RFP20261467_Exhibit_6_Price_Proposal_Form_Updated_10.6.26.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- RFP-2026-1467
- Issued by
- Seminole County, Florida
About this file
This is a Price Proposal Form for a Grounds Maintenance Services RFP issued by the City of Casselberry, Florida. The solicitation seeks one qualified firm to provide comprehensive grounds maintenance services for 13 lift station locations and 6 water plant facilities, including lawn maintenance, mowing, edging, pruning of trees and shrubs per University of Florida specifications, pest control, and weed control services. Services are to be provided on a monthly basis year-round, with biweekly frequency during summer months and monthly during winter months, plus monthly maintenance of stormwater ponds and ditches from March through October. A mandatory pre-proposal meeting was held on October 6, 2026, at 8:00 a.m. at Casselberry City Hall. Proposals were due November 3, 2026, with Phase I written evaluation occurring in November 2026 and Phase II informal interviews potentially scheduled for November 18, 2026. The contract term runs from February 1, 2027, through January 31, 2030, with two optional one-year renewal extensions available, not to exceed five years total. The contractor must maintain a two-hour response time for emergency or demand services and provide a 90-day warranty on completed work.
Compensation is fixed annually based on the submitted price proposal, with lowest price receiving maximum evaluation points. Proposers must demonstrate three consecutive years in business, maintain active Florida licenses, and provide proof of authority to conduct business in Florida. Required insurance includes $1 million commercial general liability per occurrence, $1 million automobile liability combined single limit, workers' compensation as required by law, and $1 million professional liability, with the City named as additional insured. Financial soundness documentation consisting of three years of financial statements or an accountant letter must be submitted separately and confidentially. No performance or proposal bonds are required. All costs for labor, materials, equipment, permits, and transportation are borne by the contractor. Required submittals include current insurance certificates, Local Business Tax Receipt, W-9, E-Verify affidavit, anti-human trafficking attestation, and diversity, equity, and inclusion certification. Proposals are limited to 60 pages and must be submitted electronically through VendorLink, LLC. City Commission approval is anticipated in January 2027.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WP-LS
Lift Stations Irrigation System on Site (Yes/No) Lawn Maintenance Site Requiring Weed Spraying In Addition to Lawn Maintenance 2026-2031 Scheduled Maintenance Frequency October 1st February 28th 2026-2031 Scheduled Maintenance Frequency March 1st September 30th O N D J F M A M J J A S Total Site Visits Price Per Visit Extended Price
| 1 | Marigold Lift Station #20 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 2 | Bend in the Road #31 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 3 | Forrest Brook Lift Station #70 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 4 | Howell Creek Lift Station #72 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 5 | Eagle Lift Station #36 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 6 | Eastbrook Lift Station #37 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 7 | Central V Lift Station #34 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 8 | Wyndham Way Lift Station | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 9 | Five Points Lift Station #21 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 10 | Sagittarius II Lift Station #29 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 11 | Lake Ann Lift Station #65 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 12 | Queens Mirror Lift Station #67 | Yes | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 13 | Sterling Oaks Dr. #55 | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 14 | Seminola MLS Lift Station #22 | Yes | Including Hedges Outside Fence | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||||||||||||||||
| Water/Waste Plants | |||||||||||||||||||||
| 1 | North Water Plant | Yes | X | 1x every 14 days = 2x monthly | 1x every 7 days = 4x monthly | 2 | 2 | 2 | 2 | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 38 | $0.00 | $0.00 | |
| 2 | South Water Plant | Yes | X | 1x every 14 days = 2x monthly | 1x every 7 days = 4x monthly | 2 | 2 | 2 | 2 | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 38 | $0.00 | $0.00 | |
| 3 | Hunterfield Water Plant | Yes | X | 1x every 14 days = 2x monthly | 1x every 7 days = 4x monthly | 2 | 2 | 2 | 2 | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 38 | $0.00 | $0.00 | |
| 4 | Melody Water Tower | Yes | X | 1x every 14 days = 2x monthly | 1x every 7 days = 4x monthly | 2 | 2 | 2 | 2 | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 38 | $0.00 | $0.00 | |
| 5 | Howell Park Water Plant | Yes | X | 1x every 14 days = 2x monthly | 1x every 7 days = 4x monthly | 2 | 2 | 2 | 2 | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 38 | $0.00 | $0.00 | |
| 6 | Sewer Treatment Plant | Yes | X | 1x every 14 days = 2x monthly | 1x every 7 days = 4x monthly | 2 | 2 | 2 | 2 | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 38 | $0.00 | $0.00 | |
| 7 | Belle Ave Ponds (must maintain sandy bottom) | No | X | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 |
| 8 | Reclaim Pond | No | X | 1x every 30 days = 1x monthly | 1x every 14 days = 2x monthly | 1 | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 19 | $0.00 | $0.00 | |
| Subtotal | $0.00 | ||||||||||||||||||||
| Items identified with an "X" indicate this service is required and shall be included with the per cycle cost | Total | $0.00 | |||||||||||||||||||
| Please Note: Maintenance of the irrigation systems that have been identified will not be included with the per cycle cost. The City of Casselberry will continue this maintenance. If during maintenance services any part of the irrigation system is damaged, the City of Casselberry must be notified promptly. Repairs will be made by the contractor with city staff supervising the repair. |
File details come from the government source that posted it. Updated .