J10_-_992-007_Heavy_Weather_Plan_(Remobilization).pdf

PDF 43 KB Posted

Attached to
NON-SKID ALTERATIONS FFP MAC-IDIQ Federal contract opportunity
Solicitation number
N5005420R0005
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a local work template for a Heavy Weather Plan involving the removal and reinstallation of mooring lines and tug and barge services. The work includes disconnecting and reconnecting temporary services for a berthing barge. It references standard item requirements and requires accomplishing the scope of work to restore services from TCCOR II to TCCOR V at an unspecified date and time. No government furnished material is required.

The related federal contract opportunity is a total small business set-aside solicitation seeking FFP MAC-IDIQ contracts for non-skid alterations. The Naval Sea Systems Command intends to award to offerors providing the best value.

View the file

Other files for this federal contract opportunity

Other files attached to NON-SKID ALTERATIONS FFP MAC-IDIQ, newest first.
File Type Posted
J15_-_Request_for_Specification_Clarification QUESTIONS - ANSWERS 001-002.pdf PDF
EXHIBITS A-E REV.xlsx XLSX spreadsheet
EMAIL FOR J15-REQUEST FOR SPECIFICATION CLARIFICATION.pdf PDF
J4_-_042-008_General_Requirements_for_Work_on_Aircraft_Carriers.pdf PDF
J5_-_042-010_Nuclear_Powered_ShipsNuclear_Support_Ships.pdf PDF
J7_-_042-037_General_Requirements_for_Work_Within_Naval_Station_Norfolk.pdf PDF
J6_-_042-022_General_Requirements_for_Work_Within_Norfolk_Naval_Shipyard.pdf PDF
J12_-_Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J15_-_Request_for_Specification_Clarification.xlsx XLSX spreadsheet
J1_-_ 042-005_Norfolk_Naval_Shipyard_(NNSY)_Work_Authorization_Form_(WAF).pdf PDF
J2_-_ 042-006_General_Occupational_Safety_Health_and_Environment_(OSHE).pdf PDF
RFP_N5005420R0005_NON-SKID.pdf PDF
EXHIBITS_A-E.xlsx XLSX spreadsheet
J8_-_ 042-038_General_Requirements_for_Work_Within_Joint_Expeditionary_Base.pdf PDF
J9_-_992-006_Heavy_Weather_Plan_(Demobilization).pdf PDF
J14_-_Past_Performance_Questionnaire.docx DOCX document
J16_-_DBIDS_Form.pdf PDF
J13_-_Past_Performance_Information_Form.docx DOCX document
J11_-_077-001_Hazardous_Waste_Produced_on_Naval_Vessels.pdf PDF
J3_-_042-007_Security_Requirements_for_Work_Within_Norfolk_Naval_Shipyard.pdf PDF
J17_-_Ship_Access_Form.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCAL WORK TEMPLATE

<<INSERT ACTIVITY>>

SHIP: N/A ITEM NO: 992-00

COAR: N/A PCN: N/A

LWT FILE NO: 992-007 CMP: N/A

REVISED: 04 Oct 2018 PLANNER: N/A

1 of 1 ITEM NO: 992-007

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Heavy Weather Plan (Remobilization); accomplish

1.2 Location of Work:

1.2.1 Not Applicable

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

3. REQUIREMENTS:

3.1 Accomplish the requirements of Lead Maintenance Activity's (LMA) Heavy Weather Plan to restore services from TCCOR II to TCCOR V effective __,__,__ at ____, in accordance with 2.1 when directed by the ACO.

3.1.1 Provide rigging and crane services to remove each additional mooring line installed.

3.2 Provide tug service and line handlers to move the berthing barge.

3.2.1 Disconnect/connect temporary services of the barge.

4. NOTES:

4.1 This item shall be accomplished in concurrence with 992-001 Heavy Weather Plan (Demobilization); accomplish.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

File details come from the government source that posted it. Updated .