EXHIBITS A-E REV.xlsx

XLSX spreadsheet 72 KB Posted

Attached to
NON-SKID ALTERATIONS FFP MAC-IDIQ Federal contract opportunity
Solicitation number
N5005420R0005
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is an exhibit to a solicitation for a multiple award indefinite delivery/indefinite quantity contract for non-skid alterations. The Navy seeks to award FFP MAC-IDIQ contracts to provide labor, material, and equipment for tasks including abrasive blasting, water jetting, non-skid removal and application, containment, and undisclosed work. The base year and four option years are priced separately in exhibits A through E. Tasks are priced using ELINs for quantities such as square footage with unit prices of $0. Pricing includes requirements, overhead, profit, and implementation of standard items. Subcontracting must be included in ELIN pricing. Overtime is not authorized except for undisclosed work. This is a total small business set-aside under NAICS 336611.

View the file

Other files for this federal contract opportunity

Other files attached to NON-SKID ALTERATIONS FFP MAC-IDIQ, newest first.
File Type Posted
J15_-_Request_for_Specification_Clarification QUESTIONS - ANSWERS 001-002.pdf PDF
EMAIL FOR J15-REQUEST FOR SPECIFICATION CLARIFICATION.pdf PDF
J4_-_042-008_General_Requirements_for_Work_on_Aircraft_Carriers.pdf PDF
J5_-_042-010_Nuclear_Powered_ShipsNuclear_Support_Ships.pdf PDF
J7_-_042-037_General_Requirements_for_Work_Within_Naval_Station_Norfolk.pdf PDF
J6_-_042-022_General_Requirements_for_Work_Within_Norfolk_Naval_Shipyard.pdf PDF
J12_-_Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J15_-_Request_for_Specification_Clarification.xlsx XLSX spreadsheet
J1_-_ 042-005_Norfolk_Naval_Shipyard_(NNSY)_Work_Authorization_Form_(WAF).pdf PDF
J10_-_992-007_Heavy_Weather_Plan_(Remobilization).pdf PDF
J2_-_ 042-006_General_Occupational_Safety_Health_and_Environment_(OSHE).pdf PDF
RFP_N5005420R0005_NON-SKID.pdf PDF
EXHIBITS_A-E.xlsx XLSX spreadsheet
J8_-_ 042-038_General_Requirements_for_Work_Within_Joint_Expeditionary_Base.pdf PDF
J9_-_992-006_Heavy_Weather_Plan_(Demobilization).pdf PDF
J14_-_Past_Performance_Questionnaire.docx DOCX document
J16_-_DBIDS_Form.pdf PDF
J13_-_Past_Performance_Information_Form.docx DOCX document
J11_-_077-001_Hazardous_Waste_Produced_on_Naval_Vessels.pdf PDF
J3_-_042-007_Security_Requirements_for_Work_Within_Norfolk_Naval_Shipyard.pdf PDF
J17_-_Ship_Access_Form.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A - BASE YEAR

EXHIBIT A - ELINS
CONTRACTOR'S NAME
Supplies/ServicesEst QtyUnitUnit
PriceAmount

A 101 Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 25,000 SF $0.00 $ - 0

A 102 Labor and Material to Abrasive Blast –(Open Nozzle Blast: With SSPC-AB 4 media that does not contain steel abrasive or MIL-A-22262 abrasive) Removal of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat 25,000 SF $0.00 $ - 0

A 103 Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 26,000 SF $0.00 $ - 0

A 104 Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 75,000 SF $0.00 $ - 0

A 105 Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 38,000 SF $0.00 $ - 0

A 106 Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

A 107 Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

A 108 Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 15,000 SF $0.00 $ - 0

A 109 Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

A 110 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 70,000 SF $0.00 $ - 0

A 111 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 112 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

A 113 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 114 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 23,000 SF $0.00 $ - 0

A 115 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 116 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

A 117 Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 118 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 15,000 SF $0.00 $ - 0

A 119 Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 120 Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

A121Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$ - 0
.
A122Labor and material to patch Type III membrane greater than 15%1,000SF$0.00$ - 0

A 123 Labor and material to Skim Coat Type III membrane 500 SF $0.00 $ - 0

A 124 Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings. 500 SF $0.00 $ - 0

A 125 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

A 126 Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 127 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

A 128 Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 129 Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

A 130 Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 131 Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

A 132 Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

A 133 Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

A 134 Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

A 135 Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

A 136 Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634. 1,000 LF $0.00 $ - 0

A 137 Labor and material to accomplish Barrier Coat on Previously Primed Decking. 25,000 SF $0.00 $ - 0

A 138 Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings. 10,000 SF $0.00 $ - 0

A 139 Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick. 1,000 SF $0.00 $ - 0

A 140 Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick. 1,000 SF $0.00 $ - 0

A 141 Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions. 1,000 SF $0.00 $ - 0

A 142 Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils. 1,000 SF $0.00 $ - 0

A 143 Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer. 1,000 SF $0.00 $ - 0

A 144 Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32. 25,000 SF $0.00 $ - 0

A 145 (Green Sweep) Labor and material to accomplish one additional cleaning (NACE/SSPC-SP WJ-4). Exterior MIL-PRF-24667 (Types I – VIII) surfaces. Maximum water pressure must be such that 30 seconds of stationary operation of the vacuum 1,000 SF $0.00 $ - 0

A 146 Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. 30 DAY $0.00 $ - 0

A 147 Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. 30 DAY $0.00 $ - 0

A 148 Labor and material for surface preparation of wheel stops/gutters 1,000 LF $0.00 $ - 0

A 149 Labor and Material for Gas Free Certification 5 EA $0.00 $ - 0

A150Undisclosed Work - Straight Time2,000HR$0.00$ - 0
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A149. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A149. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in FAR 52.252-4 ALTERATIONS IN CONTRACT, entitled "Ordering Work."
A151Undisclosed Work - Overtime700HR$0.00$ - 0

A 152 Undisclosed Work - Material (Covers only material required for Undisclosed Work) 1 U.S. DOLLARS $40,000.00 $ 40,000.00

A153Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)40,000X0%$ - 0
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
A154Travel/Per Diem (for bidding purposes only)1U.S. DOLLARS$36,900.00$ 36,900.00
Actual travel will be reimbursed in accordance with FAR 52.252-4 ALTERATIONS IN CONTRACT, entitled "Reimbursement of Travel Costs."
A155Travel/Per Diem G&A (Contractor to submit a percentage.)36,900X0%$ - 0

Total Estimate for Base Year $ 76,900.00

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), and Standard Work Templates (SWTs). Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

EXHIBIT B OPTION I - 2ND YR

EXHIBIT B - ELINS
CONTRACTOR'S NAME
Supplies/ServicesEst QtyUnitUnit
PriceAmount

B 101 Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 25,000 SF $0.00 $ - 0

B 102 Labor and Material to Abrasive Blast –(Open Nozzle Blast: With SSPC-AB 4 media that does not contain steel abrasive or MIL-A-22262 abrasive) Removal of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat 25,000 SF $0.00 $ - 0

B 103 Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 26,000 SF $0.00 $ - 0

B 104 Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 75,000 SF $0.00 $ - 0

B 105 Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 38,000 SF $0.00 $ - 0

B 106 Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

B 107 Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

B 108 Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 15,000 SF $0.00 $ - 0

B 109 Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

B 110 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 70,000 SF $0.00 $ - 0

B 111 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 112 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

B 113 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 114 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 23,000 SF $0.00 $ - 0

B 115 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 116 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

B 117 Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 118 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 15,000 SF $0.00 $ - 0

B 119 Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 120 Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

B121Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$ - 0
.
B122Labor and material to patch Type III membrane greater than 15%1,000SF$0.00$ - 0

B 123 Labor and material to Skim Coat Type III membrane 500 SF $0.00 $ - 0

B 124 Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings. 500 SF $0.00 $ - 0

B 125 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

B 126 Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 127 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

B 128 Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 129 Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

B 130 Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 131 Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

B 132 Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

B 133 Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

B 134 Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

B 135 Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

B 136 Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634. 1,000 LF $0.00 $ - 0

B 137 Labor and material to accomplish Barrier Coat on Previously Primed Decking. 25,000 SF $0.00 $ - 0

B 138 Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings. 10,000 SF $0.00 $ - 0

B 139 Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick. 1,000 SF $0.00 $ - 0

B 140 Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick. 1,000 SF $0.00 $ - 0

B 141 Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions. 1,000 SF $0.00 $ - 0

B 142 Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils. 1,000 SF $0.00 $ - 0

B 143 Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer. 1,000 SF $0.00 $ - 0

B 144 Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32. 25,000 SF $0.00 $ - 0

B 145 (Green Sweep) Labor and material to accomplish one additional cleaning (NACE/SSPC-SP WJ-4). Exterior MIL-PRF-24667 (Types I – VIII) surfaces. Maximum water pressure must be such that 30 seconds of stationary operation of the vacuum 1,000 SF $0.00 $ - 0

B 146 Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. 30 DAY $0.00 $ - 0

B 147 Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. 30 DAY $0.00 $ - 0

B 148 Labor and material for surface preparation of wheel stops/gutters 1,000 LF $0.00 $ - 0

B 149 Labor and Material for Gas Free Certification 5 EA $0.00 $ - 0

B150Undisclosed Work - Straight Time2,000HR$0.00$ - 0
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS B101 through B149. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS B101 through B149. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in FAR 52.252-4 ALTERATIONS IN CONTRACT, entitled "Ordering Work."
B151Undisclosed Work - Overtime700HR$0.00$ - 0

B 152 Undisclosed Work - Material (Covers only material required for Undisclosed Work) 1 U.S. DOLLARS $44,000.00 $ 44,000.00

B153Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)44,000X0%$ - 0
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
B154Travel/Per Diem (for bidding purposes only)1U.S. DOLLARS$36,900.00$ 36,900.00
Actual travel will be reimbursed in accordance with FAR 52.252-4 ALTERATIONS IN CONTRACT, entitled "Reimbursement of Travel Costs."
B155Travel/Per Diem G&A (Contractor to submit a percentage.)36,900X0%$ - 0

Total Estimate for Base Year $ 80,900.00

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), and Standard Work Templates (SWTs). Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

EXHIBIT C - OPTION II - 3RD YR

EXHIBIT C - ELINS
CONTRACTOR'S NAME
Supplies/ServicesEst QtyUnitUnit
PriceAmount

C 101 Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 25,000 SF $0.00 $ - 0

C 102 Labor and Material to Abrasive Blast –(Open Nozzle Blast: With SSPC-AB 4 media that does not contain steel abrasive or MIL-A-22262 abrasive) Removal of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat 25,000 SF $0.00 $ - 0

C 103 Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 26,000 SF $0.00 $ - 0

C 104 Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 75,000 SF $0.00 $ - 0

C 105 Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 38,000 SF $0.00 $ - 0

C 106 Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

C 107 Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

C 108 Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 15,000 SF $0.00 $ - 0

C 109 Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

C 110 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 70,000 SF $0.00 $ - 0

C 111 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 112 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

C 113 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 114 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 23,000 SF $0.00 $ - 0

C 115 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 116 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

C 117 Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 118 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 15,000 SF $0.00 $ - 0

C 119 Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 120 Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

C121Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$ - 0
.
C122Labor and material to patch Type III membrane greater than 15%1,000SF$0.00$ - 0

C 123 Labor and material to Skim Coat Type III membrane 500 SF $0.00 $ - 0

C 124 Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings. 500 SF $0.00 $ - 0

C 125 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

C 126 Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 127 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

C 128 Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 129 Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

C 130 Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 131 Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

C 132 Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

C 133 Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

C 134 Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

C 135 Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

C 136 Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634. 1,000 LF $0.00 $ - 0

C 137 Labor and material to accomplish Barrier Coat on Previously Primed Decking. 25,000 SF $0.00 $ - 0

C 138 Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings. 10,000 SF $0.00 $ - 0

C 139 Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick. 1,000 SF $0.00 $ - 0

C 140 Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick. 1,000 SF $0.00 $ - 0

C 141 Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions. 1,000 SF $0.00 $ - 0

C 142 Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils. 1,000 SF $0.00 $ - 0

C 143 Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer. 1,000 SF $0.00 $ - 0

C 144 Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32. 25,000 SF $0.00 $ - 0

C 145 (Green Sweep) Labor and material to accomplish one additional cleaning (NACE/SSPC-SP WJ-4). Exterior MIL-PRF-24667 (Types I – VIII) surfaces. Maximum water pressure must be such that 30 seconds of stationary operation of the vacuum 1,000 SF $0.00 $ - 0

C 146 Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. 30 DAY $0.00 $ - 0

C 147 Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. 30 DAY $0.00 $ - 0

C 148 Labor and material for surface preparation of wheel stops/gutters 1,000 LF $0.00 $ - 0

C 149 Labor and Material for Gas Free Certification 5 EA $0.00 $ - 0

C150Undisclosed Work - Straight Time2,000HR$0.00$ - 0
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS C101 through C149. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS C101 through C149. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in FAR 52.252-4 ALTERATIONS IN CONTRACT, entitled "Ordering Work."
C151Undisclosed Work - Overtime700HR$0.00$ - 0

C 152 Undisclosed Work - Material (Covers only material required for Undisclosed Work) 1 U.S. DOLLARS $44,000.00 $ 44,000.00

C153Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)44,000X0%$ - 0
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
C154Travel/Per Diem (for bidding purposes only)1U.S. DOLLARS$36,900.00$ 36,900.00
Actual travel will be reimbursed in accordance with FAR 52.252-4 ALTERATIONS IN CONTRACT, entitled "Reimbursement of Travel Costs."
C155Travel/Per Diem G&A (Contractor to submit a percentage.)36,900X0%$ - 0

Total Estimate for Base Year $ 80,900.00

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), and Standard Work Templates (SWTs). Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

EXHIBIT D - OPTION III - 4TH YR

EXHIBIT D - ELINS
CONTRACTOR'S NAME
Supplies/ServicesEst QtyUnitUnit
PriceAmount

D 101 Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 25,000 SF $0.00 $ - 0

D 102 Labor and Material to Abrasive Blast –(Open Nozzle Blast: With SSPC-AB 4 media that does not contain steel abrasive or MIL-A-22262 abrasive) Removal of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat 25,000 SF $0.00 $ - 0

D 103 Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 26,000 SF $0.00 $ - 0

D 104 Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 75,000 SF $0.00 $ - 0

D 105 Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 38,000 SF $0.00 $ - 0

D 106 Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

D 107 Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

D 108 Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 15,000 SF $0.00 $ - 0

D 109 Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. 1,000 SF $0.00 $ - 0

D 110 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 70,000 SF $0.00 $ - 0

D 111 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

D 112 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

D 113 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition D. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

D 114 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 23,000 SF $0.00 $ - 0

D 115 Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

D 116 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

D 117 Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

D 118 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 15,000 SF $0.00 $ - 0

D 119 Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

D 120 Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

D121Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$ - 0
.
D122Labor and material to patch Type III membrane greater than 15%1,000SF$0.00$ - 0

D 123 Labor and material to Skim Coat Type III membrane 500 SF $0.00 $ - 0

D 124 Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings. 500 SF $0.00 $ - 0

D 125 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

D 126 Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

D 127 Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

D 128 Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

D 129 Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

D 130 Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. 26,000 SF $0.00 $ - 0

D 131 Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. 25,000 SF $0.00 $ - 0

D 132 Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. 28,000 SF $0.00 $ - 0

D 133 Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

D 134 Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

D 135 Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. 1,000 SF $0.00 $ - 0

D 136 Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634. 1,000 LF $0.00 $ - 0

D 137 Labor and material to accomplish Barrier Coat on Previously Primed Decking. 25,000 SF $0.00 $ - 0

D 138 Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings. 10,000 SF $0.00 $ - 0

D 139 Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick. 1,000 SF $0.00 $ - 0

D 140 Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick. 1,000 SF $0.00 $ - 0

D 141 Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions. 1,000 SF $0.00 $ - 0

D 142 Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils. 1,000 SF $0.00 $ - 0

D 143 Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer. 1,000 SF $0.00 $ - 0

D 144 Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32. 25,000 SF $0.00 $ - 0

D 145 (Green Sweep) Labor and material to accomplish one additional cleaning (NACE/SSPC-SP WJ-4). Exterior MIL-PRF-24667 (Types I – VIII) surfaces. Maximum water pressure must be such that 30 seconds of stationary operation of the vacuum 1,000 SF $0.00 $ - 0

D 146 Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. 30 DAY $0.00 $ - 0

D 147 Labor and Material for Containment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .