Engineering Report ER20200324_NO2 UPS Review.pdf

PDF 89 KB Posted

Attached to
1305M223QNMAN0129 - NOAA's Ship Oregon II Drydock FY 2024
Solicitation number
1305M223QNMAN0129
Issued by

About this file

This engineering report provides design recommendations for upgrading the mission UPS system on NOAA's Ship Oregon II. The report reviews the existing Ferrups and Eaton UPS systems currently installed and finds them to be in good working order. However, it recommends upgrading the mission UPS to an Eaton 9PX rack mounted split-phase unit with 120/240VAC input and output located in the same space as the existing unit. The design includes an APC rack enclosure to house the new Eaton bypass switch, UPS, and three external battery units. The rack enclosure would be installed with stabilizing brackets to secure it while underway but allow movement for maintenance. The upgraded 8KVA UPS system would provide over 100 minutes of battery backup at the ship's estimated running load of 3,000VA. Attachments include schematics, layout drawings, equipment manuals and a runtime chart for the recommended upgraded mission UPS system on NOAA's Ship Oregon II.

The related federal contract opportunity is an RFQ to obtain drydocking services for NOAA's Ship Oregon II in fiscal year 2024. The solicitation includes a statement of work, forms for past performance information and questionnaires, pricing schedule, and additional vessel drawings and references. The solicitation is issued by the National Oceanic and Atmospheric Administration within the Department of Commerce.

View the file

Other files

File Type Posted
ATTACHMENT D5 Pricing Schedule O2 DD FY24_Updated.xlsx XLSX spreadsheet
Amendment_0002_1305M223QNMAN0129_Signed.pdf PDF
MRG Pic_2.jpg JPG image
R2_NONE_OT-S22-0-2-1_RevNONE_Sht1 OF 1_N_A_OT-S22-0-2-1.pdf PDF
AMC-581-1A-Inspection and Preservation of Ground Tackle (4 sheets).pdf PDF
R2-S92-0-3 Rev K 1989 Ships Service Switch Gear Wiring Diagram_Update.PDF PDF
FY23 Oregon II Life Raft-Immersion Suit _ Life Jacket Inspection Reports.pdf PDF
Oregon II MRG List of Materials_Update.pdf PDF
MRG Pic_1.jpg JPG image
Cooper_Bearing_Manual_2_Update.jpg JPG image
Cooper_Bearing_Manual_1_Update.jpg JPG image
MRG Pic_3.jpg JPG image
Amendment_0001_1305M223QNMAN0129_Signed.pdf PDF
Oregon II MRG List of Materials.pdf PDF
Oregon II Hydraulic Hose List (2)_Update.xlsx XLSX spreadsheet
OT-S48-1-1 (2)_Update.pdf PDF
FY23 Oregon II Register of Lifting Appliance_Update.pdf PDF
R2_NONE_OT-S17-1-3-1_RevNONE_Sht1 OF 1_N_A_OT-S17-1-3-1 (2)_Update.pdf PDF
OT-S48-3-3 Firemain and Sea Service System_Update.pdf PDF
AMC-300-1_Overhaul_of_Electrical_Rotating_Machinery_(10_pages) (1) (2).pdf PDF
0606- Standards for Lifting Appliances on NOAA Ships.doc DOC document
OT-S43-1-1.pdf PDF
FY21 Oregon II Annual Fire Inspection Report.pdf PDF
OT-S11-1-1(P) (1).pdf PDF
ATTACHMENT D2 Past Performance Information Form.docx DOCX document
OT-S11-1-1.pdf PDF
OT-S11-6-1 (1).pdf PDF
R2_NONE_S41-5-5_RevNONE_Sht6_N_OT-S41-5-5-6 (1).pdf PDF
OT-S3801-101 (1).pdf PDF
OT-S48-3-3 Firemain and Sea Service System.pdf PDF
OT-S41-5-5.pdf PDF
ATTACHMENT D6 Accounting System Questionnaire .pdf PDF
NOAA Standard Specification S2906 Arc Welding on Waterborne Vessels _ June 1982.pdf PDF
OT-S3801-12.pdf PDF
OT-S45-1-2 (2).pdf PDF
FY23 Oregon II Register of Lifting Appliances.pdf PDF
R2_NONE_S38-1-14_RevNONE_Sht4_N_OT-S38-1-14-4.pdf PDF
OT-S11-0-1-1 (1).pdf PDF
MOC-573-2 Overhaul Repair of Hyd Cyls.pdf PDF
OT-S3801-11.pdf PDF
R2_NONE_S38-1-14_RevNONE_Sht5_N_OT-S38-1-14-5.pdf PDF
OR-S62-0-10 Elect One Line (MRP 1998) with Galley Update.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
OR-S21-0-4 sheet 2 of 8.pdf PDF
ATTACHMENT D1 NOAA Ship Oregon II FY 2024 Drydock Specs.pdf PDF
s1205 Zinc Protectors.pdf PDF
OR-S21-0-4 sheet 5 of 8.pdf PDF
ATTACHMENT D5 Pricing Schedule O2 DD FY24.xlsx XLSX spreadsheet
AMC-000-1G General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
R2_NONE_S11-0-3_RevNONE_Sht1_N_OT-S11-0-3-1 (2) (2).pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING REPORT

ER20200324_NO2_UPS

NOAA Oregon II

NO

NOAA Oregon II – Mission/Bridge UPS

Overview The NOAA ship Oregon II has an original Ferrups Mission UPS and a recently upgraded Eaton 9SX 3KVA Bridge UPS. ISA has attended the vessel and reviewed the installed UPS systems for proper function and for details relating to a planned upgrade of the ship’s mission UPS. Based on this review and any available ship’s drawings, ISA has developed a design for upgrade of the Mission UPS. New Mission UPS electrical schematics were generated to reflect the proposed system upgrade.

Findings ISA reviewed the installed system with the ship’s Chief ET and tested the function of the UPS equipment.

Both systems tested properly and were considered in good working order.

Review of the Mission UPS showed limited space to install upgraded equipment. The best location as determined by review of available space and by discussions with the Chief ET was determined to be in the same place as the existing unit.

Given the installed base of Eaton 9SX equipment, the new design is based around the Eaton 9PX rack mounted split-phase unit. The UPS is designed for 120/240VAC input and provides 120/240VAC battery backed output. The existing bypass switch is replaced by an Eaton rack-mounted split-phase bypass switch specifically designed to work with the 9PX split-phase UPS.

Recommended Actions No deficiencies were noted during review and therefore actions are required.

It is recommended that the existing UPS be upgraded in the same location as the existing Ferrups unit.

An APC rack enclosure has been selected to house the new Eaton Bypass Switch, UPS, and three (2) external battery units. This unit should fit in the existing space and has casters to allow moving the enclosure for maintenance access. The design requires that the rack enclosure be installed with stabilizing brackets mounted to the adjacent bulkhead and deck that will secure the rack enclosure while underway but that allow movement of the enclosure by disconnection for maintenance activities.

The new UPS has a single-phase capacity of 8 KVA with 120/120VAC output. At a current estimated running load of 3000 VA, the new system will provide approximately 100 minutes of battery run-time (+/- 15% base on conditions). A UPS runtime chart is provided for review.

The recommended design is provided in attached drawing NOR-EE-MUPS-001 Rev -

ENGINEERING REPORT

ER20200324_NO2_UPS

End Report

ISA - James D. Montgomery, PE Issue Date: March 24, 2020

Attachments:

1. Mission UPS Upgrade schematics, NOR-EE-MUPS-001 Rev -

2. Proposed system layout (NOR-EE-MUPS-001, Sheet 3A)

3. Eaton 9PX UPS Installation and User Manual

4. UPS Runtime Chart

5. Equipment Cut Sheets and Manuals

File details come from the government source that posted it. Updated .