RFP_32110-82026_Evaluation_Model_v2_%20Attachment_6.3.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- SWC 820 – Debris Removal Services - UPDATED
- Solicitation number
- RFP 32110-82026 - Version 2
- Issued by
- Davidson County, Tennessee
About this file
This is an evaluation model and pricing attachment for a Request for Proposals (RFP) issued by the State of Tennessee for Emergency Debris Removal Services under contract SWC 820. The document establishes the pricing structure and evaluation framework for debris removal operations across multiple categories, including vegetative debris loading and hauling, hazardous tree and limb cutting, stump removal, debris reduction through burning or grinding, construction and demolition (C&D) debris handling, white goods processing, hazardous waste management, electronic waste, vehicles and vessels removal, staging yard operations, putrescent debris, sediment removal, sweeping, tires, and infectious waste removal. Respondents must provide pricing for all 59 line items across various units of measure, including cubic yards, per-tree, per-unit, per-pound, per-day, and linear-mile measurements. The completed pricing workbook must be submitted to the Solicitation Coordinator Seth Lake at Seth.Lake@tn.gov or by phone at 615-507-6930 by September 4, 2026, at 2:00 p.m. Central Time.
Each line item includes an evaluation factor assigned by the State, ranging from 5 to 50 points, which will be used in the scoring methodology. Respondents are required to complete company and contact information sections, including headquarters address, regional address, and primary contact details. Pricing must be entered in the designated orange-highlighted cells in Column F of the workbook's pricing tab, with extended costs calculated for each line item. The evaluation model does not specify set-aside provisions, incumbent contractors, contract term duration, or renewal options within the document provided. All line items must be bid; partial responses are not acceptable.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions State of Tennessee SWC 820 Emergency Debris Removal Services
| 1. | Instructions |
| Overview of Workbook | |
| Please note there are two (2) tabs in this workbook. The tabs are: | |
| Tab 1 – Instructions. Please read all instructions carefully. Please fill in company and contact information for all highlighted in Green Cells below (Section 2). | |
| Tab 2 - Pricing . Please completely fill in pricing for all cells highlighted in orange found in column F. Column B, respondents will see the description of the debris. Column C displays the applicable unit of measure, and column D shows the origin/destination points. More information on the description for each type of debris removal can be found in section 4 of the contract's specifications. |
Scoring of RFP Attachment 6.3. - Evaluation Model:
| General Instructions |
| Respondents must bid all lines in the workbook |
| Provide your completed quote workbook to the Solictation Coordinator via e-mail by September 4, 2026 at 2:00 p.m. CT |
SOLICITIATION COORDINATOR
Seth Lake Seth.Lake@tn.gov 615-507-6930
2. Company and Contact Information
| Please provide the following basic information about your company: | ||
| Company Name | ||
| Headquarters Address | ||
| Regional Address | ||
| Provide the following information regarding the main contact completing this bid: | Primary contact | Additional Contact |
(If any)
| Contact Name |
| Contact Title |
| Office Telephone Number |
| Mobile Phone Number (Optional) |
| Email Address |
Price List
| Emergency Debris Removal Operations | ||||||
| Line-Item Number | Description | Unit of Measure | Origin/ Destination | Evaluation Factor | Cost | Extended Cost |
| 1 | Loading and Hauling Vegetative Debris | Cubic Yard (CY) | From waterways and adjacent areas impacted by flooding to DMS | 30 | $ - 0 | |
| 2 | Loading and Hauling Vegetative Debris | Cubic Yard (CY) | From waterways and adjacent areas impacted by flooding to Final Disposal | 30 | $ - 0 | |
| 3 | Loading and Hauling Vegetative. Debris | Cubic Yard (CY) | From ROW to DMS | 50 | $ - 0 | |
| 4 | Loading and Hauling Vegetative Debris | Cubic Yard (CY) | From ROW to Final Disposal | 50 | $ - 0 | |
| 5 | Loading and Hauling Reduced Vegetative Debris | Cubic Yard (CY) | From DMS to Final Disposal | 50 | $ - 0 | |
| 6 | Debris Mgmt. Site Management | Cubic Yard (CY) | Management of DMS | 50 | $ - 0 | |
| 7 | Hazardous Limb (Hangers) Cutting (Posing an immediate threat) | Per Tree | Labor, equipment, & materials to cut/remove and place at edge of ROW. | 35 | $ - 0 | |
| 8 | Hazardous Tree (Leaners) Cutting (6” to 11.99” diameter) | Per Tree | Labor, equipment, & materials to cut/remove and place at edge of ROW. | 35 | $ - 0 | |
| 9 | Hazardous Tree (Leaners) Cutting (12” to 23.99” diameter) | Per Tree | Labor, equipment, & materials to cut/remove and place at edge of ROW. | 35 | $ - 0 | |
| 10 | Hazardous Tree (Leaners) Cutting (24” to 35.99” diameter) | Per Tree | Labor, equipment, & materials to cut/remove and place at edge of ROW. | 35 | $ - 0 | |
| 11 | Hazardous Tree (Leaners) Cutting (36” and greater diameter) | Per Tree | Labor, equipment, & materials to cut/remove and place at edge of ROW. | 35 | $ - 0 | |
| 12 | Removal, Backfilling, & Hauling of Stumps & Root-balls (24" to 35" in diameter) | Per Root-ball | Labor, equipment, & materials to extract stump & root-ball and haul to DMS | 35 | $ - 0 | |
| 13 | Removal, Backfilling, & Hauling of Stumps & Root-balls (36" to 47" in diameter) | Per Root-ball | Labor, equipment, & materials to extract stump & root-ball and haul to DMS | 35 | $ - 0 | |
| 14 | Removal, Backfilling, & Hauling of Stumps & Root-balls (48" to 71" in diameter) | Per Root-ball | Labor, equipment, & materials to extract stump & root-ball and haul to DMS | 35 | $ - 0 | |
| 15 | Removal, Backfilling, & Hauling of Stumps & Root-balls (72" and greater in diameter) | Per Root-ball | Labor, equipment, & materials to extract stump & root-ball and haul to DMS | 35 | $ - 0 | |
| 16 | Reduction of Vegetative Debris | Cubic Yard (CY) | Reduction of Vegetative Debris by Burning | 40 | $ - 0 | |
| 17 | Reduction of Vegetative Debris | Cubic Yard (CY) | Reduction of Vegetative Debris by Grinding or Chipping | 40 | $ - 0 | |
| 18 | Reduction and Compaction of C&D | Cubic Yard (CY) | Reduction of C&D Debris by Compacting/Crushing | 40 | $ - 0 | |
| 19 | Loading, Hauling, and Unloading C&D Debris | Cubic Yard (CY) | From waterways and adjacent areas impacted by flooding to DMS | 35 | $ - 0 | |
| 20 | Loading, Hauling, and Unloading C&D Debris | Cubic Yard (CY) | From waterways and adjacent areas impacted by flooding to Final Disposal | 35 | $ - 0 | |
| 21 | Loading, Hauling, & Unloading C&D Debris | Cubic Yard (CY) | From ROW to DMS | 35 | $ - 0 | |
| 22 | Loading, Hauling, & Unloading C&D Debris | Cubic Yard (CY) | From ROW to Final Disposal | 35 | $ - 0 | |
| 23 | Loading, Hauling, and Unloading Reduced C& D Debris | Cubic Yard (CY) | From DMS to Final Disposal | 35 | $ - 0 | |
| 24 | White Goods Hauling, evacuation of Freon/Refrigerants | Each Full Unit | From waterways and adjacent areas impacted by flooding to DMS | 20 | $ - 0 | |
| 25 | White Goods Hauling, evacuation of Freon/Refrigerants | Each Full Unit | From waterways and adjacent areas impacted by flooding to Final Disposal | 20 | $ - 0 | |
| 26 | White Goods Hauling, evacuation of Freon/Refrigerants | Each Full Unit | From ROW to DMS | 20 | $ - 0 | |
| 27 | White Goods Hauling, evacuation of Freon/Refrigerants | Each Full Unit | From ROW to Final Disposal | 20 | $ - 0 | |
| 28 | White Goods Hauling, evacuation of Freon/Refrigerants | Each Full Unit | From DMS to Final Disposal | 20 | $ - 0 | |
| 29 | Household Hazardous Waste (HHW) | Per Pound | From waterways and adjacent areas impacted by flooding to DMS or Final Disposal | 20 | $ - 0 | |
| 30 | Household Hazardous Waste (HHW) | Per Pound | From ROW to DMS or Final Disposal | 20 | $ - 0 | |
| 31 | Household Hazardous Waste (HHW) | Per Pound | From DMS to Final Disposal | 20 | $ - 0 | |
| 32 | Hazardous Waste | Per Pound | From waterways and adjacent areas impacted by flooding to DMS or Final Disposal | 20 | $ - 0 | |
| 33 | Hazardous Waste | Per Pound | From ROW to DMS or Final Disposal | 20 | $ - 0 | |
| 34 | Hazardous Waste | Per Pound | From DMS to Final Disposal | 20 | $ - 0 | |
| 35 | Electronic Waste | Per Pound | From waterways and adjacent areas impacted by flooding to DMS or Final Disposal | 5 | $ - 0 | |
| 36 | Electronic Waste | Per Pound | From ROW to DMS or Final Disposal | 5 | $ - 0 | |
| 37 | Electronic Waste | Per Pound | From DMS to Final Disposal | 5 | $ - 0 | |
| 38 | Trailers, Vessels, and Vehicles (Up to 24 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From waterways and adjacent areas impacted by flooding to Staging Yard or Final Disposal | 10 | $ - 0 | |
| 39 | Trailers, Vessels, and Vehicles (From 25 feet to 48 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From waterways and adjacent areas impacted by flooding to Staging Yard or Final Disposal | 10 | $ - 0 | |
| 40 | Trailers, Vessels, and Vehicles (Greater than 48 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From waterways and adjacent areas impacted by flooding to Staging Yard or Final Disposal | 10 | $ - 0 | |
| 41 | Trailers, Vessels, and Vehicles (Up to 24 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From ROW to Staging Yard or Final Disposal | 10 | $ - 0 | |
| 42 | Trailers, Vessels, and Vehicles (From 25 feet to 48 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From ROW to Staging Yard or Final Disposal | 10 | $ - 0 | |
| 43 | Trailers, Vessels, and Vehicles (Greater than 48 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From ROW to Staging Yard or Final Disposal | 10 | $ - 0 | |
| 44 | Trailers, Vessels, and Vehicles (Up to 24 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From Staging Yard to Final Disposal | 10 | $ - 0 | |
| 45 | Trailers, Vessels, and Vehicles (From 25 feet to 48 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From Staging Yard to Final Disposal | 10 | $ - 0 | |
| 46 | Trailers, Vessels, and Vehicles (Greater than 48 feet in length) | Each Vehicle (Cars, trucks, tractor trailers, boats, etc.) | From Staging Yard to Final Disposal | 10 | $ - 0 | |
| 47 | Management of Staging Yard | Per Day | Daily Operation of Secure Staging Yard | 5 | $ - 0 | |
| 48 | Blocking of Vessels in Staging Yard | Each Vessel | Proper blocking of vessels in Staging Yard to support and stabilize vessel | 5 | $ - 0 | |
| 49 | Putrescent Debris | Per Pound | From waterways and adjacent areas impacted by flooding to DMS or Final Disposal | 5 | $ - 0 | |
| 50 | Putrescent Debris | Per Pound | From ROW to Final Disposal | 5 | $ - 0 | |
| 51 | Removal Rock, Sand, Soil, Silt & Sediment | Cubic Yard (CY) | From waterways and adjacent areas impacted by flooding to DMS or Final Disposal | 10 | $ - 0 | |
| 52 | Removal Rock, Sand, Soil, Silt & Sediment | Cubic Yard (CY) | From ROW to DMS | 10 | $ - 0 | |
| 53 | Removal Rock, Sand, Soil, Silt & Sediment | Cubic Yard (CY) | From DMS to Final Disposal | 10 | $ - 0 | |
| 55 | Sweeping | Linear Mile | N/A | 5 | $ - 0 | |
| 56 | Tires | Each | From waterways and adjacent areas impacted by flooding to Final Disposal | 15 | $ - 0 | |
| 57 | Tires | Each | From ROW to Final Disposal | 15 | $ - 0 | |
| 58 | Removal & Hauling of Infectious Waste | Per Pound | Removal and Hauling of Infectious Waste to Final Disposal | 5 | $ - 0 | |
| 59 | Removal & Hauling of Chemical, Biological, Radiological, & Nuclear Contaminated Debris | Per Pound | Removal & Hauling of Chemical, Biological, Radiological, & Nuclear Contaminated Debris to Final Disposal | 5 | $ - 0 | |
| Evaluation Cost | $ - 0 |
image1.png
File details come from the government source that posted it. Updated .