RFP 70FB8025R00000001 Attachment 1 LogHOUSE Pricing Table 02-03-2025.xlsx
XLSX spreadsheet 67 KB Posted
- Attached to
- FEMA LogHOUSE II - Logistics Housing Operations Unit Installation, Maintenance and Deactivation Federal contract opportunity
- Solicitation number
- RFP-70FB8025R00000001
- Issued by
- Federal Emergency Management Agency
About this file
This is a pricing table attachment for RFP 70FB8025R00000001 (LogHOUSE II) that provides Contract Line Item Number (CLIN) pricing structure for contractors to bid on FEMA's Transportable Temporary Housing Units (TTHUs) program. The table includes detailed CLINs for transportation and staging, site inspections, installation, preventive maintenance and repairs, deactivation, commercial park expansion, group site construction/maintenance, and field task order requirements.
The pricing table is structured with base period and four ordering periods, with fixed unit prices (FUP) to be negotiated at either the Contract (CO), Task Order (TO), or Work Order (WO) level. Key service categories include transportation of manufactured homes/park models and travel trailers (with standard and long haul rates), site inspections for private/commercial locations, installation services including UFAS ramps and utility connections, preventive maintenance, deactivation services, and hourly rates for various personnel positions like Task Order Manager, Quality Manager, and trade labor rates. Each CLIN specifies the unit of measure (e.g., per mile, each, hourly) and whether pricing is Not to Exceed (NTE).
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Legend and Instructions
| Key aspects |
| INSTRUCTIONS |
| OFFERORS WILL NEED TO COMPLETE CLIN CHART PRICING SHEET IN THIS DOCUMENT. OFFERORS WILL ONLY INSERT THE PRICE PER UNIT ASSIGNED FOR EACH APPLICABLE CLIN AND FOR THE BASE AND ORDERING PERIOD (1,2,3,4) |
| ACRONYM | DEFINITION |
| CLIN | CONTRACT LINE ITEM NUMBER |
| NTE | NOT TO EXCEED |
| ACT | Actual Costs incurred when a contractor purchases an item required for the contract, such as a permit issued by an authority having jurisdiction or an insurance bond. |
| CON | CONTRACT |
| TO | TASK ORDER |
| WO | WORK ORDER |
| ANN | ANNUAL - READINESS/TRAINING |
| FUP | FIXED UNIT PRICE |
| TIME NEGOTIATED | INDICATES WHEN THE COST/PRICE (FUP) IS GOING TO BE NEGOTIATED BY FEMA AND THE OFFEROR |
| UNIT TYPE ACRONYM | DEFINITION |
| EA | COST PER EACH |
| MI | COST PER MILE |
| LF | COST PER LINEAL FOOT |
| WEEKLY | COST PER WEEK |
| MONTHLY | COST PER MONTH |
| DAILY | COST PER DAY |
| FEMA RATES | FEMA ESTABLISHED RATES |
| Price Negotiation Level | DEFINITIION |
| CO | CLINs that are CO will be negotiated at Contract Level. (Originally agreed) |
| TO | CLINs that are TO will be negotiated at Task Order Level (when a TO is issued) |
| WO | CLINS that are WO will be negotiated at Work Order Level (when a WO is issued) |
| CLIN Price Additional Information | |
| Each CLIN will be negotiated at CO or TO or WO. After a CLIN price is negotiated, it will be come a Not To Exceed Fixed Unit Price (FUP) at the rate defined by CLIN. |
The CLIN structure has two components 1) The CLIN number referenced in the PWS. Each piece of work has a CLIN number referenced. These PWS CLIN reference numbers appear in the column identified as “CLINS referenced in the PWS.” There are also 5 columns identified as “Base Period CLINs in PRISM” and “Order Period CLINs in PRISM” these are the CLINs that are incorporated in the PRISM system. When submitting an invoice the contractor shall provide FEMA with both the PWS reference CLIN and the Base or Order Period CLIN.
CON CLIN CHART PRICING
CLIN CHART
| CLIN # | CLIN TITLE | DESCRIPTION | VALUE OF ISSUE | TYPE | UNIT OF ISSUE | TIME NEGOTIATED | Base Ordering Period CLINS in PRISM | Base Ordering Period CLIN Price | Ordering Period 1 CLINS in PRISM | Ordering Period 1 CLIN PRICE | Ordering Period 2 CLINS in PRISM | Ordering Period 2 CLIN PRICE | Ordering Period 3 CLINS in PRISM | Ordering Period 3 CLIN Price | Ordering Period 4 CLINS in PRISM | Ordering Period 4 CLIN PRICE |
| 0001 | RESERVED FOR FUTURE USE | |||||||||||||||
| RESERVED FOR FUTURE USE | 0001AA | |||||||||||||||
| 0002 | MH/PM/TT TRANSPORTATION & STAGING | |||||||||||||||
| TRAVEL TRAILER STANDARD HAUL | Ground Mileage for Towing of TT from the Transportable Temporary Housing Storage Site (TTHSS) to either the Transportable Temporary Housing Staging Area (TTHSA) or other destination as directed by the COR 100 miles or less. (Includes hook-up charges) | NTE | FUP | MI | CON | 0002AC | 1002AC | 2002AC | 3002AC | 4002AC | ||||||
| MH/PM STANDARD HAUL | Ground Mileage for Towing of MH/PM from the Transportable Temporary Housing Storage Site (TTHSS) to either the Transportable Temporary Housing Staging Area (TTHSA) or other destination as directed by the COR 100 miles or less. (Includes hook-up charges) |
| NTE | FUP | MI | CON | 0002AD | 1002AD | 2002AD | 3002AD | 4002AD |
| MH/PM LONG HAUL | Long Haul - Ground Mileage for Towing of MH/PM from the Transportable Temporary Housing Storage Site (TTHSS) to the Transportable Temporarty Staging Area (TTHSA) or Installation Site (greater than 100 miles - first 100 miles is included in basic installation CLIN). (Includes hook-up charges) |
| NTE | FUP | MI | CON | 0002AE | 1002AE | 2002AE | 3002AE | 4002AE |
| TRAVEL TRAILER LONG HAUL | Long Haul - Ground Mileage for Towing of TT from the Transportable Temporary Housing Storage Site (TTHSS) to the Transportable Temporarty Staging Area (TTHSA) or Installation Site (greater than 100 miles - first 100 miles is included in basic installation CLIN). (Includes hook-up charges) |
| NTE | FUP | MI | CON | 0002AF | 1002AF | 2002AF | 3002AF | 4002AF | ||||||
| TT TRANSPORTATION FOR INSTALL (ADDITIONAL MILES) | Additional miles for installation of TT in a private or commercial site. Note: First 100 miles are included in the appropriate install CLIN. | NTE | FUP | MI | CON | 0002AG | 1002AG | 2002AG | 3002AG | 4002AG | ||||
| MH / PM TRANSPORTATION FOR INSTALL (ADDITIONAL MILES) | Additional miles for installation of a MH in a private/commercial/group site. Note: First 100 miles are included in the appropriate install CLIN. | NTE | FUP | MI | CON | 0002AH | 1002AH | 2002AH | 3002AH | 4002AH | ||||
| STAGING MANAGEMENT | Unit Staging Area - Management & Support. | NTE | FUP | WEEKLY | TO | 0002AP | 1002AP | 2002AP | 3002AP | 4002AP | ||||
| STAGING SECURITY | Staging Area Security (Level of commitment based on risk assessment. Minimum of one unarmed guard per staging area 24 hrs./day, 7 days/week.) | NTE | FUP | WEEKLY | TO | 0002AQ | 1002AQ | 2002AQ | 3002AQ | 4002AQ | ||||
| 0003 | SITE INSPECTIONS | |||||||||||||
| PRIVATE / COMMERCIAL SITE INSPECTIONS | Perform Private Site or Commercial Park Pad Inspections. For use in Commercial Parks when there are four or less pads to be inspected. Each pad is inspected individually. | NTE | FUP | EA | CON | 0003AA | 1003AA | 2003AA | 3003AA | 4003AA | ||||
| COMMERCIAL PARK SITE FEASIBILITY INSPECTION INCLUDING THE FIRST PAD ASSESSED | Perform Commercial Park Site Feasibility Inspection. Includes the first pad assessment. | NTE | FUP | EA | CON | 0003AB | 1003AB | 2003AB | 3003AB | 4003AB | ||||
| COMMERCIAL PARK SITE FEASIBILITY INSPECTION INCLUDING THE SECOND AND ALL SUBSEQUENT PADS ASSESSED. | Perform Commercial Park Site Feasibility Inspection. Includes the second and all subsequent pad assessments. | NTE | FUP | EA | CON | 0003AC | 1003AC | 2003AC | 3003AC | 4003AC | ||||
| PRIORITY PRIVATE SITE INSPECTION | Perform a Priority Private Site Inspection. Each pad is inspected individually. | NTE | FUP | EA | CON | 0003AD | 1003AD | 2003AD | 3003AD | 4003AD | ||||
| PRIORITY COMMERCIAL PARK FEASIBILITY INSPECTON INCLUDING FIRST PAD ASSESSED | Perform a Priority Commercial Park Feasibility Inspection. Includes the first pad assessment. | NTE | FUP | EA | CON | 0003AE | 1003AE | 2003AE | 3003AE | 4003AE | ||||
| PRIORITY COMMERCIAL PARK SITE FEASIBILITY INSPECTION INCLUDING THE SECOND AND ALL SUBSEQUENT PADS ASSESSED. | Perform Priority Commercial Park Site Feasibility Inspection. Includes the second and all subsequent pad assessments. | NTE | FUP | EA | CON | 0003AF | 1003AF | 2003AF | 3003AF | 4003AF | ||||
| NO CONTACT | the Contractor must perform and document a minimum of four (4) attempts to contact the disaster survivor within a 48 hour period prior to returning the SIR Work Order as “No Contact”. | NTE | FUP | EA | CON | 0003AI | 0003AI | 2003AI | 3003AI | 4003AI | ||||
| WITHDRAWN PHONE | A site inspection is deemed Withdrawn when the disaster survivor states over the phone that the survivor no longer wishes to participate in the Manufactured Housing Program. If the disaster survivor informs the Contractor during the appointment process, the Contractor will note on the SIR “withdrawn phone” and provide the time and date of the call. | NTE | FUP | EA | CON | 0003AJ | 0003AJ | 2003AJ | 3003AJ | 4003AJ | ||||
| WITHDRAWN SITE | Withdrawn – A site inspection is deemed Withdrawn when the disaster survivor informs the site inspector at the site that the survivor no longer wishes to participate in the Manufactured Housing Program. | NTE | FUP | EA | CON | 0003AK | 0003AK | 2003AK | 3003AK | 4003AK | ||||
| NO SHOW | For use when a Contractor has scheduled an appointment for a site inspection, arrived at the land where the site inspection will occur and the authorized owner or representative does not arrive for the site inspection. (this can include if there is no one over the age of 18 at the site.) | NTE | FUP | EA | CON | 0003AL | 0003AL | 2003AL | 3003AL | 4003AL | ||||
| 0004 | INSTALLATION | |||||||||||||
| PRIVATE INSTALL MH / PM | Basic Manufactured Home / Park Model Installation on a private site. Includes one set of stairs installed at the rear entrance ONLY. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical/water/sewer connection/installation (up to 50 feet), HVAC installation, skirting, and clean and make ready for occupancy. For Park Model units, the Contractor may, at their option, use a single porch bridging between both doors, provided that the Park Models have both entrance/exit doors on the same side of the unit, with a single set of stairs or platform stair servicing the porch. Up to 36" | |||||||||||||
| NTE | FUP | EA | CON | 0004AB | 1004AB | 2004AB | 3004AB | 4004AB | ||||||
| PRIVATE INSTALL TT | Basic Manufactured Travel Trailer Installation on private site. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical / water/sewer connection / installation (up to 50 feet), and Clean and Make Ready for Occupancy. This CLIN DOES NOT include steps. | |||||||||||||
| NTE | FUP | EA | CON | 0004AC | 1004AC | 2004AC | 3004AC | 4004AC | ||||||
| MH / PM COMMERCIAL / GROUP BASIC INSTALL | Basic Manufactured Home / Park Model installation at a commercial or group site. Includes one set of stairs installed at the rear entrance. Includes: transportation for install (up to 100 miles). Up to 36" | NTE | FUP | EA | CON | 0004AF | 1004AF | 2004AF | 3004AF | 4004AF | ||||
| TT COMMERCIAL / GROUP BASIC INSTALL | Basic Manufactured Travel Trailer Installation at commercial or group site. Include: Transportation for install (up to 100 miles). This CLIN DOES NOT include stairs, steps or ramp. |
| NTE | FUP | EA | CON | 0004AG | 1004AG | 2004AG | 3004AG | 4004AG | ||||||
| STEPS / STAIRS MH / PM | Standard Steps for MH/PM (Price per additional entrance, i.e. Front Stairs) | NTE | FUP | EA | CON | 0004AP | 1004AP | 2004AP | 3004AP | 4002AP | ||||
| STEPS / STAIRS TT | Standard Steps for travel trailer. | NTE | FUP | EA | CON | 0004AQ | 1004AQ | 2004AQ | 3004AQ | 4004AQ | ||||
| MH / PM UFAS RAMP | Manufactured Home UFAS Ramp (up to 40 feet of ramp- see description in C.4.3.3) | NTE | FUP | EA | CON | 0004AR | 1004AR | 2004AR | 3004AR | 4004AR | ||||
| TT UFAS RAMP | Travel Trailer UFAS Ramp (up to 30 feet of ramp- see description in C.4.3.3) | NTE | FUP | EA | CON | 0004AS | 1004AS | 2004AS | 3004AS | 4004AS | ||||
| ADDITIONAL RAMP | Additional per foot ramp | NTE | FUP | LF | CON | 0004AT | 1004AT | 2004AT | V4AT | 4004AT | ||||
| PLATFORM STEPS/STAIRS FOR MH/PM | Platform Steps For MH/PM | NTE | FUP | EA | CON | 0004AU | 1004AU | 2004AU | V4AU | 4004AU | ||||
| PLATFORM STEPS / STAIRS FOR TT | Platform Steps for TT | NTE | FUP | EA | CON | 0004AV | 1004AV | 2004AV | 3004AV | 4004AV | ||||
| ADDITIONAL SEWER LINE (ABOVE GROUND) | 4-Inch Lateral Sewer Line, Above ground (over basic install included sewer line). | NTE | FUP | LF | CON | 0004BB | 1004BB | 2004BB | 3004BB | 4004BB | ||||
| ADDITIONAL SEWER LINE (BURIED) | 4-Inch Lateral Sewer Line, Buried (over basic install included buried sewer line). | NTE | FUP | LF | CON | 0004BC | 1004BC | 2004BC | 3004BC | 4004BC | ||||
| ADDITIONAL BURIED WATER LINE | 3/4 inch Water Line Extension, Buried (over basic install included buried water line). | NTE | FUP | LF | CON | 0004BF | 1004BF | 2004BF | 3004BF | 4004BF | ||||
| POWER POLE | Power Pole and Meter Loop. | NTE | FUP | EA | CON | 0004BJ | 1004BJ | 2004BJ | 3004BJ | 4004BJ | ||||
| INTERIM (INTERMEDIATE) POWER POLE | Power Pole without a meter loop that supports overhead electrical lines | NTE | FUP | EA | CON | 0004BK | 1004BK | 2004BK | 3004BK | 4004BK | ||||
| POWER PEDESTAL | Single Power Pedestal & Meter Loop. | NTE | FUP | EA | CON | 0004BL | 1004BL | 2004BL | 3004BL | 4004BL | ||||
| ADDITIONAL WIRING | Additional wiring over basic install | NTE | FUP | LF | CON | 0004BM | 1004BM | 2004BM | 3004BM | 4004BM | ||||
| RFSS/TPS INSTALLATION TRAINING | Just in time training for INSTALLATION of the Residential Fire Suppression System (RFSS) and Tank and Pump System (TPS) | NTE | FUP | PER TRAINEE | CON | 0004BP | 1004BP | 2004BP | 3004BP | 4004BP | ||||
| 0005 | PREVENTIVE MAINTENANCE & REPAIRS | |||||||||||||
| PMIR | Preventive Maintenance Inspection and Repairs (includes minor repair labor and materials). | NTE | FUP | PER UNIT | CON | 0005AA | 1005AA | 2005AA | 3005AA | 4005AA | ||||
| CALL CENTER | Maintenance Call Center. | NTE | FUP | MONTHLY | CON | 0005AB | 1005AB | 2005AB | 3005AB | 4005AB | ||||
| TTHU MAINTENANCE TRANSFER AND INSPECTION | TTHU custodial transfer from the giving contractor to the receiving contractor and/or to the COR or COR’s designee. Physical inspection at the option of the receiving contractor. | NTE | FUP | EA | CON | 0005AN | 1005AN | 2005AN | 3005AN | 4005AN | ||||
| RFSS/TPS MAINTAINENCE TRAINING | Just in time training for MAINTENANCE of the Residential Fire Suppression System (RFSS) and Tank and Pump System (TPS) | NTE | FUP | PER TRAINEE | CON | 0005AR | 1005AR | 2005AR | 3005AR | 4005AR | ||||
| 0006 | DEACTIVATION | |||||||||||||
| CMRR | Clean and Make Ready for Reuse | NTE | FUP | EA | CON | 0006AA | 1006AA | 2006AA | 3006AA | 4006AA | ||||
| MH / PM DEACT | MH / PM Basic Deactivation Includes transportation for deactivation back to the staging or storage site (up to 100 miles) | NTE | FUP | EA | CON | 0006AC | 1006AC | 2006AC | 3006AC | 4006AC | ||||
| TT DEACT | TT Basic Deactivation. Includes transportation for deactivation back to the staging or storage site (up to 100 miles) | NTE | FUP | EA | CON | 0006AD | 1006AD | 2006AD | 3006AD | 4006AD | ||||
| MH / PM EMERGENCY DEACT | MH / PM Emergency Deactivation. | NTE | FUP | EA | CON | 0006AF | 1006AF | 2006AF | 3006AF | 4006AF | ||||
| TT EMERGENCY DEACT | TT Emergency Deactivation. | NTE | FUP | EA | CON | 0006AG | 1006AG | 2006AG | 3006AG | 4006AG | ||||
| RELOCATION MH/PM | Deactivation of the unit at its original location, and installation at a new location. | NTE | FUP | EA | CON | 0006AH | 1006AH | 2006AH | 3006AH | 4006AH | ||||
| RELOCATION TT | Deactivation of the unit at its original location, and installation at a new location. | NTE | FUP | EA | CON | 0006AI | 1006AI | 2006AI | 3005AI | 4006AI | ||||
| REPOSITION MH / PM | Deactivation of the unit at its original location, and install at a location on the same site. | NTE | FUP | EA | CON | 0006AJ | 1006AJ | 2006AJ | 3006AJ | 4006AJ | ||||
| REPOSITION TT | Deactivation of the unit at its original location, and install at a location on the same site. | NTE | FUP | EA | CON | 0006AK | 1006AK | 2006AK | 3006AK | 4006AK | ||||
| RFSS/TPS DEACTIVATION TRAINING | Just in time training for DEACTIVATION of the Residential Fire Suppression System (RFSS) and Tank and Pump System (TPS) | NTE | FUP | PER TRAINEE | CON | 0006AO | 1006AO | 2006AO | 3006AO | 4006AO | ||||
| INVENTORY OF PERSONAL PROPERTY | At the direction of the COR and issuance of a work order the Contractor shall inventory and secure all person property in accordance with the Inventory of Personal Property Procedures. | NTE | FUP | EA | CON | 0006AQ | 1006AQ | 2006AQ | 3006AQ | 4006AQ | ||||
| PERSONAL PROPERTY (NOT OTHERWISE CATEGORIZED) | The removal and disposal of personal property abandonded by the occupant, that is not subject to the inventory of personal property procedures and is above and beyond the normal dirt and debris left by a typical occupant. | NTE | FUP | EA | CON | 0006AS | 1006AS | 2006AS | 3006AS | 4006AS | ||||
| 0007 | COMMERCIAL PARK EXPANSION | |||||||||||||
| 0008 | GROUP SITE CONSTRUCTION | |||||||||||||
| 0009 | GROUP SITE MAINTENANCE | |||||||||||||
| 0010 | ADDITIONAL REQUIREMENTS | |||||||||||||
| 0011 | FIELD TASK ORDER REQUIREMENTS | |||||||||||||
| TASK ORDER MANAGER | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AA | 1011AA | 2011AA | 3011AA | 4011AA | ||||
| DEPUTY TASK ORDER MANAGER | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AB | 1011AB | 2011AB | 3011AB | 4011AC | ||||
| ADMINISTRATIVE COORDINATOR | General Contract Support | NTE | FUP | HOURLY | CON | 0011AC | 1011AC | 2011AC | 3011AC | 4011AE | ||||
| PROGRAM MANAGER | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AD | 1011AD | 2011AD | 3011AD | 4011AI | ||||
| CONTRACT MANAGER | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AE | 1011AE | 2011AE | 3011AE | 4011AK | ||||
| SUB-CONTRACT MANAGER | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AF | 1011AF | 2011AF | 3011AF | 4011AMF | ||||
| QUALITY MANAGER | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AG | 1011AG | 2011AG | 3011AG | 4011AG | ||||
| QUALITY CONTROL TECHNICIAN | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AH | 1011AH | 2011AH | 3011AH | 4011AH | ||||
| SAFETY MANAGER | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AI | 1011AI | 2011AI | 3011AI | 4011AI | ||||
| CONSTRUCTION MANAGER | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AJ | 1011AJ | 2011AJ | 3011AJ | 4011AJ | ||||
| PRICE ACCOUNTANT | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AK | 1011AK | 2011AK | 3011AK | 4011AK | ||||
| MAINTENANCE/DEACTIVATION LEAD | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AL | 1011AL | 2011AL | 3011AL | 4011AL | ||||
| MAINTENANCE/DEACTIVATION INSPECTOR | General Contract Management. | NTE | FUP | HOURLY | CON | 0011AM | 1011AM | 2011AM | 3011AM | 4011AM | ||||
| 0012 | STANDBY PRICE | |||||||||||||
| 0013 | NEW UNIT WARRANTY REPAIRS (FEMA ESTABLISHED RATES) | |||||||||||||
| 0014 | BASE CAMP | |||||||||||||
| 0015 | Working on Tribal Land | |||||||||||||
| 0016 | Emergency Group Site | |||||||||||||
| 0017 | Trade Labor Rates | Hourly Rate for Trades | ||||||||||||
| Laborer or Technician | FUP | HOURLY | CON | Base Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 | ||||||
| Electrician | FUP | HOURLY | CON | Base Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 | ||||||
| Plumber | FUP | HOURLY | CON | Base Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 | ||||||
| Carpenter | FUP | HOURLY | CON | Base Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 | ||||||
| Equipment Operator | FUP | HOURLY | CON | Base Year | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 | ||||||
| 0018 | Task Order Overhead, G&A, Fee and Profit | Percent used when Calculating Task Order Price Proposals | ||||||||||||
| FUP | EACH | CON | Base Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 | |||||||
| FUP | EACH | CON | Base Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 | |||||||
| FUP | EACH | CON | Base Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 | |||||||
| FUP | EACH | CON | Base Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Orderimg Period 4 |