3801-101 (1).pdf PDF
OT-S48-3-3 Firemain and Sea Service System.pdf PDF
OT-S41-5-5.pdf PDF
ATTACHMENT D6 Accounting System Questionnaire .pdf PDF
NOAA Standard Specification S2906 Arc Welding on Waterborne Vessels _ June 1982.pdf PDF
OT-S3801-12.pdf PDF
OT-S45-1-2 (2).pdf PDF
FY23 Oregon II Register of Lifting Appliances.pdf PDF
Engineering Report ER20200324_NO2 UPS Review.pdf PDF
R2_NONE_S38-1-14_RevNONE_Sht4_N_OT-S38-1-14-4.pdf PDF
OT-S11-0-1-1 (1).pdf PDF
MOC-573-2 Overhaul Repair of Hyd Cyls.pdf PDF
OT-S3801-11.pdf PDF
R2_NONE_S38-1-14_RevNONE_Sht5_N_OT-S38-1-14-5.pdf PDF
OR-S62-0-10 Elect One Line (MRP 1998) with Galley Update.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
OR-S21-0-4 sheet 2 of 8.pdf PDF
ATTACHMENT D1 NOAA Ship Oregon II FY 2024 Drydock Specs.pdf PDF
s1205 Zinc Protectors.pdf PDF
OR-S21-0-4 sheet 5 of 8.pdf PDF
ATTACHMENT D5 Pricing Schedule O2 DD FY24.xlsx XLSX spreadsheet
AMC-000-1G General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised August, 1994

NOAA Standard Specification - S0100

IMPLEMENTATION AND CONDUCT OF CHECK POINTS

1. CHECK POINT is a phrase inserted in a work item to establish a point in the sequence of accomplishment of work at which time the NOAA designated representative shall be notified to permit observation of a specific operation, test or inspection by the Government.

1.1 A contractor designated point of contact shall be present at operations, tests or inspections specified as CHECK POINTs.

2. Notify the NOAA designated representative and the Ship's Repair Officer at least four hours, but not more than one working day, prior to commencing the specific requirements in the paragraph following a CHECK POINT. Notify the NOAA representative in writing at least 48 hours, but not more than 72 hours, for subcontractors whose plants are located outside a 50 mile radius from the NOAA representatives work sit. Document the date, time and identification of the NOAA representative notified.

2.1 When more than one unit, operation, test or inspection is involved, the CHECK POINT requirement applies to each.

2.2 When operations, tests or inspections follow a CHECK POINT are to be performed after normal day shift working hours, on a weekend, or a Federal holiday, the NOAA representative shall be notified at least four hours before the end of the last preceding normal day shift.

3. In the event the NOAA representative is not present at the scheduled CHECK POINT, the contractor is to proceed, provided the required advance notice has been furnished to the NOAA representative and the contractor has completed and documented his preceding tests and operations.

4. In the event that work cannot be completed to a CHECK POINT for any reason (such as late delivery of material or interfacing of related work items), and work progress would be delayed in waiting for total completion of work to the CHECK POINT, the NOAA representative, upon notification, may conduct a partial inspection of the work or item. Notify the NOAA representative when the incomplete work or item is completed and ready for the remainder of the operation, test or inspection. Partial CHECK POINTs shall be documented as in Paragraph 2.

5. CHECK POINT requirements for operations, tests or inspections involving a subcontractor shall be invoked by the contractor's purchase order or otherwise described such that the requirements of Paragraph 2 are met.

Implementation and Conduct of Check Points S0100

5.1 A designated representative of the contractor shall

witness or perform and sign for all tests and inspections within a 50 mile radius of the contractor's facility.

5.2 The contractor may delegate responsibility to

subcontractors only for specific operations, tests or inspections performed at facilities located outside a 50 mile radius of the contractor's facility; however, CHECK POINT notification requirements shall not be delegated.

5.3 Submit one legible copy of the technical specification

portion of those purchase orders which involve CHECK POINTs to the NOAA representative prior to the commencement of work by the subcontractor.

6. Submit a list, for NOAA reference, designating the contractor's authorized representatives who witness, perform, present and sign for CHECK POINTs, inspections and tests. The list shall indicate the type of tests, inspections or CHECK POINTs for which each representative is qualified.

7. Provide two legible copies of the check point inspection and/or test results. One copy shall be submitted to the NOAA representative and one to the Ship's Repair Officer within 24 hours of CHECK POINT completion. Reports shall identify the test / inspection conducted, acc/rej criteria and the contractor's authorized representative.

File details come from the government source that posted it. Updated .