Exhibit A - Scope of Work UIP SP-1 CUB.pdf
PDF 252 KB Posted
- Solicitation number
- RFP-376508-CD
About this file
This is a Statement of Work (SOW) for UIP Subproject 1, the Central Utility Building (CUB) Addition and Upgrades construction project at Fermi National Accelerator Laboratory, Revision 2 dated June 3, 2026.
The project scope encompasses the construction of an addition to and upgrade of the Central Utility Building, which supplies chilled water, hot water, low conductivity water, and makeup water to various laboratory buildings and systems serving both comfort and process cooling and heating needs. The subcontractor is required to complete multiple construction activities including demolition of existing piping, equipment, conduit, and ductwork; expansion of the CUB to accommodate new chillers and increased chilled water capacity; installation of foundation and structure for the building addition; renovation of the exterior shell including the existing roof and metal façade panels; improvement of heating hot water systems; installation of new fire protection and fire alarm systems; installation of low voltage and medium voltage power systems including new switches and transformers; and civil utilities upgrade with pavement removal. All detailed construction requirements and scope of work are defined in the construction drawings and specifications attached to this document, with all subcontractor requirements listed in the Division 01 specifications including required schedule submissions. The subcontractor shall complete the CUB Addition and Upgrades project by October 1, 2029. The project is managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UIP Subproject 1 – Central Utility Building Addition and Upgrades Statement of Work (SOW)
CUB Addition and Upgrades Construction Scope
Revision 2 June 3, 2026
Statement of Work: UIP Subproject 1 – CUB Addition and Upgrades Construction ISD Engineering
Fermi National Accelerator Laboratory 2
1. SCOPE OF SERVICES – CENTRAL UTILITY BUILDING
ADDITION AND UPGRADES
1.1 Description
The Central Utility Building (CUB) subproject is one of the subprojects of the Utilities
Infrastructure Project (UIP). The subcontracted Architect/Engineer (A/E) has completed the
100% Final Design (FD) of the CUB subproject. As part of the 100% FD submission, certain pieces of equipment were identified as items to be pre-purchased by Fermilab prior to the start of the construction phase.
This scope of work is to build an addition and upgrade the CUB, which is UIP subproject SP-1.
The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It’s vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.
The Subproject 1 detailed construction requirements and scope of work is defined in the construction drawings and specifications.
1.2 Scope
At a high level, the scope of work for the CUB Addition and Upgrades includes, but is not limited to, the following:
• Demolition of existing piping, equipment, conduit, ductwork, and others as indicated in the drawings.
• Expand CUB for location of new chillers and increase in the chilled water capacity.
• Installation of foundation for new building addition.
• Provide structure and façade for the building addition.
• Renovate exterior shell including the existing roof underneath cooling towers and the metal panels on the façade.
• Improve heating hot water systems feeding the campus, within the footprint of the new building.
• Installation of new fire protection and fire alarm systems
• Installation of low voltage power to the building and within the building
• Installation of medium voltage power to the building, including new medium voltage switches and medium voltage transformers
• Civil utilities upgrade and pavement removal.
The scope of work is dictated by the drawings and specifications, which are included as an attachment to this document.
1.3 Activities
All requirements of the Subcontractor are listed in the Division 01 specifications, including required schedule submissions.
Statement of Work: UIP Subproject 1 – CUB Addition and Upgrades Construction ISD Engineering
Fermi National Accelerator Laboratory 3
1.4 Deliverables
The Subcontractor shall complete the CUB Addition and Upgrades by October 1, 2029.
| 1. SCOPE OF SERVICES – Central Utility Building Addition and upgrades |
| 1.1 Description |
| 1.2 Scope |
| 1.3 Activities |
| 1.4 Deliverables |
File details come from the government source that posted it. Updated .