This is a Request for Quotes (RFQ27007070) document from the Rhode Island Department of Environment Management for HVAC system replacement and electrification services at the NBNERR Reserve Headquarters/Field Station on Prudence Island. The project involves removal of existing fossil-fuel heating and split cooling equipment and installation of a fully electrified, high-efficiency heat pump HVAC system. A subtract alternate option permits vendors to substitute a simplified ductless heat pump system in place of the ducted VRF system with ductwork and energy recovery ventilator. Quotes are due October 29, 2026 at 11:00 a.m. EDT, with vendor questions accepted through October 23, 2026 at 2:00 p.m. EDT via the Ocean State Procures platform. A pre-bid conference is referenced in the solicitation documents. Substantial completion is required within twelve months of Notice to Proceed, with final completion within thirty calendar days thereafter. Liquidated damages are assessed at $100 per day for delays beyond substantial completion.

Vendors must include all specified work, costs of bonds, and any allowances and addenda in their proposals, submitting electronically through Ocean State Procures with a bid surety bond or certified check equal to five percent of the cost proposal. Rhode Island's minority business enterprise participation policy requires awarding a minimum of fifteen percent of the contract value to MBE/WBE firms. The awarded vendor must furnish 100% payment and performance bonds from a Rhode Island-licensed surety prior to purchase order issuance. Required insurance includes general liability ($1,000,000 per occurrence), workers' compensation ($100,000 each accident), and automobile liability ($1,000,000 each occurrence). Vendors must hold Rhode Island Contractors' Registration Board certification throughout the contract term and comply with prevailing wage requirements. The State will withhold a 0.33% contract administrative fee from invoices, and the AIA A104-2017 Standard Abbreviated Form of Agreement Between Owner and Contractor with State of Rhode Island is required.

View the file

Other files

File Type Posted
RFQ27007070_Oct_29_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_9_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_30_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_23_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_17_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_26_26_solicitation_doc.pdf PDF
RFQ27007070 QA.pdf PDF
Q&A Center Items - RFQ27007070 - Addendum # 3.pdf PDF
RFQ27007070_Nov_19_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_28_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_RFQ27007070_v4_Oct_27_26.pdf PDF
RFQ27007070 Prebid Sign In Sheet.pdf PDF
RFQ27007070_Nov_3_26_solicitation_doc.pdf PDF
Q&A Center Items - RFQ27007070 - Addendum # 4.pdf PDF
RFQ27007070_Nov_11_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_4_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_22_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_6_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_13_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_5_26_solicitation_doc.pdf PDF
Q&A Center Items - RFQ27007070 - Addendum # 2.pdf PDF
RFQ27007070_Nov_2_26_solicitation_doc.pdf PDF
RFQ27007070_Oct_21_26_solicitation_doc.pdf PDF
RFQ27007070 Scope of Work.pdf PDF
RFQ27007070_Nov_10_26_solicitation_doc.pdf PDF
RFQ27007070_Nov_12_26_solicitation_doc.pdf PDF
RFQ27007070 Prebid Conference Logistics.pdf PDF
RFQ27007070_Nov_18_26_solicitation_doc.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A.

B.

EXISTING CONDITIONS SHOWN ARE BASED ON AND NON-DESTRUCTIVE FILED INVESTIGATION. FIELD

VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK.

PATCH PENETRATIONS THAT ARE NOT USED FOR NEW HVAC SYSTEM. COORDINATE WITH ARCHITECTURAL

WORK.

DEMO NOTES

A.

B.

IT IS THE INTENTION OF THE SPECIFICATIONS AND DRAWINGS TO CALL FOR COMPLETE, FINISHED WORK, TESTED AND READY FOR CONTINUOUS OPERATION. ANY APPARATUS, APPLIANCE, MATERIAL OR WORK NOT SHOWN ON THE DRAWINGS, BUT MENTIONED IN THE SPECIFICATIONS OR VICE VERSA, OR ANY INCIDENTAL ACCESSORIES NECESSARY TO MAKE THE WORK COMPLETE IN ALL RESPECTS AND READY FOR OPERATION, EVEN IF NOT PARTICULARLY SPECIFIED, SHALL BE PROVIDED BY THE CONTRACTOR OR HIS/HER SUB-SUBCONTRACTORS, WITHOUT ADDITIONAL EXPENSE TO THE OWNER.

THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. THE LOCATIONS OF ALL ITEMS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS MUST BE DETERMINED AT THE SITE AND SHALL HAVE THE APPROVAL OF THE ARCHITECT BEFORE BEING INSTALLED. THE HVAC SUBCONTRACTOR SHALL FOLLOW DRAWINGS, INCLUDING SHOP DRAWINGS, IN LAYING OUT WORK AND SHALL CHECK THE DRAWINGS OF OTHER TRADES TO VERIFY SPACES IN WHICH WORK WILL BE INSTALLED. MAINTAIN MAXIMUM HEADROOM AND SPACE CONDITIONS. WHERE SPACE CONDITIONS APPEAR INADEQUATE, NOTIFY THE ARCHITECT BEFORE PROCEEDING WITH THE INSTALLATION. THE HVAC SUBCONTRACTOR SHALL, WITHOUT EXTRA CHARGE, MAKE REASONABLE MODIFICATIONS IN THE LAYOUT AS NEEDED TO PREVENT CONFLICT WITH WORK OF OTHER

TRADES OR FOR PROPER EXECUTION OF THE WORK.

DRAWING AND SPECIFICATIONS

GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

V.

W.

X.

Y.

Z.

AA.

AB.

AC.

AD.

AE.

AF.

AG.

AH.

AI.

AJ.

THERE SHALL BE NO SERVICE INTERRUPTION WITHOUT PRIOR APPROVAL

PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY

CODE

CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, ELECTRICAL AND FIRE PROTECTION) ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT

ONLY.

INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS ’

RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.

ALL PIPING ON THIS PLAN SHALL BE CONCEALED UNLESS OTHERWISE NOTED.

REPAIR PAVING/FLOOR AFTER INSTALLATION AND INSPECTION OF UTILITIES INSTALLED. PAINT FLOOR TO

MATCH PREVIOUS OR MATCH AND COMPLY WITH ARCHITECTURAL DRAWINGS.

CONTRACTOR TO RECONNECT EXISTING ELECTRICAL GROUNDING/BONDING TO COLD WATER PIPING SYSTEM

(AS APPLICABLE.)

PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION

TO BUILDING STRUCTURE.

PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50 FEET OF

ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS) THROUGHOUT

MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF STEAM MAINS WITHIN 50 FEET OF BOILER

OR PRESSURE REDUCING VALVES.

PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS OF STEAM MAINS WITHIN 50 FEET OF BOILERS

AND PRESSURE REDUCING VALVES.

THE LOCATION OF EXISTING UNDERGROUND/UNDERSLAB UTILITIES IS SHOWN IN AN APPROXIMATE WAY ONLY.

THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PAY FOR AND REPAIR ALL DAMAGES CAUSED BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES UNLESS OTHERWISE INDICATED.

COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

MAINTAIN A MINIMUM OF 6 ′-8″ CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED

EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.

ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.

LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP- AND DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER

FOR GOOD ACCURACY. PROVIDE ACCESS PANELS WHERE REQUIRED.

TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TESTING, ADJUSTING, AND

BALANCING SHALL BE PERFORMED IN ACCORDANCE WITH THE AABC STANDARDS.

WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE

MANUFACTURER SHALL BE USED.

REINFORCEMENT, DETAILING, AND PLACEMENT OF CONCRETE SHALL CONFORM TO ASTM 315 AND ACI 318.

CONCRETE SHALL CONFORM TO ASTM C94. CONCRETE WORK SHALL CONFORM TO ACI 318, PART ENTITLED “CONSTRUCTION REQUIREMENTS. ” COMPRESSIVE STRENGTH IN 28 DAYS SHALL BE 3,000 PSI. TOTAL AIR CONTENT OF EXTERIOR CONCRETE SHALL BE BETWEEN 5 AND 7 PERCENT BY VOLUME. SLUMP SHALL BE

BETWEEN 3 AND 4 INCHES. CONCRETE SHALL BE CURED FOR 7 DAYS AFTER PLACEMENT.

COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS ’ CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE

FABRICATION.

ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE AND DIVISION 16 OF

THE SPECIFICATION.

CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED AND LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL BE 6 INCHES. PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 6 INCHES ON EACH SIDE. CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE SIZE AND LOCATION OF CONCRETE HOUSEKEEPING PADS WITH GENERAL

CONTRACTOR.

ALL MECHANICAL ROOM DOORS SHALL BE A MINIMUM OF 4 ′-0″ WIDE.

WHERE BEAMS ARE INDICATED TO BE PENETRATED WITH DUCTWORK OR PIPING, COORDINATE DUCTWORK AND PIPING LAYOUT WITH BEAM OPENING SIZE AND OPENING LOCATIONS. COORDINATION SHALL BE DONE

PRIOR TO FABRICATION OF DUCTWORK, CUTTING OF PIPING, OR FABRICATION OF BEAMS.

WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, FIRE PROTECTION, ETC.) IS SUBCONTRACTED, IT SHALL BE THE MECHANICAL CONTRACTOR ’S RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE

MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.

THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.

ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY

THE MECHANICAL CONTRACTOR.

PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANELS

SHALL BE TURNED OVER TO GENERAL CONTRACTOR FOR INSTALLATION.

ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND REQUIRED

TO PROVIDE A VIBRATION FREE INSTALLATION.

ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL

BE AT PANEL POINTS. PROVIDE BEAM CLAMPS MEETING MSS STANDARDS.

WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE

PERMITTED.

MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM METAL DECK.

ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR.

LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER

TRADES INVOLVED.

ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH A

PRODUCT SIMILAR TO 3M OR APPROVED EQUAL.

ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND ROOFTOP UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH “P” TRAP, AND PIPED TO NEAREST DRAIN. SEE DETAILS SHOWN ON THE DRAWINGS OR THE CONTRACT SPECIFICATIONS FOR DEPTH OF AIR CONDITIONING

CONDENSATE TRAP.

REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.

GENERAL SHEET NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

PROVIDE ACCESS PANELS IN NON-ACCESSIBLE AREAS (RATED OR NON�RATED) MINIMUM 12”X12” SIZE FOR COMBINATION FIRE/SMOKE DAMPERS. INSTALL LARGER ACCESS PANELS FOR LARGER EQUIPMENT AS REQUIRED BY CODE. COORDINATE WITH ARCHITECT FOR APPROVAL OF FINAL LOCATIONS PRIOR TO

INSTALLATION.

PROVIDE FIRESTOPPING AT PASS THROUGH DUCT PENETRATIONS THROUGH RATED WALLS. DUCTWORK SHALL BE A MINIMUM 26 GA SHEET METAL. COORDINATE WITH OTHER TRADES THAT MAY HAVE PENETRANTS

AROUND THE SAME AREA. REFER TO ARCHITECTURAL SHEETS FOR RATING ASSEMBLIES.

INSULATION MATERIALS APPLIED TO DUCTWORK SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25

AND SMOKE DENSITY NOT EXCEEDING 50.

REQUIRED OFFSETS, COMPONENTS, ACCESSORIES, AND FITTINGS MAY NOT BE SHOWN BUT SHALL BE

PROVIDED AS REQUIRED TO AVOID INTERFERENCES WITH UNFORESEEN COMPONENTS.

PROVIDE DIELECTRIC UNIONS, GASKETS, AND FASTENERS AT DISSIMILAR METAL CONNECTIONS OF CONTACT

POINTS.

ROUTE CONDENSATE DRAIN PIPE TO FOLLOW EXISTING HVAC PIPING CHASES AND RISERS.

MAINTAIN A 3-0” DISTANCE FROM ENVIRONMENTAL EXHAUST OUTLETS (AS DEFINED IN RI SBC) TO BUILD

OPENINGS AND 10’-O” DISTANCE TO MECHANICALLY FORCED AIR INLET.

DUCT SIZE INDICATED ON PLANS ARE THE "FREE AREA ” INSIDE DIMENSIONS OF THE DUCT. INCREASE THE SIZE OF THE DUCT TO ACCOMMODATE ACOUSTICAL SILENCERS AND/OR DUCT LINERS. FOR EXAMPLE, A DUCT SIZE

SHOWN AS 12” X12” WITH 2” LINER SHALL BE SUPPLIED WITH A 16 ”X16” DUCT.

ROOF SUPPORTS SHALL BE POSITIVELY ATTACHED TO THE ROOF STRUCTURE.

INSTALL DUCT SYSTEMS IN THE FOLLOWING ORDER FROM LOWEST TO HIGHEST REFERENCED FROM THE

FINISHED CEILING HEIGHT: - SUPPLY DUCT - RETURN/RELIEF DUCT - EXHAUST DUCT

PROVIDE MANUAL SHEET METAL VOLUME DAMPER PRIOR TO EACH SUPPLY DIFFUSER/REGISTER AT THE BRANCH DUCT LOCATION. IF THE MANUAL IS AN INACCESSIBLE LOCATION, CONTRACTOR TO PROVIDE CABLE OPERATED DAMPER (COD) FOR HIGH CEILINGS AND ALL DRYWALL CEILING LOCATIONS. DAMPERS SHALL BE

INDICATED ON SHOP DRAWINGS FOR COORDINATION AND APPROVAL.

ALL LOW VOLTAGE CONDUIT SHALL BE CONCEALED ABOVE CEILING AND WITHIN WALLS

A.

B.

C.

a.

b.

c.

d.

e.

f.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

V.

W.

X.

Y.

PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL

COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS

REQUIRED BY CODE.

CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME DAMPERS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR THESE ITEMS. CONTRACTOR IS REQUIRED TO INSTALL ACCESSORIES INCLUDED BUT NOT LIMITED TO ACCESS PANELS, DAMPERS (INCLUDING FIRE, SMOKE AND COMBO), TEST PORTS AS REQUIRED BY CODE. FIRE AND SMOKE DAMPERS SHALL BE INSTALLED AT A MINIMUM OF ALL FIRE WALL PENETRATIONS UNLESS EXEMPT BY CODE. FIRE AN DUCT SMOKES SHALL BE INSTALLED WITH IN 5' OF THE DAMPER WHEN

REQUIRED, UNLESS OTHERWISE REQUIRED.

INSULATE THE FOLLOWING:

ALL SUPPLY AIR, OUTDOOR AIR,

EXHAUST AND RELIEF AIR BETWEEN THE MOTOR-OPERATED DAMPER AND PENETRATION OF

THE BUILDING EXTERIOR.

ALL DUCTWORK LOCATED IN UNCONDITIONED SPACES OR OUTSIDE BUILDING ENVELOPE

ALL DUCTWORK LOCATED IN ATTICS, WHETHER VENTILATED OR UNVENTILATED.

ALL DUCTWORK BURIED EITHER OUTSIDE THE BUILDING OR BELOW FLOORS

ALL SURFACES SHOULD BE RESISTANT TO MOLD GROWTH AND RESIST EROSION, ACCORDING

TO THE REQUIREMENTS OF ASHRAE STANDARD 62.1.

IN CORRIDORS WHERE CEILING SPEAKERS AND AIR DIFFUSERS ARE INDICATED BETWEEN THE SAME LIGHT FIXTURES, INSTALL BOTH DEVICES AT THE QUARTER POINTS BETWEEN THE SAME FIXTURE.

UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS AND HUMIDISTATS 4 ′-0″ (CENTERLINE)

ABOVE FINISHED FLOOR. NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE ABOVE LOCATION

CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION.

ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.

ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS AND

DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING THICKNESS.

PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS

OTHERWISE INDICATED. ELBOWS IN DISHWASHER, KITCHEN, AND LAUNDRY EXHAUST SHALL BE

UNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL TO 11 ⁄2 TIMES THE WIDTH OF THE

DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH TURNING VANES.

COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL REFLECTED

CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT MODIFICATIONS TO

SUIT.

FIELD ERECTED AND FACTORY ASSEMBLED AIR HANDLING UNIT COILS SHALL BE ARRANGED FOR

REMOVAL FROM THE UPSTREAM SIDE WITHOUT DISMANTLING SUPPORTS. PROVIDE GALVANIZED

STRUCTURAL STEEL SUPPORTS FOR ALL COILS (EXCEPT LOWEST COIL) IN BANKS OVER TWO COILS

HIGH TO PERMIT INDEPENDENT REMOVAL OF ANY COIL.

ALL AIR HANDLING UNITS SHALL OPERATE WITHOUT MOISTURE CARRYOVER.

LOCATE ALL MECHANICAL EQUIPMENT (SINGLE DUCT, DUAL DUCT, VARIABLE VOLUME, CONSTANT VOLUME AND FAN POWERED BOXES, FAN COIL UNITS, CABINET HEATERS, UNIT HEATERS, UNIT VENTILATORS, COILS, STEAM HUMIDIFIERS, ETC.) FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS

PANELS, CONTROLS AND VALVING.

FINNED TUBE RADIATION ENCLOSURES SHALL BE WALL TO WALL UNLESS OTHERWISE INDICATED.

PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND EXHAUST) CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE

EQUIPMENT UNLESS OTHERWISE INDICATED.

UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO THE UNDERSIDE OF THE

STRUCTURE, WITH SPACE FOR INSULATION IF REQUIRED.

RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5 FEET (EDIT MAXIMUM LENGTH OF FLEXIBLE DUCT TO

SUIT PROJECT; 5 FEET MAXIMUM RECOMMENDED LENGTH, 8 FEET MAXIMUM LENGTH).

ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL

COST TO THE OWNER.

PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE

DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN

THE DUCTWORK WHICH REQUIRE SERVICE AND/OR INSPECTION.

PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND MAINTENANCE OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENTS. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED

OR SOLDERED TO BOTH THE EQUIPMENT AND THE DUCT.

SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL CONTRACTOR. THE

MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE DETECTOR IN

DUCTWORK AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH MANUFACTURER ’S PRINTED

INSTRUCTIONS.

TERMINATE GAS VENTS FOR UNIT HEATERS, WATER HEATERS, HIGH PRESSURE PARTS WASHER, HIGH PRESSURE CLEANER, AND OTHER GAS APPLIANCES A MINIMUM OF 3 ′0″ ABOVE ROOF WITH RAIN CAP (EDIT APPLIANCES AND HEIGHT ABOVE ROOF TO MEET CODE AND TO SUIT PROJECT REQUIREMENTS).

SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER REQUIREMENTS.

EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. DETAILED DESCRIPTIONS ARE

PROVIDED IN THE ARCHITECTURAL SPECIFICATIONS.

EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. LOUVER SIZES, LOCATIONS, AND

DETAILS SHALL BE COORDINATED WITH GENERAL CONTRACTOR.

EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. LOUVER SIZES, LOCATIONS, MOUNTING, AND DETAILS SHALL BE COORDINATED WITH OTHER TRADES INVOLVED.

HVAC/ SHEETMETAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

V.

W.

X.

Y.

Z.

AA.

AB.

AC.

AD.

PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.

ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE CENTERLINE OF ALL PRESSURE PIPING AND TO THE

INVERT OF ALL GRAVITY PIPING.

MAINTAIN A MINIMUM OF 3 ′6″ OF GROUND COVER OVER ALL UNDERGROUND HVAC PIPING BUT ENSURE FROST

LINE IN CONSIDERED AND MET.

UNLESS OTHERWISE NOTED, ALL CHILLED WATER AND HEATING WATER PIPING SHALL BE 3 ⁄4 INCH SIZE (EDIT

SYSTEM TYPE OR PIPE SIZE TO SUIT PROJECT REQUIREMENTS).

PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP ALL HYDRONIC PIPING SYSTEMS INCLUDING BUT NOT LIMITED TO IN THE HEATING WATER, CHILLED WATER, AND OTHER CLOSED WATER PIPING SYSTEMS (EDIT SYSTEM TYPES TO SUIT PROJECT REQUIREMENTS). ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE

END DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND LOW POINTS.

UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF STRUCTURE OR SLAB, WITH

SPACE FOR INSULATION IF REQUIRED.

INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER APPURTENANCES

REQUIRING ACCESS ARE ACCESSIBLE.

ALL VALVES SHALL BE INSTALLED SO THAT VALVE REMAINS IN SERVICE WHEN EQUIPMENT OR PIPING ON

EQUIPMENT SIDE OF VALVE IS REMOVED.

ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION INDICATORS AND

MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS)

PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED GREATER THAN 7 ′-0″

ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO 7 ′-0″ ABOVE FLOOR LEVEL.

ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF PIPE BEFORE REDUCING SIZE

TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROLS.

UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN BYPASSES, AND IN LONG

PIPING RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.

PITCH STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW 1 ⁄4 INCH IN 10 FEET (1 INCH IN 40 FEET) MINIMUM.

PITCH ALL STEAM RETURN LINES DOWNWARD IN THE DIRECTION OF CONDENSATE FLOW 1 ⁄2 INCH PER 10 FEET (1 INCH IN 20 FEET) MINIMUM. WHERE LENGTH OF BRANCH LINES ARE LESS THAN 8 FEET, PITCH BRANCH LINES

TOWARD MAINS 1⁄2 INCH PER FOOT MINIMUM.

PITCH UP ALL STEAM AND CONDENSATE RUNOUTS TO RISERS AND EQUIPMENT 1 ⁄2 INCH PER FOOT. WHERE THIS PITCH CANNOT BE OBTAINED, RUNOUTS OVER 8 FEET IN LENGTH SHALL BE ONE SIZE LARGER THAN NOTED.

TAP ALL BRANCH LINES FROM TOP OF STEAM MAINS (45 DEGREES PREFERRED, 90 DEGREES ACCEPTABLE).

PROVIDE AN END OF MAIN DRIP AT EACH RISE IN THE STEAM MAIN. PROVIDE CONDENSATE DRIPS AT THE BOTTOM OF ALL STEAM RISERS, DOWNFED RUNOUTS TO EQUIPMENT, RADIATORS, ETC., AT END OF MAINS AND LOW POINTS, AND AHEAD OF ALL PRESSURE REGULATORS, CONTROL VALVES, ISOLATION VALVES, AND

EXPANSION JOINTS.

ON STRAIGHT STEAM PIPING RUNS WITH NO NATURAL DRAINAGE POINTS, INSTALL DRIP LEGS AT INTERVALS NOT EXCEEDING 200 FEET WHERE PIPE IS PITCHED DOWNWARD IN THE DIRECTION OF STEAM FLOW AND A MAXIMUM OF 100 FEET WHERE THE PIPE IS PITCHED UP SO THAT CONDENSATE FLOW IS OPPOSITE OF STEAM FLOW.

STEAM TRAPS SHALL BE MINIMUM 3 ⁄4″ SIZE.

INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.

ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AROUND

OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS, CHILLERS, COOLING TOWERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION EXCEPT WATER COILS. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE

DRAWINGS.

SLOPE REFRIGERANT PIPING ONE PERCENT IN THE DIRECTION OF OIL RETURN. LIQUID LINES MAY BE INSTALLED

LEVEL.

INSTALL HORIZONTAL REFRIGERANT HOT GAS DISCHARGE PIPING WITH 1 ⁄2″ PER 10 FEET DOWNWARD SLOPE AWAY FROM THE COMPRESSOR.Z. INSTALL HORIZONTAL REFRIGERANT SUCTION LINES WITH 1 ⁄2″ PER 10 FEET DOWNWARD SLOPE TO THE COMPRESSOR, WITH NO LONG TRAPS OR DEAD ENDS WHICH MAY CAUSE OIL TO

SEPARATE FROM THE SUCTION GAS AND RETURN TO THE COMPRESSOR IN DAMAGING SLUGS.

PROVIDE LINE SIZE LIQUID INDICATORS IN MAIN LIQUID LINE LEAVING CONDENSER OR RECEIVER. INSTALL MOISTURE-LIQUID INDICATORS IN LIQUID LINES BETWEEN FILTER DRYERS AND THERMOSTATIC EXPANSION

VALVES AND IN LIQUID LINE TO RECEIVER.

PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH AUTOMATIC VALVE. PROVIDE SHUTOFF VALVE ON EACH SIDE

OF STRAINER.

PROVIDE PERMANENT FILTER DRYERS IN LOW TEMPERATURE SYSTEMS AND SYSTEMS USING HERMETIC

COMPRESSORS.

PROVIDE REPLACEABLE CARTRIDGE FILTER DRYERS WITH THREE VALVE BYPASS ASSEMBLY FOR SOLENOID

VALVES, ADJACENT TO RECEIVERS.

PROVIDE REFRIGERANT CHARGING VALVE CONNECTIONS IN LIQUID LINE BETWEEN RECEIVER SHUTOFF VALVE

AND EXPANSION VALVE.

PIPING NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

V.

W.

X.

Y.

Z.

AA.

AB.

ALL CONTRACTORS SHALL FOLLOW THE CURRENT ENFORCED RHODE ISLAND

STATE BUILDING CODES AS A MINIMUM, HOWEVER SECTIONS OF THESE

DOCUMENTS REFLECT CURRENT VERSION OF ICC INTERNATIONAL CODES

WHERE THEY SUPERSEDE RISBC. ALL CONTRACTORS SHALL FOLLOW ALL

LOCAL REQUIREMENTS BY AUTHORITIES HAVING JURISDICTION.

CONTRACTORS SHALL INSTALL ALL EQUIPMENT FOLLOWING ASHRAE, ASME,

ASTM, NFPA AND NEC STANDARDS.

CONTRACTORS SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND

SERVICES AS SHOWN AND/OR IMPLIED ON DRAWINGS AND SPECIFICATIONS FOR

A COMPLETE AND PROPER INSTALLATION. THE DRAWINGS ARE NOT ALL

INCLUSIVE AND THE CONTRACTOR IS RESPONSIBLE FOR A COMPLETE

INSTALLATION. THE DRAWINGS SHOW MAJOR COMPONENTS AND ALL QUALIFIED

CONTRACTORS SHALL HAVE SUFFICIENT EXPERIENCE IN PERFORMANCE OF

THIS INSTALLATION.

CONTRACTORS SHALL FURNISH AND INSTALL, PURGE, CHARGE, TEST AND

OPERATE ALL EQUIPMENT, ACCESS DOORS, CAULKING, SLEEVES, FLASHING,

FLEXIBLE CONNECTIONS, INSERTS, DEVICES, HANGERS, SUPPORTS, BRACING,

FASTENERS, MISCELLANEOUS HARDWARE AND INSULATION.

CONTRACTOR SHALL OBTAIN AND PAY FOR PERMITS, INSPECTIONS AND TESTS

REQUIRED BY GOVERNING AUTHORITIES HAVING JURISDICTION

PROVIDED EQUIPMENT AND/OR EQUIPMENT COMPONENTS WITH UL LABELS TO

COMPLY WITH THE NATIONAL ELECTRIC CODE.

MAINTAIN COMPLIANCE WITH OSHA THROUGHOUT THE CONSTRUCTION PHASE

AND WITH COMPLETED WORK.

PROVIDE ALL LABOR, MATERIALS, PLANT EQUIPMENT AND SERVICES

NECESSARY AND REQUIRED TO COMPLETE MEP WORK AS SHOWN ON AND/OR

REASONABLY IMPLIED BY THE DRAWINGS AND SPECIFICATIONS.

THE FOLLOWING ARE THE GENERAL CLASSIFICATIONS OF WORK INCLUDED IN,

BUT NOT LIMITED TO THIS SECTION.

RECEIVING, RIGGING, SETTING AND INSTALLATION OF THE PURCHASED

EQUIPMENT.

PROVIDING OF SHOP DRAWINGS FOR APPROVAL WITHIN ALLOWANCE OF

ACCEPTANCE AND INSTALLATION TO NOT HINDER CONSTRUCTION SCHEDULE.

PURCHASE INSTALL, ELECTRICAL AND PIPING OF NEW EQUIPMENT AS

SCHEDULED.

DEMOLITION AND MAKE SAFE EXISTING PIPING, DUCTWORK AND ASSOCIATED

HANGERS AS INDICATED ON DRAWINGS.

DEMOLITION AND MAKE SAFE EXISTING ELECTRICAL AND CONDUIT AS

REQUIRED

LOW PRESSURE COMPRESSED AIR PIPING, VALVES, FITTINGS, LABELING,

TAGGING, ETC.

STEAM AND CONDENSATE PIPING, VALVES, FITTINGS, LABELING, TAGGING, ETC.

PIPING SUPPORTS INSIDE AND OUTSIDE.

TIE-IN OF FIRE ALARMING DEVICES TO EXISTING SYSTEM.

CONTROL WIRING TO EQUIPMENT AND DEVICES.

WORK PERFORMED DURING SUMMER MONTHS SHALL MAINTAIN HUMIDITY IN

ADDITION TO TEMPERATURES.

CUTTING AND PATCHING FOR ALL MECHANICAL WORK.

START- UP OPERATIONS.

CLEAN UP.

COORDINATION AND COOPERATION WITH CONTRACTORS AND SUPPLIERS FOR

OTHER SECTIONS AND WITH THE OWNER.

AS- BUILT DRAWINGS.

WARRANTY AND GUARANTEE.

ELECTRICAL POWER WIRING OF NEW EQUIPMENT.

CONCRETE PADS AS REQUIRED

SCOPE OF WORK

A.

a.

B.

C.

D.

REMOVE ABANDONED HVAC EQUIPMENT, MATERIALS, DUCTWORK AND COMPONENTS:

ENSURE THIS IS EITHER ABANDONED IN PLACE OR NO LONGER REQUIRED.

INSTALL NEW EQUIPMENT AND ACCESSORIES TO PROVIDE A COMPLETE INSTALLATION THAT COVERS

THE INTENT OF THE DRAWINGS.

INSTALL NEW AND/OR MODIFY DUCTWORK AS APPROPRIATE TO COMPLETE PROJECT

PROVIDE ALL MECHANICAL, ELECTRICAL, CONTROL WIRING AND PLUMBING FOR NEW EQUIPMENT.

PROJECT SCOPE OF WORK

A.

B.

C.

D.

ENGINEER OF RECORD (EOR) ANDRE GILL ENGINEERING, LLC (AGE) WAS HIRED BY NBNERR TO PROVIDE AND UPGRADED HVAC SYSTEM AND SUPPORT ELECTRIFICATION INITIATIVES. ALSO, SELECT AND SPECIFY EQUIPMENT TO BE INSTALLED BY THE SUCCESSFUL CONTRACTOR FOR WORK DESCRIBED IN THE PROJECT SCOPE OF WORK. THE SELECTED EQUIPMENT REQUIRED AND UPGRADE TO THE MAIN

DISTRIBUTION PANEL AS SHOWN ON THE ELECTRICAL DRAWINGS.

THE PREVIOUS FURNACES ARE TO BE REMOVED AND REPLACED WITH MITSUBISHI/ TRANE MULTI POSITION AIR HANDLERS AS SHOWN ON THE SCHEDULE UTILIZING THE EXISTING DUCTWORK. FRESH AIR/ VENTILATION AIR WILL BE PROVIDED VIA TWO CEILING MOUNTED DUCTED MITSUBISHI/ TRANE FRESH AIR UNITS THAT WILL BE RUN WITH NEW SEPARATE DUCTWORK AS SHOWN ON THE PLANS.

ALL SELECTED EQUIPMENT SHALL BE SUBMITTED FOR FINAL APPROVAL TO ENSURE ALL CODE

REQUIREMENTS ARE MET. THE CONTRACTOR SHALL ENSURE PRIOR TO BID SUBMISSION THAT

EQUIPMENT BEING SELECTED MEETS ALL MINIMUM REQUIREMENTS OF THE RHODE ISLAND STATE

BUILDING CODE AND ALL OTHER APPLICABLE CODES.

TRANE/MITSUBISHI IS THE BASIS OF DESIGN FOR MECHANICAL EQUIPMENT AND SHALL NOT BE SUBSTITUTED WITHOUT APPROVAL OF THE EOR AND SUBSEQUENTLY NBNERR TO ENSURE COMPLIANCE AND CONFORMANCE WITH THE ELECTRICAL DESIGN. CONTRACTOR SHALL PROVIDE DATA SHOWING AT A MINIMUM EQUIVALENCE TO BASIS OF DESIGN EQUIPMENT. EQUIVALENCE SHALL BE IN ALL MAJOR

ASPECT OF OPERATIONAL PERFORMANCE. ALTERNATE MANUFACTURERS MAY BE SUBMITTED FOR

APPROVAL AS REQUIRED TO ENSURE COST TO THE OWNER IS REDUCED WHILE MEETING THE MINIMUM CODE COMPLIANCE OF THE AHJ, HOWEVER THE CONTRACTOR SHALL SUBMIT DETAILED INFORMATION

HIGHLIGHTING EQUIVALENCY. .

ENGINEER'S STATEMENT

Project Number

Checked By:

Drawing Number

Project Title:

Location:

Issue Date: Approved By: Drawn By:

Drawing Title:

A

B

C

D

ESTAMPCONSULTANTS (1)Owner acknowledges that such Documents are not intended or represented to be suitable for use on the Project unless completed by AGE, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by AGE; (2)any such use or reuse,or any modification of the Documents, without written verification, completion, or adaptation by AGE, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to AGE or to its officers, directors, members, partners, agents, employees, and Consultants (3)Owner shall indemnify and hold harmless AGE and its officers, directors, members, partners, agents, employees, and Consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the Documents without written verification, completion, or adaptation by AGE; and (4) such limited license to Owner shall not create any rights in third parties.

Andre Gill Engineering, LLC

40 Overlea Road North Smithfield, RI 02896

T: 401.441.3414 E: andregillengineering.com W: www.andregillengineering.com

MEP ENGINEER: Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

3/ 6/

2:

:1

PM

12" = 1'-0"

MECHANICAL COVER SHEET

FIELD STATION PHASE VI

PRUDENCE ISLAND, RI

2407HVAC AND ELECTRICAL UPGRADES

16SEP24 AG AGE

M0.0

AG

HVAC SHEET INDEX

Sheet Number Sheet Name

Sheet Issue Date

M0.0 MECHANICAL COVER SHEET 16SEP24

M1.1 EXISTING MECHANICAL FLOOR PLAN - LEVEL 1 16SEP24

M1.2 NEW CONSTRUCTION MECHANICAL FLOOR

PLAN - LEVEL 1

16SEP24

M5.1 SCHEDULES 16SEP24

M5.2 SCHEDULES 16SEP24

M7.1A VRF UNITS 1 AND 2 16SEP24

M7.1B VRF UNITS 3 AND 4 16SEP24

M7.2 VRF CONTROLS 16SEP24

M7.3 VRF CONTROLS POINTS 16SEP24

M7.5 SEQUENCE OF OPERATIONS 16SEP24

Revision: Date:

Revision 1 05MAR25

T

AHU-1 (D)

AHU-2 (D)

AHU-3 (D)

AHU-4 (D)

CC UNIT #4 (D)CC UNIT #3 (D)CC UNIT #1 (D)CC UNIT #2 (D)CC UNIT (D)

GARAGE

MEETING ROOM

WATER QUALITY

STORAGE ROOM

STORAGE ROOM

117 JANITORS ROOM

LAVATORY

108 INSTRUMENT ROOM

BIOLOGICAL RESEARCH

OPEN SPACE

OFFICE 103

MEETING ROOM/ LIBRARY

EDUCATION CENTER

LAVATORY

MECHANICAL ROOM

NATURAL HISTORY LAB

HALL

118 HALL

HALL

1.

A.

B.

C.

D.

E.

2.

A.

B.

C.

D.

3.

A.

B.

4.

A.

B.

5.

A.

B.

6.

A.

7.

A.

B.

HVAC MECHANICAL DEMOLITION NOTES

GENERAL NOTES:

COORDINATE ALL DEMOLITION WORK WITH THE OWNER'S REPRESENTATIVE AND OTHER TRADES PRIOR

TO STARTING.

ALL WORK MUST COMPLY WITH APPLICABLE CODES, STANDARDS, AND PROJECT SPECIFICATIONS.

ENSURE ALL SYSTEMS, REFRIGERANT, OIL, AND ELECTRICAL, ARE MADE SAFE AND PROPERLY ISOLATED

BEFORE COMMENCING ANY WORK.

PROTECT EXISTING SYSTEMS AND EQUIPMENT NOT SCHEDULED FOR DEMOLITION TO ENSURE THEY

REMAIN OPERATIONAL.

NOT ALL PIPING AND EQUIPMENT ARE DEPICTED ON THE DRAWINGS, AS THEY WERE CREATED BASED ON MULTIPLE PROJECTS OVER THE YEARS AND NON-INVASIVE SITE WALKDOWNS. CONTRACTOR MUST THOROUGHLY REVIEW EXISTING SITE CONDITIONS AND BECOME INTIMATELY FAMILIAR WITH THE PROJECT SCOPE. ANY DISCREPANCIES OR QUESTIONS SHOULD BE REFERRED TO THE OWNER AND

ENGINEER OF RECORD FOR CLARIFICATION.

DEMOLITION PHASING:

THE EXISTING AIR HANDLING UNIT (AHU), SHALL BE REMOVED IN PHASES TO MINIMIZE DISRUPTION TO

BUILDING OPERATIONS.

DISCONNECT AND REMOVE ELECTRICAL CONNECTIONS ASSOCIATED WITH THE AHU. VERIFY IF THE

EXISTING ELECTRICAL COMPONENTS WILL BE REUSED OR REPLACED.

REMOVE THE AHU AND ASSOCIATED PIPING. PROTECT SURROUNDING AREAS, INCLUDING DUCTWORK AND

LOUVERS, TO AVOID DAMAGE DURING DEMOLITION.

IN INSTANCES WHERE SYSTEMS SUCH AS OIL LINES OR BOILER BREECHING CANNOT BE FULLY SHUT DOWN DUE TO THEIR CONNECTION TO DOMESTIC HOT WATER SERVICE, THE PROJECT MAY REQUIRE

ADDITIONAL PHASING TO MAINTAIN OPERATIONAL CONTINUITY.

DUCTWORK AND LOUVERS:

EXISTING DUCTWORK AND LOUVERS WILL BE REUSED. PROTECT THESE COMPONENTS FROM DEBRIS AND

DAMAGE DURING DEMOLITION.

CAP OPEN DUCT ENDS TEMPORARILY TO PREVENT CONTAMINATION.

PIPING DEMOLITION:

RECOVER REFRIGERANT PER EPA GUIDELINES BEFORE DISCONNECTING REFRIGERANT LINES. PROVIDE

DOCUMENTATION OF RECOVERY FOR THE PROJECT RECORD.

REMOVE ALL ABANDONED PIPING BACK TO ITS NEAREST ACTIVE CONNECTION OR TO A LOCATION

DESIGNATED BY THE OWNER.

ELECTRICAL DEMOLITION:

VERIFY WITH THE OWNER'S REPRESENTATIVE WHETHER THE EXISTING ELECTRICAL CONNECTIONS WILL

BE REUSED OR REMOVED.

DISCONNECT POWER AND CONTROLS FROM THE AHU PER LOCAL ELECTRICAL CODES. LABEL AND

IDENTIFY ALL WIRING FOR POTENTIAL REUSE.

CLEAN-UP AND DISPOSAL:

REMOVE ALL DEMOLISHED MATERIALS FROM THE SITE AND DISPOSE OF THEM PER LOCAL REGULATIONS.

CLEAN THE AREA THOROUGHLY AFTER DEMOLITION TO PREPARE FOR THE INSTALLATION OF NEW

EQUIPMENT.

DOCUMENTATION:

SUBMIT A DEMOLITION PLAN AND SCHEDULE TO THE OWNER'S REPRESENTATIVE FOR APPROVAL BEFORE

STARTING WORK.

PROVIDE PHOTOGRAPHS AND WRITTEN DOCUMENTATION OF EXISTING CONDITIONS BEFORE AND AFTER

DEMOLITION

DEMO NOTES

Project Number

Checked By:

Drawing Number

Project Title:

Location:

Issue Date: Approved By: Drawn By:

Drawing Title:

A

B

C

D

ESTAMPCONSULTANTS (1)Owner acknowledges that such Documents are not intended or represented to be suitable for use on the Project unless completed by AGE, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by AGE; (2)any such use or reuse,or any modification of the Documents, without written verification, completion, or adaptation by AGE, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to AGE or to its officers, directors, members, partners, agents, employees, and Consultants (3)Owner shall indemnify and hold harmless AGE and its officers, directors, members, partners, agents, employees, and Consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the Documents without written verification, completion, or adaptation by AGE; and (4) such limited license to Owner shall not create any rights in third parties.

Andre Gill Engineering, LLC

40 Overlea Road North Smithfield, RI 02896

T: 401.441.3414 E: andregillengineering.com W: www.andregillengineering.com

MEP ENGINEER: Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

3/ 6/

2:

:1

PM

As indicated

EXISTING MECHANICAL FLOOR PLAN - LEVEL 1

FIELD STATION PHASE VI

PRUDENCE ISLAND, RI

2407HVAC AND ELECTRICAL UPGRADES

16SEP24 AG AGE

M1.1

AGRevision: Date:

Revision 1 05MAR25

1/4" = 1'-0"1 EXISTING MECHANICAL

(D) MECHANICAL CALLOUT NOTES

# NOTE

1 DEMO EXISTING FLUE DUCTWORK, CAP AND MAKE SAFE

2 EVALUATE LOUVERS FOR FIT FOR USE.

AHU-4

AC-4

SG-1

8x6 2/ 44 CFM

(N )1

6ø

45x6x15 PLENUM

45x6x18 PLENUM

L-1

LOUVER

MANUFACTURER : RUSKIN

MODEL: EAD635

SIZE: 18x24

CU-4

OU-3

CU-3

OU-3

CU-1

OU-1

AC-1

IU-1

CU-2

OU-2

AC-2.1

IU-2

AC-2.2

IU-3

AC-4.2

IU-4

AC-3.2

IU-4

AC-4.1

IU-2

AC-3.1

IU-2

MEETING ROOM

GARAGE

HALL

WATER QUALITY

STORAGE ROOM

STORAGE ROOM

NATURAL HISTORY LAB

EDUCATION CENTER

HALL

BIOLOGICAL RESEARCH

OFFICE 103

OPEN SPACE

INSTRUMENT ROOM

JANITORS ROOM

GEAR ROOM

LAVATORY

MEETING ROOM/ LIBRARY

LAVATORY

ERV-1

(N)10ø

(N )4

/2 ø

(N)3ø

(N)3 1/2ø

(N )5 ø

(N )5 ø (N)5 1/2ø

(N )1

0ø

(N)7ø

(N)3ø

(N)6ø

(N)10ø

(N )5 ø

(N)3ø

(N )5 ø

(N)4 1/2ø

(N)3 1/2ø

(N)4 1/2ø

(N )5 ø

(N)10ø

(N )5 ø (N)5 1/2ø

Project Number

Checked By:

Drawing Number

Project Title:

Location:

Issue Date: Approved By: Drawn By:

Drawing Title:

A

B

C

D

ESTAMPCONSULTANTS (1)Owner acknowledges that such Documents are not intended or represented to be suitable for use on the Project unless completed by AGE, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by AGE; (2)any such use or reuse,or any modification of the Documents, without written verification, completion, or adaptation by AGE, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to AGE or to its officers, directors, members, partners, agents, employees, and Consultants (3)Owner shall indemnify and hold harmless AGE and its officers, directors, members, partners, agents, employees, and Consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the Documents without written verification, completion, or adaptation by AGE; and (4) such limited license to Owner shall not create any rights in third parties.

Andre Gill Engineering, LLC

40 Overlea Road North Smithfield, RI 02896

T: 401.441.3414 E: andregillengineering.com W: www.andregillengineering.com

MEP ENGINEER: Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

3/ 6/

2:

:1

PM

1/4" = 1'-0"

NEW CONSTRUCTION MECHANICAL FLOOR PLAN -

LEVEL 1

FIELD STATION PHASE VI

PRUDENCE ISLAND, RI

2407HVAC AND ELECTRICAL UPGRADES

16SEP24 AG AGE

M1.2

AG

MECHANICAL CALLOUT NOTES

# NOTE

1 INSTALL AHU ON EQUIPMENT PAD

2 CONTRACTOR TO PROVIDE CURRENT AIR FLOW CONDITIONS AT EACH TERMINAL THROUGHOUT THE BUILDING AND

PROVIDE EOR OF RECORD FOR CONFIRMATION OF AIRFLOW. UPON THE INSTALLATION OF NEW EQUIPMENT, THE AIRFLOW AT THE TERMINALS WILL BE RECONFIRMED AND BALANCED TO PROVIDE ADEQUATE AIRFLOW FOR HEATING

AND COOLING.

2 2

Revision: Date:

Revision 1 05MAR25

1.

SHEET NOTES

CONTRACTOR SHALL HAVE DISCRETION IN THE FINAL LAYOUT OF THE EQUIPMENT AS LONG AS IT MEETS THE INTENT OF THE PROJECT SCOPE.

1/4" = 1'-0"1 NEW CONSTRUCTION MECHANICAL

MITSUBISHI ELECTRIC TRANE HVAC US: CITY MULTI VRF INDOOR UNIT

SCHEDULE

Outdoor Unit Tag Reference Type Mark Model Type Nominal Cooling Capacity (BTU/h)

Nominal Heating Capacity (BTU/h)

Cooling Design Entering Temp

DB/WB (°F)

Heating Design Entering Temp DB/WB (°F)

Corrected Capacity

Estimated Cooling Coil LAT (°F)

Estimated Heating Coil LAT (°F)

Refrig Pipe Dim Liquid/Suction

(inch) Fan Speed Setting Peak Fan Airflow

(cfm) Max Fan ESP Setting 208V/230V

(IN WG)

Sound Pressure Per Fan Speed

208V/230V (dBA) Voltage / Phase Electrical

MCA/MFS

Condensate Removal Rate

(gal/hr) Notes / OptionsCooling Diversity

Full/Partial (See Note 5, 6)

Cooling Total Capacity (BTU/h)

Cooling Sensible Capacity (BTU/h)

Heating Diversity Full/Partial (See

Note 5, 6)

Heating Capacity (BTU/h)

CU-1 AC-1 IU-1 PVA-A36AA7 Multi Position 36,000 38,000 80.0/67.0 70 FULL DEMAND 38,404.8 28,741.3 FULL DEMAND 71,122.7 55.9 128.6 5/8 / 3/8 HIGH 1125 32 - 36 - 40 208/230V/1-phase Powered by Outdoor 1.02 1, 2, 3, 4, 5

CU-2 AC-2.1 IU-2 SVZ-KP36NA Multi Position 33,400 33,500 80.0/67.0 70 FULL DEMAND 33,375.0 27,853.0 FULL DEMAND 67,538.6 51.1 138.8 3/8 / 5/8 HIGH 910 0.30/0.50/0.80 35-39-43 208/230V/1-phase 4.13/15 1.07 1, 2, 3, 4, 5

CU-2 AC-2.2 IU-3 MSZ-GS12NA-U1 Wall -Mounted 12,000 14,400 80.0/67.0 70 FULL DEMAND 11,991.0 9,339.2 FULL DEMAND 14,364.4 57.4 104.1 1/4 / 3/8 HIGH 390 19-22-30-37-45/19-22-30-37-43 208/230V/1-phase 1/ 0.34 1, 2, 3, 4, 5

CU-3 AC-3.1 IU-2 SVZ-KP36NA Multi Position 33,400 33,500 80.0/67.0 70 FULL DEMAND 33,376.3 27,853.4 FULL DEMAND 54,460.7 51.1 125.5 3/8 / 5/8 HIGH 910 0.30/0.50/0.80 35-39-43 208/230V/1-phase 4.13/15 1.07 1, 2, 3, 4, 5

CU-3 AC-3.2 IU-4 MSZ-GS24NA-U1 Wall -Mounted 22,400 27,600 80.0/67.0 70 FULL DEMAND 22,384.1 16,789.8 FULL DEMAND 16,757.2 57.4 92.2 1/4 / 5/8 HIGH 701 34-41-47-53/32-41-47-52 208/230V/1-phase 1/ 0.69 1, 2, 3, 4, 5

CU-4 AC-4.1 IU-2 SVZ-KP36NA Multi Position 33,400 33,500 80.0/67.0 70 FULL DEMAND 33,376.3 27,853.4 FULL DEMAND 54,460.7 51.1 125.5 3/8 / 5/8 HIGH 910 0.30/0.50/0.80 35-39-43 208/230V/1-phase 4.13/15 1.07 1, 2, 3, 4, 5

CU-4 AC-4.2 IU-4 MSZ-GS24NA-U1 Wall -Mounted 22,400 27,600 80.0/67.0 70 FULL DEMAND 22,384.1 16,789.8 FULL DEMAND 16,757.2 57.4 92.2 1/4 / 5/8 HIGH 701 34-41-47-53/32-41-47-52 208/230V/1-phase 1/ 0.69 1, 2, 3, 4, 5

MITSUBISHI ELECTRIC TRANE HVAC US: CITY MULTI VRF OUTDOOR UNIT

SCHEDULE

System Tag Type Mark Model Number Modules

Nominal Cooling Capacity (BTU/h)

Nominal Heating Capacity (BTU/h)

Cooling Efficiency

(I)EER [SEER]

EER2

[SEER2]

Heating COP

@ 47°F [HSPF]

Nom System Connected Capacity (% of NOM)

Design Cooling Outdoor Temp DB

(°F)

Design Heating Outdoor Temp WB

(°F)

Refrig Pipe Dim High/Low Pressure (inch) (See Note

4)

Corrected Cooling Total Capacity

(BTU/h)

Corrected Heating Capacity (BTU/h)

Sound Pressure (dBA)

Inverter Driven Compressor Type /

Quantity

Preliminary Added Field Charge (See Note

5)

Electrical-Per Module

Notes / Options 208/230

Voltage / Phase MCA 208/230 RFS MOCP

CU-1 OU-1 PUZ-HA36NKA 36,000 38,000 0 [18.20] 0 [] 0 [11.20] 100.0 % 89.0 4.3 3/8 / 5/8 38,404.8 37,001.3 52/53 SCROLL/1 0.0 208/230V / 1-phase 26 35 42 1, 2, 3, 4, 5, 6, 7, 8, 9

CU-2 OU-2 MXZ-SM48NAMHZ2-U1 P48 48,000 54,000 0 19.5 3.600 100.0 % 89.0 4.3 3/8 / 5/8 47,624.8 50,355.8 51/54 SCROLL/1 6.9 208/230V / 1-phase 51 45 86 1, 2, 3, 4, 5, 6, 7, 8, 9

CU-3 OU-3 MXZ-SM60NAM2-U1 P60 60,000 66,000 0 11.9 3.740 100.0 % 89.0 4.3 3/8 / 3/4 59,768.8 37,096.5 58/59 SCROLL/1 8.5 208/230V / 1-phase 55 50 90 1, 2, 3, 4, 5, 6, 7, 8, 9

CU-4 OU-3 MXZ-SM60NAM2-U1 P60 60,000 66,000 0 11.9 3.740 100.0 % 89.0 4.3 3/8 / 3/4 59,768.8 37,096.5 58/59 SCROLL/1 8.5 208/230V / 1-phase 55 50 90 1, 2, 3, 4, 5, 6, 7, 8, 9

Project Number

Checked By:

Drawing Number

Project Title:

Location:

Issue Date: Approved By: Drawn By:

Drawing Title:

A

B

C

D

ESTAMPCONSULTANTS (1)Owner acknowledges that such Documents are not intended or represented to be suitable for use on the Project unless completed by AGE, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by AGE; (2)any such use or reuse,or any modification of the Documents, without written verification, completion, or adaptation by AGE, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to AGE or to its officers, directors, members, partners, agents, employees, and Consultants (3)Owner shall indemnify and hold harmless AGE and its officers, directors, members, partners, agents, employees, and Consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the Documents without written verification, completion, or adaptation by AGE; and (4) such limited license to Owner shall not create any rights in third parties.

Andre Gill Engineering, LLC

40 Overlea Road North Smithfield, RI 02896

T: 401.441.3414 E: andregillengineering.com W: www.andregillengineering.com

MEP ENGINEER: Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

3/ 6/

2:

:1

PM

1" = 80'-0"

SCHEDULES

FIELD STATION PHASE VI

PRUDENCE ISLAND, RI

2407HVAC AND ELECTRICAL UPGRADES

16SEP24 AG AGE

M5.1

AGRevision: Date:

Revision 1 05MAR25

1.

2.

3.

4.

5.

6.

7.

NOTES & OPTIONS:

NOMINAL COOLING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 80/67°F (DB/WB), OUTDOOR OF 95°F (DB) NOMINAL HEATING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 70°F (DB), OUTDOOR OF 43°F (WB) SEE SCHEMATIC PIPING/CONTROL DIAGRAM FOR INDICATION OF REQUIRED INDOOR UNIT REMOTE CONTROLLERS, SYSTEM CONTROLLERS, AND INTEGRATION DEVICES.

SEE OUTDOOR UNIT SCHEDULE FOR OUTDOOR AMBIENT CONDITIONS, CONNECTED CAPACITY, AND OTHER FACTORS ASSOCIATED WITH CORRECTED CAPACITIES FULL DEMAND CORRECTED CAPACITY INCLUDES DE-RATE ASSOCIATED WITH INDOOR VS. OUTDOOR CONNECTED CAPACITY INDICATED ON OUTDOOR UNIT SCHEDULE FOR ASSOCIATED SYSTEM.

PARTIAL CORRECTED CAPACITY ASSUMES SUFFICIENT DIVERSITY EXISTS SUCH THAT THE CONNECTED CAPACITY DE-RATE DOES NOT APPLY.

IT IS THE DESIGNER'S RESPONSIBILITY TO ENSURE "DIAMOND SYSTEM BUILDER" IS SET IN THE APPROPRIATE OUTPUT CAPACITY SETTING (FULL DEMAND/PARTIAL DEMAND) PRIOR TO GENERATING THIS

SCHEDULE.

IT IS RECOMMENDED TO ALWAYS BASE HEATING CORRECTED CAPACITY ON FULL DEMAND.

PROVIDE 10KW ELECTRIC HEAT KIT

PROVIDE 10KW ELECTRIC HEAT KIT

1.

2.

3.

4.

5.

6.

7.

8.

9.

NOTES & OPTIONS:

NOMINAL COOLING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 80/67°F (DB/WB), OUTDOOR OF 95°F (DB) NOMINAL HEATING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 70°F (DB), OUTDOOR OF 43°F (WB).

EFFICIENCY VALUES FOR EER, IEER, COP ARE BASED ON AHRI 1230 TEST METHOD FOR MIXTURE OF DUCTED & NON-DUCTED INDOOR UNITS.

FOR SYSTEMS WITH MULTIPLE MODULES, REFRIGERANT PIPE DIMENSIONS INDICATE TOTAL SYSTEM COMBINED PIPING DOWNSTREAM OF MODULE TWINNING.

ADDED FIELD CHARGE LISTED IS IN ADDITION TO FACTORY CHARGE, THIS MUST BE UPDATED BASED UPON FINAL AS-BUILT PIPING LAYOUT.

FACTORY REPRESENTATIVES SHALL REVIEW THE PROJECT PRIOR TO AND THROUGHOUT THE INSTALLATION OF CITY MULTI EQUIPMENT FACTORY REPRESENTATIVES SHALL STARTUP AND COMMISSION CITY MULTI EQUIPMENT UPON COMPLETION OF EQUIPMENT INSTALLATIONS FACTORY REPRESENTATIVES SHALL PROVIDE ON-SITE ASSISTANCE FOR THE BMS INTEGRATION OF THE CITY MULTI EQUIPMENT FACTORY REPRESENTATIVES SHALL PROVIDE END-USER TRAINING ON THE CITY MULTI EQUIPMENT UPON COMPLETION OF THE INSTALLATION OF EQUIPMENT

SUMMER/WINTER

SENSIBLE

EFFECTIVENESS %

TOTAL

EFFECTIVENESS %

ENTHALPY RECOVERY

RATIO (ERR) %

SENSIBLE ENERGY

RECOVERY RATIO %

MOISTURE REMOVED

(GRAINS/LB)

TOTAL ENERGY SAVED

(BTUH)

SENSIBLE LATENT TOTAL

73.0/73.0 55.3/70.6 55.3/70.6 73.0/73.0 13.3/ -14.7 10,7137/ 43,633 8,710/ 9,262 19,424/ 52,896

ERV ELECTRIC

HEATER

CFM TEMP IN

(F)

TEMP OUT

(F) KW VOLTS HERTZ PHASE FLA

(A)

MCA

(A)

MOPD

(A)

900 53.4 88.05 10 208 60 1 47.6 59.5 60

WHEEL

PERFROMANCE ELECTRICALSUMMER MOISTURE RATIO (MR)

GRAINS/LB

WINTER MOISTURE RATIO (MR)

GRAINS/LB

OA RA SA OA RA SA MCA MOP VOLTAGE

96.5 64.8 83.2 3.2 27.1 17.9 7.7 15 208-230

WHEEL

PERFROMANCE

SUMMER ENTHALPY (H)

BTU/LB

WINTER ENTHALPY (H)

BTU/LB

OA RA SA OA RA SA

36.8 28.1 32 2.5 21 15.6

ERV SCHEDULE

(ERV-1)

MARK MANUFACTURER MODEL LOCATION/SERVICE

SUPPLY

FAN

EXHAUST

FAN

WHEEL

PERFROMANCE ELECTRICAL

WEIGHT

(LBS) REMARKSSUMMER WINTER

CFM ESP IN

WC

FAN

RPM

MOTOR

HP CFM ESP IN

WC

FAN

RPM

MOTOR

HP

OA DB/WB

(F)

RA DB/WB

(F)

SA DB/WB

(F)

OA DB/WB

(F)

RA DB/WB

(F)

SA DB/WB

(F) MCA MOP VOLTAGE

ERV-1 RENEWAIRE HE1.5 MECHANICAL ROOM 935 1.25 1,475 900 1.33 1,475 90.1/73.3 75.0/62.5 79.1/67.7 8.5/5.5 70.0/51.5 53.4/40.8 7.7 15 208-230

MXZ BRANCH

BOX

SYSTEM TAG Model Number

Connectable number of Indoor unit (Maximum)

Voltage / Phase Frequency - Hz Power Input -kW

Running Current

- A External Finish Unit Dimension Weight - lb(kg)

Piping Connection Notes / Optionsto Outdoor Unit to Indoor Unit

Width - in(mm) Depth - in(mm) Height - in(mm) Liquid - in(mm) Gas - in(mm) Liquid - in(mm) Gas - in(mm)

CU-2 PAC-MKA32BC 3 208/230 /

1-PHASE 60 0 0 GALVANIZED

SHEETS 17-23/32 (450) 11-1/32 (280) 6-11/16 (170) 15 (6.7) 3/8 (9.52) 5/8 (15.88) 1/4 (6.35) X 3 {A, B, C}3/8 (9.52) X 3 {A, B, C} 1

CU-3 PAC-MKA32BC 3 208/230 /

1-PHASE 60 0 0 GALVANIZED

SHEETS 17-23/32 (450) 11-1/32 (280) 6-11/16 (170) 15 (6.7) 3/8 (9.52) 5/8 (15.88) 1/4 (6.35) X 3 {A, B, C}3/8 (9.52) X 3 {A, B, C} 1

CU-4 PAC-MKA32BC 3 208/230 /

1-PHASE 60 0 0 GALVANIZED

SHEETS 17-23/32 (450) 11-1/32 (280) 6-11/16 (170) 15 (6.7) 3/8 (9.52) 5/8 (15.88) 1/4 (6.35) X 3 {A, B, C}3/8 (9.52) X 3 {A, B, C} 1

L-1 RUSKIN ELF6350DMP 24"X18" 938 900 1.04 MILL 680 0.06

SYMBOL MANUFACTURER MODEL SIZE

(W"xH") CFM

FREE

AREA VEL.

(FPM)

MIN.FREE

AREA (SF) FINISH MAX. VEL.

(FPM)

MAX. P.D.

(IN.W.C.)

LOUVER SCHEDULE

NOTES:

1. ALL RUN OUT DUCTWORK TO DIFFUSERS SHALL BE NECK SIZE UNLESS OTHERWISE NOTED.

2. FRAME TYPE TO MATCH MOUNTING LOCATION CONSTRUCTION MATERIAL. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN.

SG-1 TITUS 300R STEEL SEE DWG. INLET +2 DUCT

MOUNTING

DOUBLE

DEFLECTION

THE FRONT BLADES VERTICAL UNLESS

NOTED OTHERWISE PAINTED TO MATCH...

SYMBOL MANUFACTURER MODEL MATERIAL INLET SIZE

(INCH)

FACE

SIZE...

MOUNTING

LOCATION FACE TYPE NOTES

GRILLES REGISTERS & DIFFUSERS SCHEDULE

Project Number

Checked By:

Drawing Number

Project Title:

Location:

Issue Date: Approved By: Drawn By:

Drawing Title:

A

B

C

D

ESTAMPCONSULTANTS (1)Owner acknowledges that such Documents are not intended or represented to be suitable for use on the Project unless completed by AGE, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by AGE; (2)any such use or reuse,or any modification of the Documents, without written verification, completion, or adaptation by AGE, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to AGE or to its officers, directors, members, partners, agents, employees, and Consultants (3)Owner shall indemnify and hold harmless AGE and its officers, directors, members, partners, agents, employees, and Consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the Documents without written verification, completion, or adaptation by AGE; and (4) such limited license to Owner shall not create any rights in third parties.

Andre Gill Engineering, LLC

40 Overlea Road North Smithfield, RI 02896

T: 401.441.3414 E: andregillengineering.com W: www.andregillengineering.com

MEP ENGINEER: Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

3/ 6/

2:

:1

PM

1" = 100'-0"

SCHEDULES

FIELD STATION PHASE VI

PRUDENCE ISLAND, RI

2407HVAC AND ELECTRICAL UPGRADES

16SEP24 AG AGE

M5.2

AGRevision: Date:

Revision 1 05MAR25

NOTES & OPTIONS:

1. THE PIPING CONNECTION SIZE DIFFERS ACCORDING TO THE TYPE AND CAPACITY OF INDOOR UNITS. MATCH THE PIPING CONNECTION SIZE FOR INDOOR AND BRANCH BOX. IF THE PIPING CONNECTION SIZE OF BRANCH BOX DOES NOT MATCH THE PIPING CONNECTION SIZE OF INDOOR UNITS, USE OPTIONAL DIFFERENT- DIAMETER (DEFORMED) JOINTS TO THE BRANCH BOX SIDE. (CONNECTED DEFORMED JOINT DIRECTLY TO THE BRANCH BOX SIDE.)

Project Number

Checked By:

Drawing Number

Project Title:

Location:

Issue Date: Approved By: Drawn By:

Drawing Title:

A

B

C

D

ESTAMPCONSULTANTS (1)Owner acknowledges that such Documents are not intended or represented to be suitable for use on the Project unless completed by AGE, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by AGE; (2)any such use or reuse,or any modification of the Documents, without written verification, completion, or adaptation by AGE, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to AGE or to its officers, directors, members, partners, agents, employees, and Consultants (3)Owner shall indemnify and hold harmless AGE and its officers, directors, members, partners, agents, employees, and Consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the Documents without written verification, completion, or adaptation by AGE; and (4) such limited license to Owner shall not create any rights in third parties.

Andre Gill Engineering, LLC

40 Overlea Road North Smithfield, RI 02896

T: 401.441.3414 E: andregillengineering.com W: www.andregillengineering.com

MEP ENGINEER: Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

3/ 6/

2:

:1

PM

VRF UNITS 1 AND 2

FIELD STATION PHASE VI

PRUDENCE ISLAND, RI

2407HVAC AND ELECTRICAL UPGRADES

16SEP24 AG AGE

M7.1A

AGRevision: Date:

Drawing Number

Project Title:

Location:

Issue Date: Approved By: Drawn By:

Drawing Title:

A

B

C

D

ESTAMPCONSULTANTS (1)Owner acknowledges that such Documents are not intended or represented to be suitable for use on the Project unless completed by AGE, or for use or reuse by Owner or others on extensions of the Project, on any other project, or for any other use or purpose, without written verification or adaptation by AGE; (2)any such use or reuse,or any modification of the Documents, without written verification, completion, or adaptation by AGE, as appropriate for the specific purpose intended, will be at Owner's sole risk and without liability or legal exposure to AGE or to its officers, directors, members, partners, agents, employees, and Consultants (3)Owner shall indemnify and hold harmless AGE and its officers, directors, members, partners, agents, employees, and Consultants from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from any use, reuse, or modification of the Documents without written verification, completion, or adaptation by AGE; and (4) such limited…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .