C-4 List of Deliverables_A00004.pdf

PDF 291 KB Posted

Attached to
USCG Response Boat Small Third Generation (RB-S III)
Solicitation number
70Z02326R93250001
Issued by
Not on record

About this file

This document is a List of Deliverables for the United States Coast Guard's Response Boat - Small Third Generation (RB-S III) program, issued under Amendment Four (A00004) dated October 22, 2026. The contract number is 70Z02326R93250001. The deliverables specify 55 distinct items that the contractor must provide throughout the contract lifecycle, ranging from proposal documents and meeting agendas to technical drawings, test procedures, and acceptance documentation. Deliverables are organized by Statement of Work (SOW) and specification references, with delivery timelines tied to specific milestones including Post Award Conference, Open Hull Inspection, Acceptance Testing, Physical Configuration Audit (PCA), and Post-Operational Test and Evaluation Review. Pricing schedules are assigned to each deliverable, with most falling under CLIN X001 (boats) or CLIN 1006 (OP2 operational items), while some developmental items are charged to CLIN 0006 (OP1).

Key deliverables include the contractor's technical proposal; formal meeting agendas and minutes; Integrated Master Schedule; Configuration Status Accounting (CSA) data files; hull structure construction documents; technical manuals and commercial parts catalogs; drawings and 3D models; calculations supporting structure and stability; maintenance requirement lists; provisioning data; acceptance test procedures and reports; incline and drainage test procedures and reports; boat information books; crew training materials; and various certification documents. Amendment Four incorporated ten specific revisions, including consolidation of testing requirements for both the first (demonstrator) and follow-on boats within the revised SOW Section 092, designation of Deliverable 40 as reserved, and addition of Deliverables 54 and 55 establishing requirements for first boat acceptance testing and documentation. Hard-copy documentation must accompany boats for several deliverables, with soft copies typically required 14 days prior to delivery. Government review periods of 30 to 45 days are specified for many technical submittals.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Homeland Security (DHS)

United States Coast Guard (USCG)

Response Boat - Small Third Generation

(RB-S III)

Section C – Attachment 4

List of Deliverables

22 OCT 2026

Amendment Four (A00004)

RECORD OF CONTRACT CHANGES

70Z02326R93250001

Version Date Purpose

Orig. 09/30/2026 Request for Proposal (RFP)

A00004 10/22/2026

A00004 incorporates the following revisions:

1) Added the Coversheet and Record of Contract

Changes.

2) Updated the far-right column description from

“Pricing Sheet” to “Pricing Schedule / CLIN.”

3) Deliverable 14: Revised to reference 068-1.4 from 068-1.3.

4) Deliverables 23 and 24: Revised to reference

083-6 from 083-7.

5) Deliverable 40: Designated as "Reserved" to align with SOW Section 091 being reserved.

The testing requirements for both the first boat

(demonstrator) and follow-on boats have been consolidated and clarified within the revised

SOW Section 092.

6) Deliverables 41 & 42: Revised to reference the updated SOW section numbers.

7) Deliverables 43 & 44: Revised to reference the updated SOW section numbers and added a requirement for hard-copy documentation to be delivered with the boats.

8) Deliverable 45: Revised to require hard-copy documentation to be delivered with the boats.

9) Deliverable 52: Revised to reference 660-1.1.6 from 660-1.1.5.

10) Deliverables 54 & 55: Added to establish requirements for first boat acceptance testing and documentation.

Response Boat -Small Third Generation (RB-S III) Section C Attachment 4 List of Deliverable A00004

RB-S III

List of Deliverables

# SOW / SPEC Ref. Deliverable Description Milestone To Required Delivery Pricing Schedule /

CLIN

1 N/A Offeror Proposal – Volume I

– Technical Proposal including all appendices

Contract Award KO &

COR

At Award NSP

2 040-2.1.2

040-2.4

Formal Meeting Agenda • Post Award Conference

• Open Hull Inspection

• Acceptance Testing

• Post-Operational Test and

Evaluation Review.

• Follow-On Order Year Reviews

KO &

COR

Formal meeting agenda seven days prior to the formal meeting

X001

3 040-2.1.2

040-2.4

Formal Meeting Draft and

Final Meeting Minutes

• Post Award Conference

• Open Hull Inspection

• Acceptance Testing

• Post-Operational Test and Evaluation

Review.

• Follow-On Order Year Reviews

KO &

COR

Formal meeting minutes two days after conclusion of the formal meeting

X001

4 040-4 Integrated Master Schedule Post Award Conference KO &

COR

Monthly for the first 12 months; Quarterly thereafter, at the end of March, June, September, and December

X001

5 041-2 Initial Configuration Status

Accounting (CSA) Data

Files

Starting with acceptance of second boat KO &

COR

• With the boat

• As needed with change(s) to the configuration tracked by hull prior to

Product Configuration

Baseline (PCB).

1006 (OP2)

RB-S III

List of Deliverables

# SOW / SPEC Ref. Deliverable Description Milestone To Required Delivery Pricing Schedule /

CLIN

6 041-2 Final Configuration Status

Accounting (CSA) Data

Files

PCB KO &

COR

• With PCB

• 45 days Gov review

• 14 days after first review comments received

1006 (OP2)

7 041-2

041-5

Revised CSA Data Files • Pre-PCB, with each contractor change(s) identified by initial hull

• Post-PCB, with each approved ECP identified by initial hull

KO &

COR

• Pre-PCB, soft copy, 14 days prior to initial hull(s).

• Post-PCB, soft copy, 14 days of approved ECP.

1006 (OP2)

8 041-4.3 Product Drawings for

Physical Configuration

Audit (PCA)

PCA KO &

COR

• 90 days prior to

• 45 days Gov review

• 14 days after first review comments received

• Hard copy, at PCA.

1006 (OP2)

9 041-4.6 PCA Resolution Report PCA KO &

COR

30 days after USCG provides PCA report to

Contractor

1006 (OP2)

10 041-5.1 Engineering Change

Installation Instructions

(ECII)

As needed KO &

COR

As needed

11 041-7.1 Configuration Status Report

(CSR)

With boats KO &

COR

• Soft copy 14 day prior

• Hard copy with Boats

X001

12 042-1.4 Warranty Repair Plan As needed KO &

COR

As needed X001

RB-S III

List of Deliverables

# SOW / SPEC Ref. Deliverable Description Milestone To Required Delivery Pricing Schedule /

CLIN

13 042-1.7 Warranty Book listing warranty provided by the contractor and all commercial component warranties

With boats • KO

CO

• Boat

• Soft copy 14 day prior

• Hard copy with Boats

X001

14 068-1.4 [A00004] Hull Structure Construction

Documents

Open Hull Inspection KO &

COR

45 days prior to; in

Contractor's Format. Shall provide sufficient detail to support Calculations. May be 2-Ddrawings, 3D model, or a combination of both. 2-

D drawings and 3D model shall be viewable in

AutoCAD. Sketches and vendor's cut sheets shall be submitted as PDFs.

1006 (OP2)

15 077-2.1 Safety Data Sheet (SDS) With boats • KO

CO

• Boat

• Soft copy 14 day prior

• Hard copy with Boats

X001

16 083-1.2 Commercial Parts Catalog With second boat KO &

COR

Soft copy 14 day prior 1006 (OP2)

17 083-2.1 1200 Hr. Maintenance

Requirement List (MRL)

With boats • KO

CO

• Boat

• Soft copy 14 day prior

• Hard copy with Boats

X001

18 083-2.4 MRL Kit (1200 Hr. Parts &

Tools) Inventory List

With boats • KO

CO

• Boat

• Soft copy 14 day prior

• Hard copy with Boats

X001

RB-S III

List of Deliverables

# SOW / SPEC Ref. Deliverable Description Milestone To Required Delivery Pricing Schedule /

CLIN

19 083-3 Initial Master Equipment

Configuration

List (MECL)

With first boat KO &

COR

• 90 days prior to

• 45 days Gov review

• 14 days after first review comments received

0006 (OP1)

20 083-3 MECL Starting with second boat and with each boat until PCB is estimated

• KO

CO

• Boat

• Soft copy 14 day prior

• Hard copy with Boat

1006 (OP2)

21 083-4 List of Special Tools & Test

Equipment

With second boat

KO &

• 14 day prior

• As needed

1006 (OP2)

22 083-5 System Insurance Stock

(SIS) Documentation

With SIS • KO

CO

• SIS

• Soft copy 14 day prior

• Hard copy with SISs

X012 – X014

23 083-6 [A00004] Provisioning Data With second boat KO &

14 days prior to

24 083-6 [A00004] Revised Provisioning Data As needed KO &

COR

As needed

25 084-1.6 Shipping Inventory List With boats • KO

CO

• Boat

• Soft copy 14 days prior

• Hard copy with Boats

X001

26 085-2 Initial Drawing Number

Assignment Report (DNAR)

With first boat KO &

COR

• 90 days prior to

• 45 days Gov review

• 14 days after first review comments received

0006 (OP1)

RB-S III

List of Deliverables

# SOW / SPEC Ref. Deliverable Description Milestone To Required Delivery Pricing Schedule /

CLIN

27 085-2 Final DNAR PCA KO &

COR

• 90 days prior to

• 45 days Gov review

• 14 days after first review comments received

1006 (OP2)

28 085-3 Preliminary Drawings;

should include sufficient info to support structure and stability review of preliminary calculations -general arrangement, structural arrangement, and lines and offsets

With first boat • KO

CO

• Boat

• 90 days prior; in

Contractor’s Format

• With; in Contractor’s format, one hard copy to be provided.

0006 (OP1)

29 085-3 Product Drawings With PCA Resolution Report KO &

COR

• With

• 45 day Gov review

• 14 days after first review comments received

1006 (OP2)

30 085-6 Preliminary 3-Dimensional

Model (3D Model); does not have to comply with MIL-

STD-31000 but include details sufficient to support design review, preliminary weight assessment, and evaluation of fabrication geometry

Open Hull Inspection KO &

COR

45 days prior to; in

Contractor’s Format.

RB-S III

List of Deliverables

# SOW / SPEC Ref. Deliverable Description Milestone To Required Delivery Pricing Schedule /

CLIN

31 085-6 3D Model With PCA Resolution Report KO &

COR

• With

• 45 day Gov review

• 14 days after first review comments received

1006 (OP2)

32 085-7 Preliminary Calculations supporting the proposal’s narrative and demonstrating the structure and stability meets ISO 12215 / 12217 requirements

With first boat KO &

COR

90 days prior in Contractor’s

Format

0006 (OP1)

33 085-7 Initial Calculations Open Hull Inspection KO &

COR

• 45 days prior to; in

Contractor’s Format.

• 30 days Gov review

• 14 days after first review comments received

1006 (OP2)

34 085-7 Final Calculations With PCA Resolution Report KO &

COR

• With

• 45 day Gov review

• 14 days after first review comments received

1006 (OP2)

35 086-1.3 Technical Manuals Index With boats • KO

COR

• Boat

• Soft copy 14 day prior

• Hard copy with Boats

X001

36 086-1.1

086-2.1

OEM Technical Manuals and Publications

With boats • KO

COR

• Boat

• Soft copy 14 day prior

• Hard copy with Boats

X001

37 086-3 Initial Boat Information

Book (including HM&E

Support Section, C4ISR

With first boat • KO

COR

• Soft copy 90 days prior

• With, Contractor Format:

Shall include preliminary

RB-S III

List of Deliverables

# SOW / SPEC Ref. Deliverable Description Milestone To Required Delivery Pricing Schedule /

CLIN

System/Network Support

Section, and Casualty

Control Section)

• Boat system schematics for fuel, electrical, communication, and navigation system, and lifting system. One hard copy

38 086-3 Final Boat Information Book

(including HM&E Support

Section, C4ISR

System/Network Support

Section, and Casualty

Control Section)

Starting with second boat • KO

COR

• Boat

• Soft copy 60 day prior

• 30 days GOV review

• Hard copy with Boats

X001

39 089-1 Crew FAM Syllabus &

FAM Material

With crew fam KO &

COR

• Soft copy 14 day prior

• Hard copy with crew fam

X004; X005

40 Reserved [A00004] Reserved Reserved • Reser ved

• Reserved Reserved

41 092-3.2.1 [A00004] Initial Acceptance Test

Procedures

Acceptance Test Starting with Second

Boat

KO &

COR

• 90 days prior to test

• 45 days Gov Review

1006 (OP2)

42 092-3.2.1 [A00004] Final Acceptance Test

Procedures

Acceptance Test KO &

COR

30 days prior to 1006 (OP2)

43 092-3.2.2 [A00004] Acceptance Test Reports and

Calibration Data and Test

Equipment Certification

[092-1.4]; Scale Weighing

Test result [092-5.13 & 14], Firmware and Software

Verification [402-1.4].

With boats • KO

COR

• Boat

• Seven days prior to

• Hard copy with Boats

X001

44 092-3.2.3 [A00004] Failure and Discrepancy

Reports

As needed KO &

COR

As needed NSP

45 096-1 [A00004] Center of Gravity Report With boats • KO

COR

• Seven days prior to

RB-S III

List of Deliverables

# SOW / SPEC Ref. Deliverable Description Milestone To Required Delivery Pricing Schedule /

CLIN

• Boat

46 097-1.2 Incline Test Plan Incline Test KO &

COR

• 90 days prior to test

• 45 days Gov Review

1006 (OP2)

47 097-1.5 Incline Test Report Incline Test KO &

COR

5 days after Incline Test 1006 (OP2)

48 097-2.1 Drainage Test Procedure Drainage Test KO &

COR

• 90 days prior to test

• 45 days Gov Review

1006 (OP2)

49 097-2.2 Drainage Test Report Drainage Test KO &

COR

5 days after Drainage Test 1006 (OP2)

50 233-1 OEM Certification Letter for

40 CFR Part 1045, Control of Emissions from Spark-

Ignition Propulsion Marine

Engines and Vessel

With boats KO &

COR

• Soft copy 14 day prior

• Hard copy with Boats

X001

51 402-5 Vulnerability and Resolution

Report

With boats KO &

COR

7 days prior X001

52 660-1.1.6 [A00004] OEM Shock Mitigating Seat

Test Report

Open Hull Inspection KO &

45 days prior to

53 910-1.1 Trailer Title With boats Trailer With the boat X001

54 092-3.1 [A00004] First Boat Procedure and

Data Sheet

First boat acceptance testing KO &

COR

5 days before acceptance testing

X001

55 092-3.1 [A00004] First Boat AT

Documentation

With first boat acceptance KO &

COR

• Seven days prior to

File details come from the government source that posted it. Updated .