RFP Attachment 6 Excel Cost Model.xlsx
XLSX spreadsheet 200 KB Posted
- Attached to
- Common Armament Tester for Fighter (CAT-F)
- Solicitation number
- FA8533-25-R-0002
About this file
The file is a comprehensive Cost Model Excel spreadsheet (RFP Attachment 6) for the Common Armament Tester-Fighters (CAT-F) solicitation. The cost model details a complex pricing structure across a basic period and four option periods, covering the development, manufacture, and sustainment of armament testers for F-16, F-15, and A-10 aircraft platforms. The contract includes Cost Plus Fixed Fee (CPFF), Firm Fixed Price (FFP), and Cost Reimbursement-No Fee (CR-NF) pricing arrangements for various contract line items (CLINs) spanning prototype design, engineering and manufacturing development (EMD), logistical support, and production of O-Level and I-Level handheld testers.
The cost model outlines estimated quantities for delivery, including 4 prototype testers during the basic period and 303 F-16, 172 F-15, and 68 A-10 O-Level testers, along with 143 F-16, 80 F-15, and 42 A-10 I-Level testers during the option periods. The pricing model is intricate, with multiple worksheets breaking down labor categories, material costs, overhead, and other direct costs across different contract periods. The solicitation is structured as an initial source selection that will result in up to two Indefinite Delivery Indefinite Quantity (IDIQ) contracts, with a final downselect to at least one contractor following a Critical Design Review.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Format C_CLIN Summary
| Common Armament Tester - Fighters (CAT-F) Excel Cost Model (RFP Attachment 6) |
| "Offeror shall enter data in yellow highlighted fields only" |
| Solicitation Number: |
| Enter Offeror's Business Name: |
| Enter Offeror's CAGE code: |
| Basic Period (12 months) | |||||||||
| CLIN | Contract Type | Description | QTY | Unit | Cost | COM | Fee | Unit Price | Extended Price |
| 0001 | CPFF | F-16 O-Level Handheld/Pre-load Tester Prototype design and digital development | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0002 | CPFF | F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0003 | CPFF | A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0004 | CPFF | F-16 I-Level Fault Isolation Tester design and digital development | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0005 | CPFF | F-15 I-Level Fault Isolation Tester design and digital development | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0006 | CPFF | A-10 I-Level Fault Isolation Tester design and digital development | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0007 | FFP | F-16 O-Level Handheld Tester Prototype | 4 | EA | $0.00 | $0.00 | |||
| 0008 | FFP | F-15 O-Level Handheld Tester Prototype | 4 | EA | $0.00 | $0.00 | |||
| 0009 | FFP | A-10 O-Level Handheld Tester Prototype | 4 | EA | $0.00 | $0.00 | |||
| 0010 | FFP | F-16 I-Level Fault Isolation Tester digital design | 1 | LO | $0.00 | $0.00 | |||
| 0011 | FFP | F-15 I-Level Fault Isolation Tester digital design | 1 | LO | $0.00 | $0.00 | |||
| 0012 | FFP | A-10 I-Level Fault Isolation Tester digital design | 1 | LO | $0.00 | $0.00 | |||
| 0013 | FFP | Program Management | 1 | LO | $0.00 | $0.00 | |||
| 0014 | CPFF | Design Demonstration (Labor- Not Travel) | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0015 | CRNF | Travel | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | |
| 0016 | FFP | IP License Rights | 1 | LO | $0.00 | $0.00 | |||
| 0017 | Data | 1 | LO | ||||||
| ELIN A001 | FFP | DI-MGMT-81605, Briefing Material | 1 | LO | $0.00 | $0.00 | |||
| ELIN A002 | FFP | DI-MGMT-81861C, Integrated Program Management Data and Analysis Report (IPMDAR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN A003 | FFP | DI-MGMT-80368A, Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN A004 | FFP | DI-MISC-81943, Trip Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN A005 | FFP | DI-MISC-80508B, Technical Report – Sustainment Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN A006 | FFP | DI-SESS-81785B, System Engineering Management Plan (SEMP) | 1 | LO | $0.00 | $0.00 | |||
| ELIN A007 | FFP | DI-MGMT-81453C, Data Accession List | 1 | LO | $0.00 | $0.00 | |||
| ELIN A008 | FFP | DI-MGMT-81948, Diminishing Manufacturing Sources and Material Shortage (DMSMS) Management Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00C | FFP | DI-IPSC-81433A, Software Requirements Specification (SRS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00D | FFP | DI-AVCS-80491B, Computer Software Flowchart (CSF) | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00E | FFP | DI-IPSC-81441A, Software Product Specification (SPS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00F | FFP | DI-MGMT-81468B Contract Funds Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00G | FFP | DI-MISC-80508B, Technical Report – Fielding Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00H | FFP | DI-MISC-80508B, Technical Report – Product Familiarization Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00J | FFP | DI-NDTI-80566A, Test Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00K | FFP | DI-IPSC-81431A, System Subsystem Specification (SSS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00R | FFP | DI-SESS-80776B, Technical Data Package | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00S | FFP | DI-SESS-82238A, Technical Data Package List | 1 | LO | $0.00 | $0.00 | |||
| ELIN A00U | FFP | DI-MISC-80508B, Technical Report- Cybersecurity Controls Report | 1 | LO | $0.00 | $0.00 | |||
| 0018 | FFP | Post Award Conference | 1 | LO | $0.00 | $0.00 | |||
| Total Extended Price - Basic Period | $0.00 |
| Option Period I (12 months) | |||||||||
| CLIN | Contract Type | Description | QTY | Unit | Cost | COM | Fee | Unit Price | Extended Price |
| 1001 | CPFF | F-16 O-Level Handheld/Pre-load Tester Engineering and Manufacturing Development (EMD) | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1002 | CPFF | F-15 O-Level Handheld/Pre-load Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1003 | CPFF | A-10 O-Level Handheld/Pre-load Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1004 | CPFF | F-16 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1005 | CPFF | F-15 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1006 | CPFF | A-10 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1007 | FFP | F-16 O-Level Handheld/Pre-load Tester Logistical Support | 1 | LO | $0.00 | $0.00 | |||
| 1008 | FFP | F-16 O-Level Handheld Tester (LRIP) | 10 | EA | $0.00 | $0.00 | |||
| 1009 | FFP | F-16 O-Level Handheld Tester Kits | 83 | EA | $0.00 | $0.00 | |||
| 1010 | FFP | Program Management | 1 | LO | $0.00 | $0.00 | |||
| 1011 | CPFF | Support Government Testing | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1012 | CRNF | Travel | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1013 | FFP | IP License Rights | 1 | LO | $0.00 | $0.00 | |||
| 1014 | Data | 1 | LO | ||||||
| ELIN B001 | FFP | DI-MGMT-81605, Briefing Material | 1 | LO | $0.00 | $0.00 | |||
| ELIN B002 | FFP | DI-MGMT-81861C, Integrated Program Management Data and Analysis Report (IPMDAR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN B003 | FFP | DI-MGMT-80368A, Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN B004 | FFP | DI-MISC-81943, Trip Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN B007 | FFP | DI-MGMT-81453C, Data Accession List | 1 | LO | $0.00 | $0.00 | |||
| ELIN B009 | FFP | DI-MISC-80508B, Technical Report – Program Status and Updates (End of Year) | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00A | FFP | DI-SCRE-82140A, Cybersecurity Test Plan (CTP) | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00B | FFP | DI-IPSC-81442A, Software Version Description | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00C | FFP | DI-IPSC-81433A, Software Requirements Specification (SRS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00E | FFP | DI-IPSC-81441A, Software Product Specification (SPS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00F | FFP | DI-MGMT-81468B Contract Funds Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00G | FFP | DI-MISC-80508B, Technical Report – Fielding Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00H | FFP | DI-MISC-80508B, Technical Report – Product Familiarization Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00J | FFP | DI-NDTI-80566A, Test Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00K | FFP | DI-IPSC-81431A, System Subsystem Specification (SSS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00L | FFP | DI-SESS-80639, Engineering Change Proposal (ECP) | 1 | LO | TO BE NEGOTIATED | ||||
| ELIN B00M | FFP | TM-86-01, Technical Manual Contract Requirement (TMCR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00N | FFP | DI-NUOR-81888B, Nuclear Certification Impact Statement | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00P | FFP | DI-MGMT-81804A, Item Unique Identification (IUID) Marking Activity, Validation, and Verification Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00Q | FFP | DI-MGMT-81803A, Item Unique Identification (IUID) Marking Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00R | FFP | DI-SESS-80776B, Technical Data Package | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00S | FFP | DI-SESS-82238A, Technical Data Package List | 1 | LO | $0.00 | $0.00 | |||
| ELIN B00V | FFP | DI-SESS-81639B, Warranty Performance Report | 1 | LO | $0.00 | $0.00 | |||
| 1015 | CPFF | Technical Data | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1016 | FFP | Surge Option | 1 | EA | $0.00 | $0.00 | |||
| Total Extended Price - Option Period I | $0.00 |
| Option Period II (12 months) | |||||||||
| CLIN | Contract Type | Description | QTY | Unit | Cost | COM | Fee | Unit Price | Extended Price |
| 2001 | CPFF | F-15 O-Level Handheld/Pre-load Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2002 | CPFF | A-10 O-Level Handheld/Pre-load Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2003 | CPFF | F-16 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2004 | CPFF | F-15 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2005 | CPFF | A-10 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2006 | FFP | F-15 O-Level Handheld/Pre-load Tester Logistical Support | 1 | LO | $0.00 | $0.00 | |||
| 2007 | FFP | A-10 O-Level Handheld/Pre-load Tester Logistical Support | 1 | LO | $0.00 | $0.00 | |||
| 2008 | FFP | F-16 O-Level Handheld Tester Kits | 210 | EA | $0.00 | $0.00 | |||
| 2009 | FFP | F-15 O-Level Handheld Tester Kits (LRIP) | 10 | EA | $0.00 | $0.00 | |||
| 2010 | FFP | F-15 O-Level Handheld Tester Kits | 162 | EA | $0.00 | $0.00 | |||
| 2011 | N/A | RESERVED | RESERVED | ||||||
| 2012 | FFP | Program Management | 1 | LO | $0.00 | $0.00 | |||
| 2013 | CPFF | Support Government Testing | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2014 | CRNF | Travel | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2015 | FFP | IP License Rights | 1 | LO | $0.00 | $0.00 | |||
| 2016 | Data | 1 | LO | NSP | |||||
| ELIN C001 | FFP | DI-MGMT-81605, Briefing Material | 1 | LO | $0.00 | $0.00 | |||
| ELIN C002 | FFP | DI-MGMT-81861C, Integrated Program Management Data and Analysis Report (IPMDAR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN C003 | FFP | DI-MGMT-80368A, Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN C004 | FFP | DI-MISC-81943, Trip Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN C007 | FFP | DI-MGMT-81453C, Data Accession List | 1 | LO | $0.00 | $0.00 | |||
| ELIN C009 | FFP | DI-MISC-80508B, Technical Report – Program Status and Updates (End of Year) | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00B | FFP | DI-IPSC-81442A, Software Version Description | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00C | FFP | DI-IPSC-81433A, Software Requirements Specification (SRS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00E | FFP | DI-IPSC-81441A, Software Product Specification (SPS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00F | FFP | DI-MGMT-81468B Contract Funds Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00G | FFP | DI-MISC-80508B, Technical Report – Fielding Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00H | FFP | DI-MISC-80508B, Technical Report – Product Familiarization Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00J | FFP | DI-NDTI-80566A, Test Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00K | FFP | DI-IPSC-81431A, System Subsystem Specification (SSS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00L | FFP | DI-SESS-80639, Engineering Change Proposal (ECP) | 1 | LO | TO BE NEGOTIATED | ||||
| ELIN C00M | FFP | TM-86-01, Technical Manual Contract Requirement (TMCR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00N | FFP | DI-NUOR-81888B, Nuclear Certification Impact Statement | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00P | FFP | DI-MGMT-81804A, Item Unique Identification (IUID) Marking Activity, Validation, and Verification Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00Q | FFP | DI-MGMT-81803A, Item Unique Identification (IUID) Marking Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00R | FFP | DI-SESS-80776B, Technical Data Package | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00S | FFP | DI-SESS-82238A, Technical Data Package List | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00T | FFP | DI-NUOR-81405B, Nuclear Safety Analysis Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN C00V | FFP | DI-SESS-81639B, Warranty Performance Report | 1 | LO | $0.00 | $0.00 | |||
| 2017 | CPFF | Technical Data | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2018 | FFP | Surge Option | 1 | EA | $0.00 | $0.00 | |||
| Total Extended Price - Option Period II | $0.00 |
| Option Period III (12 months) | |||||||||
| CLIN | Contract Type | Description | QTY | Unit | Cost | COM | Fee | Unit Price | Extended Price |
| 3001 | CPFF | A-10 O-Level Handheld/Pre-load Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3002 | CPFF | F-16 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3003 | CPFF | F-15 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3004 | CPFF | A-10 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3005 | FFP | F-16 I-Level Fault Isolation Tester Logistical Support | 1 | LO | $0.00 | $0.00 | |||
| 3006 | FFP | F-15 I-Level Fault Isolation Tester Logistical Support | 1 | LO | $0.00 | $0.00 | |||
| 3007 | FFP | A-10 O-Level Handheld Tester Kits (LRIP) | 4 | EA | $0.00 | $0.00 | |||
| 3008 | FFP | A-10 O-Level Handheld Tester Kits | 64 | EA | $0.00 | $0.00 | |||
| 3009 | FFP | F-16 I-Level Fault Isolation Tester Kits (LRIP) | 5 | EA | $0.00 | $0.00 | |||
| 3010 | FFP | F-15 I-Level Fault Isolation Tester Kits (LRIP) | 5 | EA | $0.00 | $0.00 | |||
| 3011 | FFP | F-16 I-Level Fault Isolation Tester Kits | 138 | EA | $0.00 | $0.00 | |||
| 3012 | FFP | Program Management | 1 | LO | $0.00 | $0.00 | |||
| 3013 | CPFF | Support Government Testing | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3014 | CRNF | Travel | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3015 | Data | 1 | LO | ||||||
| ELIN D001 | FFP | DI-MGMT-81605, Briefing Material | 1 | LO | $0.00 | $0.00 | |||
| ELIN D002 | FFP | DI-MGMT-81861C, Integrated Program Management Data and Analysis Report (IPMDAR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN D003 | FFP | DI-MGMT-80368A, Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN D004 | FFP | DI-MISC-81943, Trip Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN D007 | FFP | DI-MGMT-81453C, Data Accession List | 1 | LO | $0.00 | $0.00 | |||
| ELIN D009 | FFP | DI-MISC-80508B, Technical Report – Program Status and Updates (End of Year) | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00B | FFP | DI-IPSC-81442A, Software Version Description | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00C | FFP | DI-IPSC-81433A, Software Requirements Specification (SRS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00E | FFP | DI-IPSC-81441A, Software Product Specification (SPS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00F | FFP | DI-MGMT-81468B Contract Funds Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00G | FFP | DI-MISC-80508B, Technical Report – Fielding Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00H | FFP | DI-MISC-80508B, Technical Report – Product Familiarization Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00J | FFP | DI-NDTI-80566A, Test Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00K | FFP | DI-IPSC-81431A, System Subsystem Specification (SSS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00L | FFP | DI-SESS-80639, Engineering Change Proposal (ECP) | 1 | LO | TO BE NEGOTIATED | ||||
| ELIN D00M | FFP | TM-86-01, Technical Manual Contract Requirement (TMCR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00P | FFP | DI-MGMT-81804A, Item Unique Identification (IUID) Marking Activity, Validation, and Verification Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00Q | FFP | DI-MGMT-81803A, Item Unique Identification (IUID) Marking Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00R | FFP | DI-SESS-80776B, Technical Data Package | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00S | FFP | DI-SESS-82238A, Technical Data Package List | 1 | LO | $0.00 | $0.00 | |||
| ELIN D00V | FFP | DI-SESS-81639B, Warranty Performance Report | 1 | LO | $0.00 | $0.00 | |||
| 3016 | FFP | IP License Rights | 1 | LO | $0.00 | $0.00 | |||
| 3017 | CPFF | Technical Data | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3018 | FFP | Surge Option | 1 | EA | $0.00 | $0.00 | |||
| Total Extended Price - Option Period III | $0.00 |
| Option Period IV (12 months) | |||||||||
| CLIN | Contract Type | Description | QTY | Unit | Cost | COM | Fee | Unit Price | Extended Price |
| 4001 | CPFF | F-15 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4002 | CPFF | A-10 I-Level Fault Isolation Tester EMD | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4003 | FFP | A-10 I-Level Fault Isolation Tester Logistical Support | 1 | LO | $0.00 | $0.00 | |||
| 4004 | FFP | F-15 I-Level Fault Isolation Tester Kits (LRIP) | 5 | EA | $0.00 | $0.00 | |||
| 4005 | FFP | F-15 I-Level Fault Isolation Tester Kits | 75 | EA | $0.00 | $0.00 | |||
| 4006 | FFP | A-10 I-Level Fault Isolation Tester Kits (LRIP) | 2 | EA | $0.00 | $0.00 | |||
| 4007 | FFP | A-10 I-Level Fault Isolation Tester Kits | 40 | EA | $0.00 | $0.00 | |||
| 4008 | FFP | Program Management | 1 | LO | $0.00 | $0.00 | |||
| 4009 | CPFF | Support Government Testing | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4010 | CRNF | Travel | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | |
| 4011 | Data | 1 | LO | ||||||
| ELIN E001 | FFP | DI-MGMT-81605, Briefing Material | 1 | LO | $0.00 | $0.00 | |||
| ELIN E002 | FFP | DI-MGMT-81861C, Integrated Program Management Data and Analysis Report (IPMDAR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN E003 | FFP | DI-MGMT-80368A, Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN E004 | FFP | DI-MISC-81943, Trip Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN E007 | FFP | DI-MGMT-81453C, Data Accession List | 1 | LO | $0.00 | $0.00 | |||
| ELIN E009 | FFP | DI-MISC-80508B, Technical Report – Program Status and Updates (End of Year) | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00B | FFP | DI-IPSC-81442A, Software Version Description | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00C | FFP | DI-IPSC-81433A, Software Requirements Specification (SRS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00E | FFP | DI-IPSC-81441A, Software Product Specification (SPS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00F | FFP | DI-MGMT-81468B Contract Funds Status Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00G | FFP | DI-MISC-80508B, Technical Report – Fielding Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00H | FFP | DI-MISC-80508B, Technical Report – Product Familiarization Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00K | FFP | DI-IPSC-81431A, System Subsystem Specification (SSS) | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00L | FFP | DI-SESS-80639, Engineering Change Proposal (ECP) | 1 | LO | TO BE NEGOTIATED | ||||
| ELIN E00M | FFP | TM-86-01, Technical Manual Contract Requirement (TMCR) | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00P | FFP | DI-MGMT-81804A, Item Unique Identification (IUID) Marking Activity, Validation, and Verification Report | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00Q | FFP | DI-MGMT-81803A, Item Unique Identification (IUID) Marking Plan | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00R | FFP | DI-SESS-80776B, Technical Data Package | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00S | FFP | DI-SESS-82238A, Technical Data Package List | 1 | LO | $0.00 | $0.00 | |||
| ELIN E00V | FFP | DI-SESS-81639B, Warranty Performance Report | 1 | LO | $0.00 | $0.00 | |||
| 4012 | FFP | IP License Rights | 1 | LO | $0.00 | $0.00 | |||
| 4013 | CPFF | Technical Data | 1 | LO | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4014 | FFP | Surge Option | 1 | EA | $0.00 | $0.00 | |||
| Total Extended Price - Option Period IV | $0.00 |
Total Proposed Price $0.00
SOURCE SELECTION INFORMATION--SEE FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
FFP CLINs
| Notes: |
| 1. The prime offeror shall enter a proposed unit price per CLIN in the yellow-highlighted cells below. |
| 2. Each Firm Fixed Price shall be rounded to the nearest whole dollar. |
| 3. The prime offeror shall ensure the cells below are linked correctly to the CLIN cells on worksheet "Cost Format C_CLIN Summary". |
| Basic Period (12 Months) | Option Period I (12 Months) | Option Period II (12 Months) | Option Period III (12 Months) | Option Period IV (12 Months) | ||||||||||
| CLIN 0007 | CLIN 1007 | CLIN 2006 | CLIN 3005 | CLIN 4003 | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 4 | EA | 1 | LO | 1 | LO | 1 | LO | 1 | LO |
| CLIN 0008 | CLIN 1008 | CLIN 2007 | CLIN 3006 | CLIN 4004 | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 4 | EA | 10 | EA | 1 | LO | 1 | LO | 5 | EA |
| CLIN 0009 | CLIN 1009 | CLIN 2008 | CLIN 3007 | CLIN 4005 | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 4 | EA | 83 | EA | 210 | EA | 4 | EA | 75 | EA |
| CLIN 0010 | CLIN 1010 | CLIN 2009 | CLIN 3008 | CLIN 4006 | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 10 | EA | 64 | EA | 2 | EA |
| CLIN 0011 | CLIN 1013 | CLIN 2010 | CLIN 3009 | CLIN 4007 | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 162 | EA | 5 | EA | 40 | EA |
| CLIN 0012 | CLIN 1016 | CLIN 2012 | CLIN 3010 | CLIN 4008 | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | EA | 1 | LO | 5 | EA | 1 | LO |
| CLIN 0013 | ELIN B001 (CLIN 1014) | CLIN 2015 | CLIN 3011 | CLIN 4012 | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 138 | EA | 1 | LO |
| CLIN 0016 | ELIN B002 (CLIN 1014) | CLIN 2018 | CLIN 3012 | CLIN 4014 | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | EA | 1 | LO | 1 | EA |
| CLIN 0018 | ELIN B003 (CLIN 1014) | ELIN C001 (CLIN 2016) | CLIN 3016 | ELIN E001 (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO |
| ELIN A001 (CLIN 0017) | ELIN B004 (CLIN 1014) | ELIN C002 (CLIN 2016) | CLIN 3018 | ELIN E002 (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | EA | 1 | LO | |||||
| 0 | ||||||||||||||
| ELIN A002 (CLIN 0017) | ELIN B007 (CLIN 1014) | ELIN C003 (CLIN 2016) | ELIN D001 (CLIN 3015) | ELIN E003 (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO |
| ELIN A003 (CLIN 0017) | ELIN B009 (CLIN 1014) | ELIN C004 (CLIN 2016) | ELIN D002 (CLIN 3015) | ELIN E004 (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 1 | ||||||||||||||
| ELIN A004 (CLIN 0017) | ELIN B00A (CLIN 1014) | ELIN C007 (CLIN 2016) | ELIN D003 (CLIN 3015) | ELIN E007 (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 0 | ||||||||||||||
| ELIN A005 (CLIN 0017) | ELIN B00B (CLIN 1014) | ELIN C009 (CLIN 2016) | ELIN D004 (CLIN 3015) | ELIN E009 (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO |
| ELIN A006 (CLIN 0017) | ELIN B00C (CLIN 1014) | ELIN C00B (CLIN 2016) | ELIN D007 (CLIN 3015) | ELIN E00B (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 1 | ||||||||||||||
| ELIN A007 (CLIN 0017) | ELIN B00E (CLIN 1014) | ELIN C00C (CLIN 2016) | ELIN D009 (CLIN 3015) | ELIN E00C (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 0 | ||||||||||||||
| ELIN A008 (CLIN 0017) | ELIN B00F (CLIN 1014) | ELIN C00E (CLIN 2016) | ELIN D00B (CLIN 3015) | ELIN E00E (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO |
| ELIN A00C (CLIN 0017) | ELIN B00G (CLIN 1014) | ELIN C00F (CLIN 2016) | ELIN D00C (CLIN 3015) | ELIN E00F (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 2 | ||||||||||||||
| ELIN A00D (CLIN 0017) | ELIN B00H (CLIN 1014) | ELIN C00G (CLIN 2016) | ELIN D00E (CLIN 3015) | ELIN E00G (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 0 | ||||||||||||||
| ELIN A00E (CLIN 0017) | ELIN B00J (CLIN 1014) | ELIN C00H (CLIN 2016) | ELIN D00F (CLIN 3015) | ELIN E00H (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO |
| ELIN A00F (CLIN 0017) | ELIN B00K (CLIN 1014) | ELIN C00J (CLIN 2016) | ELIN D00G (CLIN 3015) | ELIN E00K (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 1 | ||||||||||||||
| ELIN A00G (CLIN 0017) | ELIN B00L (CLIN 1014) | ELIN C00K (CLIN 2016) | ELIN D00H (CLIN 3015) | ELIN E00L (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | To Be Negotiated | 1 | LO | 1 | LO | 1 | LO | To Be Negotiated | |||
| 0 | ||||||||||||||
| ELIN A00H (CLIN 0017) | ELIN B00M (CLIN 1014) | ELIN C00L (CLIN 2016) | ELIN D00J (CLIN 3015) | ELIN E00M (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | To Be Negotiated | 1 | LO | 1 | LO |
| ELIN A00J (CLIN 0017) | ELIN B00N (CLIN 1014) | ELIN C00M (CLIN 2016) | ELIN D00K (CLIN 3015) | ELIN E00P (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 1 | ||||||||||||||
| ELIN A00K (CLIN 0017) | ELIN B00P (CLIN 1014) | ELIN C00N (CLIN 2016) | ELIN D00L (CLIN 3015) | ELIN E00Q (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | To Be Negotiated | 1 | LO | ||||
| 0 | ||||||||||||||
| ELIN A00R (CLIN 0017) | ELIN B00Q (CLIN 1014) | ELIN C00P (CLIN 2016) | ELIN D00M (CLIN 3015) | ELIN E00R (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO |
| ELIN A00S (CLIN 0017) | ELIN B00R (CLIN 1014) | ELIN C00Q (CLIN 2016) | ELIN D00P (CLIN 3015) | ELIN E00S (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO | |||||
| 0 | ||||||||||||||
| ELIN A00U (CLIN 0017) | ELIN B00S (CLIN 1014) | ELIN C00R (CLIN 2016) | ELIN D00Q (CLIN 3015) | ELIN E00V (CLIN 4011) | ||||||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | 1 | LO | 1 | LO |
| ELIN B00V (CLIN 1014) | ELIN C00S (CLIN 2016) | ELIN D00R (CLIN 3015) | ||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO | 1 | LO | |||
| 0 | ||||||||
| ELIN C00T (CLIN 2016) | ELIN D00S (CLIN 3015) | |||||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price | |||
| 1 | LO | 1 | LO |
| ELIN C00V (CLIN 2016) | ELIN D00V (CLIN 3015) | ||||
| Qty | Unit | Proposed Unit Price | Qty | Unit | Proposed Unit Price |
| 1 | LO | 1 | LO |
Cost Format A_CLIN X001
| Notes: |
| 1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system. |
| 2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below. |
| 3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet. |
| 4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs. |
| 5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet. |
| 6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar. |
| CLINs 0001, 1001, 2001, 3001, and 4001: CPFF | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | ||||||||||
| 0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period | 1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 2 | 3001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 3 | 4001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4 | |||||||||||
| Labor Category | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost |
| Labor Category 1: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 2: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 3: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 4: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 5: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 6: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 7: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 8: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 9: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 10: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 11: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 12: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 13: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| TOTAL HOURS/COST | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Proposed Add-on Factor (Fringe) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0001, 1001, 2001, 3001, and 4001: CPFF | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | ||||||||||
| 0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period | 1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 2 | 3001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 3 | 4001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4 | |||||||||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Total Proposed Material Cost | |||||||||||||||
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0001, 1001, 2001, 3001, and 4001: CPFF | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | ||||||||||
| 0001: F-16 O-Level Handheld/Pre-load Tester Prototype Design and Digital Development - Basic Period | 1001: F-16 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2001: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 2 | 3001: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 3 | 4001: F-15 I-Level Fault Isolation Tester EMD - Option Period 4 | |||||||||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Total Proposed Other Direct Cost (ODC) | |||||||||||||||
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0001, 1001, 2001, 3001, and 4001: CPFF | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | |||||
| CLIN 0001: Basic Period (CPFF) | CLIN 1001: Option Period 1 (CPFF) | CLIN 2001: Option Period 2 (CPFF) | CLIN 3001: Option Period 3 (CPFF) | CLIN 4001: Option Period 4 (CPFF) | ||||||
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Cost Format A_CLIN X002
| Notes: |
| 1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system. |
| 2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below. |
| 3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet. |
| 4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs. |
| 5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet. |
| 6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar. |
| CLINs 0002, 1002, 2002, 3002, and 4002: CPFF | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | ||||||||||
| 0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period | 1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 2 | 3002: F-16 I-Level Fault Isolation Tester EMD - Option Period 3 | 4002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4 | |||||||||||
| Labor Category | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost |
| Labor Category 1: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 2: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 3: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 4: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 5: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 6: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 7: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 8: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 9: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 10: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 11: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 12: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Labor Category 13: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| TOTAL HOURS/COST | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Proposed Add-on Factor (Fringe) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0002, 1002, 2002, 3002, and 4002: CPFF | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | ||||||||||
| 0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period | 1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 2 | 3002: F-16 I-Level Fault Isolation Tester EMD - Option Period 3 | 4002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4 | |||||||||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Total Proposed Material Cost | |||||||||||||||
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0002, 1002, 2002, 3002, and 4002: CPFF | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | ||||||||||
| 0002: F-15 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period | 1002: F-15 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2002: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 2 | 3002: F-16 I-Level Fault Isolation Tester EMD - Option Period 3 | 4002: A-10 I-Level Fault Isolation Tester EMD - Option Period 4 | |||||||||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Total Proposed Other Direct Cost (ODC) | |||||||||||||||
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0002, 1002, 2002, 3002, and 4002: CPFF | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | |||||
| CLIN 0002: Basic Period (CPFF) | CLIN 1002: Option Period 1 (CPFF) | CLIN 2002: Option Period 2 (CPFF) | CLIN 3002: Option Period 3 (CPFF) | CLIN 4002: Option Period 4 (CPFF) | ||||||
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Cost Format A_CLIN X003
| Notes: |
| 1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system. |
| 2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below. |
| 3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet. |
| 4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs. |
| 5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet. |
| 6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar. |
| CLINs 0003, 1003, 2003, and 3003: CPFF | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | ||||||||
| 0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period | 1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2003: F-16 I-Level Fault Isolation Tester EMD - Option Period 2 | 3003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3 | |||||||||
| Labor Category | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost |
| Labor Category 1: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 2: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 3: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 4: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 5: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 6: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 7: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 8: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 9: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 10: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 11: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 12: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 13: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL HOURS/COST | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | ||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Proposed Add-on Factor (Fringe) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0003, 1003, 2003, and 3003: CPFF | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | ||||||||
| 0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period | 1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2003: F-16 I-Level Fault Isolation Tester EMD - Option Period 2 | 3003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3 | |||||||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Total Proposed Material Cost | ||||||||||||
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0003, 1003, 2003, and 3003: CPFF | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | Proposed Prices (Other Direct Cost) | ||||||||
| 0003: A-10 O-Level Handheld/Pre-load Tester Prototype design and digital development - Basic Period | 1003: A-10 O-Level Handheld/Pre-load Tester EMD - Option Period 1 | 2003: F-16 I-Level Fault Isolation Tester EMD - Option Period 2 | 3003: F-15 I-Level Fault Isolation Tester EMD - Option Period 3 | |||||||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Total Proposed Other Direct Cost (ODC) | ||||||||||||
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0003, 1003, 2003, and 3003: CPFF | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | Proposed Prices (Labor, Material, and ODC) | ||||
| CLIN 0003: Basic Period (CPFF) | CLIN 1003: Option Period 1 (CPFF) | CLIN 2003: Option Period 2 (CPFF) | CLIN 3003: Option Period 3 (CPFF) | |||||
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 |
Cost Format A_CLIN X004
| Notes: |
| 1. The format of this worksheet may be revised as required to be consistent with the major subcontractor's approved accounting system. |
| 2. The Prime Offeror shall propose labor hours, material costs, and other direct costs in the yellow-highlighted cells below. |
| 3. The Prime Offeror shall ensure the yellow-highlighted rate cells below are linked correctly from the relevant labor rate and add-on factors in the 'Cost Format B_PRIME Rates' worksheet. |
| 4. The proposed factors will be applied to the proposed labor hours, material cost, and other direct costs. |
| 5. Definitions of the labor categories and add-on factors are included in the 'Cost Format B_PRIME Rate Desc' worksheet. |
| 6. Each CPFF Cost, COM and Fee shall be rounded to the nearest whole dollar. |
| CLINs 0004, 1004, 2004, and 3004: CPFF | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | Proposed Prices (Labor) | ||||||||
| 0004: F-16 I-Level Fault Isolation Tester design and digital development - Basic Period | 1004: F-16 I-Level Fault Isolation Tester EMD - Option Period 1 | 2004: F-15 I-Level Fault Isolation Tester EMD - Option Period 2 | 3004: A-10 I-Level Fault Isolation Tester EMD - Option Period 3 | |||||||||
| Labor Category | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost | Hours | Rates | Cost |
| Labor Category 1: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 2: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 3: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 4: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 5: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 6: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 7: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 8: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 9: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 10: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 11: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 12: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Labor Category 13: [INSERT LABOR CATEGORY NAME HERE] | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL HOURS/COST | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | ||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Proposed Add-on Factor (Fringe) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed Fee | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed Price | $0.00 | $0.00 | $0.00 | $0.00 |
| CLINs 0004, 1004, 2004, and 3004: CPFF | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | Proposed Prices (Material) | ||||||||
| 0004: F-16 I-Level Fault Isolation Tester design and digital development - Basic Period | 1004: F-16 I-Level Fault Isolation Tester EMD - Option Period 1 | 2004: F-15 I-Level Fault Isolation Tester EMD - Option Period 2 | 3004: A-10 I-Level Fault Isolation Tester EMD - Option Period 3 | |||||||||
| Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | Base | Rates | Cost | |
| Total Proposed Material Cost | ||||||||||||
| Proposed Add-on Factor (Overhead) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (G&A) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (COM) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Proposed Add-on Factor (Fee) | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Proposed Cost | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total Proposed COM | $0.00 | $0.00 | $0.00 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .