This document is a Performance Work Statement (PWS) for Remotely Piloted Aircraft (RPA) Maintenance Support Task Order 1 under an Indefinite Delivery, Indefinite Quantity (IDIQ) contract. The PWS provides the requirements for transitioning RPA organizational-level maintenance support across multiple CONUS locations, including Creech AFB, Nellis AFB, Shaw AFB, Ellsworth AFB, Whiteman AFB, and various Air National Guard bases. Key requirements include executing an approved transition plan within 90 days, weekly status updates, notifying the government of any potential delays, coordinating with the incumbent contractor, ensuring key personnel are in place within 30 days, and completing a physical inventory of government furnished property. The period of performance for the transition is from April 1, 2025 to June 30, 2025.
The related federal contract opportunity is a Draft Request for Proposal (DRFP) for the upcoming competitive RPA Maintenance support services requirement. The DRFP is being issued to give industry a preview of the solicitation and allow for questions and clarification. The anticipated period of performance is a five-year ordering period with an estimated award date of April 1, 2025. The applicable NAICS code is 488190 with a small business size standard of $35 million. The government is requesting information, questions, and clarifications from interested parties, but is not accepting capability statements at this time.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Headquarters Air Combat Command (HQ ACC)
ACC AMIC PMAU
PERFORMANCE WORK STATEMENT
(PWS)
FOR
Remotely Piloted Aircraft (RPA)
Maintenance Support
Task Order – 1
Contract Number: FA4890-24-X-00XX
Date: 20 August 2024
REMOTELY PILOTED AIRCRAFT (RPA) Mx – Task Order 1 PWS
Date: 13 Aug 2024
Task Order 1 PWS Page | 2
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Task Order Scope
1.2 Locations
1.3 References
1.4 Period of Performance (PoP)
2.0 UNIQUE REQUIREMENTS
2.1 Unique Task Requirements
2.2 Unique Security Requirements
3.0 POINTS OF CONTACT
Date: 20 Aug 2024
Task Order 1 PWS Page | 3
1.0 INTRODUCTION
The Contractor shall provide qualified Organizational-level (O-level) maintenance IAW the Indefinite Delivery, Indefinite Quantity (IDIQ) Task Order performance work statement (PWS).
This PWS provides for transition of the unique Remotely Piloted Aircraft (RPA) O-level support requirements as specified below. All other requirements are outlined in the IDIQ PWS.
1.1 Task Order Scope
Execute the approved transition plan across all active task orders.
1.2 Locations
Locations included in this PWS are as follows:
• 432 MXG, Creech AFB, NV
• 57th Wing, 26 Weapons (WPS) Schoolhouse, Nellis AFB, NV, Building 119
• 53rd Wing, 556 Test & Evaluation Squadron (TES), Operating Location Alpha, Nellis AFB, NV
• 432 MXG, 25 ATKG, Shaw AFB, SC
• 432 MXG, 89 ATKS, Ellsworth AFB, SD
• 432 MXG, 20 ATKS, Whiteman AFB, MO
• 110th Wing, Battle Creek ANG, Battle Creek, MI
• 118th Wing, Tennessee ANG, Joint Base Berry Field, TN
• 132d Wing, Iowa ANG, Des Moines, IA
• 188th Wing, Ebbing ANG, Fort Smith, AR
• 111th Attack Wing, Horsham ANG, Horsham, PA
• 107th Attack Wing, New York ANG, Niagara Falls, NY
• 178th Wing, Ohio ANG, Springfield, OH
• DP-58
• DP-80
1.3 References
References include:
• RPA IDIQ PWS
• IDIQ PWS Attachments A-L
• IDIQ Attachment 3 – Manpower, Labor Rates, and Pricing Tables
• Task Order 2 – PWS (Creech AFB)
• Task Order 3 – PWS (26 WPN Nellis)
• Task Order 4 – PWS (Ellsworth-Shaw-Whiteman AFBs)
• Task Order 5 – PWS (ANGB)
• Task Order 6 – PWS (DP-58)
• Task Order 7 – PWS (DP-80)
1.4 Period of Performance (PoP)
The PoP for the Transition is 1 Apr 2025 – 30 Jun 2025 (90 calendar days).
Date: 20 Aug 2024
Task Order 1 PWS Page | 4
2.0 UNIQUE REQUIREMENTS
2.1 Unique Task Requirements
The Offeror shall provide a transition plan for establishing required management processes that will result in continuity of mission support, contract performance, and the transitioning of resources and personnel for the entire RPA program (inclusive of the IDIQ and all active task orders). At minimum, the plan shall contain the following:
2.1.1 The Contractor shall execute the approved phase-In plan as submitted to ensure full task order performance within 90 days of task order award.
2.1.2 The Contractor shall update Government Program Management Office (PMO) a minimum of weekly on Phase-In status.
2.1.3 The Contractor shall notify Government PMO within one duty day of any situation that will or has the potential to delay full contract performance.
2.1.4 The Contractor shall coordinate transition planning and execution with site the current
Contractor and site leadership as required to ensure a smooth hand-over and minimal mission impact.
2.1.5 The Contractor shall ensure key personnel (Appendix J) are in place within 30 days Transition Start.
2.1.6 The Contractor shall obtain data and be prepared to fully populate the Program Management Information System (PMIS) within 30 calendar days after Contract Start (NLT 5 Aug 2025).
2.1.7 The Contractor shall perform a complete physical inventory during contract transition for all GFP and annually IAW FAR Part 52.245-1.
2.2 Unique Security Requirements
2.2.1 The Contractor shall ensure personnel have required security clearance level and access badges to facilitate transition actions.
3.0 POINTS OF CONTACT
• Anne Renn, PMAU Program Manager (PM), 757-764-9427, annette.renn@us.af.mil
• Carlos D. Thomas, PMAU Deputy PM, 757-528-3972, carlos.thomas.8@us.af.mil
• MSgt Kurtis Hoar, PMAU Maintenance SME, DSN: 757-225-9718, kurtis.hoar@us.af.mil
• S. Leeann Ori, PKC Contracting Officer, 757-255-4713, sherri.ori@us.af.mil
• Emma Elmore, PKCA, emma.elmore@us.af.mil
• Anthony Mills, DRQ/Contracting Officer Representative (COR) Lead, 702-468-2511, anthony.mills.7@us.af.mil
• Site COR(s), pending appointment prior to award mailto:carlos.thomas.8@us.af.mil mailto:emma.elmore@us.af.mil mailto:anthony.mills.7@us.af.mil
| 1.0 INTRODUCTION |
| 1.1 Task Order Scope |
| 1.2 Locations |
| 1.3 References |
| 1.4 Period of Performance (PoP) |
| 2.0 UNIQUE REQUIREMENTS |
| 2.1 Unique Task Requirements |
| 2.2 Unique Security Requirements |
| 3.0 POINTS OF CONTACT |
File details come from the government source that posted it. Updated .