This Q&A Center Addendum #3 document pertains to RFQ27007070 issued by the State of Rhode Island Department of Environment Management for HVAC system replacement at the NBNERR Reserve Headquarters/Field Station on Prudence Island. The project involves removing existing fossil-fuel-fired heating and split cooling equipment and replacing it with a fully electrified, high-efficiency heat pump HVAC system. Quotes are due October 29, 2026 at 11:00 a.m. EDT, with the collaboration period closing October 23, 2026 at 2:00 p.m. EDT for vendor questions. The contract term requires substantial completion within twelve months of Notice to Proceed, with final completion within thirty calendar days thereafter. Liquidated damages are assessed at $100 per day for delays beyond substantial completion. The site includes one residential building with four bedrooms and full kitchen amenities available for worker accommodations, over 10,000 square feet of outdoor laydown area, and approximately 200 square feet of covered outdoor space for materials and equipment storage, with additional garage space available by arrangement.

Key project parameters clarified through the Q&A include: the contractor bears full responsibility for disposal of all demolished materials, including off-island transport and associated fees; BABA requirements apply to federal funding designated for equipment purchases; alternate work schedules are acceptable provided they comply with applicable labor laws; the existing roof is 5,000 square feet with bituminous surface installed in 2016-2017; no life safety system, generator, or fire alarm system integration is required; utility requirements do not need to be determined pre-award and may be factored into project costs; and for Alternate 1, the PE-stamped design may be submitted after preliminary selection but prior to final contract award. The project is tax-exempt as NBNERR operates under RIDEM, and weekly transportation between the site and ferry dock can be arranged post-award during weekday business hours with scheduling flexibility.

View the file

Other files

File Type Posted
RFQ27007070_Oct_29_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_9_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_30_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_23_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_17_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_26_26_solicitation_doc.pdf PDF
RFQ27007070 QA.pdf PDF
RFQ27007070_Nov_19_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_28_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_RFQ27007070_v4_Oct_27_26.pdf PDF
RFQ27007070 Prebid Sign In Sheet.pdf PDF
RFQ27007070_Nov_3_26_solicitation_doc.pdf PDF
Q&A Center Items - RFQ27007070 - Addendum # 4.pdf PDF
RFQ27007070_Nov_11_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_4_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_22_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_6_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_13_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_5_26_solicitation_doc.pdf PDF
Q&A Center Items - RFQ27007070 - Addendum # 2.pdf PDF
RFQ27007070_Nov_2_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_21_26_solicitation_doc.pdf PDF
RFQ27007070 Scope of Work.pdf PDF
RFQ27007070_Nov_10_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_12_26_solicitation_doc.pdf PDF
RFQ27007070 Prebid Conference Logistics.pdf PDF
RFQ27007070_Nov_18_26_solicitation_doc.pdf PDF
RFQ27007070 Plans.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Center Following Q&A center items have been published by the buying organization for Solicitation RFQ27007070

Solicitation Information

Title: DEM HVAC System Replacement, Electrification, NBNERR Field Station

Description:

The Department of Environment Management (DEM) is seeking quotes from qualified vendors to remove the existing fossil-fuel-fired heating and split cooling equipment at the NBNERR Reserve Headquarters / Field Station on Prudence Island and replace it with a fully electrified, high-efficiency heat pump HVAC system. For more information: a. when viewing from the public bid board, click on the "print/download solicitation" button in the upper right corner of this window, or b. vendor can login to their WebProcure account to view this solicitation in full.

Delivery Terms: Free On Board Destination

Payment Terms: Vendor Specified

Contact Information State of Rhode Island

Marisa DelFarno

1 Capitol Hill 2nd Floor Providence RI, 02908 United States

Tel: 401-574-9235 marisa.delfarno@purchasing.ri.gov

Start Date: Oct 15, 2026 3:30 PM EDT

Open Date: Oct 29, 2026 11:00 AM EDT

Collaboration Start Date: Oct 15, 2026 3:45 PM EDT

Collaboration End Date: Oct 23, 2026 2:00 PM EDT

Vendor may e-mail buyer directly: No

Created: Oct 27, 2026 1:07:43 PM Page: 2

Solicitation RFQ27007070, DEM HVAC System Replacement, Electrification, NBNERR Field Station

Following Questions and Answers have been published:

Question Answer Date

Submitted

Date

Responded

Attachments

What is the capacity of the on-site lodging?

Are there any restrictions on use (number of occupants, duration, amenities, or cost)?

There is one residential building with two bathrooms and four bedrooms furnished with single beds for up to twelve people. It includes a full kitchen (refrigerator, microwave, stove, oven, sink, plates, utensils, cups, cooking equipment, cleaning supplies) and common space. Guests must provide their own linens (sheets, blankets, towels) and food and remove all personal items from the premises at the end of their stay.

Arrangements for accommodations for personnel can be made between the owner and vendor post-award.

Oct 22, 2026 Oct 27, 2026 Total:0

Are alternate work schedules such as four

10-hour days or seven 12-hour days acceptable?

Alternate work schedules are acceptable to the owner so long as any applicable labor laws and regulations are adhered to.

Oct 22, 2026 Oct 27, 2026 Total:0

Can any budgetary or funding amount information related to the NOAA federal grant be disclosed?

Per Purchasing regulations, we are unable to disclose budgetary information for this project.

Oct 22, 2026 Oct 27, 2026 Total:0

Would the owner be open to providing transportation once per week between the site and the ferry dock for workers?

Yes, this could be arranged between the owner and the vendor post-award.

Preference would be that this occurs on weekdays between 8:00 a.m. and 4:00 p.m., but there is some flexibility in scheduling here.

Oct 22, 2026 Oct 27, 2026 Total:0

Is a designated laydown or storage area available for materials and equipment? If so, please describe the location, approximate size, and any restrictions.

Yes, there is a considerable amount of area available adjacent to the main building for materials and equipment including over

10,000 square feet of grassed and paved outdoor space and approximately 200 square feet of covered outdoor space (the adjacent classroom building pavilion structure). If an indoor storage area is required there is garage space available and this can be arranged post-award.

Oct 22, 2026 Oct 27, 2026 Total:0

Please confirm in writing that if the Contractor is responsible for all disposal of demolished materials, including off-island transport and associated fees.

Yes, the Contractor is responsible for all disposal of demolished materials, including off-island transport and associated fees and should account for these in their submitted quote

Oct 22, 2026 Oct 27, 2026 Total:0

Are there any requirements for integration with existing life safety systems, generator, or fire alarm systems? If so, please describe the scope of work.

No Oct 22, 2026 Oct 27, 2026 Total:0

Is this project tax exempt? NBNERR as part of RIDEM is a tax exempt entity.

Oct 22, 2026 Oct 27, 2026 Total:0

Created: Oct 27, 2026 1:07:43 PM Page: 3

Solicitation RFQ27007070, DEM HVAC System Replacement, Electrification, NBNERR Field Station

Can you clarify if there BABA requirements for this project?

BABA requirements apply to this project as stated in the RFQ. Federal funding will apply to equipment purchases, which must comply with BABA requirements.

Oct 22, 2026 Oct 27, 2026 Total:0

Will an addendum be released with updated drawings?

We do not plan to release updated drawings. Oct 22, 2026 Oct 27, 2026 Total:0

"Scope of Work §B.4.3.2 requires removal of the existing phase converter and associated equipment where no longer required, and reconfiguration of the existing three-phase distribution as shown.The electrical drawings identify the existing phase converter on the demolition single-line but do not provide a clear demolition note, detail, or location for the phase converter itself or its associated wiring and devices.Please confirm:

That the existing phase converter and all associated wiring, devices, and supports are to be removed under this contract.

The exact location of the phase converter so it can be properly accounted for in the demolition scope.

Whether any existing three-phase loads currently fed through the phase converter are to remain, and if so, how they are to be re-fed after removal."

These question requires input from the project engineer. We do not currently have a response, but can provide one prior to contract award.

Oct 22, 2026 Oct 27, 2026 Total:0

What is the condition and size of the roof? Roof is 5,000 square feet, bituminous surface that was installed in 2016-2017.

Oct 27, 2026 Oct 27, 2026 Total:0

Are utility requirements expected to be determined as part of the pre-bid process or may they legitimately remain unknown until after award?

Utility requirements do not need to be determined as part of the pre-bid process and that process may be factored into project costs. It is expected that the contractor will determine utility requirements after the award is made.

Oct 27, 2026 Oct 27, 2026 Total:0

Regarding the design requirements for

Alternate 1, is there flexibility on the submission timeline for the PE-stamped design? Specifically, could we submit this after preliminary selection but prior to the final contract award, rather than with the initial quote?

Yes, the PE-stamped design may be submitted for Alternate 1 after preliminary selection.

Oct 27, 2026 Oct 27, 2026 Total:0