RFQ27007070 Prebid Conference Logistics.pdf

PDF 275 KB Posted

Attached to
DEM HVAC System Replacement, Electrification, NBNERR Field Station
Solicitation number
RFQ27007070
Issued by
Providence County, Rhode Island

About this file

This file is a Prebid Conference Logistics document for the Rhode Island Department of Environment Management's RFQ27007070, which concerns the replacement of the HVAC system at the NBNERR Reserve Headquarters/Field Station on Prudence Island. The project involves removing existing fossil-fuel heating and split cooling equipment and installing a fully electrified, high-efficiency heat pump HVAC system, with an option to substitute a simplified ductless heat pump system as a subtract alternate. Quotes are due October 29, 2026 at 11:00 a.m. EDT. A pre-bid conference is referenced in the solicitation documents to address vendor questions, which may also be submitted through the Ocean State Procures platform until October 23, 2026 at 2:00 p.m. EDT. Substantial completion is required within twelve months of Notice to Proceed, with final completion within thirty calendar days thereafter.

Rhode Island's minority business enterprise participation policy mandates a minimum of fifteen percent of the contract value be awarded to MBE/WBE firms. Vendors must submit a bid surety bond or certified check equal to five percent of the cost proposal at submission, and upon award, furnish 100% payment and performance bonds from a surety licensed in Rhode Island. Required insurance includes general liability ($1,000,000 per occurrence), workers' compensation ($100,000 each accident), and automobile liability ($1,000,000 each occurrence). Vendors must hold Rhode Island Contractors' Registration Board certification throughout the contract term and comply with prevailing wage requirements. The State will withhold a 0.33% contract administrative fee from invoices, and liquidated damages are assessed at $100 per day for delays beyond substantial completion. The AIA A104-2017 Standard Abbreviated Form of Agreement is required, and vendors must submit electronically through Ocean State Procures.

View the file

Other files

File Type Posted
RFQ27007070_Oct_29_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_9_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_30_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_23_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_17_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_26_26_solicitation_doc.pdf PDF
RFQ27007070 QA.pdf PDF
Q&A Center Items - RFQ27007070 - Addendum # 3.pdf PDF
RFQ27007070_Nov_19_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_28_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_RFQ27007070_v4_Oct_27_26.pdf PDF
RFQ27007070 Prebid Sign In Sheet.pdf PDF
RFQ27007070_Nov_3_26_solicitation_doc.pdf PDF
Q&A Center Items - RFQ27007070 - Addendum # 4.pdf PDF
RFQ27007070_Nov_11_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_4_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_22_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_6_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_13_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_5_26_solicitation_doc.pdf PDF
Q&A Center Items - RFQ27007070 - Addendum # 2.pdf PDF
RFQ27007070_Nov_2_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_21_26_solicitation_doc.pdf PDF
RFQ27007070 Scope of Work.pdf PDF
RFQ27007070_Nov_10_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_12_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_18_26_solicitation_doc.pdf PDF
RFQ27007070 Plans.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Purchases One Capitol Hill │ Providence, RI 02908 │ (401) 574-8100

Jay Hauser, State Purchasing Agent

RFQ27007070

DEM HVAC System Replacement, Electrification, NBNERR Field Station

Pre-Bid Conference Logistics

There will be a non-mandatory pre-bid conference on Wednesday October 21, 2026 at 8:30am located at NBNERR Field Station, 55 South Reserve Drive, Prudence Island, RI 02872.

Attendance at the pre-bid conference and site walkthrough is not mandatory.

The site is accessible only by ferry from Bristol, Rhode Island; bidders are responsible for their own travel arrangements and should review the Prudence Island Ferry schedule in advance.

It is recommended that vendors take the 7:30am ferry from Bristol, Rhode Island, and take the 10:30am ferry back. You do not need to bring your own vehicle; DEM will meet us at the ferry landing on Prudence Island, and we will drive to the pre-bid site together.

Prebid Information:

Date/Time: Wednesday October 21, 2026 at 8:30am

Location: NBNERR Field Station, 55 South Reserve Drive, Prudence Island, RI 02872

Prudence Island Ferry Terminal Address:

147 Thames Street Bristol, RI 02809

Ferry Timetables:

https://prudencebayislandstransport.com/schedules/summer/

Ferry Reservations:

https://tickets.prudencebayislandstransport.com/reservation/bookatrip.aspx https://prudencebayislandstransport.com/schedules/summer/ https://tickets.prudencebayislandstransport.com/reservation/bookatrip.aspx

File details come from the government source that posted it. Updated .