This file is a construction drawing set (Exhibit B) for the Central Utility Building (CUB) Addition and Renovation project at Fermi National Accelerator Laboratory under RFP-376508-CD. The drawings provide the technical specifications and design documentation for the general contractor to execute the construction work, which includes building an addition to and renovating the existing Central Utility Building. The CUB is critical infrastructure that supplies chilled water, hot water, low conductivity water, and makeup water to various laboratory buildings and systems for both comfort and process cooling and heating applications.
The project operates under a constrained timeline tied to Fermilab's accelerator shutdown scheduled from January 1, 2028, to January 1, 2030. Key construction milestones include: Notice to Proceed issuance by December 30, 2027; construction start on January 3, 2028; AUP 1 CUB Extension completion by January 31, 2029; AUP 2 Existing CUB Upgrade completion by June 29, 2029; and final project completion including remedial work by September 28, 2029. The general contractor must provide all supervision, labor, materials, tools, equipment, transportation, bonding, safety oversight, quality control, and site management necessary to complete the work as defined in the construction drawings and technical specifications.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .