This document is an amendment to a solicitation for drydocking services for NOAA's Ship Oregon II. The amendment extends the due date for submission of quotes to July 20th, 2023 at 2pm EST. It provides responses to contractor questions to clarify requirements for items in the statement of work. These include specifications for equipment and systems onboard the ship, quantities of materials needed, and contact information for technical representatives. Suggested vendors included in the answers are for informational purposes only and do not represent any required vendors. Contractors must acknowledge receipt of the amendment.

The key details provided include clarifications to requirements for work items covering areas such as HVAC, lifesaving equipment, propulsion systems, steering gear, generators, piping systems, decking, and navigation equipment. Specifications are given for materials, quantities, equipment models where needed for pricing. Response also lists additional drawings and references applicable to the work scope. The amendment aims to ensure contractors have the information required to submit fully priced quotes for the drydocking and repair of NOAA's Ship Oregon II by the extended due date.

View the file

Other files

File Type Posted
ATTACHMENT D5 Pricing Schedule O2 DD FY24_Updated.xlsx XLSX spreadsheet
Amendment_0002_1305M223QNMAN0129_Signed.pdf PDF
MRG Pic_2.jpg JPG image
R2_NONE_OT-S22-0-2-1_RevNONE_Sht1 OF 1_N_A_OT-S22-0-2-1.pdf PDF
AMC-581-1A-Inspection and Preservation of Ground Tackle (4 sheets).pdf PDF
R2-S92-0-3 Rev K 1989 Ships Service Switch Gear Wiring Diagram_Update.PDF PDF
FY23 Oregon II Life Raft-Immersion Suit _ Life Jacket Inspection Reports.pdf PDF
Oregon II MRG List of Materials_Update.pdf PDF
MRG Pic_1.jpg JPG image
Cooper_Bearing_Manual_2_Update.jpg JPG image
Cooper_Bearing_Manual_1_Update.jpg JPG image
MRG Pic_3.jpg JPG image
Oregon II MRG List of Materials.pdf PDF
Oregon II Hydraulic Hose List (2)_Update.xlsx XLSX spreadsheet
OT-S48-1-1 (2)_Update.pdf PDF
FY23 Oregon II Register of Lifting Appliance_Update.pdf PDF
R2_NONE_OT-S17-1-3-1_RevNONE_Sht1 OF 1_N_A_OT-S17-1-3-1 (2)_Update.pdf PDF
OT-S48-3-3 Firemain and Sea Service System_Update.pdf PDF
AMC-300-1_Overhaul_of_Electrical_Rotating_Machinery_(10_pages) (1) (2).pdf PDF
0606- Standards for Lifting Appliances on NOAA Ships.doc DOC document
OT-S43-1-1.pdf PDF
FY21 Oregon II Annual Fire Inspection Report.pdf PDF
OT-S11-1-1(P) (1).pdf PDF
ATTACHMENT D2 Past Performance Information Form.docx DOCX document
OT-S11-1-1.pdf PDF
OT-S11-6-1 (1).pdf PDF
R2_NONE_S41-5-5_RevNONE_Sht6_N_OT-S41-5-5-6 (1).pdf PDF
OT-S3801-101 (1).pdf PDF
OT-S48-3-3 Firemain and Sea Service System.pdf PDF
OT-S41-5-5.pdf PDF
ATTACHMENT D6 Accounting System Questionnaire .pdf PDF
NOAA Standard Specification S2906 Arc Welding on Waterborne Vessels _ June 1982.pdf PDF
OT-S3801-12.pdf PDF
OT-S45-1-2 (2).pdf PDF
FY23 Oregon II Register of Lifting Appliances.pdf PDF
Engineering Report ER20200324_NO2 UPS Review.pdf PDF
R2_NONE_S38-1-14_RevNONE_Sht4_N_OT-S38-1-14-4.pdf PDF
OT-S11-0-1-1 (1).pdf PDF
MOC-573-2 Overhaul Repair of Hyd Cyls.pdf PDF
OT-S3801-11.pdf PDF
R2_NONE_S38-1-14_RevNONE_Sht5_N_OT-S38-1-14-5.pdf PDF
OR-S62-0-10 Elect One Line (MRP 1998) with Galley Update.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
OR-S21-0-4 sheet 2 of 8.pdf PDF
ATTACHMENT D1 NOAA Ship Oregon II FY 2024 Drydock Specs.pdf PDF
s1205 Zinc Protectors.pdf PDF
OR-S21-0-4 sheet 5 of 8.pdf PDF
ATTACHMENT D5 Pricing Schedule O2 DD FY24.xlsx XLSX spreadsheet
AMC-000-1G General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
R2_NONE_S11-0-3_RevNONE_Sht1_N_OT-S11-0-3-1 (2) (2).pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

1305M223QNMAN0129

9B. DATED (SEE ITEM 11)

06/16/2023

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

2. AMENDMENT/MODIFICATION NUMBER

A0001

3. EFFECTIVE DATE

07/14/2023

4. REQUISITION/PURCHASE REQUISITION NUMBER

NM-AN2120-23-01224

5. PROJECT NUMBER (If applicable)

CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE 6. ISSUED BY

NOAA/EAD

200 GRANBY STREET, NORFOLK, VA 23510

Elizabeth Eichelberger, elizabeth.eichelberger@noaa.gov, (757)441-6557

See Block 6

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE OF PAGES

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

Elizabeth Eichelberger

07/14/2023

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OREGON II DRY DOCK FY24

Please see attachment list.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

X

1. This Amendment is issued to respond to the following questions that were received:

Question Answer (General) Will the government confirm that the Price Volume (II) can be submitted as a PDF to include “agreement with all terms, conditions, and provisions”, the firm price statement and representations and certifications (FAR 52.212-3) in addition to providing the completed and unlocked Excel document template as a separate file? If not, where should the “agreement with all terms, conditions, and provisions”, the firm price statement and completed representations and certifications (FAR 52.212-3) be included in the proposal?

Yes. The pricing has to be submitted in Excel file format and not password protected. The other documentation needed can be submitted as PDF format.

(General) Is there a cost estimate, budget or ballpark figure for the project listed? Is there an actual start date for the project?

There is no cost estimate that can be shared.

Please see CAR 1352.270-70 PERIOD OF PERFORMANCE (APR 2010) on page 10 of the RFQ for information regarding the start date.

(Item 3.1)

a. Can you tell me what Delta T you are looking for out of this chiller? We also need to know the water temperature coming into the chiller and what you want leaving the chiller so we can size it appropriately.

b. 3.1.3.1.a How many KWH/day do you want us to include for electrical usage?

c. 3.1.3.1.c How many tons for cooling water do you want included in the item?

d. 3.1.3.1.o Please specify the number of crane hours to include for this item. If none are provided, we will provide a unit price.

a. See question “c” below.

b. The item requires a 300-amp 450-volt connection to be available the entire repair period.

c. The requirement is for cooling water at 100 gpm and 60 psi to operate our AC and Refrigeration system not to provide chilled water.

d. The requirement is to have the crane available when needed with notice. There is not a defined number of hours, however crew will require a crane on average of 1 – 2 times per week usually less than 2 hours per occurrence.

(Item 3.2)

a. Can we get copies of the raft certificates so we will know the date of manufacture?

b. Please provide the model/serial numbers along with the date of manufacture for the Viking rafts.

a. Included.

b. Current certifications included.

(Item 3.3)

a. 3.3.3.7 Need the manufacturer of the SCBA’s to quote.

a. Scott Air-Pak 4500.

(Item 3.4)

a. Please provide the specs on the 3 Lifting Devices:

i. Aft Telescopic Boom Crane - Alaska Telescopic Crane;

ii. Forward Deck Crane – Aurora;

iii. J-Frame Lifting System - J-Frame.

a.i.ii.iii. The specification lists the non-extended ratings of the two cranes and the extended rating of the J-frame. The included “Register of lifting appliances” includes the extended ratings of the two cranes.

(Item 3.6)

a. 3.6.3.2 For bidding purposes, how many gallons of hydraulic oil and lube oil should be included in the bid price for storage? For bidding purposes, how many gallons of CPP oil, waste oil/oily wastes, and dirty oil should be included in the bid price for disposal?

b. 3.6.3.8.3 Replace any deteriorated plates and hardware. New plates and hardware shall be 316 stainless steel. Provide quantities and sizes for bidding purposes.

a. Item 3.6 includes a table of tank capacities, assume 85% of that volume.

b. Assume 8 square feet of diamond tread plate and 50 1 inch flush head 5/16” bolts.

(Item 3.7)

a. Points 3.7.3.16.1 thru 3.7.3.16.10 detail a very thorough in place condition found inspection.

Point 3.7.3.16.11 calls for complete disassembly of drive motor, drive shaft, removal of thruster leg from vessel, overhaul of thruster leg and reassembly of all components back into vessel.

The question to be clarified is that if the condition of the thruster and drive line components is acceptable after inspection does point 3.7.3.16.11 need to be accomplished? Is this an and/or situation depending on condition found?

b. 3.7.3.15.7, 3.7.3.15.8, 3.7.3.15.12: Does this work need to be overseen/completed by Tech Reps (Babbitt, Cooper, Aegir) or would you allow shipyard to complete the work?

c. 3.7.3.15.8: From the information and drawing provided, I do not see where these bearings are Government Furnished nor do I see the Cooper Bearing Part #’s nor how many per shaftline with the drawings that were provided for this work item. Can you please confirm qty. and Cooper Bearing Part #’s and if any alignment assistance may be needed?

d. 3.7.3.10 and 3.7.3.16.2: Please provide the size of the propeller.

e. 3.7.3.16 (bow thruster overhaul)

i. Points 3.7.3.16.1 thru 3.7.3.16.10 detail a very thorough in place condition found inspection.

Point 3.7.3.16.11 calls for complete disassembly of drive motor, drive shaft, removal of thruster leg from vessel, overhaul of thruster leg and reassembly of all components back into vessel. The question to be clarified is that if the condition of the thruster and drive line components is acceptable after inspection does point 3.7.3.16.11 need to be accomplished? Is this an and/or situation depending on condition found?

f. Please provide a GA drawing of the seal assembly.

g. 3.7.3.15.2 For bidding purposes, how much

a. The intention is to determine the as found condition and then to overhaul the thruster. The exact order of every step is not critical as long as the as found condition is assessed for any signs of failure before being dissembled and overhauled.

b. The shipyard would perform the majority of the work under the supervision of Sound Propeller System as the tech rep.

c. Sound Propeller has the required information and technical knowledge for these parts. There are 2 line shaft bearings. See OT-S22-0-2 included in response, also included are 2 pictures of the Cooper Bearing Manual.

d. 102”.

e.i. The intention is to determine the as found condition and then to overhaul the thruster. The exact order of every step is not critical as long as the as found condition is assessed for any signs of failure before being dissembled and overhauled.

f. See OT-S22-0-2 included in response.

g. 200 gallons of Mobil SHC Aware ST Series ISO

100. Any remaining will be given to the ship for spare.

h. Sound Propeller Services is the technical rep for these bearings and has the required knowledge.

i. The alignment will need to include jack loading and feeler gauges for the initial alignment and strain gages for final alignment. Laser may be used if needed for the initial rough alignment.

j. The General section of the spec requires a one-day sea trials. There is a numbering mistake in the spec in the general section. The section 2.0 but the requirements for the general section are under 3.0.

oil should be replenished? What type of oil is required?

h. 3.7.3.15.8 Can a standard size bearing be used or does this bearing have to be custom?

i. 3.7.3.1 and 3.7.3.15.4 Can the alignment check be done by a feeler gauge? Or are you going to require strain or laser alignment?

j. Paragraph 3.7.3.17 states that the Technical representatives need to be present for sea trial, but there is no sea trial item in the Spec for the Oregon II. Can you please confirm if this paragraph was added in error? If you want the Tech Reps present for sea trial, will you be adding in a sea trial item to the Spec?

(Item 3.8)

a. 3.8.3.1 and 3.8.3.7 Please specify or provide an image of the general interferences called out by these paragraphs.

b. 3.8.3.3 Will you be providing the Lufkin Tech rep or does that need to be provided by the shipyard?

c. 3.8.3.19 Provide a shaft arrangement plan or any reference on coupling and engine alignment tolerances.

d. 3.8.3.19 and 3.8.3.20 Can the alignment check be done by a feeler gauge? Or are you going to require strain or laser alignment?

e. 3.8.3.2 states to provide the services of Senner Services to overhaul the MRG. 3.8.3.3 states that while the MRG is open, we must have the supervision of a Lufkin Industries Tech Rep.

Are both tech reps required or is this an either-or situation?

a. Images are included.

b. The contractor is expected to provide the Lufkin Rep.

c. OT-S22-0-2 shows the general arrangement of the shaft line. However, the exact tolerances and parameters will need to be determined by discussion with the tech reps involved in the repair. Senner, Lufkin, Cooper, Sound Propeller, etc. will need to be consulted during the procedure development.

d. The alignment will need to include jack loading and feeler gauges for the initial alignment and strain gages for final alignment. Laser may be used if needed for the initial rough alignment.

e. Senner Services is intended to be the primary rebuilder of the gear with Lufkin as oversight and the shipyard providing interference removal, rigging, other labor, etc.

(Item 3.10)

a. 3.10.3.1 Remove concrete ballast form Steering Gear Bilge. Provide more information:

location, area, quantity, etc. for bidding purposes.

The steering bilge has a series of longitudinal frames with deck plates. Once the deck plates are removed the center area athwart ship has concrete. Assume 3 yards of concrete will be removed.

(Item 3.11)

a. 3.11.3.1.6 How many swivels and shackles to be renewed total?

a. 1 swivel and 1 shackle per anchor.

(Item 3.12)

a. 3.12.4.1 What thickness is the plates being renewed? Please provide photos of the location of the shell plating to be renewed that is under the air receivers.

b. 3.12.4.4 What is the length required and the material for the new 2” pipe install?

c. 3.12.5.1.1 Is this steel rectangular

a. The spec states approximately ½”, the shell expansion included in the references show ½” also. Photos are not available at this time.

b. Assume 10 feet for bidding purposes.

c. Yes – 4x6x3/8” Rectangle tube.

d. These are small pads ranging in size form 3” around to 8”x8” squares. They are located over the rudder room and net stores on the aft main tubing?

d. 3.12.6.1 What sizes are the mounting plates to be cropped out and reinstalled? There were no specific locations provided, only “aft main deck.” Are these in the way of any tanks?

e. 3.12.7.1 and 3.12.7.2 What lengths are the ladder handrails to be renewed?

f. 3.12.8.1 What size and material is the Focsle deck hatch?

g. 3.12.9.1 What size coaming to be installed?

h. 3.12.10.1 What thickness is the deck plate to be cropped and renewed?

i. 3.12.11 Is the only portion of the mast deck to be renewed the 16 square feet of aluminum decking? If not, please provide the additional size of plating (include thickness and material) to be renewed.

j. 3.12.11.3 What type of aluminum decking is this and please provide the specs too.

deck. See the general arrangement included in the references.

e. Assume 15 feet for bidding purposes.

f. Approximately 18” round steel.

g. 3/8” x 4 inch.

h. 5/16”.

i. The flat deck surrounding the exhaust is planned to be replaced.

j. Drawing S17-1-3 show the plate as 7/32” 5056- H32, if 7/32” is not available a slightly thicker plate may be used.

(Item 3.15)

a. 3.15.3.1 Are 40-man hours and $2000 material allocated for the full item? Or included on top of pricing the work item?

a. This allocation is for the outrigger retention system work only.

(Item 3.16)

a. Do we need access cuts in the side shell or will the generators fit through the engine room hatch?

b. 3.16.4.11. Calibrate all meters on the main and emergency switchboards and provide calibration stickers for each meter. Provide meters type and qty.

a. This is one option. The generators could also be removed through the fiddley with interference removals.

b. See drawing R2-S92-0-3 included.

(Item 3.19)

a. Please provide information for the hoses:

Hose specifications, and the total length desired for estimating purposes.

b. 3.19.3.1 Provide the quantity of hoses.

c. 3.19.5.1 Sizes and lengths of hoses shall be determined by prospective bidders during ship check. Could you provide any information as we couldn’t attend the ship check?

b. Included Hose list, this will still need to be verified at execution but is good for estimating.

c. Included Hose list, this will still need to be verified at execution but is good for estimating.

(Item 3.20)

a. 3.20.2.2.2 and 3.20.2.3.1 Who is the OEM called out for the equipment in these paragraphs?

a. The OEM of the selected system, i.e – if a Carrier unit is used a Carrier designed and built splitter system can be used.

(General) The Spec calls out for a QP-1 cert. Can we use a Paint Sub that does not have a QP-1 cert but will have a NACE Inspector?

The government will consider well detailed plans and procedures that show the quality of the finished product will perform as well as the required QP-1 certification. The key points would be preparation, application, inspection, qualifications of personnel and inspectors, etc., 3rd party NACE inspectors would be an effective measure to ensure quality.

(Missing References) Please provide the following references:

a. Item 3.7

i. 3.7.1.7. Oregon II Technical Manual, Stern Tube Bearings and Seals, Size 240 MKII.

ii. 3.7.1.8. Wärtsilä Defense (Formerly John Crane Lips) Instruction Manual, MK2/MK2-M Seals, Issue A, Dated 16/08/01.

iii. 3.7.1.9. Hundested Thruster Manual, “Bow Thruster Manuf. No. BT 1187, Type SFT 5”.

iv. 3.7.1.10. Technical Manual, "Kamewa Controllable Pitch Marine Propeller, Bird-Johnson Company, for NOAA Ship Oregon II."

b. Item 3.8

i. 3.8.1.1.1. Oregon II MRG Overhaul List of Material.

c. Item 3.11

i. 3.11.1.1. NOAA Standard Specification AMC-581-1A, “Inspection and Preservation of Ground Tackle”.

d. Item 3.18

i. 3.18.1.2. Oregon II drawing number OT- S4803 Diagrammatic Arrangement of seawater service and fire main system.

ii. 3.18.1.3. NOAA Ship Oregon II drawing number #OT-S4801-1 Diagrammatic Arrangement of Bilge and Ballast System.

a. These are only available in hard copy and were available to be viewed at the ship check if requested.

b.i. Included in response.

c.i. Included in response.

d.i. Included in response see OT-S48-3-3.

d.ii. Included in response see OT-S48-1-1.

(Item 3.9)

a. 3.9.3.3 Can you confirm that you want 10 UT shots per each spool piece? There are 84 skin valves listed for overhaul, so according to this paragraph there would be 84 spool pieces, requiring 10 UT shots each (840 UTs total), which seems excessive.

b. 3.9.3.12 For all valves listed 2” and below, are you sure that you want these all of these to be monel trimmed?

a. Not every valve is actually a “sea valve”, see the docking plan for the overboard discharges and seachest.

b. The 2” gate / globe valves should be Monel trimmed the other types and sizes valves can be Bronze or stainless similar to as removed.

(Item 3.18)

a. 3.18.4.1 Provide the serial number for the strainer.

b. 3.18.7.2 Provide material and pipe diameter for this pipe as wrought iron has been discontinued according to note 4.

c. 3.18.8.4 Provide the material for the Sch 40 2” pipe as this appears to be listed as wrought iron (no longer used) or galvanized steel.

d. 3.18.9 For the piping modification, please provide specs for all the new desired equipment in red on the sketch (tees, ball valve, camlocks, hose, etc.).

a. The serial number on the strainer could not be located.

b. The piping in this location is copper nickel.

c. The piping in this location is copper nickel.

d. The intention is for the materials selected to meet ABS requirements for the intended service.

The only specified requirements are for flow rate of the pump and the general layout of the system.

(Item 3.21)

a. Please provide a square footage estimate for the two areas receiving decking, or provide a drawing.

a. Section 3.21.3.4 misstate the spaces requiring flooring. The title of the section is the correct spaces requiring flooring. The spaces require approximately 160 square feet of new flooring.

(Items 3.10 and 3.14)

a. Paragraph 3.10.3.2.1 in item 3.10 states to prepare (blast) the void but I think you meant to write bilge. Paragraphs 3.10.3.2.1 and

3.10.3.4 are already covered in item 3.14 paragraph 3.14.4. Therefore, the work to blast and paint the bilge is covered by 3.14 and the scope of work in item 3.10 is only to inspect the steering gear bilge. Can you confirm this?

Correct. This is a bilge not a void. The blast in

3.10.3.2.1 is intended to remove the lose paint and rust to allow for inspection. 3.10.3.4 requires the prep and paint to be complete by item 3.14. This was to prevent double charging for painting this space.

(Item 3.17)

a. In respect to WI 3.17 ECDIS: We contact Mackay Marine as per the spec.

Mackay states that model that they cannot service as they have no Tech Rep available. They recommend Wartsila.

Can you provide a Wartsila contact or other Tech Rep for this system?

a. Wartsilla is the parent company for TRANSAS. We recommend contacting Wartsilla and discussing availability of tech reps. If that is unsuccessful, Beier Radio in Louisiana is a TRANSAS installer and would be an acceptable choice.

2. The due date for the submission of quotes is hereby extended to July 20, 2023, at 2:00 pm Eastern Standard Time (EST).

3. Any suggested or possible vendors included in the answers provided are intended solely for informational purposes and do not impose any obligation or requirement to engage with or utilize these vendors.

4. Contractors are reminded of their obligation to promptly acknowledge receipt of this Amendment.

5. End Amendment 0001.

6 ISSUED BY CODE:
AJ930073:
5 PROJECT NUMBER If applicableRow1:
8 NAME AND ADDRESS OF CONTRACTOR Number street county State and ZIP Code:
undefined:
10A MODIFICATION OF CONTRACTORDER NUMBER:
undefined_2:
10A MODIFICATION OF CONTRACTORDER NUMBER_2:
10B DATED SEE ITEM 13:
11 THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS:
The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off
13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS:
undefined_3:
B THE ABOVE NUMBERED CONTRACTORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES such as changes in paying office:
undefined_4:
undefined_5:
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
undefined_6:
1:
is not: Off
is required to sign this document and return: Off
14 DESCRIPTION OF AMENDMENTMODIFICATION Organized by UCF section headings including solicitationcontract subject matter where feasible:
15B CONTRACTOROFFEROR:
15C DATE SIGNED:
2023-07-14T09:03:20-0400
EICHELBERGER.ELIZABETH.MARIE.1177422750