RPA Task Order 5 - PWS (ANGB) - FINAL.pdf
PDF 283 KB Posted
- Solicitation number
- DRFP2-FA4890-24-R-0012
About this file
This document is a Performance Work Statement (PWS) for a task order under an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to provide Remotely Piloted Aircraft (RPA) organizational-level maintenance support for the Air National Guard Bureau (ANGB) at several locations.
The PWS outlines the unique task requirements, including the need to provide 24/7 support, and the security clearance and access badge requirements for each location. The task order has a base period of 12 months from July 2025 to June 2026, with four 12-month option periods. The PWS references the overall IDIQ PWS for additional requirements. Key details include the specific RPA maintenance services required, the locations covered, the period of performance, and the unique security requirements.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Headquarters Air Combat Command (HQ ACC)
ACC AMIC PMAU
PERFORMANCE WORK STATEMENT
(PWS)
FOR
Remotely Piloted Aircraft (RPA)
Maintenance Support
For the Air National Guard Bureau (ANGB)
Task Order – 5
Contract Number: FA4890-24-X-00XX
Date: 20 August 2024
REMOTELY PILOTED AIRCRAFT (RPA) Mx – Task Order 5 PWS
Date: 20 Aug 2024
Task Order 5 PWS Page | 2
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Task Order Scope
1.2 Locations
1.3 References
1.4 Period of Performance (PoP)
2.0 UNIQUE REQUIREMENTS
2.1 Unique Task Requirements
2.2 Unique Security Requirements
3.0 POINTS OF CONTACT
Table 1. Unique Requirements Level of Effort Table 2. Security Clearance & Access Badge Requirements
Task Order 5 PWS Page | 3
1.0 INTRODUCTION
The Contractor shall provide qualified Organizational-level (O-level) maintenance IAW the Indefinite Delivery, Indefinite Quantity (IDIQ) Task Order performance work statement (PWS).
This PWS provides unique Remotely Piloted Aircraft (RPA) O-level support requirements as specified below. All other requirements are outlined in the IDIQ PWS.
1.1 Task Order Scope
Conduct MQ-9 Ground Control Station (GCS) cockpit and RPA O-Level maintenance for the Air National Guard Bureau (ANGB).
1.2 Locations
ANGB locations included in this PWS are as follows:
• 110th Wing, Battle Creek ANG, Battle Creek, MI
• 118th Wing, Tennessee ANG, Joint Base Berry Field, TN
• 132d Wing, Iowa ANG, Des Moines, IA
• 188th Wing, Ebbing ANG, Fort Smith, AR
• 111th Attack Wing, Horsham ANG, Horsham, PA
• 107th Attack Wing, New York ANG, Niagara Falls, NY
• 178th Wing, Ohio ANG, Springfield, OH
1.3 References
References include:
• RPA IDIQ PWS
• IDIQ PWS Apendices A-L
• IDIQ Attachment 3 – Manpower, Labor Rates, and Pricing Tables
1.4 Period of Performance (PoP)
The PoP for the Base Year is twelve months: 1 Jul 2025 – 30 Jun 2026 followed by four 12-month options.
2.0 UNIQUE REQUIREMENTS
2.1 Unique Task Requirements
2.1.1 The Contractor shall be prepared to support operations 24 hours per day, seven (7) days per week.
2.1.2 The Contractor shall provide support for the individual GCS configurations, as determined by ACC through approved TCTOs, AF 1067s, or Modification Directives as indicated in the Level of Effort table below:
RPA Mx Site UTC AC GCS
110th Wing, Battle Creek ANG, Battle Creek, MI 0 0 2 118th Wing, Tennessee ANG, Joint Base Berry Field, TN 0 0 2
132d Wing, Iowa ANG, Des Moines, IA 0 0 2 188th Wing, Ebbing ANG, Fort Smith, AR 0 0 2
111th Attack Wing, Horsham ANG, Horsham, PA 0 0 2
Task Order 5 PWS Page | 4
RPA Mx Site UTC AC GCS
107th Attack Wing, New York ANG, Niagara Falls, NY 0 0 2 178th Wing, Ohio ANG, Springfield, OH 0 0 2
Total 0 0 14
Table 1. Unique Requirements Level of Effort
2.2 Unique Security Requirements
2.2.1 Security clearance level and access badges required are detailed in Table 2 below.
Location Security Clearance Level Required Access Badges Required
Battle Creek ANG TS/SCI Comon Access Card (CAC) & Restricted Area Badge
Berry Field ANG TS/SCI CAC, SCIF Badge, Building Badge
Biddle ANG TS/SCI CAC, SCIF Badge
Ebbing ANG TS/SCI CAC, SCIF Badge
Iowa ANG TS/SCI CAC, SCIF Badge, Secure Badge
Niagara Falls ARS TS/SCI CAC, SCIF Badge
Springfield ANG TS/SCI CAC, SCIF Badge
Table 2. Security Clearance & Access Badge Requirements
3.0 POINTS OF CONTACT
• Anne Renn, PMAU Program Manager (PM), 757-764-9427, annette.renn@us.af.mil
• Carlos D. Thomas, PMAU Deputy PM, 757-528-3972, carlos.thomas.8@us.af.mil
• MSgt Kurtis Hoar, PMAU Maintenance SME, DSN: 757-225-9718, kurtis.hoar@us.af.mil
• S. Leeann Ori, PKC Contracting Officer, 757-255-4713, sherri.ori@us.af.mil
• Emma Elmore, PKCA, emma.elmore@us.af.mil
• Anthony Mills, DRQ/Contracting Officer Representative (COR) Lead, 702-468-2511, anthony.mills.7@us.af.mil
• Site COR(s), pending appointment prior to award mailto:carlos.thomas.8@us.af.mil mailto:emma.elmore@us.af.mil mailto:anthony.mills.7@us.af.mil
| 1.0 INTRODUCTION |
| 1.1 Task Order Scope |
| 1.2 Locations |
| 1.3 References |
| 1.4 Period of Performance (PoP) |
| 2.0 UNIQUE REQUIREMENTS |
| 2.1 Unique Task Requirements |
| 2.2 Unique Security Requirements |
| 3.0 POINTS OF CONTACT |
File details come from the government source that posted it. Updated .