NOAA Standard Specification S2906 Arc Welding on Waterborne Vessels _ June 1982.pdf

PDF 146 KB Posted

Attached to
1305M223QNMAN0129 - NOAA's Ship Oregon II Drydock FY 2024
Solicitation number
1305M223QNMAN0129
Issued by

About this file

This document provides standard specifications for arc welding on waterborne vessels for the National Oceanic and Atmospheric Administration. The specifications outline proper installation of welding equipment to prevent damage to vessel hulls, shafts, and propellers from current leakage into water. Welding generators must be installed so that ground leads are connected only to the vessel being welded. Insulated positive and negative leads are required, and no cables can be submerged or connected between vessels. Welding is permitted on one vessel at a time per generator to avoid current flowing between vessels or into water. All welding setups must be approved by the Contracting Officer, and fire safety precautions are outlined.

View the file

Other files

File Type Posted
ATTACHMENT D5 Pricing Schedule O2 DD FY24_Updated.xlsx XLSX spreadsheet
Amendment_0002_1305M223QNMAN0129_Signed.pdf PDF
MRG Pic_2.jpg JPG image
R2_NONE_OT-S22-0-2-1_RevNONE_Sht1 OF 1_N_A_OT-S22-0-2-1.pdf PDF
AMC-581-1A-Inspection and Preservation of Ground Tackle (4 sheets).pdf PDF
R2-S92-0-3 Rev K 1989 Ships Service Switch Gear Wiring Diagram_Update.PDF PDF
FY23 Oregon II Life Raft-Immersion Suit _ Life Jacket Inspection Reports.pdf PDF
Oregon II MRG List of Materials_Update.pdf PDF
MRG Pic_1.jpg JPG image
Cooper_Bearing_Manual_2_Update.jpg JPG image
Cooper_Bearing_Manual_1_Update.jpg JPG image
MRG Pic_3.jpg JPG image
Amendment_0001_1305M223QNMAN0129_Signed.pdf PDF
Oregon II MRG List of Materials.pdf PDF
Oregon II Hydraulic Hose List (2)_Update.xlsx XLSX spreadsheet
OT-S48-1-1 (2)_Update.pdf PDF
FY23 Oregon II Register of Lifting Appliance_Update.pdf PDF
R2_NONE_OT-S17-1-3-1_RevNONE_Sht1 OF 1_N_A_OT-S17-1-3-1 (2)_Update.pdf PDF
OT-S48-3-3 Firemain and Sea Service System_Update.pdf PDF
AMC-300-1_Overhaul_of_Electrical_Rotating_Machinery_(10_pages) (1) (2).pdf PDF
0606- Standards for Lifting Appliances on NOAA Ships.doc DOC document
OT-S43-1-1.pdf PDF
FY21 Oregon II Annual Fire Inspection Report.pdf PDF
OT-S11-1-1(P) (1).pdf PDF
ATTACHMENT D2 Past Performance Information Form.docx DOCX document
OT-S11-1-1.pdf PDF
OT-S11-6-1 (1).pdf PDF
R2_NONE_S41-5-5_RevNONE_Sht6_N_OT-S41-5-5-6 (1).pdf PDF
OT-S3801-101 (1).pdf PDF
OT-S48-3-3 Firemain and Sea Service System.pdf PDF
OT-S41-5-5.pdf PDF
ATTACHMENT D6 Accounting System Questionnaire .pdf PDF
OT-S3801-12.pdf PDF
OT-S45-1-2 (2).pdf PDF
FY23 Oregon II Register of Lifting Appliances.pdf PDF
Engineering Report ER20200324_NO2 UPS Review.pdf PDF
R2_NONE_S38-1-14_RevNONE_Sht4_N_OT-S38-1-14-4.pdf PDF
OT-S11-0-1-1 (1).pdf PDF
MOC-573-2 Overhaul Repair of Hyd Cyls.pdf PDF
OT-S3801-11.pdf PDF
R2_NONE_S38-1-14_RevNONE_Sht5_N_OT-S38-1-14-5.pdf PDF
OR-S62-0-10 Elect One Line (MRP 1998) with Galley Update.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
OR-S21-0-4 sheet 2 of 8.pdf PDF
ATTACHMENT D1 NOAA Ship Oregon II FY 2024 Drydock Specs.pdf PDF
s1205 Zinc Protectors.pdf PDF
OR-S21-0-4 sheet 5 of 8.pdf PDF
ATTACHMENT D5 Pricing Schedule O2 DD FY24.xlsx XLSX spreadsheet
AMC-000-1G General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
R2_NONE_S11-0-3_RevNONE_Sht1_N_OT-S11-0-3-1 (2) (2).pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 1982 (6/95)

NOAA Standard Specification S2906

ARC WELDING ON WATERBORNE VESSELS

1. PURPOSE

The purpose of this directive is to set out rules that shall be followed in regard to the proper use of arc welding equipment when welding on waterborne vessels in order to reduce damage to the underwater body, shafting and propeller by pitting and deterioration.

2. SCOPE

The continued occurrence of serious pitting of underwater hulls of various vessels makes necessary the strict adherence to the requirements contained herein. The procedures in grounding welding leading leads should be closely followed to avoid damage to underwater hulls and appurtenances.

3. INSTRUCTIONS

A. Welding motor-generator sets or rectifiers shall be so installed that the welding and ground leads from shore to ship or from ship to ship shall be connected only to the vessel on which welding is to be done. The welding lead as well as the ground lead shall be thoroughly insulated and at no time shall be allowed to become submerged in the intervening water. Welding shall be done on but one ship from one source of welding current.

The ground lead shall not be electrically connected to any object ashore or to any other vessel except the one which welding is being done. The ground cables should have an area of at least one million CM per 1000 amperes of welding current and be secured by metal to metal contact to an integral part of the vessel on which the welding is done.

B. Figures 1, 2 and 3 (See Enclosure 1) illustrate CORRECT methods for installing welding generators. In all of these cases, it should be noted that the only ground in the circuit is to the ship where welding is being done so there is no possibility of current flowing from the ship's hull into the water. It is entirely safe to place the welding generator on the pier, or have it installed permanently on a repair ship, provided both positive and negative welding cables to the ship are well insulated from ground and all other grounded structures, and that no welding cables are returned from the vessel to shore or adjacent vessels for welding in either location. Figures 4, 5, 6 and 7 illustrate INCORRECT methods for installing welding generators. Figures 4 and 5 illustrate the condition when a welding generator, placed on a vessel and with the negative cable grounded to that vessel, is used to weld on another vessel. This situation often occurs when a welding generator on a repair ship is used to weld another ship. Obviously the way to correct this situation is to insulate the negative cable of the generator from

Arc Welding on Waterborne Vessels S2906

Ship A and run both positive and negative leads to the ship where the welding is being done, as illustrated in Figure 1. Figure 6 illustrates the condition when the negative side of the generator is grounded at the pier. This might occur if the negative leads are connected to crane tracks, pipe lines, or submerged or buried structures, or if the negative cables are immersed in water at some points. If the positive side of the generator becomes grounded to the vessel, of course the situation would be considerably worse since the entire generator voltage would cause a continuous short circuit to flow from the positive cable to the ship's hull. Figure 7 illustrates conditions when one generator is used to weld on two ships. There seems to be a general impression that if two ships are connected with a cable of reasonable size, say 1,000,000 CM and 100' long, all of the current used on Ship B will return to the generator through the cable. The resistance of the cable is of the same order as the resistance through the water so part of the current flow from Ship B through the water to Ship A, corroding the hull of Ship B.

Measurements show that the resistance of the water path between two vessels alongside each other is about 0.01 ohms. The resistance of the cable would be about 0.001 ohms, hence about one-tenth of the welding current used on Ship B would flow through the water.

4. ACTION REQUIREMENTS

No welding shall be done on a water-borne ship until the hook-up of welding equipment has been examined and approved by the Contracting Officer.

5. SAFETY

No welding or burning shall be undertaken without the presence of a fire watch. All equipment in way of welding or burning shall be covered with a fire proof covering supplied by the Contractor.

Adequate precautions shall be taken by the Contractor before welding or burning to insure that contiguous compartments and tanks are gas-free. No hot work in tanks shall be started before consulting with the Contracting Officer and supplying a gas-free certificate as required by local authorities. No employee shall enter any tank void, cofferdam or closed area without first consulting and obtaining permission of the Officer of the Deck.

File details come from the government source that posted it. Updated .