J9_-_992-006_Heavy_Weather_Plan_(Demobilization).pdf
PDF 45 KB Posted
- Attached to
- NON-SKID ALTERATIONS FFP MAC-IDIQ Federal contract opportunity
- Solicitation number
- N5005420R0005
About this file
This document contains a local work template for a heavy weather plan for demobilization of a ship. The template provides requirements for accomplishing the lead maintenance activity's heavy weather plan, including securing the ship for adverse weather with rigging, crane services, and additional mooring lines. It also requires providing tug service and line handlers to move the berthing barge, installing additional mooring lines, and disconnecting/connecting temporary services for the barge. Accomplishment is to be concurrent with another item for heavy weather plan remobilization. No government furnished material is provided.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCAL WORK TEMPLATE
<<INSERT ACTIVITY>>
SHIP: N/A ITEM NO: 992-00
COAR: N/A PCN: N/A
LWT FILE NO: 992-006 CMP: N/A
REVISED: 04 Oct 2018 PLANNER: N/A
1 of 2 ITEM NO: 992-006
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Heavy Weather Plan (Demobilization); accomplish
1.2 Location of Work:
1.2.1 Not Applicable
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
3. REQUIREMENTS:
3.1 Accomplish the requirements of Lead Maintenance Activity's (LMA) Heavy Weather plan in accordance with 2.1 when directed by the ACO.
3.1.1 Due to _________________, duration will be for a period of __ days.
3.1.2 Accomplish all required preparations to secure the ship for adverse weather.
3.1.3 Provide rigging and crane services and install additional mooring lines to ensure safety and preclude damage to the ship.
3.1.4 Disconnect and remove temporary services.
3.2 Provide tug service and line handlers to move the berthing barge.
3.2.1 Install additional mooring lines to ensure safety and preclude damage to the barge.
3.2.2 Disconnect/connect temporary services of the barge.
4. NOTES:
4.1 This item shall be accomplished in concurrence with 992-001 Heavy Weather Plan (Remobilization); accomplish.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP:
2 of 2 ITEM NO: 992-006
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
File details come from the government source that posted it. Updated .