This document is a Contract Data Requirements List (CDRL) that specifies data items to be delivered under a federal government contract. The CDRL covers submission requirements for the following data items:
Administrative Systems, Safety Systems, Management Systems, and Quality Control/Inspection Systems. The first submittal of these data items is required on 06 February 2024, with subsequent submissions as specified. The CDRL indicates the government will require a total of 33 copies of the data items across draft and final submissions, to be distributed to various government offices.
The CDRL is related to a federal contract opportunity titled "Technical Data Support Services Enterprise – TDSSe3" solicited by the Department of the Air Force Materiel Command Air Force Sustainment Center. This is a nine-year Indefinite Delivery Indefinite Quantity (IDIQ) contract to be awarded within the 8(a) Small Business Development Program. The contract will cover management, update, conversion, distribution, and library services for technical orders and engineering data.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001 PagesPage of
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
16. REMARKS
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15.TOTAL
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
16. REMARKS (Continued)
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
DD FORM 1423-1 (BACK), FEB 2001
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DRAFT
SAMPLE
PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
Pages
PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
Pages
DRAFT
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
DD FORM 1423-1 (BACK), FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft
Final
Reg
Repro
15.TOTAL
G. PREPARED BY
I. APPROVED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
C. CATEGORY:
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data
Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in
Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in
Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785
DD Form 1423-1, "CONTRACT DATA REQUIREMENTS LIST (1 Data Item) "
Click this button to save this form.:
Click this button to print this form.:
Click this Reset button to erase data from all fields.:
Enter total page numbers.:
A. CONTRACT LINE ITEM NUMBER: 4009
EXHIB: E
Select for "TDP.": 0
Select for "TM.": 0
Enter specification for "Other.": ENVR
SYS:
PR: F3QCAM3202A002
CONF:
TextField2: E006
TextField2: Programmatic Environmental Safety and Health Evaluation (PESHE) Plan
TextField2: Safety and Health Plan
TextField2: DI-ENVR-81840
TextField2: 5.5.2
TextField2: AFLCMC/LZPTA
TextField2: LT
TextField2: NA
TextField2: C
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: Safety and Health Plan
Contractor Safety & Health Plan (as per Basic Contract PWS Para 5.5.2):
Block 4 & 5: Contractor format is acceptable. Contractor shall submit a Safety and Health Plan in accordance with the elements listed in the PWS Paragraph 5.5.2.
Block 7: The Government will accept the Environmental Health and Safety Plan (HSP) as part of the proposal as part of the Vol I submittal. One paper copy and one digital copy shall be sent to the AFSC/PZIE and the 78 ABW/SEG
Block 8, 10-13: Contractor shall submit a Health and Safety Plan with their proposal. If, during the performance of this contract, changes to the Safety and Health Plan are required, submit the revised Safety and Health Plan to AFSC/PZIE and the Safety Office, 78 ABW/SEG. Procedures identified for blocks 8, 10-13 will apply.
Block 9: U.S. Government employees, qualified U.S. contractors, and qualified U.S. DoD contractors are entitled to receive documents marked “C”. Other requests shall be submitted to:
Block 10, 11, 12, & 13 as per Basic Contract PWS Para 5.5.1.
Block 14:
AFSC/LZPTA: aflcmc.tdss.prog@us.af.mil Program Mgr: cleveland.harper.1@us.af.mil PCO: kristen.campbell.2@us.af.mil
TextField2: AFSC/PZIE
TextField2: ATTN: PCO
TextField2: NEED ADDRESSS
TextField2: Robins AFB, GA
TextField2: 31098
TextField2: AFLCMC/LZPTA
TextField2: ATTN: Progam Mgr
TextField2: Need Address
TextField2: Robins AFB, GA
TextField2: 31098
TextField2: 78 ABW/SEG
TextField2: 675 Seventh St, TextField2: Bldg 707
TextField2: Robins AFB GA
TextField2: 31098
TextField2: COR
TextField2: Ordering CO
TextField2: DCMA/ACO
TextField2: Cleveland Harper, TDSSe³ Program Manager
TextField2: 02 February 2024
TextField2: Todd M. Heaton
TextField2: 06 February 2024
Total draft copies is automatically calculated.: 1
Total draft copies is automatically calculated.: 1
Total draft copies is automatically calculated.: 1
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 3
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 6
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
DecimalField1:
G. PREPARED BY (Signature):
I. APPROVED BY (Signature):
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
Pages
PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
Pages
DRAFT
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
DD FORM 1423-1 (BACK), FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft
Final
Reg
Repro
15.TOTAL
G. PREPARED BY
I. APPROVED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
C. CATEGORY:
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data
Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in
Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in
Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785
DD Form 1423-1, "CONTRACT DATA REQUIREMENTS LIST (1 Data Item) "
Click this button to save this form.:
Click this button to print this form.:
Click this Reset button to erase data from all fields.:
Enter total page numbers.:
A. CONTRACT LINE ITEM NUMBER: 4009
EXHIB: E
Select for "TDP.": 0
Select for "TM.": 0
Enter specification for "Other.": SAFT
SYS:
PR: F3QCAM3202A002
CONF:
TextField2: E007
TextField2: Accident/Incident Report
TextField2: DI-SAFT-81563
TextField2: 5.5.3
TextField2: AFLCMC/LZPTA
TextField2: LT
TextField2: NA
TextField2: C
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: Block(s) 10, 11, 12, 13, and 14 as per Basic Contract PWS.
Accident/Incident Reporting:
Mishap Notification/Investigation (Para 5.5.3):
The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations. The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 24 hours of the mishap. the report shall be sent to:
AFSC/LZPTA: aflcmc.tdss.prog@us.af.mil Program Mgr: cleveland.harper.1@us.af.mil PCO: kristen.campbell.2@us.af.mil
TextField2: AFSC/PZIE
TextField2: ATTN: PCO
TextField2: NEED ADDRESSS
TextField2: Robins AFB, GA
TextField2: 31098
TextField2: AFLCMC/LZPTA
TextField2: ATTN: Progam Mgr
TextField2: Need Address
TextField2: Robins AFB, GA
TextField2: 31098
TextField2: Cleveland Harper, TDSSe³ Program Manager
TextField2: 02 February 2024
TextField2: Todd M. Heaton
TextField2: 06 February 2024
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 2
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
DecimalField1:
G. PREPARED BY (Signature):
I. APPROVED BY (Signature):
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
Pages
PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
Pages
DRAFT
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
DD FORM 1423-1 (BACK), FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft
Final
Reg
Repro
15.TOTAL
G. PREPARED BY
I. APPROVED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
C. CATEGORY:
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data
Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in
Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in
Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785
DD Form 1423-1, "CONTRACT DATA REQUIREMENTS LIST (1 Data Item) "
Click this button to save this form.:
Click this button to print this form.:
Click this Reset button to erase data from all fields.:
Enter total page numbers.:
A. CONTRACT LINE ITEM NUMBER: 4009
EXHIB: E
Select for "TDP.": 0
Select for "TM.": 0
Enter specification for "Other.": QCIC
SYS:
PR: F3QCAM3202A002
CONF:
TextField2: E008
TextField2:
Quality Program Plan (QPP)
TextField2:
TextField2: DI-QCIC-81722
TextField2: 5.9.1, 5.9.2
TextField2: AFLCMC/LZPTA
TextField2: LT
TextField2: NA
TextField2: C
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: See Blk 16
TextField2: Block(s) 10, 11, 12, 13, and 14 as per Basic Contract PWS:
Contractor Quality Control and Management:
Quality Control Plan (QCP) (5.9.1):
The Contractor shall submit a QCP that ensure quality standards are met and maintained throughout the contract period of performance no later than 30 days after contract award. The plan shall include the type and frequency of quality assurance/control inspections planned by the Contractor. The Contractor may electronically send the QCP in lieu of mailing it to the physical addresses in Blk 14. Report shall be provided in Microsoft Office compatible format. Below are the e-mail addresses the report shall be sent to:
AFSC/LZPTA: aflcmc.tdss.prog@us.af.mil Program Mgr: cleveland.harper.1@us.af.mil PCO: kristen.campbell.2@us.af.mil
Quality Management System (QMS) (5.9.2):
The Contractor’s QMS shall be established and maintained in accordance with ISO9001:2015, Quality System Model for Quality Assurance in Design, Development, Production, Installation, and Servicing (or equivalent). If the Contractor is not ISO9001:2015 certified, then the Contractor shall ensure the quality of services through a comparable quality and/or inspection system. The Contractor shall submit their ISO9001:2015 certificate or QMS description no later than 30 days after contract award. Contractor may electronically send the certificate or QMS description in lieu of mailing it to the physical addresses in Blk 14. Report shall be provided in Microsoft Office compatible format. Below are the e-mail addresses the report shall be sent to:
AFSC/LZPTA: aflcmc.tdss.prog@us.af.mil Program Mgr: cleveland.harper.1@us.af.mil PCO: kristen.campbell.2@us.af.mil
Additional QCP/QMS plans may be required at program task order level.
TextField2: AFSC/PZIE
TextField2: ATTN: PCO
TextField2: 480 Richard Ray Blvd
TextField2: Ste 202, Bldg 301
TextField2: Robins AFB, GA
TextField2: 31098
TextField2: AFLCMC/LZPTA
TextField2: ATTN: Progam Mgr
TextField2: 235 Byron St. Bldg 300
TextField2: Robins AFB, GA
TextField2: 31098
TextField2: COR
TextField2: Ordering CO
TextField2: DCMA/ACO
TextField2: Cleveland Harper, TDSSe³ Program Manager
TextField2: 02 February 2024
TextField2: Todd M. Heaton
TextField2: 06 February 2024
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total draft copies is automatically calculated.: 0
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 1
Total final regular copies is automatically calculated.: 5
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
Total final reproducible copies is automatically calculated.: 0
DecimalField1:
G. PREPARED BY (Signature):
I. APPROVED BY (Signature):
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
Pages
PREVIOUS EDITION MAY BE USED.
DD FORM 1423-1, FEB 2001
Pages
DRAFT
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
DD FORM 1423-1 (BACK), FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft
Final
Reg
Repro
15.TOTAL
G. PREPARED BY
I. APPROVED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
C. CATEGORY:
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data
Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in
Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .