Appendix H - C5ISR Demarcation Points - FINAL.pdf

PDF 233 KB Posted

Attached to
DRAFT REQUEST FOR PROPOSAL 2 - Remotely Piloted Aircraft (RPA) Maintenance (Mx)
Solicitation number
DRFP2-FA4890-24-R-0012
Issued by

About this file

This document is an appendix to a Performance Work Statement for a federal contract opportunity related to Remotely Piloted Aircraft (RPA) Maintenance (Mx) support services. The appendix establishes demarcation points for communications facilities and equipment between the contractor's responsibilities and other organizational entities. It identifies the specific demarcation points for various RPA systems and equipment, such as the Mobile Ground Control Station (MGCS), Large Runway Ground Control Station (LR-GCS), and Fixed Ground Control Station (FGCS).

The associated federal contract opportunity is a Draft Request for Proposal (DRFP) for the RPA Mx support services, with a planned five-year ordering period and an estimated award date of April 2025. The solicitation is being issued by the Department of the Air Force's Air Combat Command, and the applicable NAICS code is 488190. The government is seeking questions and clarifications from industry on the DRFP during this review period, but this is not a request for proposals or quotes.

View the file

Other files

File Type Posted
RPA Task Order 5 - PWS (ANGB) - FINAL.pdf PDF
RPA Task Order 0 - PWS (AFRB) - FINAL.pdf PDF
Appendix I - Certifications_Trainings_and Qualifications - FINAL.pdf PDF
RPA Task Order 6 - PWS (DP-58) - FINAL.pdf PDF
RPA Task Order 2 - PWS (Creech AFB) - FINAL.pdf PDF
Appendix F - RPA Mx Award Fee Plan - FINAL.pdf PDF
FA4890-24-R-0012_Section L_REV FINAL.docx DOCX document
RPA Task Order 4 - PWS (Ellsworth-Shaw-Whiteman) - FINAL.pdf PDF
Appendix B - DD Form 1423 - Contract Data Requirements List (CDRL) - FINAL.pdf PDF
Manpower_Labor Rates_and Pricing Tables.xlsx XLSX spreadsheet
fa489024R0012 RPA 254 PKG FOR SOLICIT.pdf PDF
Appendix L - Manning Matrix (Proprietary Data) - FINAL.xlsx XLSX spreadsheet
Appendix C - Compliance Matrix - FINAL.pdf PDF
FA4890-24-R-0012_Section M_REV FINAL.docx DOCX document
RPA Task Order 1 - PWS (Transition) - FINAL.pdf PDF
RPA Task Order 7 - PWS (DP-80) - FINAL.pdf PDF
Appendix J - Contractor Identified Key Personnel - Quals_Template - FINAL.pdf PDF
RPA Task Order 3 - PWS (26 WPN Nellis) - FINAL.pdf PDF
Appendix G - Special Requirement for Deployment Support - FINAL.pdf PDF
Appendix E - Government Property Inventory (15OCT23) - FINAL.xlsx XLSX spreadsheet
Appendix D - Publications Forms Websites - FINAL.pdf PDF
RPA Mx PWS_Re-compete - FINAL.pdf PDF
Solicitation - FA489024R0012.pdf PDF
Appendix A - Definitions_Abbreviations_and Acronyms - FINAL.pdf PDF
Appendix K - PWS Addendum (Proprietary Data) - FINAL.pdf PDF
Appendix M - Government Furnished Vehicles_FINAL.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REMOTELY PILOTED AIRCRAFT (RPA) Mx – PWS Appendix H Solicitation: FA4890-24-R-0012

Date: 1 Mar 2024

Appendix H Page | 1

APPENDIX H: C5ISR DEMARCATION POINTS

MQ-9 Equipment/System Established Demarcation Points

Demarcation points (DEMARC) are established to designate where O&M responsibilities for communications facilities or equipment changes from one organizational entity to another. The contractor is responsible for the O&M of RPA systems and equipment up to the established communications DEMARC. The contractor shall coordinate/support diagnostic and repair efforts that cross contractor responsible DEMARC boundaries with local communications providers, as required to meet mission requirements, or as directed by the government.

System Established DEMARC Point

MGCS w/legacy cables (CONUS/OCONUS) GCS signal I/O panel for external signals such as video distribution

LR-GCS w/legacy cables (CONUS/OCONUS) LR-GCS signal I/O panel for external signals such as video distribution

MGCS w/fiber interface kit (CONUS/OCONUS) GCS fiber interface box and GDT/SETSS fiber interface box

LR-GCS w/fiber interface kit (CONUS/OCONUS) LR-GCS fiber interface box and GDT/SETSS interface box

FGCS (CONUS) FGCS I/O and power distribution panels and GDT/SETSS fiber interface box

GDT w/fiber interface kit (CONUS/OCONUS) GDT Fiber converter/interface box

SETSS w/fiber interface kit (CONUS) SETSS fiber converter/interface box (if installed)

REMOTELY PILOTED AIRCRAFT (RPA) Mx – PWS Appendix H Solicitation: FA4890-24-R-0012

Date: 1 Mar 2024

Appendix H Page | 2

Scenario: MGCS or LRGCS on Outdoor Pad, Legacy Cables

MGCS

or

LRGC

Legacy GDT/SETSS Cable (up to 300') GDT or

SETSS

Scenario: MGCS or LRGCS on Outdoor Pad, Fiber Cable

MGCS

or

LRGC

Legacy Cable Base Fiber

Legacy Cable

MGCS

Fiber

Interface

MGCS Pad Fiber Panel

MGCS Pad Fiber Panel

GDT/SETSS

Fiber

Interface

GDT

or

SETSS

Scenario: Fixed GCS

Building Fiber/Copper Legacy

Cable

FGCS

FGCS FF

I/O Panel I/O Panel Comm Closet

GDT/SETSS GDT/SETSS

Pad Fiber Fiber

Panel Interface

GDT

or

SETSS

Areas of Responsibility

DEMARC

MQ-9 DEMARC

File details come from the government source that posted it. Updated .