Q&A Center Items - RFQ27007070 - Addendum # 4.pdf
PDF 3 KB Posted
- Solicitation number
- RFQ27007070
- Issued by
- Providence County, Rhode Island
About this file
This document is a Questions and Answers addendum (Addendum #4) related to Rhode Island Department of Environment Management's RFQ27007070 for HVAC system replacement and electrification at the NBNERR Field Station on Prudence Island. The project involves removal of existing fossil-fuel heating and split cooling equipment and installation of a fully electrified, high-efficiency heat pump HVAC system. The scope includes a subtract alternate option for a simplified ductless heat pump system as an alternative to the ducted VRF system with ductwork and energy recovery ventilator. Vendor questions could be submitted through October 23, 2026 at 2:00 p.m. EDT via the Ocean State Procures platform, with quotes due October 29, 2026 at 11:00 a.m. EDT. Substantial completion is required within twelve months of Notice to Proceed, with final completion within thirty calendar days thereafter. Liquidated damages are assessed at $100 per day for delays beyond substantial completion.
Vendors must hold Rhode Island Contractors' Registration Board certification and comply with prevailing wage requirements. Rhode Island's minority business enterprise participation policy requires awarding a minimum of fifteen percent of contract value to MBE/WBE firms. Vendors must submit electronically through Ocean State Procures and furnish a bid surety bond or certified check equal to five percent of the cost proposal at submission. Prior to purchase order issuance, the awarded vendor must furnish 100% payment and performance bonds from a surety licensed in Rhode Island. Required insurance includes general liability ($1,000,000 per occurrence), workers' compensation ($100,000 each accident), and automobile liability ($1,000,000 each occurrence). The State will withhold a 0.33% contract administrative fee from invoices, and the AIA A104-2017 Standard Abbreviated Form of Agreement is required.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Center Following Q&A center items have been published by the buying organization for Solicitation RFQ27007070
Solicitation Information
Title: DEM HVAC System Replacement, Electrification, NBNERR Field Station
Description:
The Department of Environment Management (DEM) is seeking quotes from qualified vendors to remove the existing fossil-fuel-fired heating and split cooling equipment at the NBNERR Reserve Headquarters / Field Station on Prudence Island and replace it with a fully electrified, high-efficiency heat pump HVAC system. For more information: a. when viewing from the public bid board, click on the "print/download solicitation" button in the upper right corner of this window, or b. vendor can login to their WebProcure account to view this solicitation in full.
Delivery Terms: Free On Board Destination
Payment Terms: Vendor Specified
Contact Information State of Rhode Island
Marisa DelFarno
1 Capitol Hill 2nd Floor Providence RI, 02908 United States
Tel: 401-574-9235 marisa.delfarno@purchasing.ri.gov
Start Date: Oct 15, 2026 3:30 PM EDT
Open Date: Nov 02, 2026 11:00 AM EST
Collaboration Start Date: Oct 15, 2026 3:45 PM EDT
Collaboration End Date: Oct 23, 2026 2:00 PM EDT
Vendor may e-mail buyer directly: No
Created: Oct 27, 2026 3:57:50 PM Page: 2
Solicitation RFQ27007070, DEM HVAC System Replacement, Electrification, NBNERR Field Station
Following Questions and Answers have been published:
Question Answer Date
Submitted
Date
Responded
Attachments
Scope of Work §B.4.3.2 requires removal of the existing phase converter and associated equipment where no longer required, and reconfiguration of the existing three-phase distribution as shown.The electrical drawings identify the existing phase converter on the demolition single-line but do not provide a clear demolition note, detail, or location for the phase converter itself or its associated wiring and devices.Please confirm: That the existing phase converter and all associated wiring, devices, and supports are to be removed under this contract. The exact location of the phase converter so it can be properly accounted for in the demolition scope. Whether any existing three-phase loads currently fed through the phase converter are to remain, and if so, how they are to be re-fed after removal."
UPDATED ANSWER: The removal and demolition of the phase converter is not required. The existing and new service are single phase. The phase converter should not be removed.
Oct 27, 2026 Oct 27, 2026 Total:0
File details come from the government source that posted it. Updated .