This is an evaluation model and pricing attachment for a Request for Proposals (RFP) issued by the State of Tennessee for Emergency Debris Removal Services under contract SWC 820. The document establishes the pricing structure and evaluation framework for debris removal operations across multiple categories, including vegetative debris loading and hauling, hazardous tree and limb cutting, stump removal, debris reduction through burning or grinding, construction and demolition (C&D) debris handling, white goods processing, hazardous waste management, electronic waste, vehicles and vessels removal, staging yard operations, putrescent debris, sediment removal, sweeping, tires, and infectious waste removal. Respondents must provide pricing for all 59 line items across various units of measure, including cubic yards, per-tree, per-unit, per-pound, per-day, and linear-mile measurements. The completed pricing workbook must be submitted to the Solicitation Coordinator Seth Lake at Seth.Lake@tn.gov or by phone at 615-507-6930 by September 4, 2026, at 2:00 p.m. Central Time.

Each line item includes an evaluation factor assigned by the State, ranging from 5 to 50 points, which will be used in the scoring methodology. Respondents are required to complete company and contact information sections, including headquarters address, regional address, and primary contact details. Pricing must be entered in the designated orange-highlighted cells in Column F of the workbook's pricing tab, with extended costs calculated for each line item. The evaluation model does not specify set-aside provisions, incumbent contractors, contract term duration, or renewal options within the document provided. All line items must be bid; partial responses are not acceptable.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions State of Tennessee SWC 820 Emergency Debris Removal Services

1.Instructions
Overview of Workbook
Please note there are two (2) tabs in this workbook. The tabs are:
Tab 1 – Instructions. Please read all instructions carefully. Please fill in company and contact information for all highlighted in Green Cells below (Section 2).
Tab 2 - Pricing . Please completely fill in pricing for all cells highlighted in orange found in column F. Column B, respondents will see the description of the debris. Column C displays the applicable unit of measure, and column D shows the origin/destination points. More information on the description for each type of debris removal can be found in section 4 of the contract's specifications.

Scoring of RFP Attachment 6.3. - Evaluation Model:

General Instructions
Respondents must bid all lines in the workbook
Provide your completed quote workbook to the Solictation Coordinator via e-mail by September 4, 2026 at 2:00 p.m. CT

SOLICITIATION COORDINATOR

Seth Lake Seth.Lake@tn.gov 615-507-6930

2. Company and Contact Information

Please provide the following basic information about your company:
Company Name
Headquarters Address
Regional Address
Provide the following information regarding the main contact completing this bid:Primary contactAdditional Contact

(If any)

Contact Name
Contact Title
Office Telephone Number
Mobile Phone Number (Optional)
Email Address

Price List

Emergency Debris Removal Operations
Line-Item NumberDescriptionUnit of MeasureOrigin/ DestinationEvaluation FactorCostExtended Cost
1Loading and Hauling Vegetative DebrisCubic Yard (CY)From waterways and adjacent areas impacted by flooding to DMS30$ - 0
2Loading and Hauling Vegetative DebrisCubic Yard (CY)From waterways and adjacent areas impacted by flooding to Final Disposal30$ - 0
3Loading and Hauling Vegetative. DebrisCubic Yard (CY)From ROW to DMS50$ - 0
4Loading and Hauling Vegetative DebrisCubic Yard (CY)From ROW to Final Disposal50$ - 0
5Loading and Hauling Reduced Vegetative DebrisCubic Yard (CY)From DMS to Final Disposal50$ - 0
6Debris Mgmt. Site ManagementCubic Yard (CY)Management of DMS50$ - 0
7Hazardous Limb (Hangers) Cutting (Posing an immediate threat)Per TreeLabor, equipment, & materials to cut/remove and place at edge of ROW.35$ - 0
8Hazardous Tree (Leaners) Cutting (6” to 11.99” diameter)Per TreeLabor, equipment, & materials to cut/remove and place at edge of ROW.35$ - 0
9Hazardous Tree (Leaners) Cutting (12” to 23.99” diameter)Per TreeLabor, equipment, & materials to cut/remove and place at edge of ROW.35$ - 0
10Hazardous Tree (Leaners) Cutting (24” to 35.99” diameter)Per TreeLabor, equipment, & materials to cut/remove and place at edge of ROW.35$ - 0
11Hazardous Tree (Leaners) Cutting (36” and greater diameter)Per TreeLabor, equipment, & materials to cut/remove and place at edge of ROW.35$ - 0
12Removal, Backfilling, & Hauling of Stumps & Root-balls (24" to 35" in diameter)Per Root-ballLabor, equipment, & materials to extract stump & root-ball and haul to DMS35$ - 0
13Removal, Backfilling, & Hauling of Stumps & Root-balls (36" to 47" in diameter)Per Root-ballLabor, equipment, & materials to extract stump & root-ball and haul to DMS35$ - 0
14Removal, Backfilling, & Hauling of Stumps & Root-balls (48" to 71" in diameter)Per Root-ballLabor, equipment, & materials to extract stump & root-ball and haul to DMS35$ - 0
15Removal, Backfilling, & Hauling of Stumps & Root-balls (72" and greater in diameter)Per Root-ballLabor, equipment, & materials to extract stump & root-ball and haul to DMS35$ - 0
16Reduction of Vegetative DebrisCubic Yard (CY)Reduction of Vegetative Debris by Burning40$ - 0
17Reduction of Vegetative DebrisCubic Yard (CY)Reduction of Vegetative Debris by Grinding or Chipping40$ - 0
18Reduction and Compaction of C&DCubic Yard (CY)Reduction of C&D Debris by Compacting/Crushing40$ - 0
19Loading, Hauling, and Unloading C&D DebrisCubic Yard (CY)From waterways and adjacent areas impacted by flooding to DMS35$ - 0
20Loading, Hauling, and Unloading C&D DebrisCubic Yard (CY)From waterways and adjacent areas impacted by flooding to Final Disposal35$ - 0
21Loading, Hauling, & Unloading C&D DebrisCubic Yard (CY)From ROW to DMS35$ - 0
22Loading, Hauling, & Unloading C&D DebrisCubic Yard (CY)From ROW to Final Disposal35$ - 0
23Loading, Hauling, and Unloading Reduced C& D DebrisCubic Yard (CY)From DMS to Final Disposal35$ - 0
24White Goods Hauling, evacuation of Freon/RefrigerantsEach Full UnitFrom waterways and adjacent areas impacted by flooding to DMS20$ - 0
25White Goods Hauling, evacuation of Freon/RefrigerantsEach Full UnitFrom waterways and adjacent areas impacted by flooding to Final Disposal20$ - 0
26White Goods Hauling, evacuation of Freon/RefrigerantsEach Full UnitFrom ROW to DMS20$ - 0
27White Goods Hauling, evacuation of Freon/RefrigerantsEach Full UnitFrom ROW to Final Disposal20$ - 0
28White Goods Hauling, evacuation of Freon/RefrigerantsEach Full UnitFrom DMS to Final Disposal20$ - 0
29Household Hazardous Waste (HHW)Per PoundFrom waterways and adjacent areas impacted by flooding to DMS or Final Disposal20$ - 0
30Household Hazardous Waste (HHW)Per PoundFrom ROW to DMS or Final Disposal20$ - 0
31Household Hazardous Waste (HHW)Per PoundFrom DMS to Final Disposal20$ - 0
32Hazardous WastePer PoundFrom waterways and adjacent areas impacted by flooding to DMS or Final Disposal20$ - 0
33Hazardous WastePer PoundFrom ROW to DMS or Final Disposal20$ - 0
34Hazardous WastePer PoundFrom DMS to Final Disposal20$ - 0
35Electronic WastePer PoundFrom waterways and adjacent areas impacted by flooding to DMS or Final Disposal5$ - 0
36Electronic WastePer PoundFrom ROW to DMS or Final Disposal5$ - 0
37Electronic WastePer PoundFrom DMS to Final Disposal5$ - 0
38Trailers, Vessels, and Vehicles (Up to 24 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From waterways and adjacent areas impacted by flooding to Staging Yard or Final Disposal10$ - 0
39Trailers, Vessels, and Vehicles (From 25 feet to 48 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From waterways and adjacent areas impacted by flooding to Staging Yard or Final Disposal10$ - 0
40Trailers, Vessels, and Vehicles (Greater than 48 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From waterways and adjacent areas impacted by flooding to Staging Yard or Final Disposal10$ - 0
41Trailers, Vessels, and Vehicles (Up to 24 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From ROW to Staging Yard or Final Disposal10$ - 0
42Trailers, Vessels, and Vehicles (From 25 feet to 48 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From ROW to Staging Yard or Final Disposal10$ - 0
43Trailers, Vessels, and Vehicles (Greater than 48 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From ROW to Staging Yard or Final Disposal10$ - 0
44Trailers, Vessels, and Vehicles (Up to 24 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From Staging Yard to Final Disposal10$ - 0
45Trailers, Vessels, and Vehicles (From 25 feet to 48 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From Staging Yard to Final Disposal10$ - 0
46Trailers, Vessels, and Vehicles (Greater than 48 feet in length)Each Vehicle (Cars, trucks, tractor trailers, boats, etc.)From Staging Yard to Final Disposal10$ - 0
47Management of Staging YardPer DayDaily Operation of Secure Staging Yard5$ - 0
48Blocking of Vessels in Staging YardEach VesselProper blocking of vessels in Staging Yard to support and stabilize vessel5$ - 0
49Putrescent DebrisPer PoundFrom waterways and adjacent areas impacted by flooding to DMS or Final Disposal5$ - 0
50Putrescent DebrisPer PoundFrom ROW to Final Disposal5$ - 0
51Removal Rock, Sand, Soil, Silt & SedimentCubic Yard (CY)From waterways and adjacent areas impacted by flooding to DMS or Final Disposal10$ - 0
52Removal Rock, Sand, Soil, Silt & SedimentCubic Yard (CY)From ROW to DMS10$ - 0
53Removal Rock, Sand, Soil, Silt & SedimentCubic Yard (CY)From DMS to Final Disposal10$ - 0
55SweepingLinear MileN/A5$ - 0
56TiresEachFrom waterways and adjacent areas impacted by flooding to Final Disposal15$ - 0
57TiresEachFrom ROW to Final Disposal15$ - 0
58Removal & Hauling of Infectious WastePer PoundRemoval and Hauling of Infectious Waste to Final Disposal5$ - 0
59Removal & Hauling of Chemical, Biological, Radiological, & Nuclear Contaminated DebrisPer PoundRemoval & Hauling of Chemical, Biological, Radiological, & Nuclear Contaminated Debris to Final Disposal5$ - 0