RFP_N5005420R0005_NON-SKID.pdf
PDF 2 MB Posted
- Attached to
- NON-SKID ALTERATIONS FFP MAC-IDIQ Federal contract opportunity
- Solicitation number
- N5005420R0005
About this file
This is a solicitation for non-skid alterations services to be provided on a firm-fixed-price multiple-award indefinite-delivery/indefinite-quantity contract basis. The Naval Sea Systems Command seeks to award these contracts to support non-skid work on various Navy vessels. Offerors are required to submit proposals by 10:00 AM local time on September 1, 2020 for consideration. Pricing will be on a firm-fixed-price basis for individual delivery orders issued against the contracts. The solicitation is set aside for total small business and contemplates the award of multiple IDIQ contracts for non-skid work to include surface preparation, coating application and installation, and related services. Relevant details are provided on labor categories, materials, equipment, and specific tasks.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 01 Sep 2020
X
A
X B
X C X D
EX
X
G
F 97 - 104
105 - 117
X H 118 - 123 susan.rosquist@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A3 1 123
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N50054 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
DOD SAFE
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
SUSAN ROSQUIST (757) 400-2789
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
7 - 52
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
55 - 56 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 57 - 64 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 65 - 69 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
70 - 94
PART II - CO NTRACT CLAUSES
MID-ATLANTIC REGIONAL MAINTENANCE CENTER
CODE 412
9727 AVIONICS LOOP
NORFOLK VA 23511-2124 (757) 400-3069
(757) 400-3070FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
95 - 96
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
31 Jul 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N5005420R0005
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
CLIN
Number
1 Job
NON-SKID ALTERATIONS – BASE YEAR EFFORT
FFP
Reference Exhibit A for Non-Skid Alterations Base Year Effort in accordance with the Statement of Work
FOB: Destination
PSC CD: J998
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
CLIN
NON-SKID ALTERATIONS - OPTION I - 2ND YR
FFP
Reference Exhibit B for Non-Skid Alterations Option I - Second Year Effort in accordance with the Statement of Work
UNIT UNIT PRICE MAX AMOUNT
CLIN
NON-SKID ALTERATIONS - OPTION II -3RD YR
FFP
Reference Exhibit C for Non-Skid Alterations Option II - Third Year Effort in
UNIT UNIT PRICE MAX AMOUNT
CLIN
NON-SKID ALTERATIONS - OPTION III-4TH YR
FFP
Reference Exhibit D for Non-Skid Alterations Option III - Fourth Year Effort in
UNIT UNIT PRICE MAX AMOUNT
CLIN
NON-SKID ALTERATIONS - OPTION IV- 5TH YR
FFP
Reference Exhibit E for Non-Skid Alterations Option IV - Fifth Year Effort in
OPTION NOTE
NOTE A: CLINs 2001 through 5001 are option items to which the option clause 52.217-7 in SECTION I applies and which are to be supplied only if and to the extent said option is exercised.
Section C - Descriptions and Specifications
C.1. SCOPE OF WORK
C.1.1. The contractor shall provide management, administrative and production services, materials, tools, equipment, and required support to accomplish removal of old deck covering and underlayment (including rubber base if present), abrasive blast, ultra high pressure water jet, and power tool clean decks; prepare surfaces, apply primer coatings, and install new non-skid deck covering onboard U.S. Navy or other military type vessels. The areas where non-skid work may be authorized shall include, but is not limited to, flight decks, hangar bays, vertical replenishment decks, cargo decks, elevators, tank decks, vehicle stowage, walkways (fixed and portable), catwalks, and interior spaces as designated. Non-skid deck covering installation and repair is to be accomplished with ship’s force personnel living onboard and with a minimum of disruptions as possible.
C.1.2. A requirement will normally consist of a single vessel. The resulting delivery order may require multiple line items within the contract. Due to U.S. Navy or other customer commitments and ship’s schedules, a number of delivery orders may be issued as emergent requirements. The contractor may be required to respond to more than one requirement (simultaneous delivery orders for more than one vessel).
C.1.3. Required reports and documentation must be compatible with Microsoft Office.The use of Web
Applications will also be required.
C.1.4. Single delivery orders for LHA, LHD, CV, or CVN classes of ships may require the capacity to cut
18,000 square feet and apply 18,000 square feet of non-skid per day. Contractors may be tasked with multiple delivery orders at any given time.
C.2. PERSONNEL
C.2.1. The contractor is responsible for employing and maintaining the personnel, organizational and administrative control necessary to ensure the performance meets or exceeds all contract specification requirements hereunder and as set forth in each individual delivery order. The contractor, upon request of the Government representative, shall produce the qualifications of an individual to substantiate qualifications to perform the requirement being worked.
C.2.2. In addition, the contractor shall be responsible for the employment of trained and technically qualified personnel to perform delivery orders to include personnel maintaining the following certifications for accomplishing preservation operations defined as critical coated areas (refer to NAVSEA Standard Item
(NSI) 009-32). Information for these certifications is available at www.sspc.org:
a. Coating inspectors shall be certified in accordance with the NAVSEA Basic Paint Inspector
(NBPI) course or NACE Coating Inspector Program (CIP) Level 1 or higher.
b. Organizations performing blasting operations (abrasive or water jetting) or paint/nonskid application shall be certified in accordance with QP 1 of Systems and Specifications, SSPC
Painting Manual, Volume 2 or NAVSEA-approved equivalent.
c. Spray painters shall be certified in accordance with SSPC C-12 or SSPC C-14 or NAVSEA-approved equivalent. For equivalent certifications, a copy of the NAVSEA approval letter shall be maintained by the repair activity.
d. Plural Component Pump Tenders and Applicators shall be certified in accordance with SSPC C-
14 or NAVSEA-approved equivalent certifications. For equivalent certifications, a copy of the
NAVSEA approval letter shall be maintained by the repair activity.
e. Blasters shall be certified in accordance with SSPC C-7 or NAVSEA-approved equivalent. For equivalent certifications, a copy of the NAVSEA approval letter shall be maintained by the repair activity.
f. Blasters performing Ultra-High Pressure water jetting shall be certified in accordance with
SSPC C-13 or NAVSEA-approved equivalent. For equivalent certifications, a copy of the
NAVEA approval letter shall be maintained by the repair activity.
C.3. ORGANIZATION
C.3.1. The contractor shall have an organization with the experience and comprehensive understanding to apply management techniques, methods and procedures required to efficiently complete the requirements of this solicitation.
C.4. REFERENCES
C.4.1. In performing the requirements of this contract, the contractor shall comply with all the following references and attachments (Section J) to this solicitation.
a. The following Category I and II NAVSEA STANDARD ITEMS (NSIs) may be viewed on the
Internet at https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/ and will be invoked on all delivery orders:
009-01 General Criteria; accomplish 01 Oct 2019
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide
01 Oct 2019
009-03 Toxic and Hazardous Substances; control
009-04 Quality Management System, provide 01 Oct 2019
009-06
Maintaining Protection and Cleanliness from Non-Radioactive Contaminate-
Producing Operations; accomplish
06 Mar 2020
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 24 Jul 2019
009-09 Process Control Procedure (PCP); provide and accomplish
009-10 Shipboard Asbestos-Containing Material (ACM); control
009-20 Government Property; control
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish
009-26 Deck Covering Requirements 01 Oct 2018 https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/
009-32 Cleaning and Painting Requirements; accomplish 06 Mar 2020
009-40 a. Requirements for Contractor Cranes at Naval Facilities; accomplish b.
01 Jan 2019
009-60 Schedule and Associated Reports; provide and manage
14 Jan 2020
009-69 Heavy Weather Plan; provide 30 Apr 2018
009-74 Occupational, Safety and Health Requirements; accomplish
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
06 Mar 2018
009-106
Work Authorization Form Coordinator (WAFCOR); provide 01 Oct 2017
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
30 Apr 2018
b. The following LOCAL WORK TEMPLATES (LWTs) will be provided on the Internet as attachments and will be invoked on individual delivery orders as required:
042-005 Norfolk Naval Shipyard (NNSY) Work Authorization Form (WAF) Requirements;
accomplish (Attachment J1)
16 Jan 2019
042-006 General Occupational Safety, Health and Environmental (OSHE) Requirements for
Work Within Norfolk Naval Shipyard; accomplish (Attachment J2)
01 Feb 2019
042-007 Security Requirements for Work Within Norfolk Naval Shipyard; accomplish
(Attachment J3)
01 Feb 2019
042-008 General Requirements for Work on Aircraft Carriers; accomplish (Attachment J4) 19 May 2018
042-010 Nuclear Powered Ships/Nuclear Support Ships; special requirements (Attachment J5)
06 Feb 2019
042-022 General Requirements for Work Within Norfolk Naval Shipyard
(NNSY) (Attachment J6)
13 June 2019
042-037 General Requirements for Work Within Naval Station Norfolk (Attachment J7) 12 Oct 2018
042-038 General Requirements for Work Within Joint Expeditionary Base (JEB) Little Creek
- Fort Story (Attachment J8)
15 Oct 2018
992-006 Heavy Weather Plan (Demobilization); accomplish (Attachment J9) 04 Oct 2018
992-007 Heavy Weather Plan (Remobilization); accomplish (Attachment J10) 04 Oct 2018
c. The following STANDARD WORK TEMPLATES (SWTs) will be provided on the Internet as attachments and will be invoked on individual delivery orders as required:
077-001 Hazardous Waste Produced on Naval Vessels; control (Attachment J11)
26 Oct 2018
d. Best Management Practice Manual for Shipbuilding and Repair Industry (BMP)
Commonwealth of Virginia State Water Control Board (1990) (Available on the Internet at www.deq.virginia.gov)
e. The National Surface Treatment (NST) Center web site is available to contractors for informational purposes at http://nstcenter.biz
NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked. Additionally, in the event that there is any conflict between the references, NSIs, LWTs, and SWTs take precedence over technical manuals/specifications and other references. Also, when drawings reference other tiered drawings, they are to be followed.
C.5. POST-AWARD SUBMISSION
C.5.1. After receipt of a Delivery Order Award and prior to starting work onboard the vessel, the contractor shall review and comply with requirements of applicable portions of SECNAV M-5510.30 (Dept. of the
Navy, Personnel Security Program), DOD 5220.22M (National Industrial Security Program Operating
Manual), and/or Defense Biometric Identification System (DBIDS) to the Contracting Officer via the Mid-
Atlantic Regional Maintenance Center (MARMC) Security Officer (Attachment J16).
NOTE: The contractor shall comply with the latest revision of these documents in effect prior to starting work.
C.6. FACILITIES
C.6.1. The contractor shall perform the services specified within this contract as may be tasked by the issuance of delivery orders. The contractor shall have sufficient facilities in appropriate locations to fully support the work intended by this contract and be able to respond to emergent requirements.
C.7. GENERAL REQUIREMENTS
The following are applicable to the extent they apply to all repairs, modifications, testing and adjustments. Any cost to comply with these requirements shall be included in the price of the CLINs
C.7.1. The Contractor Shall:
a. Exercise own judgment and expertise to assure the successful completion of all requirements placed hereunder.
b. Designate those persons authorized to accept/reject verbal orders.
c. Coordinate schedules in the work affected areas with the Ship’s Authorized Representative
(SAR), MARMC Maintenance Team and the MARMC Technical Point of Contact (TPOC) during the performance period of the delivery order. Obtain a copy of the ship’s operation drills, etc.
(prior to start of work) from the SAR thus avoiding unnecessary delays. The work effort on delivery orders shall be coordinated at a minimum on a daily basis with the SAR to allow for changing situations onboard ships, vessels, and shore facilities to minimize delays and disruptions.
http://www.deq.virginia.gov/ http://nstcenter.biz/
d. Progressively forward all requests for changes in delivery schedules, funding requirements and scope of work in writing to the MARMC TPOC. These requests shall include specific details as to what changes are required and circumstances requiring such and shall be submitted to the
MARMC TPOC for forwarding to the Administrative Contracting Officer (ACO) prior to 20% of delivery availability being exceeded.
e. Not respond to new performance requirements until a delivery order or a modification has been signed or verbal authorization has been given by the ACO.
f. Not respond to any requests requiring deviations in technical performance as specified in the delivery order without obtaining prior approval of the ACO.
g. Be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day to day work schedule.
h. Provide protection during contamination-producing operations and maintain cleanliness in accordance with NSI 009-06. Remove and properly dispose of all debris or trash resulting from cleaning, removal, installation or any other aspect of requirement performance. This will be required of all tasks performed on this contract whether at a Government facility or at a privately owned facility.
i. Request that ship’s force schedule and remove shipboard, land, and waterborne assistance interferences in the way of the work identified by the delivery order prior to the start of work. The request shall be made in writing after delivery order award, but no later than the day of contract mobilization to prevent interference with contractor personnel duties and operation. All requests shall be submitted to the Maintenance Team via condition report or e-mail no later than the contractor in-brief with ship’s force or the start of work whichever is earlier. The contractor shall request in writing that ship’s force schedule and re-install interferences in the way of the work identified by the delivery order on decks turned over to ship’s force.
j. Include within the price for applicable ELINs the cost of any required lifting, handling, on-loading/off-loading, and transporting, whether on board or going from or to the ship. If crane services are to be provided, they will be contractor provided and priced in the individual ELIN.
Comply with the requirements of NSI 009-40 when working at Commander Naval Base Norfolk and Joint Expeditionary Base Little Creek-Fort Story. Additionally, for authorized work at
Norfolk Naval Shipyard, comply with the additional crane requirements of LWTs 042-08 and 042-
11.
k. Except as otherwise provided in this contract, or delivery orders issued hereunder, the
Contractor shall provide all material, labor services, equipment, supplies, power, accessories, facilities and such other supplies and services as necessary for accomplishing assigned tasks. The
Contractor may request on a case-by-case basis to use ship’s services that are available. A request for use of ship’s services must be made jointly to the SAR and MARMC TPOC. Written permission will be obtained from the CO of the ship before actual use of any ship services. A request for ship’s services may be turned down whether or not the requested service is available.
Denial of a request for use of ship’s services will not be a valid basis for any claim or request for compensation. Regardless of any request for ship’s services, ship’s services shall not be used for contractor life support systems (compressors for breathing air), lifting equipment or any other equipment wherein an unexpected disruption of services has a high potential for loss of life, injury, or damage to the ship’s equipment.
l. Accomplish the requirements of NSI 009-40 for the use of contractor cranes at naval facilities.
For work at other than naval facilities, contact the facility manager to determine the requirements and restrictions for crane operations prior to mobilization on-load, final determination of production sequencing and production zone layout, and demobilization off-load. Crane placement restrictions may affect production sequencing and zoning.
m. Ensure that persons assigned to render services hereunder are at all times under the direction and control of the contractor and are not employees of the Government.
n. Remove and dispose of all debris or trash resulting from cleaning, removal, installation or any other aspects of task performance. This will be required of all tasks performed on this contract whether at a Government facility or at a privately owned facility.
o. Follow all applicable federal, state, and local laws concerning safety, health, and welfare of his personnel and equipment as well as other personnel and equipment within a close proximity of the ongoing work.
p. Contact the MARMC TPOC and the ship’s Command Duty Officer when problems are encountered after normal working hours. If the MARMC TPOC and the SAR cannot be reached, the contractor shall contact the MARMC Duty Officer at 757-400-0000.
q. As required by 40 Code of Federal Regulations Part 63, painting operations shall be reported in accordance with NSIs 009-01 and 009-02 and LWTs 042-11 042-37 and 042-38. The contractor, when awarded work within another contractor’s facility, is required to contact the facility owner’s environmental staff to determine requirements and report accordingly using federal requirements as standard.
r. Quality assurance personnel shall be independent from production personnel. Quality assurance personnel shall be dedicated to quality assurance and shall not participate in the accomplishment of production work.
s. Ensure that work crews and persons assigned to render services hereunder are on the job site fully supported to accomplish assigned work at the beginning of each shift. Ensure that resources are sufficient to provide the timely delivery of material, support equipment, and personnel to the job site through security access and other access control check points at private contractor facilities and government installations on a daily basis.
t. Fax/email (I), (V), and (G) point notifications to the MARMC TPOC. Submit (I), (V), and (G) point notifications to the fax number or the e-mail address of the Maintenance Team as determined by mutual agreement of the contractor, MARMC TPOC, and the Maintenance Team.
u. Record and maintain in-process records, as stipulated in NSI 009-32.
v. If a deviation is required, deviation/waiver requests will be processed using the Electronic
Departure from Specification program; https://eforms.nslc.navy.mil/eDFS/home.
w. Accomplish the requirements of NSI 009-09, Process Control Procedure (PCP) to the
Government when required by delivery orders for approval by the Government. Submit PCPs as specified by delivery orders. The contractor shall revise the contractor generated PCPs as necessary to achieve approval of PCPs by MARMC no later than the delivery order performance period start date.
https://eforms.nslc.navy.mil/eDFS/home
x. Accomplish a discrepancy walk through at the start of work for each area of work (deck and/or compartment). All identified pre-existing discrepancies shall be reported to the Maintenance
Team in writing no later than one day after inspection by condition report.
y. Ensure that industrial debris from contractor work operations do not contaminate adjacent decks and/or completed non-skid installations accomplished by the contractor.
z. Progressively correct discrepancies prior to the turn over of each deck and/or production zone to the Government.
aa. Not schedule or perform final surface preparation work, application of primer coat, stripe coat, non-skid, color topping, or deck gray top coat before dawn or after dark except as approved by
MARMC.
ab. Meet the requirements of this contract where each delivery order is silent.
ac. Contact the Maintenance Team Project Manager and/or the Port Engineer and the SAR no later than 24 hours, or as otherwise directed by the delivery order, after delivery order award by telephone or e-mail to start coordination efforts.
ad. When the requirements of this contract, a delivery order, or delivery order attachment, NSI, LWT, or SWT attachment state “submit one legible copy of a report to the SUPERVISOR”, the contractor shall make distribution of the report to the MARMC Maintenance Team Project
Manager, SAR, and TPOC by electronic media or hard copy simultaneously.
ae. Accomplish a Pre-Production in-brief with the MARMC SAR and the Maintenance
Team/Project Team prior to the start of each delivery order performance period. The in-brief shall address and coordinate the following:
- Pier space
- Ship’s force drills
- Shipboard space
- Contractor temporary services
- Crane and rigging operations
- Fire, mishap, force protection procedures, and designation of shipboard and pier assembly areas (by pier foot mark)
- Fire and rescue requirements
- Point of contact data exchange (name/organization/position/cell phone/e-mail address/weekend, holiday, or after normal business hour emergency duty contact data)
- The requirements of the scope sheet
- The requirements of the PCP, hazardous material and waste material control - MARMC
TPOC contact data
- List ship’s force responsible interference items in way of contractor work
- Check point contact points and process procedures for the MARMC Maintenance
Team, SAR, and TPOC
The contractor shall:
- Provide a copy of the Pre-Production In-Brief checklist to the MARMC SAR and the
Maintenance Team.
- List the name and title of in-brief attendees on the checklist.
- Submit one legible copy, in hard copy or electronic media, of a report providing the in-brief checklist with printed attendee names and signatures to the MARMC Maintenance
Team no later than 72 hours after the in-brief.
- Review the requirements of the delivery order and delivery order scope sheet with the
Maintenance Team and the SAR.
- Provide the following documents to the Maintenance Team members.
- Copy of the scope sheet (Project Manager and SAR only)
- Copy of the MARMC approved PCP (Project Manager and SAR only)
- List of interference items in the way of the work of the delivery order (MARMC Project manager, SAR, TPOC only)
af. Comply with NSI 009-24 in accomplishing isolation, blanking and tagging of equipment, systems, circuits, components, piping and valves. Also comply with LWT 042-02 if the work is being performed in Norfolk Naval Shipyard. Work Authorization Form (WAF) will be utilized and invoked in conjunction with NSI 009-24 when work is being accomplished in Norfolk Naval
Shipyard. The web site for the WAF is:
https://www.navsea.navy.mil/Home/SUBMEPP/Products/JFMM/
ag. Freeze protection shall be provided for contractor’s equipment as required during the months from October to April.
ah. Ventilation intakes, filters, equipment, and all soft materials (rubber gaskets, seals, and insulation), arresting gear sheaves, fairlead accesses, flight deck countermeasure/AFFF wash down nozzles, barricade stanchions, jet blast deflectors, jet blast deflector control station, wire support foundations, catapult water brakes, integrated catapult control station, center deck hatch, catapult track covers, all internal wrenching bolt heads, high power turn-up tie-downs, aircraft electrical start system hatches, scupper drains, weapons elevator hatches/safety chain stanchion receptacles, centerline cameras, flight deck lighting, lighting fixtures, and deck edge aircraft elevator stanchions, which may be damaged during the removal of the non-skid, shall be protected and all deck drains, elevator pad-eyes openings shall be sealed/plugged.
https://www.navsea.navy.mil/Home/SUBMEPP/Products/JFMM/
ai. (V) (G) GTG and GTM intake plenum pre-work cleanliness inspection – Accomplish a cleanliness inspection of each Gas Turbine Generator (GTG) intake, Gas Turbine Main (GTM) intake, and exterior intake vent plenum in way of non-skid or preservation work with ship’s force prior to the start of work. Submit one legible copy, in hard copy or electronic media, to the
MARMC TPOC and the Maintenance Team.
aj. Should hydrogen gas be detected at any level, notify the MARMC TPOC and the vessel’s CDO immediately.
ak. Aircraft elevators on aircraft carriers will not be available to the non-skid contractor for material/equipment transfer due to scheduled maintenance.
al. Contractor will be required to on-load and off-load materials and supplies for aircraft carriers directly from flight decks.
am. The aircraft carrier flight deck landing area is from safe parking line to safe parking line and from the stern deck ramp to the round down of the angled flight deck.
an. Surface prep for blast pads to be accomplished by water jet only. No hot work is allowed on pads.
ao. Replace any area that chalks, blooms, blushes, or discolors after application and before final cure when rejected by the Government at contractor’s expense.
ap. When failures or defects occur in newly installed non-skid systems, either prior to final acceptance or during the warranty period, the Government shall apply ASTM F1130 as the technical guidance to determine the extent of non-skid that must be removed and replaced.
Specifically, Designation F1130-93, or latest revision, entitled, "Standard Practice for Inspecting the Coating System of a Ship" shall be determinative. When areas of failures and defects meet the criteria of ASTM F1130 "Figure 1, Diagram 4, Overall Extent of Failure Diagrams", and "Figure
2, Diagram D, Extent Within Affected Area Diagrams (B Through K)", the "zone of work", "deck" or other area defined in the work package shall be determined to be 100 percent failed.
The Government reserves the right to evaluate failure and defect rates and to make final judgment as to repair scope based on ASTM F1130 listed in Section B.
C.7.2. Environmental and Safety Requirements. The Contractor Shall:
a. Consider all insulation, lagging, deck tile, underlayment, gasket shipboard cabling and mastic to be asbestos-containing material (ACM) until it can be established by laboratory analysis, or other reliable methods, that the material does not contain asbestos, in accordance with 29 CFR
1915.1001. Removal, disturbance, or disposal of ACM shall be accomplished IAW the requirements of NSI 009-10.
b. Accomplish confined space entry, certification, fire prevention and housekeeping requirements of NSI 009-07 and 009-70. Maintain area cleanliness and ensure all residues and refuse are removed daily and ensure that general housekeeping is maintained for the duration of the task in the work areas specified on each delivery order.
c. Contractor shall perform personnel air monitoring unless a negative initial determination is made by the contractor. If no personnel monitoring will be conducted, contractor shall submit one legible copy, in hard copy or electronic media, of the written rationale providing the basis for the decision not to engage in personnel monitoring to the MARMC TPOC, prior to disturbance of the non-skid/coatings.
d. The contractor shall review and evaluate all solid waste generated during work operations to determine if that waste is hazardous waste IAW 40 CFR 262.11. This includes liquids generated as a result of hydro blasting operations, and includes wastes not identified under SWT 077-01.
e. All solid waste with the known potential to be hazardous, including but not limited to non-skid debris, paint chip debris, flooring/debris, and all liquid waste removed from the ship shall be tested by a certified laboratory for metals IAW 40 CFR 261.24, using the Toxicity Characteristic
Leaching Procedure (TCLP), Method 1311 in EPA Publication SW-846. Contractor shall submit all laboratory analysis reports to the MARMC TPOC as soon as possible upon receipt from the laboratory. No solid waste removed from the ship shall be transported off the facility until authorized by the MARMC TPOC.
f. All removed non-skid/paint debris shall be containerized IAW 40 CFR Subpart I. Non-skid/paint debris shall not be accumulated and stored in cardboard, “tri-wall” containers. During the timeframe between when a solid waste is generated and a sample of that solid waste is collected and submitted to an accredited laboratory for analysis, and when the laboratory analysis results are received by the contractor, all containers of the solid waste shall be labeled as “Pending
Analysis.”
g. Contractor shall prepare, provide and affix labels/placards for all containers of solid waste accumulated on the land, pier and/or the vessel, including solid waste that is “Pending Analysis.”
Labels/placards shall be weatherproof, large enough to provide ready identification, and provide the following information:
- Contractor Name
- Contractor POC: (name, cell phone number, phone number)
- Vessel
- MARMC Contract Number
- MARMC Delivery order Number
- Technical Point f Contact (name, cell phone number, phone number)
- Ship’s QTR Deck/OOD phone number
- Description of waste
- Analysis Pending/Sample date (if applicable)
- MARMC Maintenance Team Project Manager (name, cell phone number, phone number) if applicable. - MARMC Port Engineer (name, cell phone number, phone number) if applicable.
h. For operations at Naval Station Norfolk, Joint Expeditionary Base Little Creek-Fort Story, and all private contractor shipyards in the Commonwealth of Virginia, all solid waste determined to be hazardous waste shall be turned over to the ship/vessel from which the waste was produced for processing and disposal through NAVFAC MIDLANT (formerly PWC) hazardous waste operations. For operations in Norfolk Naval Shipyard (NNSY), all hazardous waste shall be turned in to NNSY Code 106, via the MARMC TPOC, for disposal. For operations at Naval
Facilities or private contractor’s facilities outside the Commonwealth of Virginia, the contractor shall comply with all state and local regulations and local work items applicable in those areas.
i. In the event that a solid waste is determined to be non-hazardous, the contractor shall dispose of the waste in accordance with federal, state, and local regulations.
j. Provide a clean/empty barge or tank truck for off-loading and transport of wastewater generated to accomplish the requirements of the delivery order. The contractor shall coordinate the barge/tank truck placement with the SAR. The contractor is responsible for the barge/tank truck and all plumbing and piping up to 2000 linear feet. Accomplish continuous clean up of all debris and fluids incidental to installation or removal of piping system components during performance of work in individual delivery orders.
k. When pumping wastewater from the ship/vessel to the barge/tank truck, the contractor shall provide a minimum of three (3) personnel to monitor pumping operations as follows: one person on the barge/tank truck receiving the wastewater, one person walking the piping/hoses from the pumping site to the barge/tank truck, and one person at the pumping site. The three personnel shall be in constant radio contact so that pumping operations can be ceased immediately in the event of a leak or a spill.
l. The contractor shall submit to the MARMC TPOC, upon completion of each delivery order, one legible copy, in hard copy or electronic media, a report of the types and amounts of wastewater generated as a result of accomplishment of the delivery order. The report shall include:
description of wastewater, volume of wastewater, name/address of transporter, and the name/address of the disposal facility. If work is performed in a private contractor’s facility, the contractor shall submit this report to the MARMC TPOC and to the facility’s environmental manager.
m. Accomplish the requirements of NSI 009-97 for all delivery orders performed. If work is performed on a naval facility, contractor shall submit all required reports to the MARMC TPOC.
If work is performed in a private contractor’s facility, contractor shall submit reports to the
MARMC TPOC and to the facility’s environmental manager.
C.8. THE SHIP’S FORCE WILL:
C.8.1. Provide a ship’s force coordinator who shall act as the ship’s quality assurance representative to aid the contractor in gaining access to areas of the ship/vessel and monitor job progress.
C.8.2. The ship shall be responsible for the removal of all interferences. The contractor shall coordinate with the MARMC TPOC to verify that interferences have been removed prior to any production effort.
C.8.3. On aircraft carriers, ship’s force to remove arresting gear wires, blast pads, and impact pads.
C.9. DETAILED REQUIREMENTS
C.9.1. ELINS A101, B101, C101, D101, E101 – Labor and Material to Abrasive Blast – Remove up to
25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.
The contractor shall clean and prep deck surface (steel or aluminum) in the areas designated by the.
delivery order, including all tie-down fittings (top side and underside), tie-down cups, deck edges, miscellaneous fittings, and any new installation in accordance with NSI 009-32. The contractor shall use only vacuum blast cleaning equipment or equal with self-contained grit blast recovery system.
Apply the prime coat to all surfaces cleaned in accordance with NSI 009-32.
Apply the stripe coat to the primed surfaces in accordance with NSI 009-32.
C.9.2. ELINS A102, B102, C102, D102, E102– Labor and Material to Abrasive Blast –(Open Nozzle
Blast: With SSPC-AB 4 media that does not contain steel abrasive or MIL-A-22262 abrasive) Removal of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.
The contractor shall clean and prep deck surface (steel or aluminum) in the areas designated by the miscellaneous fittings, and any new installation in accordance with NSI 009-32.
C.9.3. ELINS A103, B103, C103, D10, E103 – Labor and Material to Abrasive Blast – Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than
25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.
The contractor shall clean and prep deck surface (steel or aluminum) in the areas designated by the delivery order, including all tie-down fittings (top side and underside), tie-down cups, deck edges, miscellaneous fittings, and any new installation in accordance with NSI 009-32.
The contractor shall use only vacuum blast cleaning equipment or equal with self-contained grit blast recovery system.
Apply the prime coat to all surfaces cleaned in accordance with NSI 009-32. Apply the stripe coat to the primed surfaces in accordance with NSI 009-32.
C.9.4. ELINS A104, B104, C104, D104, E104 – Labor and Material to accomplish Ultra High Pressure
Water Jetting – Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.
Water jet equipment shall be capable of performing its intended function in accordance with the operation and performance specified herein. The equipment shall be of the manufacturer’s current field proven design, representative of equipment whose design capacity and performance characteristics, having been proven through actual field application, are substantially the same as those required of the equipment specified herein.
Attach warning labels to both ends of all high-pressure water hoses, identifying the presence of high-pressure water.
Notify personnel working in the proximity of water jet operations of the dangers of high pressure. If personnel access is possible in areas near the nozzle, post with barrier tape and appropriate warning signs, such as “DANGER: HIGH PRESSURE WATER JETTING OPERATIONS.”
The contractor shall clean and prep deck surfaces (steel or aluminum) in the areas designated by the miscellaneous deck fittings, and any new installation in accordance with NSI 009-32.
Surface preparation of bolted RAST track plates (steel and aluminum) shall be accomplished by water jetting using a closed loop system, hand wands shall not be used as they will cause trash and debris to be deposited into the RAST track troughs/drains.
C.9.5. ELINS A105, B105, C105, D105, E105 – Labor and Material to accomplish Ultra High Pressure
Water Jetting – Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.
Water jet equipment shall be capable of performing its intended function in accordance with the operation design, representative of equipment whose design capacity and performance characteristics, having been proven through actual field application, are substantially the same as those required of the equipment
Attach warning labels to both ends of all high-pressure water hoses, identifying the presence of high
Notify personnel working in the proximity of water jet operations of the dangers of high pressure. If personnel access is possible in areas near the nozzle, post with barrier tape and appropriate warning signs, jetting using a closed loop system, hand wands shall not be used as they will cause trash and debris to be
C.9.6. ELINS A106, B106, C106, D106, E106 – Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat.
The contractor shall clean and prep deck surface (steel or aluminum) in the areas designated by the delivery order, including all tie-down fittings (top side and underside), tie-down cups, deck edges, miscellaneous
The contractor shall use only vacuum blast cleaning equipment or equal with self-contained grit blast
C.9.7. ELINS A107, B107, C107, D107, E107 – Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat.
Water jet equipment shall be capable of performing its intended function in accordance with the operation design, representative of equipment whose design capacity and performance characteristics, having been proven through actual field application, are substantially the same as those required of the equipment
Attach warning labels to both ends of all high-pressure water hoses, identifying the presence of high-
Notify personnel working in the proximity of water jet operations of the dangers of high pressure. If personnel access is possible in areas near the nozzle, post with barrier tape and appropriate warning signs, jetting using a closed loop system, hand wands shall not be used as they will cause trash and debris to be
C.9.8. ELINS A108, B180, C108, D108, E108 – Labor and material to remove any high solid nonskid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.
The contractor shall clean and prep deck surface (steel or aluminum) in the areas designated by the delivery order, including all tie-down fittings (top side and underside), tie-down cups, deck edges, miscellaneous
The contractor shall use only vacuum blast cleaning equipment or equal with self-contained grit blast
C.9.9. ELINS A109, B109, C109, D109, E109 – Labor and material to remove any high solid nonskid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.
Water jet equipment shall be capable of performing its intended function in accordance with the operation design, representative of equipment whose design capacity and performance characteristics, having been proven through actual field application, are substantially the same as those required of the equipment
Attach warning labels to both ends of all high-pressure water hoses, identifying the presence of high-
Notify personnel working in the proximity of water jet operations of the dangers of high pressure. If personnel access is possible in areas near the nozzle, post with barrier tape and appropriate warning signs, jetting using a closed loop system, hand wands shall not be used as they will cause trash and debris to be
C.9.10. ELINS A110, B110, C110, D110, E110 – Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.
Shall be mixed and applied to the primed and striped surfaces in accordance with NSI 009-32.
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to be applied in accordance with NSI 009-32.
Contact the local NAVAIR Field Office to obtain the current NAVAIR Visual Landing Aids drawing for the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in accordance with NSI 009-32.
Apply color-topping product upon verification acceptance by NAVAIR Field Office.
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied directly to the prime or stripe coats, color topping shall be applied to the topcoat system.
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s equipment to assist with the layout of safety/danger/warning/VLA markings.
C.9.11. ELINS A111, B111, C111, D111, E111 – Labor and material to apply non-high solid nonskid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s
C.9.12. ELINS A112, B112, C112, D112, E112 – Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s
C.9.13. ELINS A113, B113, C113, D113, E113 – Labor and material to apply non-high solid nonskid above 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s
C.9.14. ELINS A114, B114, C114, D114, E114– Labor and material to apply non-high solid nonskid up to
25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s
C.9.15. ELINS A115, B115, C115, D115, E115– Labor and material to apply non-high solid nonskid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s
C.9.16. ELINS A116, B116, C116, D116, E116– Labor and material to apply non-high solid nonskid up to
25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s
C.9.17. ELINS A117, B117, C117, D117, E117– Labor and material to apply non-high solid nonskid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s
C.9.18. ELINS A118, B118, C118, D118, E118 – Labor and material to apply non-high solid nonskid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA
The Government, by delivery order, shall determine the Type and Composition of the non-skid coating to the ship/vessel specified in the delivery order. The markings shall be applied using a color topping in
Where color topping is specified in way areas not to receive non-skid, color topping shall not be applied
The contractor shall provide ship’s force a minimum of 48 hours notice, in writing, for operation of ship’s
C.9.19. ELINS A119, B119, C119, D119, E119– Labor and material to apply non-high solid nonskid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA
The Government, by…
This is the start of the file's text. The full file is on GovTribe.