Amend 03 CUB Electrical Upgrade As-Builts.pdf

PDF 17 MB Posted

Attached to
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation number
RFP-376508-CD
Issued by

About this file

This document is a comprehensive set of as-built electrical drawings for the CUB (Central Utility Building) Electrical Service Upgrade Project 11-2-80 at Fermi National Accelerator Laboratory. The drawings represent the final constructed state of the electrical system and serve as reference documentation for the facility's electrical infrastructure.

The project encompasses extensive electrical system upgrades including installation of a new 250 kW emergency generator, new distribution panels (DHP-CU-1, DHP-CU-2, DHP-CU-3), lighting panels (LHP-CU-1, LHP-CU-2), power panels (PP-CU-1 through PP-CU-5), step-down transformers (T-CU-1 through T-CU-5), an automatic transfer switch, and associated electrical equipment rated for 480/277V and 4.16KV service. The drawings document power distribution to multiple systems including HVAC chillers, cooling tower fans, pump systems, boilers, compressed air systems, and lighting throughout the facility's ground floor, mezzanine, and roof levels. The electrical scope includes cable routing specifications (IMC/rigid conduit with various wire gauges), equipment locations, circuit schedules, one-line diagrams, motor control centers, lighting fixture layouts, emergency lighting provisions with battery backup units, and grounding systems. All equipment features minimum 65,000 AIC withstand ratings, and the design complies with NEC standards. The drawings are marked "PRELIMINARY - FOR REVIEW ONLY" as of February 28, 2023, and include detailed notes requiring field verification of equipment locations and circuit numbering against actual as-built conditions.

View the file

Other files

File Type Posted
Amend 03 Transformer Pics.zip ZIP file
Amend 03 to RFP 376508-CD.pdf PDF
Amend 03 Submittal for DHP-CU-1.pdf PDF
Amend 03 CUB Original As-Built Drawings.pdf PDF
Amend 02 to RFP 376508-CD.pdf PDF
Amend 01 to RFP 376508-CD.pdf PDF
Exhibit Q- Davis Bacon Wage Rate.pdf PDF
Exhibit H - Construction Insurance Requirements.pdf PDF
Exhibit K- Price Proposal Form.pdf PDF
Exhibit E- Electrical (LV) Calculations.pdf PDF
Exhibit D- Geotechnical Engineering Report.pdf PDF
Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf PDF
Exhibit I - Statement of Acknowledgment (SF-1413).pdf PDF
Exhibit F- Army Corp NPR-Letter.pdf PDF
Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf PDF
Exhibit P- Performance Bond_FL-40.pdf PDF
Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf PDF
Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit B- Construction Drawing Set.pdf PDF
Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf PDF
Exhibit N- Bond Bid FL-41.pdf PDF
Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
1.0 RFP 376508-CD Instructions to Offerors.pdf PDF
Exhibit A - Scope of Work UIP SP-1 CUB.pdf PDF
Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .