Q&A Center Items - RFQ27007070 - Addendum # 2.pdf
PDF 3 KB Posted
- Solicitation number
- RFQ27007070
- Issued by
- Providence County, Rhode Island
About this file
This document is a Questions and Answers addendum (Addendum #2) issued by the Rhode Island Department of Environment Management for RFQ27007070 regarding HVAC system replacement and electrification at the NBNERR Field Station on Prudence Island. The project involves removing existing fossil-fuel heating and split cooling equipment and installing a fully electrified, high-efficiency heat pump HVAC system. Quotes were due October 29, 2026 at 11:00 a.m. EDT. Vendor questions were accepted through October 23, 2026 at 2:00 p.m. EDT via the Ocean State Procures platform. A pre-bid conference was referenced in the solicitation documents. Substantial completion is required within twelve months of Notice to Proceed, with final completion within thirty calendar days thereafter. Liquidated damages are assessed at $100 per day for delays beyond substantial completion.
Pricing terms require submission of a bid surety bond or certified check equal to five percent of the cost proposal. Prior to purchase order issuance, the awarded vendor must furnish 100% payment and performance bonds from a surety licensed in Rhode Island. Rhode Island's minority business enterprise participation policy requires awarding a minimum of fifteen percent of the contract value to MBE/WBE firms. Required insurance includes general liability ($1,000,000 per occurrence), workers' compensation ($100,000 each accident), and automobile liability ($1,000,000 each occurrence). Vendors must hold Rhode Island Contractors' Registration Board certification throughout the contract term and comply with prevailing wage requirements. The State will withhold a 0.33% contract administrative fee from invoices. The solicitation mandates use of the AIA A104-2017 Standard Abbreviated Form of Agreement Between Owner and Contractor with State of Rhode Island. A subtract alternate option permits substitution of a simplified ductless heat pump system in lieu of the ducted VRF system with ductwork and energy recovery ventilator.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Center Following Q&A center items have been published by the buying organization for Solicitation RFQ27007070
Solicitation Information
Title: DEM HVAC System Replacement, Electrification, NBNERR Field Station
Description:
The Department of Environment Management (DEM) is seeking quotes from qualified vendors to remove the existing fossil-fuel-fired heating and split cooling equipment at the NBNERR Reserve Headquarters / Field Station on Prudence Island and replace it with a fully electrified, high-efficiency heat pump HVAC system. For more information: a. when viewing from the public bid board, click on the "print/download solicitation" button in the upper right corner of this window, or b. vendor can login to their WebProcure account to view this solicitation in full.
Delivery Terms: Free On Board Destination
Payment Terms: Vendor Specified
Contact Information State of Rhode Island
Marisa DelFarno
1 Capitol Hill 2nd Floor Providence RI, 02908 United States
Tel: 401-574-9235 marisa.delfarno@purchasing.ri.gov
Start Date: Oct 15, 2026 3:30 PM EDT
Open Date: Oct 29, 2026 11:00 AM EDT
Collaboration Start Date: Oct 15, 2026 3:45 PM EDT
Collaboration End Date: Oct 23, 2026 2:00 PM EDT
Vendor may e-mail buyer directly: No
Created: Oct 22, 2026 2:11:43 PM Page: 2
Solicitation RFQ27007070, DEM HVAC System Replacement, Electrification, NBNERR Field Station
Following Questions and Answers have been published:
Question Answer Date
Submitted
Date
Responded
Attachments
Regarding the design requirements for
Alternate 1, is there flexibility on the submission timeline for the PE-stamped design? Specifically, could we submit this after preliminary selection but prior to the final contract award, rather than with the initial quote?
Yes, DEM is fine with the vendor submitting the PE-stamped design after initial selection but prior to the final contract award. DEM expects the vendor to provide as-built documents and stamped plans as part of the closeout of the project.
Oct 22, 2026 Oct 22, 2026 Total:0