RFP No. 70Z02326R93250001_Conformed.pdf

PDF 3 MB Posted

Attached to
USCG Response Boat Small Third Generation (RB-S III)
Solicitation number
70Z02326R93250001
Issued by
Not on record

About this file

This is a Request for Proposals (RFP) for the United States Coast Guard (USCG) to acquire Response Boat Small Third Generation (RB-S III) vessels and associated equipment. The Government intends to award up to four (4) Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts for the design, production, testing, delivery, and logistics support of RB-S III boats and purpose-built trailers. The acquisition will recapitalize the aging fleet of 29-foot RB-S II platforms. The anticipated IDIQ ordering period spans ten (10) years, consisting of a two (2) year base ordering period and one eight (8) year option ordering period. Required deliverables include boats, trailers, logistics support, technical documentation, configuration management, and supply support services.

The solicitation employs a two-phase competitive acquisition and down-select process. In Phase I, proposals will be evaluated on three non-price factors: Mission Effectiveness, Production and Management, and Price. Up to four (4) offerors may be selected for IDIQ contract awards and will each receive an initial delivery order for construction and delivery of one demonstrator boat and trailer to satisfy the contract minimum guarantee. Phase II consists of a Government-conducted In-Water Demonstration lasting up to 90 calendar days, during which Phase I awardees' vessels will be evaluated on performance criteria. The RFP is issued by the Department of Homeland Security US Coast Guard under solicitation number 70Z02326R93250001.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING

2. CONTRACT NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

until local time

PAGE OF PAGES

1 148

3. SOLICITATION NUMBER

70Z02326R93250001

70Z023

70Z023 CG-9123

2703 Martin Luther King Ave, SE Washington, DC, 20593, US

See Section L Proposal Instructions 11/13/2026

LEWIS III, Mr. WILLIAM E 703/850-4153

William.E.Lewis3@uscg.mil

Se e

Pa ge

Se e

Pa ge

TABLE OF CONTENTS:

1. Listing of Incorporated Purchase Requisitions

2. Section B - Supplies or Services and Prices/Costs

3. Section C - Statement of Work

4. Section D - Packaging and Marking

5. Section E - Inspection and Acceptance Terms

6. Section F - Delivery or Performance

7. Section G - Contract Administration Data

8. Section H - Special Contract Requirements

9. Section I - Contract Clauses

10. Section J - List of Documents, Exhibits, and other Attachments

11. Section K - Representations, Certifications, and Other Statements of Offerors

12. Section L - Instructions, Conditions and Notices to Offerors

13. Section M - Evaluation Factors for Award

1. Listing of Incorporated Purchase Requisitions

TBD

2. Section B - Supplies or Services and Prices/Costs

Item Number Base Item Number

Supplies/Services Quantity Unit

0001 RB-S III (Boat and Trailer) 0 DO Contract Type:Fixed Price Economic Price Adjustment

Unit Price Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0002 Boat and Trailer Shipping - CONUS

[SOW/SPEC 084-3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0003 Boat and Trailer Shipping -

OCONUS [SOW/SPEC 084-3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0004 Crew FAM - CONUS [SOW/SPEC 089]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0005 Crew FAM - OCONUS

[SOW/SPEC 089]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0006 List of Deliverables [SOW/SPEC/Attachment 5]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

Item Number Base Item Number

Supplies/Services Quantity Unit

0007 Loading Rate - Materials and Subcontracts [SOW/SPEC 80]

Unit Amount Total Other Direct Costs

Description:

- Ordering Period 1

- Loading Rate: All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification. [SOW/SPEC 80]

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0008 Services - Labor (Composite Labor Rate Non-Engineering)

[SOW/SPEC 80-1]

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0009 Services - Engineering (Composite Labor Rate Engineering)

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

Supplies/Services Quantity Unit

0010 Travel - Reimbursable at Cost IAW

FAR 31.205-46

0 DO

Contract Type:Cost Contract Total Estimated Cost

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0011 MRL Kit (Additional) [SOW/SPEC 083-2.5]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0012 Insurance Spares - Outboard Engine (Port) [SOW/SPEC 083-

6.3.1]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0013 Insurance Spares - Outboard Engine (STBD) [SOW/SPEC 083-

6.3.2]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0014 Insurance Spares - Fendering

[SOW/SPEC 083-6.3.3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0015 Retrofit [SOW/SPEC 041-5.1.4] 0 DO Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

0016 Display Model [SOW/SPEC 097] 0 DO Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Ordering Period 1

Number

Supplies/Services Quantity Unit

0017 Non-Recurring Engineering for OGA Variant

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 1

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1001 RB-S III (Boat and Trailer) 0 DO Contract Type:Fixed Price Economic Price Adjustment

Unit Price Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1002 Boat and Trailer Shipping -

OCONUS [SOW/SPEC 084-3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

Supplies/Services Quantity Unit

1003 Boat and Trailer Shipping - CONUS

[SOW/SPEC 084-3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1004 Crew FAM - CONUS [SOW/SPEC 089]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1005 Crew FAM - OCONUS

[SOW/SPEC 089]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1006 List of Deliverables [SOW/SPEC/Attachment 5]

0 DO

Contract Type:Firm Fixed Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1007 Loading Rate - Materials and Subcontracts [SOW/SPEC 80]

Unit Amount Total Other Direct Costs

Description:

- Ordering Period 2

- Loading Rate: All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification. [SOW/SPEC 80]

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1008 Services - Labor (Composite Labor Rate Non-Engineering)

[SOW/SPEC 80-1]

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1009 Services - Engineering (Composite Labor Rate Engineering)

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1010 Travel - Reimbursable at Cost IAW

FAR 31.205-46

0 DO

Contract Type:Cost Contract Total Estimated Cost

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1011 MRL Kit (Additional) [SOW/SPEC 083-2.5]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1012 Insurance Spares - Outboard Engine (Port) [SOW/SPEC 083-

6.3.1]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Number

Supplies/Services Quantity Unit

1013 Insurance Spares - Outboard Engine (STBD) [SOW/SPEC 083-

6.3.2]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1014 Insurance Spares - Fendering

[SOW/SPEC 083-6.3.3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1015 Retrofit [SOW/SPEC 041-5.1.4] 0 DO Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Ordering Period 2

Purchase Requisitions

Supplies/Services Quantity Unit

1016 Display Model [SOW/SPEC 097] 0 DO Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

1017 Non-Recurring Engineering for OGA Variant

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Ordering Period 2

Purchase Requisitions

IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2001 RB-S III (Boat and Trailer) 0 DO Contract Type:Fixed Price Economic Price Adjustment

Unit Price Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2002 Boat and Trailer Shipping -

OCONUS [SOW/SPEC 084-3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2003 Boat and Trailer Shipping - CONUS

[SOW/SPEC 084-3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2004 Crew FAM - CONUS [SOW/SPEC 089]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days

Number

Supplies/Services Quantity Unit

2005 Crew FAM - OCONUS

[SOW/SPEC 089]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2006 List of Deliverables [SOW/SPEC/Attachment 5]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2007 Loading Rate - Materials and Subcontracts [SOW/SPEC 80]

Unit Amount Total Other Direct Costs

- This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

- Loading Rate: All inclusive loading rate to be added to materials and subcontracts. Materials and Subcontracts will be negotiated at time of order/modification. [SOW/SPEC 80]

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2008 Services - Labor (Composite Labor Rate Non-Engineering)

[SOW/SPEC 80-1]

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2009 Services - Engineering (Composite Labor Rate Engineering)

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days

Supplies/Services Quantity Unit

2010 Travel - Reimbursable at Cost IAW

FAR 31.205-46

0 DO

Contract Type:Cost Contract Total Estimated Cost

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2011 MRL Kit (Additional) [SOW/SPEC 083-2.5]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2012 Insurance Spares - Outboard Engine (Port) [SOW/SPEC 083-

6.3.1]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2013 Insurance Spares - Outboard Engine (STBD) [SOW/SPEC 083-

6.3.2]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2014 Insurance Spares - Fendering

[SOW/SPEC 083-6.3.3]

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2015 Retrofit [SOW/SPEC 041-5.1.4] 0 DO

Contract Type:Firm Fixed Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2016 Display Model [SOW/SPEC 097] 0 DO Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days IDC Type: Not Applicable

Item Number Base Item Number

Supplies/Services Quantity Unit

2017 Non-Recurring Engineering for OGA Variant

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

This CLIN is for one optional eight (8)-Year Ordering Period covering Ordering Periods 3-10

Purchase Requisitions

Option:

Option Time Date: 1/31/29 Option Time Duration: 2921 Option Time Units: Days

Part I – The Schedule Section B – Supplies or Services and Prices/Costs

B-1

TABLE OF CONTENTS

B.1 CONTRACT TYPE

B.2 CONTRACT LINE-ITEMS NUMBERS

B.3 CONTRACT ORDERING PERIODS

B.1 CONTRACT TYPE

This contract is a Commercial Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract containing a combination of Firm-Fixed-Price (FFP) and Fixed Price with Economic Price Adjustment (FP-EPA) contract line items (CLINs). RB-S III boat production line items will be FP-EPA as specified herein; other supplies, support items, and separately identified deliverables will generally be FFP unless otherwise specified. The IDIQ nature of the contract provides flexibility, enabling the Government to order an indefinite quantity of supplies during the contract period, within specified minimum and maximum limits.

Individual requirements are fulfilled through the issuance of Delivery Orders, each of which will specify the exact CLINs, quantities, and schedule for the required supplies. Each Delivery Order placed under this contract will be awarded on a FFP and/or FP-EPA basis.

B.2 CONTRACT LINE-ITEM NUMBER (CLIN)

All CLINs associated with this contract are clearly delineated and identified within the Standard Form (SF) 33, which serves as the primary contractual document for commercial acquisitions. The SF-33 provides a summary of the contract’s essential terms and conditions, including the identification and description of each CLIN, which represents a distinct deliverable, or supply item to be provided under the contract.

In addition to their listing on the SF-33, the CLINs are further detailed in Attachment J-1, Pricing Schedule. The Pricing Schedule provides a comprehensive breakdown of each CLIN, including the associated unit prices, quantities (where applicable), and any relevant pricing or performance information.

This attachment serves as the authoritative reference for all pricing matters under the contract, ensuring transparency and consistency in the application of prices to individual Delivery Orders.

The following descriptions identify the supplies and services associated with each CLIN.

(a) CLIN X001 – RB-S III (BOAT AND TRAILER) This Contractor must provide the design, construction, and delivery of a complete and operational Response Boat - Small III (RB-S III). Each unit shall be delivered inclusive of its purpose-built trailer, Contractor-installed equipment, all associated outfitting and equipment as detailed in the Specification, and the initial Maintenance Requirements List (MRL) Kit as required per Statement of Work (SOW) Section 083-2.4.

(b) CLIN X002 / X003 – BOAT AND TRAILER SHIPPING – CONUS / OCONUS The Contractor must provide the transportation of the RB-S III boat and trailer to designated CONUS and OCONUS locations as required by SOW Section 084-3. The Contractor is responsible for all arrangements, including safe loading, transit, and offloading.

(c) CLIN X004 / X005 – CREW FAMILIARIZATION (FAM) – CONUS / OCONUS The Contractor must provide operator and maintainer familiarization sessions at CONUS and OCONUS locations to be conducted by the Contractor in accordance with SOW Section 089.

Section B – Supplies or Services and Prices/Costs

B-2

(d) CLIN 0006 & 1006 – LIST OF DELIVERABLES The Contractor must provide all data deliverables as specified in the SOW and detailed in Attachment C- 4, List of Deliverables. This includes, but is not limited to, agendas, meeting minutes, schedules, technical data packages, manuals, and reports.

(e) CLIN X007 / X008 / X009 / X010 – INTERIM CONTRACTOR LOGISTICS SUPPORT (ICLS) The Contractor must provide ICLS in accordance with SOW Section 80. This includes materials, subcontracts, non-engineering and engineering labor services, and travel costs.

(f) CLIN X011 – MRL KIT (ADDITIONAL) The Contractor must provide Maintenance Requirements List (MRL) Kits. The MRL kits ordered under this line item are separately procured kits in addition to the initial kit delivered with each boat and must contain all parts and consumables as specified in SOW Section 083-2.1 – 083-2.3.

(g) CLIN X012 / X013 / X014 – INSURANCE SPARES The Contractor must provide System Insurance Stock (SIS), including major equipment such as outboard engines and fendering systems, in accordance with SOW Section 083-5.

(h) CLIN X015 – RETROFIT The Contractor must provide the kits and instructions of approved Engineering Change Proposals (ECPs) on previously delivered boats, as described in SOW Section 041-5.1.4.

(i) CLIN X016 – DISPLAY MODEL The Contractor must provide the design and construction of a scale display model of the RB-S III and trailer, suitable for display, in accordance with SOW Section 098.

(j) CLIN X017 - Non-Recurring Engineering for OGA Variant The Contractor must provide non-recurring engineering services to develop an Other Government Agency (OGA) Variant of the RB-S III.

B.3 CONTRACT ORDERING PERIODS

This IDIQ includes a two (2)-year base ordering period and one (1) optional eight (8)-year ordering period. Each ordering period includes CLINs with pricing applicable to orders placed during each 12-month period of each ordering period as set forth in Attachment J-1, Pricing Schedule. Orders for supplies and services within the scope of this contract may be issued by the Contracting Officer (KO) against the applicable ordering period CLINs at any time during the corresponding ordering period identified in the contract.

(End of Section B)

Section C – Statement of Work

Department of Homeland Security (DHS)

United States Coast Guard (USCG)

Response Boat - Small Third Generation

(RB-S III)

Section C

STATEMENT OF WORK

(SOW)

30 SEP 2026

Revision Orig

C-i

Table Of Contents 040 [ORIG] PROGRAM MANAGEMENT ----------------------------------------------------------------------------- 1 041 [ORIG] CONFIGURATION MANAGEMENT (CM) ----------------------------------------------------------- 3 042 [ORIG] WARRANTY -------------------------------------------------------------------------------------------------- 6 044 [ORIG] IN-WATER DEMONSTRATION (IWD) ---------------------------------------------------------------- 8 045 [ORIG] CARE OF RB-S III DURING CONSTRUCTION AND TRIALS ---------------------------------- 8 068 [ORIG] OPEN HULL INSPECTION (OHI) ----------------------------------------------------------------------- 9 077 [ORIG] PRODUCTION SAFETY AND ACCIDENT PREVENTION --------------------------------------- 9 080 [ORIG] INTERIM CONTRACTOR LOGISTICS SUPPORT (ICLS) REQUIREMENTS ------------ 10 081 [ORIG] OPERATIONAL TESTING (OT) SUPPORT -------------------------------------------------------- 10 083 [ORIG] SUPPLY SUPPORT ---------------------------------------------------------------------------------------- 10

[ORIG] PACKAGING, HANDLING, STORAGE, AND TRANSPORTATION ------------------------- 14 085 [ORIG] TECHNICAL DATA PACKAGE (TDP) REQUIREMENTS ------------------------------------- 15 086 [ORIG] TECHNICAL MANUALS -------------------------------------------------------------------------------- 23 089 [ORIG] CREW FAMILIARIZATION (FAM) ------------------------------------------------------------------ 26 091 [ORIG] ACCEPTANCE TESTING (AT) FOR FIRST BOAT ----------------------------------------------- 26 092 [ORIG] ACCEPTANCE TESTING (AT) FOR SECOND BOAT AND ONWARD --------------------- 26 096 [ORIG] CENTER OF GRAVITY REPORT --------------------------------------------------------------------- 31 097 [ORIG] ONE TIME TEST FOR SECOND BOAT ------------------------------------------------------------- 32 098 [ORIG] DISPLAY MODEL ----------------------------------------------------------------------------------------- 33

C-ii

RECORD OF CONTRACT CHANGES

Version Date Purpose

Orig 09/30/2026 Request for Proposal (RFP)

C-1

040 [ORIG] PROGRAM MANAGEMENT

040-1 [Orig] General

040-1.1 [Orig] This Statement of Work (SOW) and the Specification define the requirements to design, build, test, and deliver the boats (RB-S III), and to provide logistics support and technical documentation. The Contractor shall manage and coordinate all work to ensure compliance with this SOW and the Specification.

040-2 [Orig] Meetings

040-2.1 [Orig] General

040-2.1.1 [Orig] The Contractor shall host or attend U.S. Coast Guard (USCG) meetings as required.

040-2.1.2 [Orig] For each formal meeting, the Contractor shall provide an agenda, draft minutes, incorporate USCG input, and issue final minutes.

040-2.1.3 [Orig] Minutes shall list all action items, assign responsibility (Contractor or USCG), and state each item’s status.

040-2.2 [Orig] Routine Status Meetings

040-2.2.1 [Orig] The Contractor shall hold routine status meetings with the USCG via Microsoft Teams video or phone, as requested by either party, to review contract administration and technical issues.

040-2.2.2 [Orig] Routine status meetings shall occur at least monthly and no more than weekly.

040-2.3 [Orig] Formal Meetings

040-2.3.1 [Orig] The Contractor or Contracting Officer (KO) may request formal in‑person meetings at the Contractor’s or USCG facility.

040-2.3.2 [Orig] The requesting party shall provide at least 14 calendar days’ notice, unless the KO approves a different period.

040-2.4 [Orig] Identified Formal Meetings

040-2.4.1 [Orig] Post-Award Conference.

040-2.4.2 [Orig] Open Hull Inspection.

040-2.4.3 [Orig] Acceptance Testing.

040-2.4.4 [Orig] Post-Operational Test and Evaluation Review.

040-2.4.5 [Orig] Follow-On Order Reviews.

040-3 [Orig] Data Exchange and Data Deliverables

040-3.1 [Orig] General

040-3.1.1 [Orig] The Contractor shall develop, prepare, and submit all data deliverables per Section C Attachment 4 List of Deliverable.

040-3.1.2 [Orig] All data, drawings, and information shall be submitted to the USCG as electronic copies unless this SOW or the Specification requires hard copies.

C-2

040-3.1.3 [Orig] All data shall be readable and usable on current USCG workstation operating systems and software.

040-3.2 [Orig] Formats and Systems

040-3.2.1 [Orig] Current USCG workstation operating systems and software include:

040-3.2.1.1 [Orig] Microsoft Windows 11.

040-3.2.1.2 [Orig] Microsoft 365.

040-3.2.1.3 [Orig] Adobe Acrobat.

040-3.2.1.4 [Orig] AUTODESK AutoCAD 2025.

040-3.2.1.5 [Orig] Rhino 8.

040-3.3 [Orig] USCG Review and Acceptance of Data Deliverables

040-3.3.1 [Orig] The USCG will review incoming data deliverables for contract conformance within 30 calendar days of receipt, unless otherwise specified in the List of Deliverables.

040-3.3.2 [Orig] After review, the USCG will:

040-3.3.2.1 [Orig] Accept: The KO/COR will provide written acceptance confirming the submittal meets content, quality, and quantity requirements.

040-3.3.2.2 [Orig] Not Accept: The KO/COR will provide written non‑acceptance with rationale. The Contractor shall revise and resubmit, may seek clarification, and if disagreeing with the rationale, may resubmit with written explanation and proposed alternatives.

040-3.4 [Orig] Data Deliverable Cover Sheet and Submission

040-3.4.1 [Orig] Each data deliverable shall include a cover sheet that provides the following information:

040-3.4.1.1 [Orig] Contract Name.

040-3.4.1.2 [Orig] Contract Number.

040-3.4.1.3 [Orig] Deliverable Name.

040-3.4.1.4 [Orig] Revision identifier and Revision Date.

040-3.4.1.5 [Orig] The Contractor’s Signature and date line of USCG acceptance.

040-4 [Orig] Integrated Master Schedule (IMS)

040-4.1 [Orig] The Contractor shall develop and maintain an event‑driven IMS showing milestone events for the prime Contractor and major subcontractors through contract completion, including:

040-4.1.1 [Orig] Boat deliveries.

040-4.1.2 [Orig] Deliverable submission schedule.

040-4.1.3 [Orig] Formal meetings.

040-4.2 [Orig] The IMS shall show baseline and actual start and finish dates.

C-3

041 [ORIG] CONFIGURATION MANAGEMENT (CM)

041-1 [Orig] General

041-1.1 [Orig] The Contractor shall establish, implement, and maintain a Configuration Management (CM) program for the RB‑S III and trailer for the contract duration.

The CM program shall:

041-1.1.1 [Orig] Develop and document the RB‑S III configuration (hull, mechanical, electrical, C4ISR, trailer, and all software/firmware, including adjustable parameters).

041-1.1.2 [Orig] Document the RB-S III configuration in the Technical Data Package (TDP), Master Equipment Configuration List (MECL), Configuration Status Report (CSR), provisioning technical data, and other contractually required deliverables.

041-1.1.3 [Orig] Perform configuration status accounting (CSA).

041-1.1.4 [Orig] Support configuration audits, including the Physical Configuration Audit (PCA).

041-2 [Orig] Configuration Status Accounting (CSA)

041-2.1 [Orig] The Contractor shall perform CSA from acceptance of the first RB‑S III through establishment of the Product Configuration Baseline (PCB). After PCB establishment, the USCG will maintain the CSA system.

041-2.2 [Orig] The CSA system shall:

041-2.2.1 [Orig] Identify approved configuration baselines and associated technical documentation (drawings, models, calculations, software/firmware versions, adjustable parameter sets, manuals).

041-2.2.2 [Orig] Record implementation status of authorized changes to technical documentation, production (effectivity by hull and trailer), and RB‑S III boats and trailers already accepted by the USCG.

041-2.2.3 [Orig] Record results and status of configuration audits and follow‑on corrective actions.

041-2.2.4 [Orig] Track resolution and final disposition of discrepancies, including those from acceptance testing, one‑time tests, and post‑delivery inspections.

041-2.3 [Orig] The CSA system shall record all baseline documentation, change implementation status, and audit results. The structure and content of the CSA system should align with the examples provided in Section 7 and Figure 8 of MIL- HDBK-61 (series). The CSA system shall be accessible, viewable, and maintainable from a standard USCG workstation.

041-3 [Orig] Configuration Baselines

041-3.1 [Orig] Preliminary‑Product Configuration Baseline (p‑PCB)

041-3.1.1 [Orig] The p‑PCB is established upon USCG acceptance of the second RB‑S III and documents the configuration entering the Operational Test and Evaluation (OT&E) period.

C-4

041-3.1.2 [Orig] The p‑PCB is under Contractor control; all changes (including software/firmware and adjustable parameters) shall be recorded in the CSA system and promptly communicated to the USCG for review and any needed testing or documentation updates.

041-3.1.3 [Orig] All RB‑S III boats and trailers shall conform to the p‑PCB until the PCB is established. Changes to the p‑PCB shall be incorporated into all boats and trailers unless otherwise agreed in writing by the USCG.

041-3.2 [Orig] Product Configuration Baseline (PCB)

041-3.2.1 [Orig] The PCB will be established upon USCG approval of the PCA Resolution Report for a designated production RB‑S III.

041-3.2.2 [Orig] The PCB shall be defined by the approved product drawings/models and associated lists required in the TDP and shall reflect all changes from OT&E, one‑time tests, and USCG‑approved Engineering Change Proposals (ECPs).

041-3.2.3 [Orig] Once established, the PCB is under USCG control. The Contractor shall not change hardware, software, firmware, or adjustable parameters on any RB‑S III in production or in service without prior written USCG approval, including changes during warranty work, casualty repairs, or retrofits.

041-4 [Orig] Physical Configuration Audit (PCA)

041-4.1 [Orig] The USCG will conduct a PCA on a production RB‑S III and trailer to verify conformance to the approved product drawings/models and associated lists.

041-4.2 [Orig] The USCG will designate the PCA boat and trailer, which shall have all OT&E and USCG‑directed changes incorporated.

041-4.3 [Orig] The Contractor shall provide one hard copy and one electronic set (PDF and native CAD) of product drawings/models and associated lists for the PCA, and shall provide access to the production facility, or an agreed on alternate site that has electricity, lighting, shelter from wind and rain, and safe access to all areas of the boat and trailer.

041-4.4 [Orig] The USCG will compare the physical RB‑S III and trailer to each product drawing/model and vice versa. Discrepancies will be documented in a USCG PCA report.

041-4.5 [Orig] The PCA will normally take no more than five working days. A Contractor representative is invited but not required.

041-4.6 [Orig] The Contractor shall resolve all PCA discrepancies and prepare a PCA Resolution Report identifying each discrepancy, corrective action, expected completion dates, and applicability by hull and trailer.

041-4.7 [Orig] Corrective actions shall be implemented on all affected RB‑S III boats and trailers, delivered and in production, unless otherwise agreed in writing by the

USCG.

041-5 [Orig] Configuration Control

041-5.1 [Orig] Engineering Change Proposals (ECPs)

C-5

041-5.1.1 [Orig] After delivery of the second RB‑S III, the Contractor may propose changes to contract requirements to address Diminishing Manufacturing Sources and Material Shortages (DMSMS) / obsolescence or to improve safety, reliability, maintainability, or supportability.

041-5.1.2 [Orig] The Contractor shall request an ECP number from the USCG before submitting an ECP and shall use DD Form 1692 (https://www.esd.whs.mil/Directives/forms/dd1500_1999/DD1692/).

041-5.1.3 [Orig] Each ECP shall describe the proposed change and rationale, identify effectivity (second hull or trailer to receive the change), recommend retrofit for previously accepted boats and trailers, list all affected configuration and technical documentation in DD Form 1692, and address impacts to performance, safety and stability, software/firmware and parameter sets, logistics (MECL, SNR, spares, manuals), cost, and schedule.

041-5.1.4 [Orig] The USCG may order retrofit to install an approved change in the field.

When installation is included, the Contractor shall perform it and shall develop and deliver Engineering Change Installation Instructions (ECII) (template provided as GFI) identifying all required parts, consumables, tools, and step‑by‑step instructions. The Contractor shall provide all components and instructions listed in the ECII as part of the retrofit

041-5.1.5 [Orig] If an ECP is approved, implementation details will be established via contract modification. No change shall be implemented on any RB‑S III or trailer without written USCG approval.

041-5.2 [Orig] Field and Warranty Changes

041-5.2.1 [Orig] If correcting defects during warranty requires a configuration change before PCB establishment, the Contractor shall inform the USCG of the proposed change, recommend implementation on all delivered and in‑production boats and trailers, and update the CSA system, MECL, SNR, and applicable TDP elements.

041-5.2.2 [Orig] If a configuration change is identified after PCB establishment, the Contractor shall submit an ECP for USCG approval prior to implementation, even when the change is to correct a defect under warranty.

041-5.3 [Orig] Request for Variance (RFV)

041-5.3.1 [Orig] The Contractor may propose variance from a particular requirement of an item’s configuration baseline documentation for a specific hull or number of hulls, or for a specific period, by submitting a Request for Variance (RFV). An RFV differs from an engineering change because it does not require a change to the configuration baseline document but merely documents the authority for the specified hulls and their configuration documentation to differ from the baseline document. The USCG will review RFVs. Upon acceptance in the form of a contract change, the KO will authorize the Contractor to implement the RFV. (https://www.esd.whs.mil/Directives/forms/dd1500_1999/DD1694/)

041-6 [Orig] DMSMS and Obsolescence https://www.esd.whs.mil/Directives/forms/dd1500_1999/DD1692/ https://www.esd.whs.mil/Directives/forms/dd1500_1999/DD1694/

C-6

041-6.1 [Orig] The Contractor shall identify and address Diminishing Manufacturing Sources and Material Shortages (DMSMS) and obsolescence for all Contractor‑selected Configuration Items (CIs) for the life of the contract.

041-6.2 [Orig] When DMSMS or obsolescence affects the RB‑S III, the Contractor shall promptly inform the USCG and provide recommended solutions (alternate vendors, new sources, or substitute parts/components).

041-6.3 [Orig] For Contractor‑selected CIs, the Contractor shall bear all costs of substitution due to DMSMS or obsolescence. This responsibility includes all costs associated with engineering, non-recurring activities, testing, documentation updates (TDP, MECL, SNR, manuals), and procurement of the replacement item. This obligation shall remain in effect for the entire duration of the contract plus the longest applicable warranty period of the final RB-S III delivered under this contract. All substitutions shall be processed via a no‑cost‑impact ECP submitted for USCG approval.

041-6.4 [Orig] For USCG‑specified parts, this cost‑allocation requirement does not apply;

however, the Contractor shall still notify the USCG of DMSMS/obsolescence and support identification of suitable replacements as requested.

041-7 [Orig] Configuration Status Report (CSR)

041-7.1 [Orig] The Contractor shall provide a Configuration Status Report (CSR) for all items, equipment, and systems on the boat. The report shall follow the template provided as GFI.

041-8 [Orig] Non-Recurring Engineering for CBP or OGA Variant

041-8.1 [Orig] If ordered, the Contractor shall provide non-recurring engineering services to modify the USCG .

042 [ORIG] WARRANTY

042-1 [Orig] General

042-1.1 [Orig] The Contractor shall provide a warranty program that covers all labor, travel, registration of component if needed, material, parts, shipping, and marine chemist certifications required to effect warranty repairs. The Contractor shall follow USCG policy for gas‑free certification and marine chemist requirements for warranty work completed at a USCG facility.

042-1.2 [Orig] The workmanship, performance, and operation of each RB‑S III and all installed systems shall be warranted by the Contractor against defects or failures for the following periods from acceptance:

042-1.2.1 [Orig] Two years of “stem‑to‑stern” total boat warranty that includes all equipment, material, and components.

042-1.2.2 [Orig] Two years of total trailer warranty.

042-1.2.3 [Orig] Three years or 1800 hours on steering and propulsion systems.

042-1.2.4 [Orig] Five years on material and structural workmanship for hull, decks, other structures, and fuel tank.

C-7

042-1.3 [Orig] The Contractor shall acknowledge warranty claims with a proposed resolution and timeline within:

042-1.3.1 [Orig] 24 hours of notification during Operational Testing; or

042-1.3.2 [Orig] 48 hours of notification not during Operational Testing.

042-1.4 [Orig] Warranty Resolution and Repair Plan Timelines:

042-1.4.1 [Orig] During Operational Testing: For any warranty claim initiated during operational testing that is not expected to be resolved within five (5) calendar days of submission, the Contractor shall submit a Warranty Repair Plan before the 5-day point that identifies the steps, scope, and schedule for resolution.

042-1.4.2 [Orig] During Non-Operational Testing Phase: For any warranty claim initiated outside of operational testing not expected to be resolved within fourteen (14) calendar days of submission, the Contractor shall submit a Warranty Repair Plan before the 14-day point that identifies the steps, scope, and schedule for resolution.

042-1.5 [Orig] If correction of defects during the warranty period requires a configuration change before the Product Configuration Baseline (PCB) is established, the Contractor shall inform the USCG of the change and provide a recommendation for implementation on all delivered boats and boats in production. If a configuration change is identified after the PCB is established, the Contractor shall notify the USCG and submit an ECP for approval.

042-1.6 [Orig] Warranties shall not be voided if trained USCG personnel effect repairs to meet mission requirements.

042-1.7 [Orig] All commercial component warranties that exceed the warranty terms herein shall be passed through to the USCG and managed and monitored by the Contractor.

The Contractor shall deliver a Warranty Book. The Warranty Book shall map each OEM, model, part number, warranty coverage terms and durations, claim channels, required registrations, and any exclusions.

042-2 [Orig] Warranty Management

042-2.1 [Orig] The Contractor shall use the Fleet Management Information System (FMIS), or its successor system, to communicate warranty information and to coordinate warranty efforts. The following information should be captured in the FMIS:

042-2.1.1 [Orig] Initial data (Contractor) with delivery of the Boat;

042-2.1.1.1 [Orig] Component breakdown;

042-2.1.1.2 [Orig] OEM technical manuals and drawings;

042-2.1.2 [Orig] Pre-delivery input (Contractor);

042-2.1.2.1 [Orig] Hull number;

042-2.1.2.2 [Orig] Serial numbers of installed component from the CSR;

042-2.1.3 [Orig] Date claim submitted (USCG);

042-2.1.4 [Orig] Date of remediation (USCG);

042-2.1.5 [Orig] Parts affected (USCG – expanded by Contractor if resolution warrants);

C-8

042-2.1.5.1 [Orig] Make/Model/Serial/Part Number Removed, Repaired, or Replaced (Contractor);

042-2.1.5.2 [Orig] Firmware/Software Version Removed, Repaired/Updated, or Replaced (Contractor);

042-2.1.6 [Orig] Nature of casualty (USCG);

042-2.1.7 [Orig] Actions taken (USCG and Contractor);

042-2.1.8 [Orig] Intended action (Contractor);

042-2.1.9 [Orig] USCG hull number (USCG);

042-2.1.10 [Orig] USCG unit (USCG);

042-2.1.11 [Orig] Engine hours (USCG); and

042-2.1.12 [Orig] Log of corrective action(s) taken that closed the claim (Contractor).

044 [ORIG] IN-WATER DEMONSTRATION (IWD)

044-1 [Orig] General

044-1.1 [Orig] The first RB-S III delivered under this contract shall be used for the In-Water Demonstration (IWD). The Contractor shall deliver the first RB-S III within 225 calendar days of contract award to one of the following locations, as specified by the

KO:

044-1.1.1 [Orig] Combatant Craft Division, 1052 Pocahontas Street Naval Station Bldg.

V-47, Norfolk, VA 23511; or

044-1.1.2 [Orig] USCG Base Portsmouth, 4000 Coat Guard Blvd, Portsmouth, VA 23703.

045 [ORIG] CARE OF RB-S III DURING CONSTRUCTION AND TRIALS

045-1 [Orig] General

045-1.1 [Orig] The boat shall be kept clean to prevent deterioration or contamination of equipment, machinery, and materials. This includes routine cleaning and managing condensation buildup.

045-1.2 [Orig] OEM‑applied preservatives or protective covers shall remain intact, or be replaced if damaged, until the machinery or equipment is installed.

045-2 [Orig] Physical Protection

045-2.1 [Orig] The Contractor shall provide physical protection and access control for the boat and its associated components until acceptance by the USCG.

045-3 [Orig] Protection of the RB-S III During Construction and Trials

045-3.1 [Orig] All parts of the boat shall be maintained in undamaged condition for the entire period the boat is in the Contractor’s possession. The Contractor shall take all necessary actions to prevent abnormal wear and damage to the boat and to prevent

C-9 corrosion or other environmental deterioration during construction, testing, trials, and delivery.

068 [ORIG] OPEN HULL INSPECTION (OHI)

068-1 [Orig] General

068-1.1 [Orig] The Open Hull Inspection (OHI) shall be conducted on the second boat ordered and does not apply to the first boat ordered.

068-1.2 [Orig] During construction of the second boat, the Contractor shall make arrangements for the USCG to conduct an open hull inspection at the site of construction once the hull structure has been completed, including the transom, all bulkheads, all frames, all longitudinals, engine foundations, the shell plating, and all necessary brackets that will be inaccessible after the deck is installed. This inspection shall be completed before the deck is installed.

068-1.3 [Orig] The open hull inspection shall be performed at the construction facility and shall not take more than eight consecutive hours in the construction area to complete.

068-1.4 [Orig] The Contractor shall provide relevant documents, drawings or sketches, and welding information that are being or have been used to construct the boat structure for the open hull inspection. This information will be used by the USCG during the open hull inspection to review the structure against the contract requirements, which may not be visible when the boat construction is completed, including an assessment of the quality of workmanship; any damage, buckling, or distortion of the hull and its supporting structure; and the presence of hard spots, knife edges, misalignment, and other detail defects, whether or not they are shown on the drawings/model.

068-1.5 [Orig] The Coast Guard may provide feedback regarding the OHI either verbally or in writing. Any Coast Guard feedback shall be recorded in the meeting minutes and fully addressed by the Contractor prior to boat production completion.

068-1.6 [Orig] The open hull inspection does not constitute USCG acceptance of the design or construction. It represents an opportunity for the USCG to view construction details that may not be visible when the boat construction is complete.

077 [ORIG] PRODUCTION SAFETY AND ACCIDENT PREVENTION

077-1 [Orig] General

077-1.1 [Orig] The Contractor shall inform USCG personnel of its accident prevention programs, policies, and procedures.

077-2 [Orig] Hazardous Materials (HAZMAT)

077-2.1 [Orig] The Contractor shall provide a Safety Data Sheet (SDS) Report that contains safety data information for each hazardous material (HAZMAT) used in the RB-S III. The report shall include an index of all SDSs. SDS report shall be in English.

C-10

080 [ORIG] INTERIM CONTRACTOR LOGISTICS SUPPORT (ICLS) REQUIREMENTS

080-1 [Orig] General

080-1.1 [Orig] The Contractor shall provide non‑warranty technical support, materials and other direct costs, and labor as additional services that the Coast Guard may order.

Specific requirements and pricing for these services will be agreed upon at the time each order is issued.

080-1.1.1 [Orig] Technical support may include analysis, studies, inspections, surveys, on-site casualty response, maintenance, software updates, or documentation.

080-1.1.2 [Orig] Material may include any item or equipment installed on the boat or trailer.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .