RFP 70FB8025R00000001 Attachment 1 LogHOUSE CLIN Listings 02-03-2025 REFERENCE ONLY.pdf

PDF 680 KB Posted

Attached to
FEMA LogHOUSE II - Logistics Housing Operations Unit Installation, Maintenance and Deactivation Federal contract opportunity
Solicitation number
RFP-70FB8025R00000001
Issued by
Federal Emergency Management Agency

About this file

This is a CLIN (Contract Line Item Number) listing document that provides detailed pricing structure for FEMA's LogHOUSE II contract across multiple order periods. The document outlines CLINs for transportation and staging, site inspections, installation, preventive maintenance and repairs, deactivation, commercial park expansion, group site construction, group site maintenance, base camp operations, tribal land work, emergency group sites, and trade labor rates.

The CLIN structure includes not-to-exceed (NTE) fixed unit prices (FUP) for specific services such as transportation permits, repairs, standard and long haul transportation of manufactured homes and travel trailers, staging area management, site assessments, utility installations, maintenance inspections, and deactivation activities. Each CLIN has separate pricing columns for the base period and four additional order periods. Notable categories include detailed warranty repair pricing for replacement of specific components (with set dollar amounts), contractor field housing operations, and trade labor rates. The document serves as a reference-only template for contractors to understand the full scope of potential services and pricing structure required under the LogHOUSE II contract.

View the file

Other files for this federal contract opportunity

Other files attached to FEMA LogHOUSE II - Logistics Housing Operations Unit Installation, Maintenance and Deactivation, newest first.
File Type Posted
Amendment 0003 RFP 70FB8025R00000001 LogHOUSE 04-21-2025.pdf PDF
Amendment 0003 RFP 70FB8025R00000001 LogHOUSE 04-21-2025 SF30.pdf PDF
Amendment 0003 Attachment 9 Phase II Questions and GOVT Responses.xlsx XLSX spreadsheet
Amendment 0003 Attachment 12 TOPR LogHOUSE II DR-XXXX-Some State 04-21-2025.pdf PDF
Amendment 0003 Attachment 2 LogHOUSE 2 Section C PWS 20250421.pdf PDF
Amendment 0003 RFP 70FB8025R00000001 Attachment 1 LogHOUSE Pricing Table 4-24-2025.xlsx XLSX spreadsheet
Amendment 0002 RFP 70FB8025R00000001 LogHOUSE 02-27-2025.pdf PDF
Amendment 0002 RFP 70FB8025R00000001 SF30.pdf PDF
RFP 70FB8025R00000001 Amendment 0001 Attachment 9 RFP Questions Template GOVT Responses.xlsx XLSX spreadsheet
Amendment 0001 RFP 70FB8025R00000001 Attachment 1A LogHOUSE CLIN Listings 02-24-2025.pdf PDF
Amendment 0001 RFP 70FB8025R00000001 Attachment 1 LogHOUSE Pricing Table 02-24-2025.xlsx XLSX spreadsheet
Amendment 0001 RFP 70FB8025R00000001 Attachment 10 Factor 1 Corporate Experience Phase I Submission.docx DOCX document
Amendment 0001 RFP 70FB8025R00000001 LogHOUSE 02-25-2025.pdf PDF
Amendment 0001 RFP 70FB8025R00000001 SF30.pdf PDF
Amendment 0001 RFP 70FB8025R00000001 Attachment 5 Section J Admin Forms 20250221.pdf PDF
Amendment 0001 RFP 70FB8025R00000001 Attachment 11 LogHOUSE Installation Appendix 20250224.pdf PDF
Amendment 0001 RFP 70FB8025R00000001 Attachment 6 LogHOUSE Design and Construction Appendix 20250219.pdf PDF
Amendment 0001 RFP 70FB8025R00000001 Attachment 4 Section F Deliveries 20250214.pdf PDF
Amendment 0001 RFP 70FB8025R00000001 Attachment 2 LogHOUSE 2 Section C PWS 20250219 FINAL.pdf PDF
RFP 70FB8025R00000001 Attachment 9 RFP Questions Template.xlsx XLSX spreadsheet
RFP 70FB8025R00000001 Attachment 8 DHS Form 700-23 Subcontracting Review Checklist 12-2020.pdf PDF
RFP 70FB8025R00000001 Attachment 7 Past Performance Questionnaire.pdf PDF
RFP 70FB8025R00000001 Attachment 3 SECTION E PEP 20240925.pdf PDF
RFP 70FB8025R00000001 Attacchment 2 LogHOUSE 2 Section C PWS 20250202.pdf PDF
RFP 70FB8025R00000001 LogHOUSE II 02-04-2025.pdf PDF
RFP 70FB8025R00000001 Attachment 10 Factor 1 Corporate Experience Phase I Submission.docx DOCX document
RFP 70FB8025R00000001 Attachment 6 LogHOUSE Design and Construction Appendix 20240815.pdf PDF
RFP 70FB8025R00000001 Attachment 5 Section J Admin Forms 20240924.pdf PDF
RFP 70FB8025R00000001 Attachment 4 Section F Deliveries 20240815.pdf PDF
RFP 70FB8025R00000001 Attachment 1 LogHOUSE Pricing Table 02-03-2025.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN # CLIN TITLE DESCRIPTION

VA

LU

E O

F

IS

SU

E

TY

PE UNIT OF

ISSUE TI

M

E N

EG

O

TI

AT

ED

Base

Order Period

CLINS in

PRISM

BASE ORDER

PERIOD CLIN

PRICE

Order Period 1 CLINS in

PRISM

ORDER

PERIOD 1

CLIN PRICE

Order Period 2 CLINS in

PRISM

ORDER

PERIOD 2

CLIN PRICE

Order Period 3 CLINS in

PRISM

ORDER

PERIOD 3

CLIN PRICE

ORDER

PERIOD 4

CLINS in

PRISM

ORDER

PERIOD 4

CLIN PRICE

0001 RESERVED FOR FUTURE USE

RESERVED FOR FUTURE USE 0001AA

0002 MH/PM/TT TRANSPORTATION & STAGING

TRANSPORTATION PERMITS

Payment for applicable transportation permits. Receipts shall be submitted to the COR.

NTE FUP EACH WO 0002AA 1002AA 2002AA 3002AA 4002AA

TRANSPORTATION REPAIRS

Transportation Maintenance Repairs and cleaning. As required by the COR in writing prior to any work being done. COR approval required.

CO approval required if >$3,500.

NTE FUP EA WO 0002AB 1002AB 2002AB 3002AB 4002AB

TRAVEL TRAILER STANDARD HAUL

Ground Mileage for Towing of TT from the Transportable Temporary Housing Storage Site (TTHSS) to either the Transportable Temporary Housing Staging Area (TTHSA) or other destination as directed by the COR 100 miles or less. (Includes hook-up charges)

NTE FUP MI CON 0002AC 1002AC 2002AC 3002AC 4002AC

MH/PM STANDARD HAUL

Ground Mileage for Towing of MH/PM from the Transportable Temporary Housing Storage Site (TTHSS) to either the Transportable Temporary Housing Staging Area (TTHSA) or other destination as directed by the COR 100 miles or less. (Includes hook-up charges) NTE FUP MI CON 0002AD 1002AD 2002AD 3002AD 4002AD

MH/PM LONG HAUL

Long Haul - Ground Mileage for Towing of MH/PM from the Transportable Temporary Housing Storage Site (TTHSS) to the Transportable Temporarty Staging Area (TTHSA) or Installation Site (greater than 100 miles - first 100 miles is included in basic installation CLIN). (Includes hook-up charges)

NTE FUP MI CON 0002AE 1002AE 2002AE 3002AE 4002AE

TRAVEL TRAILER LONG HAUL

Long Haul - Ground Mileage for Towing of TT from the Transportable Temporary Housing Storage Site (TTHSS) to the Transportable Temporarty Staging Area (TTHSA) or Installation Site (greater than 100 miles - first 100 miles is included in basic installation CLIN). (Includes hook-up charges)

NTE FUP MI CON 0002AF 1002AF 2002AF 3002AF 4002AF

TT TRANSPORTATION FOR INSTALL (ADDITIONAL MILES)

Additional miles for installation of TT in a private or commercial site.

Note: First 100 miles are included in the appropriate install CLIN.

NTE FUP MI CON 0002AG 1002AG 2002AG 3002AG 4002AG

MH / PM TRANSPORTATION FOR INSTALL (ADDITIONAL MILES)

Additional miles for installation of a MH in a private/commercial/group site. Note: First 100 miles are included in the appropriate install CLIN.

NTE FUP MI CON 0002AH 1002AH 2002AH 3002AH 4002AH

TRANSPORTATION MISCELLANOUS

This CLIN is only to be used if the work required does not fit within the definition of any other “transportation” CLIN. The contractor shall develop a task order price proposal which includes all prices related to the unforeseen work and present the estimate to the CO/COR for review. Once the CO/COR has agreed to a price for the work, the final price will become a fixed unit price. CO approval required if >$3,500.

NTE FUP EACH WO 0002AI 1002AI 2002AI 3002AI 4002AI

EXTERNAL TPS TRANSPORTATION

Ground mileage for Transportation of TPS when the transportation is not related to an installation.

NTE FUP EACH WO 0002AJ 1002AJ 2002AJ 3002AJ 4002AJ

EXTERNAL TPS STANDARD HAUL FOR INSTALLATION

Ground Mileage for Towing for external TPS from a FEMA dispatch point to a FEMA receiving point 100 miles or less

NTE FUP EACH WO 0002AK 1002AK 2002AK 3002AK 4002AK

CLIN CHART - FOR REFERENCE ONLY (DO NOT SUBMIT)

EXTERNAL TPS LONG HAUL FOR INSTALLATION

Ground mileage for Transporation of a TPS during Installation the mileage greater than 100 miles

NTE FUP EACH WO 0002AL 1002AL 2002AL 3002AL 4002AL

INTERNAL TPS TRANSPORTATION

Ground mileage for Transportaion of an Internal TPS either during Maintenance when replacing an Internal TPS or when transporting an Internal TPS for any other reason.

NTE FUP EACH WO 0002AM 1002AM 2002AM 3002AM 4002AM

CANCELLED TT TOW Price for the cancellation of a TT Tow for any reason NTE FUP EACH WO 0002AN 1002AN 2002AN 3002AN 4002AN

CANCELLED MHU TOW Price for the cancellation of a MHU Tow for any reason NTE FUP EACH WO 0002AO 1002AO 2002AO 3002AO 4002AO

STAGING MANAGEMENT Unit Staging Area - Management & Support. NTE FUP WEEKLY TO 0002AP 1002AP 2002AP 3002AP 4002AP

STAGING SECURITY

Staging Area Security (Level of commitment based on risk assessment.

Minimum of one unarmed guard per staging area 24 hrs./day, 7 days/week.)

NTE FUP WEEKLY TO 0002AQ 1002AQ 2002AQ 3002AQ 4002AQ

STAGING MHU MAINTENANCE & REPAIR Perform maintenance and repair activities at the staging area(s) NTE FUP EACH WO 0002AR 1002AR 2002AR 3002AR 4002AR

STAGING MISCELLANOUS

This CLIN is only to be used if the work required does not fit within the definition of any other “staging” CLIN. The contractor shall develop a task order price proposal which includes all prices related to the unforeseen work and present the estimate to the CO/COR for review. Once the CO/COR has agreed to a price for the work, the final price will become a fixed unit price. CO approval required if >$3,500

NTE FUP EACH WO 0002AS 1002AS 2002AS 3002AS 4002AS

STAGING AREA - TIER ONE SITE ASSESSMENT FOR SITE DEVELOPMENT

Windshield identification and basic assessment of land for staging area site development. A report identifying certain features and development potential is submitted to the COR.

NTE FUP EA WO 0002AT 1002AT 2002AT 3002AT 4002AT

STAGING AREA - FLOOD PLAIN EVALUATION

Determine Flood Plain designation of potential Staging area as directed by the COR

NTE FUP EA WO 0002AU 1002AU 2002AU 3002AU 4002AU

STAGING AREA - TIER TWO SITE ASSESSMENT

A more detailed assessment of sites identified in Tier One assessment. A report identifying certain features and development potential is submitted to the COR.

NTE FUP EA WO 0002AV 1002AV 2002AV 3002AV 4002AV

STAGING AREA - HISTORICAL PRESERVATION SURVEY

Conduct research on each site in accordance with preservation laws, policies, and executive orders such as the National Historic Preservation Act. Submit a report of findings to the COR.

NTE FUP EA WO 0002AW 1002AW 2002AW 3002AW 4002AW

STAGING AREA - ENVIRONMENTAL DATABASE SEARCH

Conduct a database search on each site to identify past uses of the site

NTE FUP EA WO 0002AX 1002AX 2002AX 3002AX 4002AX

STAGING AREA - NEPA COMPLIANCE ASSESSMENT

Generate a report addressing the items needed for a comprehensive Environmental Assessment (EA)

NTE FUP EA WO 0002AY 1002AY 2002AY 3002AY 4002AY

STAGING AREA - CONCEPTUAL DESIGN

At the direction of the COR and with the issuance of a work order, conduct a conceptual design not to exceed 25% design package.

NTE FUP EA WO 0002AZ 1002AZ 2002AZ 3002AZ 4002AZ

STAGING AREA - CONCEPTUAL DESIGN - RE-DESIGN

During the design process FEMA may request that the Contractor redesign the Staging Area to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the conceptual design.

NTE FUP EA WO 0002BA 1002BA 2002BA 3002BA 4002BA

STAGING AREA - 50% SITE DESIGN

This CLIN covers all design activities as outlined under the contract section “Staging Area” from concept to 50 percent design package.

NTE FUP EA WO 0002BB 1002BB 2002BB 3002BB 4002BB

STAGING AREA - 50% SITE DESIGN - REDESIGN

During the design process FEMA may request that the Contractor redesign the Staging Area to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 50% design.

NTE FUP EA WO 0002BC 1002BC 2002BC 3002BC 4002BC

STAGING AREA - 100% SITE DESIGN

This CLIN covers all design activities as outlined under the contract section “Staging Area” for 100% design package.

NTE FUP EA WO 0002BD 1002BD 2002BD 3002BD 4002BD

STAGING AREA - 100% SITE DESIGN - REDESIGN

During the design process FEMA may request that the Contractor redesign the “Staging Area” to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 100% design.

NTE FUP EA WO 0002BE 1002BE 2002BE 3002BE 4002BE

STAGING AREA - COMPLETE CONSTRUCTION

This CLIN includes all work required to complete a fully functional “Staging Area" site in accordance with the references and requirements described in this contract. Includes all Labor, Material and Equipment.

NTE FUP EA WO 0002BF 1002BF 2002BF 3002BF 4002BF

STAGING AREA - ADDITIONAL SITE WORK

This CLIN is to be used for additional considerations during the construction period that are either new requirements or requirements not readily identifiable at the time of design. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final price will become a fixed unit price. CO approval required if >$3,500

NTE FUP EA WO 0002BG 1002BG 2002BG 3002BG 4002BG

TEMPORARY CONSTRUCTION OFFICE FOR FEMA PERSONNEL

At the discretion of the COR, the Contractor may be required to furnish and install an office trailer complete with all utilities and restroom facility

NTE FUP EA WO 0002BH 1002BH 2002BH 3002BH 4002BH

STAGING AREA TPS TESTING

Set-up an area to be used for testing Tank and Pump Systems (TPS) at the staging area.

NTE FUP EA WO 0002BI 1002BI 2002BI 3002BI 4002BI

TPS TESTING OPERATIONS Perform TPS testing NTE FUP EA WO 0002BJ 1002BJ 2002BJ 3002BJ 4002BJ

STAGING AREA CONSTRUCTION-RELATED BONDS Obtain appropriate and required bonds for construction tasks NTE FUP EA WO 0002BK 1002BK 2002BK 3002BK 4002BK

UTILITY ACCOUNT SET UP Price to set up a utility account for the government. NTE FUP EA WO 0002BL 1002BL 2002BL 3002BL 4002BL

PRE-ACCEPTANCE TESTING FOR TRAVEL TRAILERS

Pre- acceptance testing will include connecting the TT to power at a minimum. Connection of the TT to water and sewer can be requested at the direction of the COR. Visual inspections without connection to utilities is included in Basic Installation.

NTE FUP EA WO 0002BM 1002BM 2002BM 3002BM 4002BM

PRE-ACCEPTANCE TESTING FOR MANUFACTURED HOMES

Pre- acceptance testing will include connecting the MHU to power at a minimum. Connection of the MHU to water and sewer can be requested at the direction of the COR. Visual inspections without connection to utilities is included in Basic Installation.

NTE FUP EA WO 0002BN 1002BN 2002BN 3002BN 4002BN

HEAVY TOW TT FOR TRANSPORTATION

Heavy Tow is if additional equipment beyond a single tow vehicle is needed to move a TT during a transportation movement, but does not include equipment used on site for installation.

NTE FUP EA WO 0002BO 1002BO 1002BP 3004BO 4004BO

HEAVY TOW MHU/PM FOR TRANSPORTATION

Heavy Tow is if additional equipment beyond a single tow vehicle is needed to move a MHU/PM during a transportation movement, but does not include equipment used on site for installation.

NTE FUP EA WO 0002BP 1002BP 2004BP 3004BP 4004BP

0003 SITE INSPECTIONS

PRIVATE / COMMERCIAL SITE INSPECTIONS

Perform Private Site or Commercial Park Pad Inspections. For use in Commercial Parks when there are four or less pads to be inspected.

Each pad is inspected individually.

NTE FUP EA CON 0003AA 1003AA 2003AA 3003AA 4003AA

COMMERCIAL PARK SITE FEASIBILITY INSPECTION INCLUDING THE FIRST PAD

ASSESSED

Perform Commercial Park Site Feasibility Inspection. Includes the first pad assessment.

NTE FUP EA CON 0003AB 1003AB 2003AB 3003AB 4003AB

COMMERCIAL PARK SITE FEASIBILITY INSPECTION INCLUDING THE SECOND AND

ALL SUBSEQUENT PADS ASSESSED.

Perform Commercial Park Site Feasibility Inspection. Includes the second and all subsequent pad assessments.

NTE FUP EA CON 0003AC 1003AC 2003AC 3003AC 4003AC

PRIORITY PRIVATE SITE INSPECTION

Perform a Priority Private Site Inspection. Each pad is inspected individually.

NTE FUP EA CON 0003AD 1003AD 2003AD 3003AD 4003AD

PRIORITY COMMERCIAL PARK FEASIBILITY INSPECTON INCLUDING FIRST PAD

ASSESSED

Perform a Priority Commercial Park Feasibility Inspection. Includes the first pad assessment.

NTE FUP EA CON 0003AE 1003AE 2003AE 3003AE 4003AE

PRIORITY COMMERCIAL PARK SITE FEASIBILITY INSPECTION INCLUDING THE

SECOND AND ALL SUBSEQUENT PADS ASSESSED.

Perform Priority Commercial Park Site Feasibility Inspection. Includes the second and all subsequent pad assessments.

NTE FUP EA CON 0003AF 1003AF 2003AF 3003AF 4003AF

UTILITY LOCATOR FEE

In the event that the Contractor pays for the service required for TTHU installation, the Government will reimburse the Contractor at actual expense (receipt and/or proper documentation required).

NTE FUP EA WO 0003AG 1003AG 2003AG 3003AG 4003AG

FLOOD ZONE SITE INSPECTION ENGINEERING

Fee for a professional engineer to determine the requirements for installation of a TTHU in a flood zone.

NTE FUP EA WO 0003AH 1003AH 2003AH 3003AH 4003AH

NO CONTACT

the Contractor must perform and document a minimum of four (4) attempts to contact the disaster survivor within a 48 hour period prior to returning the SIR Work Order as “No Contact”.

NTE FUP EA CON 0003AI 0003AI 2003AI 3003AI 4003AI

WITHDRAWN PHONE

A site inspection is deemed Withdrawn when the disaster survivor states over the phone that the survivor no longer wishes to participate in the Manufactured Housing Program. If the disaster survivor informs the Contractor during the appointment process, the Contractor will note on the SIR “withdrawn phone” and provide the time and date of the call.

NTE FUP EA CON 0003AJ 0003AJ 2003AJ 3003AJ 4003AJ

WITHDRAWN SITE

Withdrawn – A site inspection is deemed Withdrawn when the disaster survivor informs the site inspector at the site that the survivor no longer wishes to participate in the Manufactured Housing Program.

NTE FUP EA CON 0003AK 0003AK 2003AK 3003AK 4003AK

NO SHOW

For use when a Contractor has scheduled an appointment for a site inspection, arrived at the land where the site inspection will occur and the authorized owner or representative does not arrive for the site inspection. (this can include if there is no one over the age of 18 at the site.)

NTE FUP EA CON 0003AL 0003AL 2003AL 3003AL 4003AL

SEMI-PERMANENT/PERMANENT AREA ASSESSMENT

Conduct area assessment to investigate the regulations that govern permanent installation work and other data for the area.

NTE FUP EA WO 0003AM 1003AM 2003AM 3003AM 4003AM

SEMI-PERMANENT/PERMANENT INDIVIDUAL SITE INSPECTION/DETAILED SCOPE OF

WORK

Perform site inspection and provide a detailed Scope of Work including a sketch and detailed price estimate

NTE FUP EA WO 0003AN 1003AN 2003AN 3003AN 4003AN

SEMI-PERMANENT/PERMANENT HISTORICAL PRESERVATION SURVEY

Conduct research on each site in accordance with preservation laws, policies, and executive orders such as the National Historic Preservation Act. Submit a report of findings to the COR.

NTE FUP EA WO 0003AO 1003AO 2003AO 3003AO 4003AO

SEMI-PERMANENT/PERMANENT ENVIRONMENTAL DATABASE SEARCH

Conduct a database search on each site to identify past uses of the site

NTE FUP EA WO 0003AP 1003AP 2003AP 3003AP 4003AP

LOCATING SEWER LINES - CAMERA SYSTEM

Perform a visual inspection of a sewer line in conjunction with a site inspection or installation using a camera system.

NTE FUP EA WO 0003AQ 1003AQ 2003AQ 3003AQ 4003AQ

0004 INSTALLATION

TEMPORARY INSTALLATION PERMITS Bonds and Permits for Temporary Installation NTE FUP EA ACT 0004AA 1004AA 2004AA 3004AA 4004AA

PRIVATE INSTALL MH / PM

Basic Manufactured Home / Park Model Installation on a private site.

Includes one set of stairs installed at the rear entrance ONLY.

Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical/water/sewer connection/installation (up to 50 feet), HVAC installation, skirting, and clean and make ready for occupancy. For Park Model units, the Contractor may, at their option, use a single porch bridging between both doors, provided that the Park Models have both entrance/exit doors on the same side of the unit, with a single set of stairs or platform stair servicing the porch. Up to 36"

NTE FUP EA CON 0004AB 1004AB 2004AB 3004AB 4004AB

PRIVATE INSTALL TT

Basic Manufactured Travel Trailer Installation on private site.

Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical / water/sewer connection / installation (up to 50 feet), and Clean and Make Ready for Occupancy. This CLIN DOES NOT include steps.

NTE FUP EA CON 0004AC 1004AC 2004AC 3004AC 4004AC

MISCELLANOUS SITE PREP MH / PM

Misc. Expenses for Private Site Preparation and /or MH / PM installation over & above basic installation charges. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final negotiated price will become a fixed price item. CO approval required if >$3,500

NTE FUP EA WO 0004AD 1004AD 2004AD 3004AD 4004AD

MISCELLANOUS SITE PREP TT

Misc. Expenses for Private Site Preparation and/or Travel Trailer Installation over & above basic installation charges. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final negotiated price will become a fixed price item. CO approval required if >$3,500

NTE FUP EA WO 0004AE 1004AE 2004AE 3004AE 4004AE

MH / PM COMMERCIAL / GROUP BASIC INSTALL

Basic Manufactured Home / Park Model installation at a commercial or group site. Includes one set of stairs installed at the rear entrance.

Includes: transportation for install (up to 100 miles). Up to 36"

NTE FUP EA CON 0004AF 1004AF 2004AF 3004AF 4004AF

TT COMMERCIAL / GROUP BASIC INSTALL

Basic Manufactured Travel Trailer Installation at commercial or group site. Include: Transportation for install (up to 100 miles). This CLIN DOES NOT include stairs, steps or ramp. NTE FUP EA CON 0004AG 1004AG 2004AG 3004AG 4004AG

MISCELLANOUS COMMERCIAL SITE PREP MH / PM

Misc. expenses for commercial site preparation over & above basic MHU installation charges. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final negotiated price will become a fixed price item.

CO approval required if >$3,500.

NTE FUP EA WO 0004AH 1004AH 2004AH 3004AH 4004AH

MISCELLANOUS COMMERCIAL SITE PREP TT

Misc. expenses for commercial site preparation over & above basic TT installation charges. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final negotiated price will become a fixed price item. CO approval

NTE FUP EA WO 0004AI 1004AI 2004AI 3004AI 4004AI

PRIVATE INSTALL ATTHU Installation of TTHUs on a Private Site that are not TTs, MHU, or PM NTE FUP EA WO 0004AJ 1004AJ 3004AJ 3004AJ 4002AJ

ATTHU COMMERCIAL/GROUP/BASIC INSTALL

Installation of TTHUs on a Commercial Park/Group Site that are not TTs, MHU, or PM

NTE FUP EA WO 0004AK 1004AK 2004AK 3004AK 4002AK

ADDITIONAL PRICE TO INSTALL MH/PM WITH PIERS GREATER THAN 36" UP TO AND

INCLUDING PIERS 67"

The additional price to install a MHU/PM when the pier height is greater than 36" up to and including piers 67"

NTE FUP EA WO 0004AL 1004AL 2004AL 3004AL 4002AL

DESIGN PRICE FOR MH/PM INSTALL WITH PIERS IN EXCESS OF 67"

The price to have an engineer or architect design piers for installation that will exceed 67"

NTE FUP EA WO 0004AM 1004AM 2004AM 3004AM 4002AM

INSTALLATION PRICE FOR MH/PM INSTALL WITH PIERS IN EXCESS OF 67" The price to install piers that will exceed 67" NTE FUP EA WO 0004AN 1004AN 2004AN 3004AN 4002AP

EXTERNAL PAD ENHANCEMENT

For External TPS Pad Enhancement if the only way to install an external TPS is to follow the diagram shown in Figure 5 in MHU Fire Sprinkler System Installation, Test, Maintenance, Repair and Deactivation Guide (Section J, Attachment J.38), which would require excavation and the construction of a wood frame/retaining wall to accommodate installation of a TPS on a high-slope.

NTE FUP EA WO 0004AO 1004AO 2004AO 3004AO 4002AO

STEPS / STAIRS MH / PM

Standard Steps for MH/PM (Price per additional entrance, i.e. Front Stairs)

NTE FUP EA CON 0004AP 1004AP 2004AP 3004AP 4002AP

STEPS / STAIRS TT Standard Steps for travel trailer. NTE FUP EA CON 0004AQ 1004AQ 2004AQ 3004AQ 4004AQ

MH / PM UFAS RAMP

Manufactured Home UFAS Ramp (up to 40 feet of ramp- see description in C.4.3.3)

NTE FUP EA CON 0004AR 1004AR 2004AR 3004AR 4004AR

TT UFAS RAMP

Travel Trailer UFAS Ramp (up to 30 feet of ramp- see description in C.4.3.3)

NTE FUP EA CON 0004AS 1004AS 2004AS 3004AS 4004AS

ADDITIONAL RAMP Additional per foot ramp NTE FUP LF CON 0004AT 1004AT 2004AT V4AT 4004AT PLATFORM STEPS/STAIRS FOR MH/PM Platform Steps For MH/PM NTE FUP EA CON 0004AU 1004AU 2004AU V4AU 4004AU PLATFORM STEPS / STAIRS FOR TT Platform Steps for TT NTE FUP EA CON 0004AV 1004AV 2004AV 3004AV 4004AV TRAVEL TRAILER RFSS Installation of Residential Fire Sprinkler System for TT NTE FUP EA WO 0004AW 1004AW 2004AW 3004AW 4004AW

RFSS AND EXTERNAL TPS INSTALLATION AND COMMISSIONNG

Installation of the RFSS and External TPS and the commissioning of the complete system.

NTE FUP EA WO 0004AX 1004AX 2004AX 3004AX 4004AX

RFSS AND INTERNAL TPS INSTALLATION AND COMMISSIONNG

Installation of the RFSS and Internal TPS and the commissioning of the complete system.

NTE FUP EA WO 0004AY 1004AY 2004AY 3004AY 4004AY

SEWER TAP FEE Sewer Tap Fee. NTE FUP EA WO 0004AZ 1004AZ 2004AZ 3004AZ 4004AZ

CAMERA FOR SEWER LINE INVESTIGATION - INSTALLATION

Camera for sewer line investigation that is required to trace the sewer line during installation.

NTE FUP EA WO 0004BA 1004BA 2004BA 3004BA 4004BA

ADDITIONAL SEWER LINE (ABOVE GROUND)

4-Inch Lateral Sewer Line, Above ground (over basic install included sewer line).

NTE FUP LF CON 0004BB 1004BB 2004BB 3004BB 4004BB

ADDITIONAL SEWER LINE (BURIED)

4-Inch Lateral Sewer Line, Buried (over basic install included buried sewer line).

NTE FUP LF CON 0004BC 1004BC 2004BC 3004BC 4004BC

BLADDER INSTALLATION (FLEXIBLE HOLDING TANK)

Contractor shall provide and install a poly-plastic bladder (holding tank ) to capture and store waste water from the MHU.

NTE FUP EA WO 0004BD 1004BD 2004BD 3004BD 4004BD

WATER TAP FEE Municipal Water Tap Fee. NTE ACT EA WO 0004BE 1004BE 2004BE 3004BE 4004BE

ADDITIONAL BURIED WATER LINE

3/4 inch Water Line Extension, Buried (over basic install included buried water line).

NTE FUP LF CON 0004BF 1004BF 2004BF 3004BF 4004BF

ADDITIONAL WATER LINE FOR TT

Provide additional RV grade polyurethane hose that is RoHS compliant.

NTE FUP EA WO 0004BG 1004BG 2004BG 3004BG 4004BG

WELL PUMP Direct Wiring of Well Pump. NTE FUP EA WO 0004BH 1004BH 2004BH 3004BH 4004BH ELECTRIC TAP FEE Electric Tap Fee. NTE ACT EA WO 0004BI 1004BI 2004BI 3004BI 4004BI POWER POLE Power Pole and Meter Loop. NTE FUP EA CON 0004BJ 1004BJ 2004BJ 3004BJ 4004BJ

INTERIM (INTERMEDIATE) POWER POLE

Power Pole without a meter loop that supports overhead electrical lines

NTE FUP EA CON 0004BK 1004BK 2004BK 3004BK 4004BK

POWER PEDESTAL Single Power Pedestal & Meter Loop. NTE FUP EA CON 0004BL 1004BL 2004BL 3004BL 4004BL ADDITIONAL WIRING Additional wiring over basic install NTE FUP LF CON 0004BM 1004BM 2004BM 3004BM 4004BM

ELECTRICAL GANG RACK

Provide and install an electrical gang rack consisting of two (2) or more two hundred (200) amp meter loops. The contractor shall develop a task order price proposal for this work. Once the CO/COR has approved the task order price proposal, the final price will become a fixed unit price. CO approval required if >$3,500

NTE FUP EA WO 0004BN 1004BN 2004BN 3004BN 4004BN

ADDITIONAL EXCAVATION

Excavation beyond 48 inches requires COR approval and price proposal.

NTE FUP CUBIC YARD WO 0004BO 1004BO 2004BO 3004BO 4004BO

RFSS/TPS INSTALLATION TRAINING

Just in time training for INSTALLATION of the Residential Fire Suppression System (RFSS) and Tank and Pump System (TPS)

NTE FUP PER TRAINEE CON 0004BP 1004BP 2004BP 3004BP 4004BP

LIQUID PROPANE (LP) INSTALLATION

May be used in conjunction with a separate contract to provide delivery, rental, maintenance of tanks and fuel.

NTE FUP EA WO 0004BQ 1004BQ 2004BQ 3004BQ 4004BQ

LP INITIAL FILL Initial fill of liquid propane tanks. NTE FUP EA WO 0004BR 1004BR 2004BR 3004BR 4004BR NATURAL GAS CONNECTION Natural Gas Connection. NTE FUP EA WO 0004BS 1004BS 2004BS 3004BS 4004BS

CONVERT FROM NATURAL GAS TO LIQUID PROPANE

Convert appliances from Natural Gas to Liquid Propane. For use when there is an TTHU that is suited for Natural Gas but the available source is Liquid Propane.

NTE FUP EA WO 0004BT 1004BT 2004BT 3004BT 4004BT

SKIRTING FOR TT (ANY TYPE OF SKIRTING) Installation of skirting on a TT. Requires COR approval NTE FUP EA WO 0004BU 1004BU 2004BU 3004BU 4004BU

INSULATED SKIRTING FOR MHU Installation of insulated skirting on a MHU. Requires COR approval NTE FUP EA WO 0004BV 1004BV 2004BV 3004BV 4004BV

OTL INSTALLATION

Work over and above basic installation that is required to install an Off the Lot (OTL) MHU

NTE FUP EA WO 0004BW 1004BW 2004BW 3004BW 4004BW

HVAC OTL

The installation of a MHU/PM of a split HVAC system when the outside AC condensor is not provided pre-installed.

NTE FUP EA WO 0004BW 1004BW 2004BW 3004BW 4004BW

DESIGN OF COLD WEATHER ENTRY

Design a Cold Weather Entry to be constructed on the top platform of stairs, platform steps or ramps.

NTE FUP EA WO 0004BX 1004BX 2004BX 3004BX 4004BX

CONSTRUCTION OF COLD WEATHER ENTRY

Construct a Cold Weather Entry on the top platform of stairs, platform steps or ramps.

NTE FUP EA WO 0004BY 1004BY 2004BY 3004BY 4004BY

SEMI-PERMANENT/PERMANENT BASIC INSTALLATION FOR MH/PM/EXPRESS Requirements necessary to make an MHU installation permanent. NTE FUP EA WO 0004BZ 1004BZ 2004BZ 3004BZ 4004BZ

SEMI-PERMANENT/PERMANENT PERMITS Bonds and Permits for Temporary Installation NTE FUP EA WO 0004CA 1004CA 2004CA 3004CA 4004CA

SEMI-PERMANENT/PERMANENT SEPTIC SYSTEMS

Install septic systems in accordance with local/state/tribal codes and ordinances

NTE FUP EA WO 0004CB 1004CB 2004CB 3004CB 4004CB

SEMI-PERMANENT/PERMANENT PACKAGE PLANTS Sewer Package Plant design and installation NTE FUP EA WO 0004CC 1004CC 2004CC 3004CC 4004CC

SEMI-PERMANENT/PERMANENT ROAD/ACCESS PREPARATION

Work to make ingress/egress feasible prior to manufactured home transportation to private/commercial site. Requires COR/CO approval.

NTE FUP EA WO 0004CD 1004CD 2004CD 3004CD 4004CD

SEMI-PERMANENT/PERMANENT EXTENSION OF UTILITY SERVICES

Contractor shall be prepared to coordinate and/or contract with the power utility, water company, and sewer service for the extension of services to the designated property. Requires COR/CO approval.

NTE FUP EA WO 0004CE 1004CE 2004CE 3004CE 4004CE

SEMI-PERMANENT/PERMANENT MISCELLANEOUS INSTALLATION

Misc. Expenses for Semi-Permanent/Permanent Site Preparation and /or MH/PM/Express installation over & above basic installation charges. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final negotiated PRICE will become a fixed price item. CO approval required if >$3,500

NTE FUP EA WO 0004CF 1004CF 2004CF 3004CF 4004CF

GENERATOR POWER FOR PRE TURNOVER MH/PM

This CLIN is only used when the Contractor is directed by the government to use a generator during the installation phase of the TTHU lifecycle. This CLIN is not used if the Contractor chooses, without direction from the government, to use a generator to test a

TTHU.

NTE FUP EA WO 0004CG 1004CG 2004CG 3004CG 4004CG

DEHUMIDIFIER INSTALL MHU/PM

The installation of a dehumidifier in an MHU/PM when directed by the government.

NTE FUP EA WO 0004CH 1004CH 2004CH 3004CH 4004CH

GENERATOR POWER FOR PRE TURNOVER TT

This CLIN is only used when the Contractor is directed by the government to use a generator during the installation phase of the TTHU lifecycle. This CLIN is not used if the Contractor chooses, without direction from the government, to use a generator to test a

TTHU.

NTE FUP EA WO 0004CI 1004CI 2004CI 3004CI 4004CI

WATER LINE WINTERIZATION

The winterization of a water line to prevent freezing when installing TTHU when directed by the government.

NTE FUP EA WO 0004CJ 1004CJ 2004CJ 3004CJ 4004CJ

INTERNAL TPS INSTALLATION

The installation of an Internal TPS in a TTHU when directed by the government.

NTE FUP EA WO 0004CK 1004CK 2004CK 3004CK 4004CK

EXTERNAL TPS INSTALLATION

The installation of an External TPS in a TTHU when directed by the government.

NTE FUP EA WO 0004CL 1004CL 2004CL 3004CL 4004CL

PRE-ACCEPTANCE INSPECTION FOR HAUL & INSTALL TT

Conducting a pre-acceptance inspection prior to the haul of a TT. This CLIN is applicable only when the government directs or agrees with the Contractor that a pre-acceptance inspection is necessary.

NTE FUP EA WO 0004CM 1004CM 2004CM 3004CM 4004CM

PRE-ACCEPTANCE INSPECTION FOR HAUL & INSTALL MH/PM

Conducting a pre-acceptance inspection prior to the haul of a MHU/PM. This CLIN is applicable only when the government directs or agrees with the Contractor that a pre-acceptance inspection is necessary.

NTE FUP EA WO 0004CN 1004CN 2004CN 3004CN 4004CN

REMOVAL OF EQUIPMENT, EXCESS MATERIALS, AND DEBRIS

This CLIN is for the removal of equipment (when heavy equipment for installation on site is used), excess material (above and beyond the material typically generated during an installation), and debris (above and beyond the debris typically generated during an installation).

NTE FUP EA WO 0004CO 1004CO 2004CO 3004CO 4004CO

HEAVY TOW TT FOR INSTALLATION

Heavy Tow is if additional equipment beyond a single tow vehicle is needed to move a TT during a transportation movement, but does not include equipment used on site for installation.

NTE FUP EA WO 0004CP 1004CP 2004CP 3004CP 4004CP

HEAVY TOW MH/PM FOR INSTALLATION

Heavy Tow is if additional equipment beyond a single tow vehicle is needed to move a MHU/PM during a transportation movement, but does not include equipment used on site for installation.

NTE FUP EA WO 0004CQ 1004CQ 2004CQ 3004CQ 4004CQ

HEAVY EQUIPMENT FOR INSTALL ONSITE

Heavy equipment on site for installation is additional equipment beyond the equipment used during a typical installation. Heavy equipment does not include equipment used prior to the TTHU arriving on site for installation.

NTE FUP EA WO 0004CR 1004CR 2004CR 3004CR 4004CR

TEMPORARY GENERATOR MH/PM

When directed by the government, the Contractor provides a generator to temporarily run a TTHU for pre RFO inspection and testing or to operate the TTHU until the local utiliy can provide electrical service from the grid.

NTE FUP EA WO 0004CS 1004CS 2004CS 3004CS 4004CS

LIFT STATION The installation of a lift station/grinder pump for a single TTHU. NTE FUP EA WO 0004CT 1004CT 2004CT 3004CT 4004CT

TRAVEL TRAILER STOOP

The installation of a platform used in conjunction with the built in stairs of a TT.

NTE FUP EA WO 0004CU 1004CU 2004CU 3004CU 4004CU

LANDING PADS The installation of a transition to/from a ramp and an accessible path. NTE FUP EA WO 0004CV 1004CV 2004CV 3004CV 4004CV

DEHUMIDIFIER PURCHASE

The purchase of a dehumidifier for use in an MHU/PM when directed by the government.

NTE FUP EA WO 0004CW 1004CW 2004CW 3004CW 4004CW

200 AMP DISCONNECT

The installation of a 200amp power disconnect when required by the local utility or AHJ.

NTE FUP EA WO 0004CX 1004CX 2004CX 3004CX 4004CX

ACCESSIBLE PATH ON A SITE

The accessible route provided within the site from accessible parking spaces and accessible passenger loading zones; public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve.

NTE FUP EA WO 0004CY 1004CY 2004CY 3004CY 4004CY

MISCELLANEOUS INSTALL FOR TT

Misc. expenses for installation over & above basic TT installation charges. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final negotiated price will become a fixed price item. CO approval required if >$3,500.

NTE FUP EA WO 0004CZ 1004CZ 2004CZ 3004CZ 4004CZ

0005 PREVENTIVE MAINTENANCE & REPAIRS

PMIR

Preventive Maintenance Inspection and Repairs (includes minor repair labor and materials).

NTE FUP PER UNIT CON 0005AA 1005AA 2005AA 3005AA 4005AA

CALL CENTER Maintenance Call Center. NTE FUP MONTHLY CON 0005AB 1005AB 2005AB 3005AB 4005AB

ROUTINE REPAIRS

Repairs that are serious but do not present an imminent danger to the health, safety or security of the unit occupant or property. Routine repairs are up to a $250.00 material. Labor for routine repairs is included in PMIR.

NTE FUP EA WO 0005AC 1005AC 2005AC 3005AC 4005AC

MAJOR REPAIRS

Major Repairs Items. As required by the COR in writing prior to any work being done. Maintenance in excess of $250 for materials and/or $250 in labor but less than $3500 will require COR approval. CO approval required if >$3,500.

NTE FUP EA WO 0005AD 1005AD 2005AD 3005AD 4005AD

EMERGENCYT REPAIR TTHU VISIT AND DETERMINATION

Use this CLIN to cover the Inspection and Determination of an Emergency Repair TTHU. Includes Labor and Travel to the site.

NTE FUP EA WO 0005AE 1005AE 2005AE 3005AE 4005AE

EMERGENCY REPAIRS LABOR

Emergency Repair Labor: Labor for emergency repairs performed. The contractor shall make repairs to the extent there is no longer a safety hazard, life or death situation, or emergency issue. The Contractor shall respond and initiate the repair within two hours. Contractor shall notify the COR by the next day.

NTE FUP

FIXED HOURLY

RATE

WO 0005AF 1005AF 2005AF 3005AF 4005AF

EMERGENCY REPAIR, ODC MATERIAL, AND EQUIPMENT

Emergency Maintenance Repair Equipment and Material. This CLIN is used to cover the actual price for material and equipment only used during the Emergency Repair. The contractor shall use this CLIN for the material and equipment used to respond to Emergency Repairs to the extent there is no longer a safety hazard, life or death situation, or emergency issue. The Contractor shall respond and initiate the repair within two hours. Contractor shall notify the COR by the next day.

ACT ACT EA ACT 0005AG 1005AG 2005AG 3005AG 4005AG

LP REFILL /REFILLING Refill/refilling of liquid propane tanks. NTE FUP EA WO 0005AH 1005AH 2005AH 3005AH 4005AH LP TANK RENTAL Renting of a Liquid Propane Tank. NTE FUP EA WO 0005AI 1005AI 2005AI 3005AI 400AI

EMERGENCY UNIT ENTRY SERVICE (LOCK-OUT)

Perform Emergency Unit Entry Service for occupants unable to gain access to a unit.

NTE FUP EA WO 0005AJ 1005AJ 2005AJ 3005AJ 4005AJ

BLADDER PUMP OUT SERVICE

Provide septic pump out service for MHUs that have bladders installed to collect waste water. The Government will reimburse the Contractor at actual expense (receipt and proper documentation required).

NTE AC

T EA WO 0005AK 1005AK 2005AK 3005AK 4005AK

MAINTENANCE MISCELLANOUS

During the “maintenance” of an TTHU there may be issues that cannot be foreseen but are required to complete the “maintenance”.

This CLIN is only to be used if the work required does not fit within the definition of any other “maintenance” CLIN. The contractor shall develop a task order price proposal which includes all prices related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$3,500.

NTE FUP EA WO 0005AL 1005AL 2005AL 3005AL 4005AL

RESIDENTIAL FIRE SPRINKLER SYSTEM REPAIRS

During the “maintenance” of the Residential Fire Sprinkler System and Tank and Pump System there may be issues that requires the utilization of a certified Fire Suppression / Installation expert. This CLIN is only to be used if the work required does not fit within the definition of the “maintenance” CLIN and requires parts and specialty labor . The contractor shall develop a task order price proposal which includes all prices related to the unforeseen work and present the estimate to the CO/COR for review. The final negotiated price will become a fixed price item. COR approval required. CO approval required if >$3,500.

NTE FUP EA WO 0005AM 1005AM 2005AM 3005AM 4005AM

TTHU MAINTENANCE TRANSFER AND INSPECTION

TTHU custodial transfer from the giving contractor to the receiving contractor and/or to the COR or COR’s designee. Physical inspection at the option of the receiving contractor.

NTE FUP EA CON 0005AN 1005AN 2005AN 3005AN 4005AN

OCCUPANT SUBSTITUTE RELOCATION (HOTEL)

Temporary housing for a survivor that requires relocation or an emergency repair that will not resolve or mitigate a threat or imminent danger

NTE FUP EA WO 0005AO 1005AO 2005AO 3005AO 4005AO

THIRD PARTY MICROBIAL GROWTH INSPECTION SERVICES

Employ a third party to perform mold sampling, testing and reporting services

NTE FUP EA WO 0005AP 1005AP 2005AP 3005AP 4005AP

THIRD PARTY MOLD REMEDIATION SERVICE

At the instruction of the COR, the contractor shall hire an appropriately licensed and/or certified company to remediate microbial growth in an TTHU.

NTE FUP EA WO 0005AQ 1005AQ 2005AQ 3005AQ 4005AQ

RFSS/TPS MAINTAINENCE TRAINING

Just in time training for MAINTENANCE of the Residential Fire Suppression System (RFSS) and Tank and Pump System (TPS)

NTE FUP PER TRAINEE CON 0005AR 1005AR 2005AR 3005AR 4005AR

PANDEMIC/EPIDEMIC/MEDICAL/EMERGENCY CLEANING

At the instruction of the COR, the contractor shall hire an appropriately licensed and/or certified company to remediate pandemic/epidemic/medical/emergency by cleaning in an TTHU.

NTE FUP EA WO 0005AS 1005AS 2005AS 3005AS 4005AS

RFSS MAINTENANCE Performing maintenance and repair for RFSS. (Not including TPS) NTE FUP EA WO 0005AT 1005AT 2005AT 3005AT 4005AT

FUMIGATION AND PEST CONTROL INSPECTION

Employ a third party to perform fumigation, pest control and inspection services without sealing the TTHU.

NTE FUP EA WO 0005AU 1005AU 2005AU 3005AU 4005AU

PEST MITIGATION - SEALED TTHU

Employ a third party to perform fumigation, pest control and inspection services with a sealed TTHU.

NTE FUP EA WO 0005AV 1005AV 2005AV 3005AV 4005AV

SEPTIC CLEAN OUT Cleaning out a septic system located on a Private Site. NTE FUP EA WO 0005AW 1005AW 2005AW 3005AW 4005AW TPS DIAGNOSTICS Diagnostic services for TPS. NTE FUP EA WO 0005AX 1005AX 2005AX 3005AX 4005AX TPS MAINTENANCE & REPAIRS Maintenance and repairs for TPS. (not including monthly PMIR) NTE FUP EA WO 0005AY 1005AY 2005AY 3005AY 4005AY EXTERNAL TPS SWAP OUT Swaping out the External TPS. NTE FUP EA WO 0005AZ 1005AZ 2005AZ 3005AZ 4005AZ INTERNAL TPS SWAP OUT Swaping out the Internal TPS. NTE FUP EA WO 0005BA 1005BA 2005BA 3005BA 4005BA

CAMERA FOR SEWER LINE INVESTIGATION - MAINTENANCE

Camera for sewer line investigation that is required to trace the sewer line during maintenance.

NTE FUP EA WO 0005BB 1005BB 2005BB 3005BB 4005BB

GREY AND BLACK WATER TANK TRAINING TT

To train occupant on the use and draining of grey and black water tanks.

NTE FUP EA WO 0005BC 1005BC 2005BC 3005BC 4005BC

0006 DEACTIVATION

CMRR Clean and Make Ready for Reuse NTE FUP EA CON 0006AA 1006AA 2006AA 3006AA 4006AA

CLEAN AND MAKE READY FOR REUSE MISCELLANOUS

A miscellaneous CLIN for Clean and Make Ready for Reuse may be issued to the Contractor if the work needed cannot be completed within the SCOPE of an existing CLIN. Any items or services required to Clean and Make Ready for Reuse not covered in other parts of this PWS will require approval from the CO or COR. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final negotiated price will become a fixed price item. CO approval required if >$3,500.

NTE FUP EA WO 0006AB 1006AB 2006AB 3006AB 4006AB

MH / PM DEACT

MH / PM Basic Deactivation Includes transportation for deactivation back to the staging or storage site (up to 100 miles)

NTE FUP EA CON 0006AC 1006AC 2006AC 3006AC 4006AC

TT DEACT

TT Basic Deactivation. Includes transportation for deactivation back to the staging or storage site (up to 100 miles)

NTE FUP EA CON 0006AD 1006AD 2006AD 3006AD 4006AD

DEACTIVATION MISCELLANOUS

This CLIN is only to be used if the work required does not fit within the definition of any other “deactivation” CLIN. The contractor shall develop a task order price proposal which includes all prices related to the unforeseen work and present the estimate to the CO/COR for review. Once the CO/COR has agreed to a price for the work, the final price will become a fixed unit price. CO approval required if >$3,500.

NTE FUP EA WO 0006AE 1006AE 2006AE 3006AE 4006AE

MH / PM EMERGENCY DEACT MH / PM Emergency Deactivation. NTE FUP EA CON 0006AF 1006AF 2006AF 3006AF 4006AF TT EMERGENCY DEACT TT Emergency Deactivation. NTE FUP EA CON 0006AG 1006AG 2006AG 3006AG 4006AG

RELOCATION MH/PM

Deactivation of the unit at its original location, and installation at a new location.

NTE FUP EA CON 0006AH 1006AH 2006AH 3006AH 4006AH

RELOCATION TT

Deactivation of the unit at its original location, and installation at a new location.

NTE FUP EA CON 0006AI 1006AI 2006AI 3005AI 4006AI

REPOSITION MH / PM

Deactivation of the unit at its original location, and install at a location on the same site.

NTE FUP EA CON 0006AJ 1006AJ 2006AJ 3006AJ 4006AJ

REPOSITION TT

Deactivation of the unit at its original location, and install at a location on the same site.

NTE FUP EA CON 0006AK 1006AK 2006AK 3006AK 4006AK

MH / PM REINSTALLATION

The work order includes removal and replacement of the MHU at the same site.

NTE FUP EA WO 0006AL 1006AL 2006AL 3006AL 4006AL

TT REINSTALLATION

The work order includes removal and replacement of the TT at the same site.

NTE FUP EA WO 0006AM 1006AM 2006AM 3006AM 4006AM

CROWNING REMOVAL

The work includes all materials, equipment and labor to remove the crowning at a Commercial/Private Site.

NTE FUP EA WO 0006AN 1006AN 2006AN 3006AN 4006AN

RFSS/TPS DEACTIVATION TRAINING

Just in time training for DEACTIVATION of the Residential Fire Suppression System (RFSS) and Tank and Pump System (TPS)

NTE FUP PER TRAINEE CON 0006AO 1006AO 2006AO 3006AO 4006AO

BLADDER TANK REMOVAL (FLEXIBLE HOLDING TANK)

Contractor shall remove a previously installed poly-plastic bladder (holding tank) to capture and store waste water from the MHU.

NTE FUP EA WO 0006AP 1006AP 2006AP 3006AP 4006AP

INVENTORY OF PERSONAL PROPERTY

At the direction of the COR and issuance of a work order the Contractor shall inventory and secure all person property in accordance with the Inventory of Personal Property Procedures.

NTE FUP EA CON 0006AQ 1006AQ 2006AQ 3006AQ 4006AQ

PROPANE REMOVAL AND DISPOSAL

Removal and disposal of the propane and propane tanks that are not typically part of a TT.

NTE FUP EA WO 0006AR 1006AR 2006AR 3006AR 4006AR

PERSONAL PROPERTY (NOT OTHERWISE CATEGORIZED)

The removal and disposal of personal property abandonded by the occupant, that is not subject to the inventory of personal property procedures and is above and beyond the normal dirt and debris left by a typical occupant.

NTE FUP EA CON 0006AS 1006AS 2006AS 3006AS 4006AS

TEMPORARY POWER POLE REMOVAL NON-CONCURRENT WITH TTHU REMOVAL

Temporary power pole removal non-concurent with the TTHU removal

NTE FUP EA WO 0006AT 1006AT 2006AT 3006AT 4006AT

STAGING DEACTIVATION Deactivation of items installed at the staging yard. NTE FUP EA WO 0006AU 1006AU 2006AU 3006AU 4006AU

FUMIGATION AND PEST CONTROL INSPECTION SERVICES

Employ a third party to perform fumigation, pest control and inspection services without sealing the TTHU.

NTE FUP EA WO 0006AV 1006AV 2006AV 3006AV 4006AV

FUMIGATION AND PEST CONTROL INSPECTION SERVICES (SEALED TTHU)

Employ a third party to perform fumigation, pest control and inspection services with a sealed TTHU.

NTE FUP EA WO 0006AW 1006AW 2006AW 3006AW 4006AW

SPECIAL DEACTIVATION (DEPARTMENT OF JUSTICE)

Deactivation in conjunction with DOJ actions when an occupant will not surrender a TTHU without a court order.

NTE FUP EA WO 0006AX 1006AX 2006AX 3006AX 4006AX

HEAVY TOW TT

Heavy Tow is if additional equipment beyond a single tow vehicle is needed to move a TT during a deactivation movement, but does not include equipment used on site for deactivation.

NTE FUP EA WO 0006AY 1006AY 2006AY 3006AY 4006AY

HEAVY TOW MH/PM

Heavy Tow is if additional equipment beyond a single tow vehicle is needed to move a MHU/PM during a deactivation movement, but does not include equipment used on site for deactivation.

NTE FUP EA WO 0006AZ 1006AZ 2006AZ 3006AZ 4006AZ

HEAVY EQUIPMENT FOR DEACTIVATION ONSITE

Heavy equipment on site for deactivation is additional equipment beyond the equipment used during a typical deactivation. Heavy equipment does not include equipment used prior to the TTHU departing on site for deactivation.

NTE FUP EA WO 0006BA 1006ABA 2006BA 3006BA 4006BA

EXTERNAL TPS REMOVAL/DEACTIVATION

Decommissioning of an External TPS in accordance with the manufactures manual.

NTE FUP EA WO 0006BB 1006BB 2006BB 3006BB 4006BB

INTERNAL TPS REMOVAL/DEACTIVATION

Decommissioning of an Internal TPS in accordance with the manufactures manual.

NTE FUP EA WO 0006BC 1006BC 2006BC 3006BC 4006BC

PANDEMIC/EPIDEMIC/MEDICAL/EMERGENCY CLEANING

At the instruction of the COR, the contractor shall hire an appropriately licensed and/or certified company to remediate pandemic/epidemic/medical/emergency by cleaning in an TTHU.

NTE FUP EA WO 0006BD 1006BD 2006BD 3006BD 4006BD

THIRD PARTY MOLD REMEDIATION SERVICE

At the instruction of the COR, the contractor shall hire an appropriately licensed and/or certified company to remediate microbial growth in an TTHU.

NTE FUP EA WO 0006BE 1006BE 2006BE 3006BE 4006BE

GROUP SITE DEACTIVATION Deactivation of items installed at a Group Site. NTE FUP EA WO 0006BF 1006BF 2006BF 3006BF 4006BF COMMERCIAL PARK DEACTIVATION Deactivation of items installed at a Commercial Park. NTE FUP EA WO 0006BG 1006BG 2006BG 3006BG 4006BG

0007 COMMERCIAL PARK EXPANSION

TIER ONE SITE ASSESSMENT FOR COMMERCIAL PARK EXPANSION DEVELOPMENT

Windshield identification and basic assessment of land for commercial park development. A report identifying certain features and development potential is submitted to the COR.

NTE FUP EA WO 0007AA 1007AA 2007AA 3007AA 4007AA

FLOOD PLAIN EVALUATION

Determine Flood Plain designation of potential commercial park expansion as directed by the COR.

NTE FUP EA WO 0007AB 1007AB 2007AB 3007AB 4007AB

WRAP AROUND SERVICES EVALUATION Identify distances to the nearest shopping area, schools, etc. NTE FUP EA WO 0007AC 1007AC 2007AC 3007AC 4007AC

TIER TWO SITE ASSESSMENT

A more detailed assessment of sites identified in Tier One assessment. A report identifying certain features and development potential is submitted to the COR.

NTE FUP EA WO 0007AD 1007AD 2007AD 3007AD 4007AD

HISTORICAL PRESERVATION SURVEY

Conduct research on each site in accordance with preservation laws, policies, and executive orders such as the National Historic Preservation Act. Submit a report of findings to the COR.

NTE FUP EA WO 0007AE 1007AE 2007AE 3007AE 4007AE

ENVIRONMENTAL DATABASE SEARCH

Conduct a database search on each site to identify past uses of the site.

NTE FUP EA WO 0007AF 1007AF 2007AF 3007AF 4007AF

NEPA COMPLIANCE ASSESSMENT

Generate a report addressing the items needed for a comprehensive Environmental Assessment (EA).

NTE FUP EA WO 0007AG 1007AG 2007AG 3007AG 4007AG

CONCEPTUAL DESIGN

At the direction of the COR and with the issuance of a work order, conduct a conceptual design not to exceed 25% design package.

NTE FUP EA WO 0007AH 1007AH 2007AH 3007AH 4007AH

CONCEPTUAL DESIGN- REDESIGN

During the design process FEMA may request that the Contractor redesign the commercial site expansion to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the conceptual design.

NTE FUP EA WO 0007AI 1007AI 2007AI 3007AI 4007AI

50% SITE DESIGN

This CLIN covers all design activities as outlined under the contract section “Commercial Park Expansion” from concept to 50 percent design package.

NTE FUP EA WO 0007AJ 1007AJ 2007AJ 3007AJ 4007AJ

50% SITE DESIGN - REDESIGN

During the design process FEMA may request that the Contractor redesign the commercial site expansion to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 50% design.

NTE FUP EA WO 0007AK 1007AK 2007AK 3007AK 4007AK

100% SITE DESIGN

This CLIN covers all design activities as outlined under the contract section “Commercial Park Expansion” for 100% design package.

NTE FUP EA WO 0007AL 1007AL 2007AL 3007AL 4007AL

100% SITE DESIGN - REDESIGN

During the design process FEMA may request that the Contractor redesign the commercial site expansion to include changes. If FEMA requests a redesign, the Contractor shall complete the work within the timeframes and performance requirements that are mandatory for the 100% design.

NTE FUP EA WO 0007AM 1007AM 2007AM 3007AM 4007AM

COMPLETE CONSTRUCTION

This CLIN includes all work required to complete a fully functional commercial park expansion site in accordance with the references and requirements described in this contract. Includes all Labor, Material and Equipment.

NTE FUP EA WO 0007AN 1007AN 2007AN 3007AN 4007AN

ADDITIONAL SITE WORK

This CLIN is to be used for additional considerations during the construction period that are either new requirements or requirements not readily identifiable at the time of design. The Contractor shall develop a task order price proposal for all work to be carried out as part of this assignment. The final negotiated price will become a fixed price item. CO approval required if >$3,500.

NTE FUP EA WO 0007AO 1007AO 2007AO 3007AO 4007AO

UTILITY ACCOUNT SET UP

Contractor to obtain utility account(s) for initial set-up of units and / or group site construction

NTE FUP EA WO 0007AP 1007AP 2007AP 3007AP 4007AP

TEMPORARY CONSTRUCTION OFFICE FOR FEMA STAFF

At the discretion of the COR, the Contractor may be required to furnish and install an office trailer complete with all utilities and restroom facility

NTE FUP EA WO 0007AQ 1007AQ 2007AQ 3007AQ 4007AQ

COMMERCIAL PARK EXPANSION CONSTRUCTION-RELATED BONDS Obtain appropriate and required bonds for construction tasks NTE FUP EA WO 0007AR 1007AR 2007AR 3007AR 4007AR

0008 GROUP SITE CONSTRUCTION

TIER ONE SITE ASSESSMENT GROUP SITE DEVELOPMENT

Windshield identification and basic assessment of land for group site development. A report identifying certain features and development potential is submitted to the COR.

NTE FUP EA WO 0008AA 1008AA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .