Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf

PDF 29 MB Posted

Attached to
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation number
RFP-376508-CD
Issued by

About this file

This is a specification document for the Central Utility Building (CUB) Addition and Renovation Construction project at Fermi National Accelerator Laboratory. The specifications detail the technical requirements for constructing an addition to and renovating the existing Central Utility Building, which provides chilled water, hot water, low conductivity water, and makeup water to various laboratory buildings and systems supporting both comfort and process cooling and heating needs. The project must be completed within Fermilab's accelerator shutdown window, scheduled from January 1, 2028, through January 1, 2030, with five key milestones: Notice to Proceed issuance by December 30, 2027; construction commencement on January 3, 2028; AUP 1 CUB Extension completion by January 31, 2029; AUP 2 Existing CUB Upgrade completion by June 29, 2029; and final project completion including remedial work by September 28, 2029.

The general contractor must provide all required supervision, labor, materials, tools, equipment, and related services to complete the work as specified in drawings and technical specifications. The contract scope encompasses transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision necessary for full construction execution. The project is being executed under RFP-376508-CD, issued by the Department of Energy's Fermi National Accelerator Laboratory, and represents a critical infrastructure investment to revitalize and expand the CUB to serve both existing and future operational loads essential to the laboratory's mission.

View the file

Other files

File Type Posted
Amend 03 Transformer Pics.zip ZIP file
Amend 03 CUB Electrical Upgrade As-Builts.pdf PDF
Amend 03 to RFP 376508-CD.pdf PDF
Amend 03 Submittal for DHP-CU-1.pdf PDF
Amend 03 CUB Original As-Built Drawings.pdf PDF
Amend 02 to RFP 376508-CD.pdf PDF
Amend 01 to RFP 376508-CD.pdf PDF
Exhibit Q- Davis Bacon Wage Rate.pdf PDF
Exhibit H - Construction Insurance Requirements.pdf PDF
Exhibit K- Price Proposal Form.pdf PDF
Exhibit E- Electrical (LV) Calculations.pdf PDF
Exhibit D- Geotechnical Engineering Report.pdf PDF
Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf PDF
Exhibit I - Statement of Acknowledgment (SF-1413).pdf PDF
Exhibit F- Army Corp NPR-Letter.pdf PDF
Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf PDF
Exhibit P- Performance Bond_FL-40.pdf PDF
Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf PDF
Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit B- Construction Drawing Set.pdf PDF
Exhibit N- Bond Bid FL-41.pdf PDF
Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
1.0 RFP 376508-CD Instructions to Offerors.pdf PDF
Exhibit A - Scope of Work UIP SP-1 CUB.pdf PDF
Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .