This document is a Quality Assurance Surveillance Plan (QASP) for the Technical Data Support Services Enterprise (TDSSe3) contract. The QASP outlines the methods, frequency, and responsibilities for the government's surveillance of the contractor's performance to ensure contract standards are met. Key details include:

The TDSSe3 contract encompasses the sustainment of technical orders and engineering data for various Air Force organizations. The QASP provides specific performance objectives, thresholds, and monitoring methods for basic contract services as well as task order services. It describes the roles and responsibilities of the Multi-Functional Team, Contracting Officer's Representative, Contracting Officer, and Contractor in managing and documenting performance. The plan also covers corrective action procedures, acceptance of services, safety requirements, and contractor performance assessments using CPARS. The QASP is a living document that will be updated as needed based on contractor performance.

View the file

Other files

File Type Posted
Pre-Proposal Question and Answer Document 4_30APR24.xlsx XLSX spreadsheet
Pre-Proposal Question and Answer Document 3_24APR24.xlsx XLSX spreadsheet
Pre-Proposal Question and Answer Document 2_22APR24.xlsx XLSX spreadsheet
Pre-Proposal Question and Answer_16APR24_UPDATED.xlsx XLSX spreadsheet
Pre-Proposal Conference Attendee POC List.xlsx XLSX spreadsheet
RFP_Attch_6_PWS_Amend_0001.pdf PDF
RFP_Attch_7_CDRL G00X Year_7_Portfolio_Amend_0001.pdf PDF
RFP_Attch_7_CDRL H00X Year_8_Portfolio_Amend_0001.pdf PDF
RFP_Attch 17_S1000D_Issue_4.1_Capability Task Ref_Amend_0001.pdf PDF
RFP_Attch_7_CDRL B00X Year_2_Portfolio_Amend_0001.pdf PDF
RFP_Attch_7_CDRL J00X Year_9_Portfolio_Amend_0001.pdf PDF
Solicitation Amendment FA853024RB0010001 SF 30.pdf PDF
RFP_Attch_7_CDRL A00X Year_1_Portfolio_Amend_0001.pdf PDF
RFP_Attch_7_CDRL D00X Year_4_Portfolio_Amend_0001.pdf PDF
Pre-Proposal Question and Answer_16APR24.xlsx XLSX spreadsheet
RFP Attch 1_Cross Reference Matrix_Amend_0001.pdf PDF
RFP_Attch_7_CDRL C00X Year_3_Portfolio_Amend_0001.pdf PDF
RFP_Attch_7_CDRL E00X Year_5_Portfolio_Amend_0001.pdf PDF
RFP_Attch_7_CDRL F00X Year_6_Portfolio_Amend_0001.pdf PDF
Pre-Proposal Briefing Charts.pdf PDF
RFP_Attch_2_Cost_Price_Evaluation_Model.xlsx XLSX spreadsheet
RFP_Attch_6_PWS.pdf PDF
RFP_Attch_08_DD254.pdf PDF
RFP_Attch_13_ DI-SESS-82351A_Capability Task Ref.pdf PDF
RFP_Attch_14_MIL-DTL-83495D_Capability Task Ref.pdf PDF
RFP_Attch_15_MIL-STD-1808C_Capability Task Ref.pdf PDF
RFP_Attch_18_TO 00-5-3_Capability Task Ref.pdf PDF
RFP_Attch_19_Section L.pdf PDF
RFP_Attch_7_CDRL H00X Year_8_Portfolio.pdf PDF
RFP_Attch_7_CDRL J00X Year_9_Portfolio.pdf PDF
RFP_Attch_9_WD_(Robins)_Rev23.pdf PDF
RFP_Attch_11_WD_(Tinker)_Rev22.pdf PDF
RFP_Attch_5_Awardable Task.pdf PDF
RFP_Attch_7_CDRL A00X Year_1_Portfolio.pdf PDF
RFP_Attch_7_CDRL B00X Year_2_Portfolio.pdf PDF
RFP_Attch_10_WD_(Hill)_Rev22.pdf PDF
RFP_Attch_12_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
RFP_Attch_16_MIL-STD-3048C_Capability Task Ref.pdf PDF
RFP_Attch_17_S1000D_Issue_5.0_Capability Task Ref.pdf PDF
Solicitation - FA853024RB001.pdf PDF
RFP_Attch_1_Cross_Reference_Matrix.pdf PDF
RFP_Attch_3_Labor Categories.xlsx XLSX spreadsheet
RFP_Attch_4_Capability_Task.pdf PDF
RFP_Attch_7_CDRL C00X Year_3_Portfolio.pdf PDF
RFP_Attch_7_CDRL D00X Year_4_Portfolio.pdf PDF
RFP_Attch_7_CDRL E00X Year_5_Portfolio.pdf PDF
RFP_Attch_7_CDRL F00X Year_6_Portfolio.pdf PDF
RFP_Attch_7_CDRL G00X Year_7_Portfolio.pdf PDF
RFP_Attch_20_Section M.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: F3QCAM3202A002 QASP REVISION: 0

Quality Assurance Surveillance Plan for

Technical Data Support Services Enterprise Program (TDSSe³)

Purchase Request: F3QCAM3202A002

Rev: 0

12 December 2023

1.0 Purpose

This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the details associated with a continuous oversight process, to include:

What will be monitored How monitoring will take place Who will conduct the monitoring How monitoring efforts and results will be documented

1.1 The contractor is responsible for implementing and delivering performance that meets contract standards using its own quality control plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance and their Quality Assurance/Quality Control (QA/QC) actions to assure they meet contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.

1.2 The QASP is not part of the contract nor is it intended to duplicate the contractor’s Quality Control Plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance. Copies of the QASP and any revisions may be provided to the contractor to facilitate open communication. In addition, the QASP should recognize and accommodate unforeseen or uncontrollable circumstances which might occur that are outside the control of the contractor. The QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

1.3 Objective(s)

TDSSe³ encompasses the sustainment of Technical Orders (TO) and engineering data for AF organizations such as but not limited to: Air Force Sustainment Center (AFSC), Air Force Nuclear Weapons Center (AFNWC), Air Force Research Laboratory (AFRL), Air Force Test Center (AFTC), Air Force Installation and Mission Support Center (AFIMSC), and Air Force Life Cycle Management Center (AFLCMC).

1.4 Result(s)

The QASP is used for managing contractor performance assessment by ensuring that systematic quality assurance methods validate that contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards specified in the PWS. It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document contractor performance results to determine if the contractor has met the required performance standards for each objective in the PWS. Successful completion of the objectives for the performance of the contract constitutes success of the program.

1.5 Authority

Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. If commercial, quality assurance will be applied in accordance with commercial items clause.

2.0 Performance Assessment/Service Summary

The matrix below details the method of surveillance and frequency the COR will use to validate and inspect performance objectives. Inspection of each objective will be documented in the COR file.

Performance objectives define the desired outcomes and performance thresholds define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance.

2.1 Method of Surveillance

2.1.1 Basic Contract Services Summary

Performance Objective PWS Reference

Performance Threshold

Basic Contract Reports:

CDRL X001 -Management Plan CDRL X002 - Status Report CDRL X003 - Presentation Material CDRL X004 - Conference Minutes CDRL X005 - ESOH Plan CDRL X006 - Safety Plan

CDRL X007 -

Accident/Incident Reports CDRL X008 – Quality Program Plan

4.2 4.11

The Contractor shall deliver:

- Sub-Contractor Participation Report (4.11.1) no later than 30 days after basic contract award.

- AbilityOne Participation Report (4.11.2) no later than 30 days after basic contract anniversary date.

- Employee Status/Cost Report (4.11.3) no later than the 10th day of each month.

- PMR Presentation Material (4.11.4) no less than five

(5) business days prior to the meeting.

- PMR minutes (4.11.4) within five (5) business days following the meeting.

- ESOH Plan (5.5.1) no later than 30 days after basic contract award.

- Safety Plan (5.5.2) no later than 30 days after basic contract award.

- Accident/Incident Reports (5.5.3) within 24 hours of the mishap.

- Quality Control Plan (5.9.1) no later than 30 days after basic contract award.

- QMS Certificate/Description (5.9.2) no later than 30 days after basic contract award.

There shall be no more than two total rejection(s) or one late submission of deliverables per contract year for the basic contract.

Task order coverage 4.11.3.1

The Contractor shall provide task order employee coverage based on proposed task order levels and categories.

There shall be no more than 3% vacancies across all task orders.

Proposal Timeliness 4.12.2 The Contractor shall have no more than two untimely proposals per contract year.

2.1.2 Task Order Services Summary: Task Orders will each have a tailored services summary addressing delivery schedule(s), performance threshold(s) and any additional performance metrics applicable for that task order. Task Orders may have multiple performance thresholds for each performance objective.

Performance Objective

PWS

Reference Performance Threshold

Provide editorial support 4.3.1 Required cycle times and quality measurements will be defined within program task orders.

Provide Technical Order Management Agent Support

4.3.2 Required cycle times and quality measurements will

be defined within program task orders.

Provide Technical Data Distribution Support

4.3.3 Required cycle times and quality measurements will

be defined within program task orders.

Provide Technical Content Management

4.3.4 Required cycle times and quality measurements will

be defined within program task orders.

Provide TO Library Management

4.3.5 Required cycle times and quality measurements will

be defined within program task orders.

Provide Engineering Data Sustainment

4.3.6 Required cycle times and quality measurements will

be defined within program task orders.

Provide Interactive Electronic Technical Manual Support

4.3.7 Required cycle times and quality measurements will

be defined within program task orders.

Provide Technical Data Functional/Customer Support

4.3.8 Required cycle times and quality measurements will

be defined within program task orders.

Request for emergency Assistance

4.5 The Contractor shall initially respond to a request for

emergency assistance within four (4) business hours.

Follow-up assistance, if required, shall be provided by the suspense date acceptable to the Government.

2.2 COR Surveillance File Documentation

The Contracting Officer Representative (COR) will establish and maintain an online file containing training and surveillance documentation in the Procurement Integrated Enterprise Environment (PIEE) via the Joint Appointment Module (JAM) and Surveillance and Performance Module (SPM). At a minimum, the following documentation will be maintained in

JAM/SPM by the COR or Contracting Officer, as applicable.

a. Joint Appointment Module (JAM) Training and Appointment

DAU CLC 222, Contracting Officers Representative (COR) Online Training DAU ACQ 0030, Overview of Acquisition Ethics, or agency equivalent DAU DOD 0020, Combatting Trafficking in Persons for Acquisition & Contracting

Personnel SYS 600, Wide Area Workflow (WAWF) Introduction QAPC-Led Training Certificate Contract Specific Training DAU CLC 206, CORs in a Contingency Environment (if applicable) Confirmation of reviewing JAM/SPM Training (Memo) Refresher training (16 CLPs every three years) Confirmation of filing the annual OGE 450

Complete COR Experience (Agency & Technical Experience) Designation of Contracting Officer’s Representative (Smart Form) Termination of Contracting Officer’s Representative (Smart Form)

b. Surveillance & Performance Monitoring Module (SPM)

QA Surveillance Plan QASP, QASP revision(s)

SPM Smart Forms COR Status Report (Surveillance, equivalent to PAR) Contract Discrepancy Report (equivalent to CAR) Trip Report (if applicable) Contractor Progress Report Review Correspondence Report Surveillance Schedule Surveillance Checklist Memorandum for the Record

Manually Uploaded Documents (examples):

Other Surveillance Document

- Performance Assessment Reports (PARs)

- Corrective Action Reports (CARs)

Deliverables (CDRLs, including Contractor Status Reports) Safety Plan (Contractor) Integrated Master Schedule

- Master/Delivery Schedules

Other

- Contract, including modifications (if not in EDA)

- PWS, including revisions (if not in EDA)

- DD Form 254 (if not in EDA)

- CDRLs (Form 1423 - if not in EDA)

- Customer Complaint Records

- Documentation of Contractor payment (if not processed in WAWF)

- Trip Reports

- CAV-AF Repair Item Actions Report(s)

- Surveillance Schedule/Checklist

- Annual COR File Inspection Checklist(s)

2.3 Plan for Corrective Action

2.3.1 Unsatisfactory Contractor performance will result in the COR issuing a negative PAR or SPM Smart Form “COR Status Report” to the Contractor. The Contractor will be required to respond by the suspense date. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. PARs and/or COR Status Reports shall be prepared as fillable PDF documents and coordinated through the Contracting Officer (CO) and Contractor for signature.

2.3.2 If repetitive negative PARs are issued without satisfactory resolution, the COR will initiate the CAR process. However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The COR will prepare and sign the CAR, and forward to the CO for signature. The CO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR by the established suspense date with a corrective action plan to the CO for acceptance by the MFT. The plan shall include identification of the root cause and a get-well-date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT. The COR will upload the CAR in SPM to become part of the contract file. If the CAR process fails to resolve the deficiency, the MFT has the prerogative to issue an interim Contractor Performance Assessment Report (CPAR), and the CO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

2.3.3 CORs will establish a tracking system for corrective actions that includes date COR submitted CAR to PM/FSM, date reviewed by PM/FSM, date reviewed by CO, date issued by CO, contractor’s identified root cause, proposed corrective action, contractor follow-up actions, and get-well date.

2.4 Acceptance of Services

2.4.1 The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area Workflow (WAWF). Services will be accepted by the COR.

2.4.2 CDRL deliverables shall be submitted using WAWF and directly to the MFT member identified on the CDRL. The CDRL will determine submittal requirements; however, separately priced data must be accepted in WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.

3.0 Roles and Responsibilities of Multi-Functional Team (MFT)

3.1 General Responsibilities

3.1.1 The MFT is responsible for ensuring the acquisition utilizes Performance-Based Service(s) Acquisition (PBSA) methods including establishment of performance thresholds, procedures to evaluate Contractor performance and positive/negative incentives to encourage the highest quality of services.

3.1.2 The MFT is responsible for conducting surveillance of Contractor performance to ensure Government requirements including quality of services, cost and schedule are met. The MFT will provide the results of their surveillance to the Contracting Officer’s Representative (COR) for input into the Performance Assessment Report (PAR) and to the MFT member updating the Contractor Performance Assessment Reporting System (CPARS).

3.1.3 For contracts requiring higher-level quality requirements, the MFT is responsible for developing metrics in tracking the effectiveness of the contractors Quality Management System (QMS) that tie to the SS, QASP, and CPARS. Ensure contracts requiring higher-level contract quality requirements include a SS performance objective that encompasses MFT goals related to quality directly relates to the CPARS category of “Quality”.

3.1.4 The MFT ensures contract oversight focuses on the adequacy and adherence of the contractor to their proposed QMS. The MFT shall focus on whether the COR or contractor is first in detecting defects and trends, who (COR or contractor) accomplishes more inspections, and, whether the contractor is proactively pursuing key QMS functions to ensure quality related problems or defects do not recur.

3.2 Contracting Officer’s Representative (COR)

3.2.1 The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR will use the QASP as the primary tool for conducting surveillance of the contractor’s performance. The COR shall keep a surveillance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract.

3.2.2 Works with the MFT in conducting and documenting surveillance on Contractor performance. Reports unethical conduct and instances of fraud, waste and/or abuse to the Contracting Officer. Inspects and accepts/rejects deliverables during contract/order performance and at close-out to ensure contract/order terms and conditions are met. Develop an inspection schedule that shall comprise of at least ten percent of non-services summary items, as a recommended best practice. Monitors control and disposition of Government property. Monitors Contractor payment and verifies it is commensurate with Contractor performance. Documents Contractor performance via PARs, or SPM COR Status Reports, and CARs. Issues PARs, at a minimum quarterly, and negative PARs / CARs as required.

3.2.2.1 If issuing a PAR, the COR will forward to the CO and the Contractor for signature. After all signatures have been obtained, the COR uploads the signed PAR in SPM under “COR Documents” (select “Add Documents”, and then select the Document Type, “Other Surveillance Document”).

3.2.2.2 If issuing a COR Status Report, the CO will approve the report in SPM after submission.

The COR will print the report in PDF format and email it to the contractor. If the contractor responds to a negative report, the COR should upload the email correspondence with the contractor into SPM.

3.2.3 Registers in PIEE as a COR. Self-nominates in JAM as the designated COR for the contract. If required, files the annual Office of Government Ethics (OGE) Form 450, Confidential Financial Disclosure Report. Establishes and maintains a COR File – training documentation is maintained in JAM, and surveillance documentation is maintained in SPM.

3.2.4 Establish a System for Award Management (SAM) Individual Account after designation as a COR to search and view Service Contract Reporting (SCR) information. After the contractor has submitted the SCR, the COR or Program Manager will review contractor reported information for reasonableness and consistency. If SCR revisions are required, the COR will notify the contractor no later than November 15. By November 30, the contractor shall revise the report, or document the rationale.

3.2.5 Ensure contractor’s Quality Control Plan/Quality Management System (QMS) complies with contract requirements. CORs need to place special emphasis in ensuring the contractor’s QMS is being followed as written, plus is effective in bringing about the desired results – performance equal to or greater than the SS metrics, plus an inspection and corrective action program that identifies and fixes issues without having to be identified by the Government.

3.3 Contracting Officer’s Representative (COR) Supervisor

3.3.1 Upon PCO request for COR support, selects a qualified nominee. Confirms the COR nominee has no personal conflicts of interest with performing the responsibilities to be delegated by the PCO. Verifies the COR nominee has the appropriate clearance for the contract/order. If required, ensures the COR nominee files an OGE Form 450. Ensures the COR takes initial, annual and any additional training required by the contracting activity. Ensures the COR completes 16 hours of refresher training every three years after completion of the QAPC-Led Training.

3.3.2 Registers for the SPM Manager Role via PIEE to obtain access to the COR’s Online file in SPM. Ensures the COR registers in PIEE, and self-nominates as the designated COR for the contract in JAM. Upon email notification of the COR self-nomination, approves the nomination via email link. Conducts regular reviews of the COR Online File to ensure surveillance documentation is timely and complete; and conducts an annual review of the COR’s Profile to ensure the COR’s technical experience is complete and up-to-date. Considers performance of COR duties in their annual appraisal.

3.4 Contracting Officer (CO)

3.4.1 Only individual authorized to enter into contracts and determines if a COR is required. If the requiring activity has not initiated a COR nomination in JAM, the CO submits a Request for Contracting Officer’s Representative Support memorandum to the requiring activity. Determines whether a COR is required to file an OGE Form 450. Provides Contract-Specific Training to the

COR.

3.4.2 Upon notification of COR Supervisor approval of the COR self-nomination, reviews the nomination in JAM, and completes the Smart Form Designation Letter. The contract must be awarded and in EDA to complete the designation process in JAM. The CO shall provide a copy of the designation memo to the Contractor. Upon notification of transfer/retirement of the COR, the CO shall complete the Termination Letter in JAM. The CO shall provide a copy of the termination memo to the Contractor, and designate the replacement COR.

3.4.3 Reviews the COR reports on contractor performance in SPM, and approves/rejects PARs, CARs, or COR Status Reports. Reviews the COR Profile and COR Online File, at a minimum, annually. Documents the results of their review on the Annual COR File Inspection Checklist and uploads to SPM under COR Documents (select “Add Documents”, and select category “Miscellaneous”, Subcategory “Other”, and label as “Annual COR File Inspection Checklist”). Checklist must be signed by the CO, COR, and COR Supervisor prior to uploading to SPM.

3.5 PZIE-R (Robins) PCO

Only the PZIE-R PCO is authorized to modify the basic contract. PZIE-R PCO approves and processes all CAR actions. Performs courtesy PAR reviews upon request. PZIE-R PCO is in charge of the overall health of the TDSSe³ Contract.

3.6 Quality Assurance Program Coordinator (QAPC)

3.6.1 Supports the MFT in the development of the contract/order quality assurance requirements specifically ensuring the requirements are clearly stated and enforceable. Prior to contract/order award, provides training to CORs and COR management. Ensures training requirements are accomplished in accordance with DoDI 5000.72, DoD Standards for COR Certification. Monitor records of all COR training records and conducts reviews of SPM records for assigned organizations.

3.6.2 Provides functional, not technical, support for JAM/SPM users including assistance with registration and role activation.

3.7 Contractor

3.7.1 Participates as a member of the MFT upon approval of the Justification & Approval (J&A) or Sole Source Justification (SSJ) if the acquisition is sole source and upon contract/order award if it is competitive.

3.7.2 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on COR’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.

3.7.3 Signs and returns a positive PAR within five business days. Signs and returns a negative PAR with corrective action identified by the suspense date. Signs and returns a CAR with a corrective action plan by the suspense date.

3.7.4 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, and applicable government regulations specified in the contract/order.

3.7.5 Report the total amount invoiced and contractor labor hours expended on the services performed during the previous fiscal year. Prime contractor labor hours, including any required Tier 1 subcontractor information, shall be reported in the System for Award Management (SAM). The reporting period for contractors is open from October to November for reporting against the prior fiscal year.

3.8 Task Order Program Manager

Ensures key stakeholders participate in the development, implementation, and execution of the acquisition strategy. The PM develops reports to provide early warnings of significant variances in cost, schedule, and/or performance to senior leadership when requested. The PM provides initial input for the acquisition strategy and ensures that the users’ needs are being addressed. Submits annual TDSSe Post Contractor Performance Assessment survey.

3.9 TDSSe Program Manager (PM)

Responsible for overall TDSSe program management. Ensures Basic contract PWS requirements meet AF technical data sustainment needs. Works closely with CORs, and reports performance trends as needed. Prepares and briefs the Annual Execution Review. Assist task order PMs with requirements development and advises on best business practices as needed. Performs scope reviews on requirement before sending to TDSSe PCO for assignment of control number.

Reviews all task order TDSSe Post Contractor Performance Assessment surveys to analyze poor performance trends and recommends to TDSSe PCO on possible actions or remedies. Develops and coordinates annual CPARS.

3.10 Functional Services Manager (FSM)

3.10.1 The FSM provides primary program oversight, nominates the COR, ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities.

3.10.2 The Functional Services Manager has determined these services are not mission-essential and will not continue in the event of a crisis. Reference PWS and QASP signature page.

4.0 Management Strategy

4.1 The MFT will meet and record minutes quarterly to review contractor’s performance. The COR will issue PARs, documenting both satisfactory and unsatisfactory Contractor performance quarterly, at a minimum.

4.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the CO or Contract Specialist will issue a CAR. However, the MFT, through approval of the Contracting Officer, reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. If the CAR process fails to resolve the unsatisfactory Contractor performance, the CO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

4.3 Incentives

4.3.1 If Contractor performance meets or exceeds contractual requirements, positive incentives may include, but are not limited to, decreased surveillance (by revision to the QASP/Method of Surveillance), favorable CPARs and exercising options.

4.3.2 If Contractor performance does not meet contractual requirements, negative incentives may include, but are not limited to, increased surveillance, unfavorable CPARs, not exercising options and Government recourse authorized by the Inspection of Supply/Services clause(s) identified in the contract/order

5.0 Annual COR Online File Inspection: The Contracting Office shall perform, with participation of the COR and COR supervisor, a yearly administrative review of the COR's online file. The Contracting Officer will document the results of their review on the Annual COR File Inspection Checklist. The COR and COR Supervisor will acknowledge the results of the annual inspection via signature on the checklist. The Contracting Officer, or Contract Specialist, will upload the checklist to the COR’s Online file.

6.0 Contractor Performance Assessment Reporting System (CPARS):

The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.

6.1 The MFT will evaluate Contractor performance. The Assessing Official Representative (AOR) will review the PARs and other information contained in the COR Online File to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order. The MFT should refer to the latest CPARS Guidance for CPAR processes and timelines, https://www.cpars.gov/sysreq.htm. Users can refer to Table 4.9 for the CPARs Timeline, and “Table 1 for the Business Sector, Dollar Threshold and Reviewing Official” information.

6.2 The Contractor shall have input into the CPAR prior to it being finalized. For each reporting period, the TDSSe PM will provide the Contractor a draft CPAR with no ratings, only justifications, to examine for seven calendar days. After MFT review of the Contractor’s response, the CPAR will be coordinated through management up to the Division level. Once approved, the CPAR will be sent to the Contractor via CPARS for the official 60 calendar day review.

The Contractor shall have the option to concur or non-concur, with comments, via CPARS.

6.3 In the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include: Quality, Schedule, Cost Control (if applicable), Management, Small Business Subcontracting (if applicable), and Regulatory Compliance.

Performance Rating

Criteria

Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

7.0 Safety Requirements

7.1 Mishap Notification/Investigation: The Contractor shall report mishaps in accordance with the safety requirements identified in the PWS. The Contractor shall ensure the Safety Office, COR, and CO are notified of mishaps.

7.2 MFT Surveillance: MFT member(s) will report any potential safety hazards or actual mishaps to the COR. The COR will monitor Contractor reporting and review any mishap notifications. The COR will address safety and/or health issues in the PAR or in a CAR as applicable.

8.0 Trafficking in Persons: IAW DFARS PGI 222.17, Combatting Trafficking in Persons, the COR will monitor the contractor’s performance regarding trafficking in persons, such that non- compliance with FAR clause 52.222-50, Combatting Trafficking in Persons, is brought to the immediate attention of the Contracting Officer. The Contracting Officer shall report that the contractor, subcontractor, or employee has failed to comply with the requirements of FAR clause 52.222-50. The Contracting Office may use any of the remedies outlined in PGI

222.1704 to report the violations. The COR should refer to the U.S. Department of State website, at http://www.state.gov/j/tip, for the latest guidance of monitoring trafficking in persons.

9.0 Signatures

By signing below, you are appointed to the MFT for this acquisition and accept the above responsibilities.

QAPC

TDSSe³ PM

TDSSe³ PM Supervisor

Contracting Officer

By signing below, you are identifying these services as not mission-essential.

Functional Services Manager (formerly FC/FD)

2024-03-22T11:34:13-0400
WHATLEY.JOANNA.MATHIS.1512756260
2024-03-22T14:44:58-0400
HARPER.CLEVELAND.JR.1113450653
2024-03-22T09:33:35-0400
HEATON.TODD.MICHAEL.1064368067
2024-03-25T07:19:52-0400
CAMPBELL.KRISTEN.ETHRIDGE.1369747254
2024-03-22T15:08:54-0400
GRESHAM.JAMES.D.1229989150

File details come from the government source that posted it. Updated .