Engineering Study Summary: Gadsden County Special Needs Storm Shelter

This is an engineering study report prepared by Simes & Rosch Engineering on behalf of Gadsden County for the retrofit of HCA Florida Gadsden Emergency Facility (formerly Gadsden County Hospital) in Quincy to function as a Special Needs Storm Shelter. The study evaluates the adequacy of existing mechanical, electrical, and plumbing (MEP) systems at the approximately 16,800 square feet of patient care wings and adjacent core area designated for shelter use. The proposed shelter will accommodate individuals with special needs during hurricanes and natural disasters, with the facility also intended for secondary uses such as a senior center or conference center throughout the year. The original hospital was constructed in the early 1980s, with the shelter area gutted to remove interior partitions, drop ceilings, flooring, power, lighting, and plumbing fixtures. The study was conducted following a June 6, 2023 site survey and addresses compliance with Florida Building Code Chapter 423, ICC 500 standards, and Florida Department of Health guidelines for special needs shelters.

The study recommends independent mechanical and electrical systems separate from the existing hospital infrastructure. For HVAC, a dedicated 1,700 CFM outdoor air system with energy recovery wheel (7.5 tons cooling capacity), a 10-ton core area heat pump system, and replacement of 36 existing packaged terminal heat pumps are proposed. Plumbing requirements include six new ADA-accessible toilet rooms with water closets, lavatories, and showers to comply with ICC 500 standards requiring one water closet per 50 occupants. Electrical systems include a new 600-amp service, a separate 300 KW diesel generator with 72-hour sub-base tank, new distribution panels, 200 LED light fixtures, telecommunications infrastructure with Category 6 cabling, fire alarm system, and security system provisions. The preliminary MEP cost estimate totals $1,765,170, including materials, labor, sales tax, labor taxes, insurance, fringe benefits, overhead, and a 10-percent contingency. All mechanical and electrical systems serving the shelter are required to operate on standby power with a minimum 24-hour capacity to support life-sustaining equipment and maintain continuous operations during power failures.

View the file

Other files

File Type Posted
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT_(Addendum_#4_Revision).pdf PDF
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT.pdf PDF
RFP_26-10_Hurricane_Special_Needs_Shelter_-_LEGAL_ADVERTISEMENT.docx DOCX document
Addendum_#5_Electrical_Study._Revised.pdf PDF
Addendum_#5_Design_Specifications_Rev_2.pdf PDF
ITB_2612_Construction_Special_Needs_Shelter_Att_5_Engineering_Drawings_Specifications.pdf PDF
2425301_Revised_Electrical_Drawings_111825_Signe.pdf PDF
ITB_2612_Construction_Special_Needs_Shelter_Att_4_Engineering_Study_March_12_2024.pdf PDF
Special_Needs_Agreement_Mod_#1.pdf PDF
special_needs_agreement.pdf PDF
Special_Needs_Retrofit_MOD_#2_-_Fully_Executed_Contract.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
West_Bay_Parkway_Engineering_Design_Services_(Addendum_#1_Revision).pdf PDF
West_Bay_Parkway_Engineering_Design_Services.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_E-_Engineer_Performance_Review_Template_FILLABLE.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_E-_Engineer_Performance_Review_Template_FILLABLE.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3/12/24

3/12/24

Section 1

Section 2

Section 3

Section 4

Section 5

Section 6

Attachments:

TABLE OF CONTENTS

Introduction

Criteria

Mechanical Systems

Plumbing Systems

Electrical Systems

Conclusions and Recommendations

Drawings

Preliminary Cost Data

Photos

Calculations

1. Introduction.

Gadsden County, Florida has identified a requirement for a new Special Needs Storm Shelter for use during hurricanes and other natural disasters. HCA Florida Gadsden Emergency Facility (formally Gadsden County Hospital) in Quincy has been identified as the potential site for this future shelter. As a result, the County contracted with AE Engineering, Incorporated who in-turn hired Simes & Rosch Engineering to evaluate the adequacy of existing mechanical, electrical and plumbing (MEP) systems at the emergency facility for use as a special needs shelter. This report will investigate the relevant criteria, existing conditions, and required MEP upgrades for the shelter. Note that the adequacy of the structure itself will be evaluated by others and is not included in the scope of this study.

The original hospital was designed and built in the early 1980s. With the exception of approximately 16,800 square feet of patient care wings and adjacent core that make up the proposed area for the shelter, the facility was upgraded in approximately 2009, including new 480 Volt electrical distribution and generator systems conforming to NEC Article 517 and a new chilled water HVAC system with air cooled chillers. The proposed area for the shelter was gutted with most of the interior partition walls, drop ceilings, flooring, power, lighting, and plumbing fixtures removed (Photo 1 shows a typical wing).

This study assumes that the three wings will be dedicated to people with special needs and the core would be used for administrative personnel, kitchen area, equipment rooms, storage, etc. (See Sheet A1, Overall Plan in the drawings). Sheet A2, shows a preliminary concept for typical wing with cots, nursing stations, restrooms, and storage rooms as previously designed for the County by local Architect, Joel Sampson. Per discussions, the shelter will also be used for other purposes throughout the year (i.e. potentially a senior center, conference center, etc), which have not been finalized. Ideally, the design will also support these other uses.

Note that the configuration, sizing, and cost data of MEP systems below are preliminary and may change as the design matures.

2. Criteria.

Florida Building Code (FBC) Chapter 423, Storm Shelters, covers requirements for storm shelters. FBC Chapter 423 calls out 2020 ICC 500, Standard for the Design and Construction of Storm Shelters, and FBC Chapter 16, Structural Design as the main source of detailed criteria for storm shelters. Chapter 7 of ICC 500 covers specific MEP system features for hurricane storm shelters, including ventilation, the number of private water closets and lavatories, drinking water, rainfall drainage, lighting, and standby power. Note that the standby power system for the shelter is required to power the standby lighting and any mechanical ventilation and shall have a capacity for at least 24 hours.

Chapter 64-3, Special Needs Shelter, of the Florida Administrative Code calls out the Florida Department of Health Guidelines for Special Needs Shelters (2016 Edition) as the source of specific requirements for Special Needs Shelters. Per the guidelines, a person with special needs is defined as someone who during periods of evacuation or emergency, requires sheltering assistance, due to physical impairment, mental impairment, cognitive impairment, or sensory disabilities. Along with the other requirements for a typical storm shelter, the special needs shelter shall have “backup generator power to provide electricity during a power failure sufficient to support life sustaining equipment for the anticipated demand”.

3. Mechanical Systems.

On June 06, 2023, personnel from AE Engineering and Simes & Rosch visited the site to survey the condition and configuration of the existing heating, ventilation and cooling (HVAC) systems as described below:

a. HVAC Systems.

(1) Existing HVAC Systems. The existing HVAC systems include air-cooled chillers, heating hot water boilers, associated chilled water and hot water pumps, central station air handling units (AHU’s), fan coil units, packaged terminal heat pumps (PTHP”S) and exhaust fans. The HVAC systems were renovated in approximately 2009 and the chillers, boilers and AHU’s were replaced at this time. The 2009 renovation was limited to the area that the hospital occupies and did not include renovations to the wings that are intended to be used for the new shelter. There are 2 air-cooled chillers sized at 110 Tons each and approximately 9 central station AHU’s that serve the facility. The central station AHU”S serve critical parts of the hospital like operating and other medical procedural rooms. The patient rooms are served by PTH’S. The existing HVAC systems are in good condition but are essentially already separated from the wings for the shelter and are not recommended for use for the shelter. These systems are also not served by the emergency generator and are not intended to be provided with emergency power.

(2) Shelter HVAC Requirements. ICC 500 Section 703.6 requires mechanical ventilation systems for occupancies greater than 50 people. The required ventilation rate is 5 CFM per person and the ventilation system must be on standby power. It should be noted that the Florida mechanical code also requires

0.06 CFM/SF of ventilation air so this will be included in the ventilation calculations. The county requires that all HVAC systems serving the shelter be on standby power.

(3) Shelter Ventilation System. To comply with the ventilation requirements, it is recommended that a dedicated outdoor air system be provided for the shelter.

Preliminary sizing for this system is 1,700 CFM. Since this is a 100% outside air system, the unit must incorporate an energy recovery wheel. This system will provide ventilation air to the wings and central core area. The energy recovery wheel will provide significant energy savings and will reduce the required cooling capacity to approximately 7.5 Tons. This will be a direct expansion type unit and will not be connected to the existing chilled water system. This unit will be served by the standby generator. This unit will require a new mechanical room space for the air handling unit. The ideal location for this AHU will be in the NW corner of the core area adjacent to the west wing. The condensing unit section is intended to be located to the south of the west wing. See Drawing M1 for proposed layout.

(4) Shelter Wings HVAC Systems. The existing wings were served by a total of 36 PTHP’s. It is recommended that this same approach be used. The existing PTHP’s are in various states of disrepair so it is recommended that all 36 existing PTHP’s be replaced with new units. These units will be served by the standby generator.

(5) Shelter Core Area HVAC System. The central core area is recommended to be served by a dedicated direct expansion VAV split-system heat pump. This unit has an estimated capacity of 10 Tons. The air handling unit will be located in the proposed new mechanical room and the outdoor unit will be located adjacent to the DOAS-1 condensing unit. This unit will be served by the standby generator.

4. Plumbing Systems.

a. Domestic Water Systems.

(1) Shelter Plumbing Requirements. ICC 500 Table 703.3 requires one water closet per 50 people and that water closets must be private. Lavatories are not required.

Section 703.4 requires 1 gallon of drinking water per occupant. The proposed new plumbing systems for the shelter wings is shown in the concept drawing sheet A2 that was discussed in the introduction. Each side of each wing would be provided with a new toilet room for a total of 6 new toilet rooms. Each toilet room would be provided with a water closet, lavatory, and shower. All toilet rooms would be ADA accessible. New plumbing systems for the core area would be determined based on the specific architectural layout for the core area.

(2) Domestic Cold Water. The shelter area is currently served by the domestic cold-water system that serves the hospital. The existing system is sufficient in size capacity to serve the shelter and unless there is a specific requirement by the county to provide a separate domestic water service to the shelter, it is recommended that the shelter remain connected to the existing domestic cold-water system. If desired, a meter could be added to the cold-water piping serving the shelter. This meter could be used to domestic water monitor consumption by the shelter if necessary to calculate the water cost of the shelter.

(3) Domestic Hot Water. The shelter area is currently served by the domestic hot water system that serves the hospital. The existing system is sufficient in size and capacity to serve the shelter. If desired, a new dedicated domestic water heater could be provided to serve the shelter. This water heater would be installed in the proposed new mechanical room.

b. Sanitary Systems.

(1) The shelter area is currently connected to the existing hospital sanitary system.

The existing sanitary system is sufficient in size capacity to serve the shelter and there is no need to provide a dedicated sanitary service for the hospital. It is recommended that the new and existing sanitary systems in the shelter be connected to the existing sanitary system.

5. Electrical Systems.

a. Power.

(1) Existing Electrical Distribution System. As mentioned in the introduction, with the exception of the wings and core that make up the proposed area for the shelter, the facility electrical distribution system was upgraded in approximately 2009 (see Partial Existing Single Line Diagram, Sheet E3). A pad-mount utility transformer (see Photo 2) feeds a 2,000 Amp, 480Y/277 Volt main Switchboard ‘MSB’ in the main electrical room that in turn, feeds normal power panelboards throughout the building. Switchboard ‘MSB’ also feeds a hospital style Type 1 Essential Electrical System as defined by NEC Article 517 (via three automatic transfer switches). The essential power system is also fed by a 500 KiloWatt (KW), 480Y/277 Volt diesel emergency generator with a 2,500-gallon sub-base tank, weatherproof enclosure and a concrete barrier wall for protection. All of this equipment appears to be in excellent condition. Note that if the existing electrical distribution system was used for the shelter, it is anticipated that the Florida Agency for Healthcare Administration (AHCA) will not allow the shelter to use the existing transfer switches given that it does not fall under the allowable electrical loads for essential power systems as defined by NFPA 99, Healthcare Facilities. Also, the existing generator appears to be fully loaded without the shelter (see Generator load calculations in the attachments). Given this and the fact that the County wants to keep the electrical service separate from the emergency facility for billing purposes, a new electrical service and meter would be provided for the shelter as described below.

(2) Electrical Service for the Shelter. Based on preliminary load data, a new 600 Amp, 480 Volt underground service lateral would be provided from the existing pad-mounted 480Y/277V utility transformer to new service equipment for the shelter include a CT enclosure and meter and a new 600 Amp, 480 Volt three pole enclosed circuit breaker in a NEMA 3R enclosure. A 600 Amp, 480 Volt feeder would be routed to a new 600 Amp, 480 Volt Panel ‘MDP’ via a new service-rated 600 Amp, 480 Volt, four pole automatic transfer switch that will allow automatic transfer to a new generator described below.

(3) New Generator for Shelter. The SpecSizer generator sizing program from Caterpillar was used to evaluate the proposed loads on the new generator (see SpecSizer report in the calculations). The estimated load for the new shelter is 244 KVA. Note that per discussions, this estimated load for the shelter includes the new HVAC system described above. Based on the fact that the existing generator appears to be fully loaded and the shelter is not part of the emergency care facility, which falls under the Florida Agency for HealthCare Administration (AHCA), the standby power for the shelter will be kept separate from the hospital essential power system described above. A new separate 300 KW diesel generator with 150 mph rated aluminum enclosure and a 72 hour subbase tank is recommended for the shelter.

(4) Electrical Distribution for Shelter. 600 Amp, 480 Volt Panel ‘MDP’, located in the core, will feed all 277 Volt lighting in the shelter, as well as 480 Volt HVAC equipment (see Electrical Plan, Sheet E1 for preliminary location). Panel ‘MDP’ will also feed new 600 Amp, 208Y/120 Volt Panel ‘SLDP’ (via a 150 KVA dry transformer) that will provide power to 225 Amp, 208Y/120 Volt Panel‘SL4’ (also located in the core) and 225 Amp Panels ‘SL1’ through ‘SL3’, located in the wings. These panels will feed all 120 and 208 Volt loads, including receptacles for medical equipment (i.e oxygen concentrators), the exhaust fans, telecommunications, and fire alarm panel. See panel schedules on Sheet E2 and new single line diagram on Sheet E3 for more information.

b. Lighting. Most of the original lighting in the area of the proposed shelter has been removed. New energy efficient, recessed 2’ x 4’ LED light fixtures will be provided throughout the shelter. The light fixtures will have minimum color rendering index (CRI) of 80 and a color temperature rating of 4,000K. Light fixtures in the corridors and along the path of egress will be provided with 90-minute emergency batteries. Exterior light fixtures will consist of photocell controlled, full cutoff LED wall pack fixtures to replace the existing fixtures.

Lighting Control. To increase energy efficiency, a lighting control system consisting of occupancy sensors and time controls will be provided where appropriate and as required by the 2023 Florida Energy Code.

c. Telecommunications. Telecommunications Systems will be provided per EIA/TIA and the County’s standards. Per discussions, the telecommunication systems will be kept separate from the existing system for the emergency facility. Details are as follows:

(1) Telecommunications Outside Plant. 2-4” telecom service conduits (one with 4-1” innerducts) will be provided from the property line to a new IT room in the core.

See Telecommunications Riser Diagram, Sheet E5, for more information.

(2) Telecommunications Inside Plant. A wall-mounted telecommunications rack with Category 6 patch panels will be provided (active equipment by Owner). Standard workstation outlets consisting of two Cat 6 jacks will be provided in offices and at the nurse’s stations per EIA/TIA standards. A 4” x 4” box with conduit routed above the ceiling will be provided for each workstation outlet. Horizontal Category 6 cabling will be supported by J Hooks above the ceiling.

Approximately eight network drops and related power will be provided for wireless access points (WAPs) throughout the shelter.

(3) Telecommunication Grounding. Telecommunications grounding will be provided per IEEE Emerald Book, latest edition, and TIA/EIA standards with all grounding pathways and conductors labeled in accordance with TIA/EIA 606-A. A main 18”x 4”x 1/4” copper grounding bar will be provided in the telecom room. A #6 AWG insulated grounding conductor will be provided from the grounding bar to each equipment cabinet.

(4) Cable TV (CATV) System. The point of connection for the CATV system will be a new handhole located five feet outside the building. A (4) inch conduit will be provided from the handhole to the CATV distribution board located in the new telecommunications room. Service entrance cable will be provided by the local CATV provider. RG-6 and RG-11 cabling will be provided throughout the facility (based on CATV outlet locations provided by the County).

d. Security Systems. Boxes, raceways, and power will be provided for intrusion detection, access control, and closed-circuit television (CCTV) systems throughout the shelter based on security systems selected by the County.

e. Fire Alarm. The existing abated area that will be used for the shelter is fed by limited fire alarm devices as part of the fire alarm for the facility. A new separate addressable fire alarm system will be provided for the shelter. The fire alarm panel will be located in the electrical room in the core with an annunciator at the manager’s office in the core.

6. Conclusions and Recommendations.

New independent mechanical and electrical systems should be provided for the shelter as described above. An assessment of the structure should be completed before a final decision is made on the viability of this facility for use as a special needs shelter.

DRAWINGS

OV

ER

AL

L

PL

AN

STUDY DRAWING - NOT FOR CONSTRUCTION

FL

. C er t.

of A ut h.

E n g in e e r in gR

S& Si me s &

R os ch , L

LC

C

O N

SU

LT

IN

G

E N

G

IN

E E

R S

F ul le rt on S tr ee t, Su ite

Ja ck so nv ill e, F

L

Ph

4)

-3

F ax

4)

-9

S T

U D

Y

F

O R

G

A D

S D

E N

C

U

N T

Y

S P

E C

I A

L

N

E E

D

M E

R G

E N

H E

L T

E R

B

L U

E

S

T A

R

H

W

Q

U I N

C Y

F

L O

R I D

A

SCALE: 1" = 20'

0 20' 40'1" = 20'

OVERALL PLAN

N

EL

EC

TR

ICA

L S

CH

ED

UL

ES

A2

STUDY DRAWING - NOT FOR CONSTRUCTION

FL

. C er t.

of A ut h.

E n g in e e r in gR

S& Si me s &

R os ch , L

LC

C

O N

SU

LT

IN

G

E N

G

IN

E E

R S

F ul le rt on S tr ee t, Su ite

Ja ck so nv ill e, F

L

Ph

4)

-3

F ax

4)

-9

S T

U D

Y

F

D

S D

U

N

E C

I A

L

N

E E

E

R G

E N

E

L T

E R

B

L U

E

S

T A

R

H

I N

C Y

F

L O

R I D

A

3/32" = 1'

ELECTRICAL PLAN

N

SPECIFIC NOTES:

EL

EC

TR

IC

AL

P

LA

N

SCALE: 3/32" = 1'-0"

0 10' 20'

EL

EC

TR

IC

AL

S

CH

ED

UL

ES

STUDY DRAWING - NOT FOR CONSTRUCTION

FL

. C er t.

of A ut h.

E n g in e e r in gR

S

Si me s & R os ch

, L

LC

C O

N

SU

LT

IN

G E

N G

IN

E

E R

S

F ul le rt on

S tr ee t, Su ite

Ja ck so nv ill e, F L

Ph

4)

-3

F ax

4)

-9

S T

U D

Y

F

D

S D

U

N

E C

I A

L

N

E E

E

R G

E N

E

L T

E R

B

L U

E

S

T A

R

H

I N

C Y

F

L O

R I D

A PANEL - SLDP

PANEL - MDP PANEL - SL1

PANEL - SL2

PANEL - SL3

PANEL - SL4

PA

RT

IA

L

EX

. S

IN

GL

E

LI

NE

D

IA

GR

AM

, E

M

FA

CI

LI

TY

STUDY DRAWING - NOT FOR CONSTRUCTION

FL

. C er t.

of A ut h.

E n g in e e r in gR

S

Si me s & R os ch

, L

LC

C O

N

SU

LT

IN

G E

N G

IN

E

E R

S

F ul le rt on

S tr ee t, Su ite

Ja ck so nv ill e, F L

Ph

4)

-3

F ax

4)

-9

S T

U D

Y

F

D

S D

U

N

E C

I A

L

N

E E

E

R G

E N

E

L T

E R

B

L U

E

S

T A

R

H

I N

C Y

F

L O

R I D

A

PARTIAL EXISTING SINGLE LINE DIAGRAM

EMERGENCY FACILTY

SI

NG

LE

L

IN

E

DI

AG

RA

M, S

HE

LT

ER

STUDY DRAWING - NOT FOR CONSTRUCTION

FL

. C er t.

of A ut h.

E n g in e e r in gR

S

Si me s & R os ch

, L

LC

C O

N

SU

LT

IN

G E

N G

IN

E

E R

S

F ul le rt on

S tr ee t, Su ite

Ja ck so nv ill e, F L

Ph

4)

-3

F ax

4)

-9

S T

U D

Y

F

D

S D

U

N

E C

I A

L

N

E E

E

R G

E N

E

L T

E R

B

L U

E

S

T A

R

H

I N

C Y

F

L O

R I D

A

SINGLE LINE DIAGRAM, SHELTER

SPECIFIC NOTES:

TE

LE

CO

MM

UN

IC

AT

IO

NS

R

IS

ER

D

IA

GR

AM

STUDY DRAWING - NOT FOR CONSTRUCTION

FL

. C er t.

of A ut h.

E n g in e e r in gR

S

Si me s & R os ch

, L

LC

C O

N

SU

LT

IN

G E

N G

IN

E

E R

S

F ul le rt on

S tr ee t, Su ite

Ja ck so nv ill e, F L

Ph

4)

-3

F ax

4)

-9

S T

U D

Y

F

D

S D

U

N

E C

I A

L

N

E E

E

R G

E N

E

L T

E R

B

L U

E

S

T A

R

H

I N

C Y

F

L O

R I D

A

SPECIFIC NOTES:

GENERAL NOTES:

EX.X

XX

SCALE: NTS

TELECOMMUNICATIONS RISER DIAGRAM

PRELIMINARY COST DATA

DATE PREPARED

MEP COST ESTIMATE 11-Jan-24 SHEET 1 OF 2

CUSTOMER: CONSTRUCTION CONTRACT NO. IDENTIFICATION NO.

GADSDEN COUNTY

ESTIMATED BY CATEGORY CODE

PROJECT TITLE

ENGINEERING STUDY, SPECIAL NEEDS SHELTER DAVE SIMES AND ART HILL

STATUS OF DESIGN JOB ORDER NO.

___ 35% ___ 100% ___ FINAL ___ OTHER

ITEM DESCRIPTION QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE

NUMBER UNIT UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL

ELECTRICAL:

300 KW GENERATOR, ATS, AND ACCESSORIES 1 LS $288,000.00 $288,000.00 $35,000.00 $35,000.00 $323,000.00 $323,000.00 ELECTRICAL DISTRIBUTION 16000 SF $13.00 $208,000.00 $11.00 $176,000.00 $24.00 $384,000.00 LIGHTING, 2' x 4' LED FIXTURES 200 EA $245.00 $49,000.00 $150.00 $30,000.00 $395.00 $79,000.00 TELECOMMUNICATIONS 1 LS $12,000.00 $12,000.00 $18,000.00 $18,000.00 $30,000.00 $30,000.00 FIRE ALARM SYSTEM 1 LS $19,000.00 $19,000.00 $24,000.00 $24,000.00 $43,000.00 $43,000.00 SECURITY SYSTEMS (RACEWAY AND BOXES ONLY) 1 LS $3,900.00 $3,900.00 $4,500.00 $4,500.00 $8,400.00 $8,400.00

MECHANICAL:

DOAS-1 & CU-1 1 EA $55,000.00 $55,000.00 $40,000.00 $40,000.00 $95,000.00 $95,000.00 AHU-1 &HP-1 1 EA $38,000.00 $38,000.00 $35,000.00 $35,000.00 $73,000.00 $73,000.00

PTHP'S 36 EA $2,000.00 $72,000.00 $1,000.00 $36,000.00 $3,000.00 $108,000.00

DUCTWORK & AIR DISTRIBUTION 1 LS $20,000.00 $20,000.00 $20,000.00 $20,000.00 $40,000.00 $40,000.00

PLUMBING: 1 LS $20,000.00 $20,000.00 $40,000.00 $40,000.00 $60,000.00 $60,000.00

SUBTOTAL: $784,900.00 $458,500.00 $1,243,400.00

DATE PREPARED

MEP COST ESTIMATE 14-May-09 SHEET 2 OF 2

CUSTOMER: CONSTRUCTION CONTRACT NO. IDENTIFICATION NO.

GADSDEN COUNTY

ESTIMATED BY CATEGORY CODE

PROJECT TITLE

ENGINEERING STUDY, SPECIAL NEEDS SHELTER

STATUS OF DESIGN JOB ORDER NO.

___ 35% ___ 100% ___ FINAL ___ OTHER

ITEM DESCRIPTION QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE

NUMBER UNIT UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL

SUBTOTAL FIRST PAGE: $784,900.00 $458,500.00 $1,243,400.00

SALES TAX 7% $54,943.00 $54,943.00

LABOR TAX, INSURANCE, FRINGE 35% $160,475.00 $160,475.00

SUBTOTAL $1,458,818.00

PROFIT & OVERHEAD 10% $145,881.80

SUBTOTAL $1,604,699.80

CONTINGENCY @ 10 PERCENT: $160,469.98

GRAND TOTAL: $1,765,170

PHOTOS

Photo 1, Typical Wing

Photo 2, Typical Corridor

Photo 3, Existing Air Cooled Chillers

Photo 4, Existing Utility Pad-Mount Transformer and CT Meter

Photo 5, Existing Main Switchboard ‘MSB’

Photo 6, Existing Generator Alternator Nameplate

CALCULATIONS

PRELIMINARY GENERATOR SIZING REPORT,

EXISTING GENERATOR

Project Sizing Report

Sizing Id 11026404 Electricity Supply 60 Hz 480/277 V

Project Name Gadsden County Emergency Shelter Connection STAR

Customer Name AE Engineering Max. Ambient Temperature 77.0 F

Region U.S. Altitude 278.0 Ft. A.S.L

Prepared By Adam Stone Humidity 30%

Modified Date 5-Jan-2024 Project Description

Load Analysis Summary

Max Transient Load Step 294.5 SkVA / 283.5 SkW

Peak Transient Load Step 548.8 SkVA / 529.1 SkW

Final Running Load 511.5 kVA / 504.0 kW / 0.99 PF

Max Running Non Linear Load 184.1 RkVA

Selection Criteria Step 2 Peak SkW requirements

Project THDI 41.88%

Generator Set

Engine Model (1) of C18 Nameplate Rating 550.0 ekW / 687.5 kVA / 0.8 PF

Package Model D550GC Site Output Rating 550 ekW / 687.5 kVA

Voltage Regulator and Slope D350 2:1 slope; Rating Type Standby

Feature Code C18DE7A Open / Enclosure Open

Fuel Diesel UL Listed UL Listed

Sizing Methodology Conventional Capacity Used 91.6%

Project THDV 11.09% Generator Set Type Stationary

Engine

Make/Model C18 Emissions / Certifications EPA ESE

Aspiration TA Governor ELEC

Cylinder Configuration INLINE - 6 Aftercooler Type ATAAC

Speed 1800 RPM Displacement 1,106 Cubic Inch / 18 Liter

Engine Performance Number DM8517 Bore 145

Fuel Consumption at 100% Load 39.4 gph Stroke 183

Alternator

Alternator Type/Frame Size SR500 / M3173L41 Insulation Class H

Alternator Winding Pitch 0.6667 Temperature Rise 130 C

Excitation/Winding Type SE / RANDOM Number Of Poles 4

Alternator Arrangement Number 6263799 Number of Leads 6

Subtransient Reactance X''d 0.0988 Rated Amps 826.9

**** See your Caterpillar dealer and/or Spec Sheet for technical information.

***** Package Power Tolerance: +/- 5%

Block Load(Only) Transient Response *

Load Change % FDip % VDip % Recovery Time (sec)

0 - 25 <5% <5% < 3

0 - 50 <5% 8.1 < 3

0 - 75 7.7 14.5 < 3

0 - 100 12.3 23.7 < 3

0 - 100 Load Change %

0 < 3

Recovery Time (sec)

Transient Performance Block Load (only) Transient Response values are at factory conditions with a resistive load. This information is representative of a typical Cat generator set, but is not guaranteed. Generator set block load capabilities at site conditions may vary from factory transient response test results due to site altitude, site ambient, and engine to engine variation.

Load Report

Project Name Gadsden County Emergency Shelter Electricity Supply 60 Hz 480/277 V

Customer Name AE Engineering Rating Type Standby

Region U.S. Max. Ambient Temperature 77.0 F

Prepared By Adam Stone Altitude 278.0 Ft. A.S.L

Modified Date 5-Jan-2024 Humidity 30%

Engine Model (1) of C18 Nameplate Rating 550.0 ekW / 687.5 kVA / 0.8 PF

Load Details Permitted Predicted Transient Inrush Running Resultant Peak Cumulative Running

Load Step Load Description FDip VDip FDip VDip SkVA SkW kVA kW SkVA SkW kVA kW

Step 1

1.1 1x161.00 kVA - Resistive Load - ATS-C: Resistive, 3-Phase 30% 30% 161.0 161.0 161.0 161.0

1.2 2x15.00 HP - PUMP-3 (P3), PUMP-4 (P4): NEMA, Centrifugal Pump, Soft Starter, 300% Current Limit, Intermittent , 29.1 THDI%

30% 30% 90.9 43.6 30.3 25.1

1.3 1x78.90 kVA - CT R009: Resistive, 3-Phase 30% 30% 78.9 78.9 78.9 78.9

Step 1 Total 30% 30% <5% 8.3% 294.5 283.5 265.6 265.0

Total Through Step 1 299.8 290.1 265.6 265.0

Step 2

2.1 1x53.10 kVA - X-RAY R012: Resistive, 3-Phase 30% 30% 53.1 53.1 53.1 53.1

2.2 2x5.00 HP - PUMP-5 (P5), PUMP-6 (P6): NEMA, Centrifugal Pump, Soft Starter, 300% Current Limit, Intermittent , 29.1 THDI%

30% 30% 33.7 19.2 11.2 8.9

2.3 1x16.60 kVA - Lighting Load - ATS-C: LED Lighting, Distr. 3-Phase, Starting Power Factor: 0.75, Running Power Factor: 0.9 , 60.7 THDI%

30% 30% 19.9 14.9 16.6 14.9

2.4 1x15.50 kVA - Lighting Load - ATS-L: LED Lighting, Distr. 3-Phase, Starting Power Factor: 0.75, Running Power Factor: 0.9 , 60.7 THDI%

30% 30% 18.6 14.0 15.5 14.0

2.5 1x2.50 kVA - Resistive Load - ATS-L: Resistive, 3-Phase 30% 30% 2.5 2.5 2.5 2.5

2.6 1x1.60 kVA - Resistive Load - ATS-Q: Resistive, 3-Phase 30% 30% 1.6 1.6 1.6 1.6

2.7 1x71,652.00 BTU - RTU-1: NEMA, 3-Phase Air Conditioning, VFD, 110% Current Limit, Intermittent, Single Operating Point, 6 Pulse , 29.1 THDI%

20% 20% 0.7 0.7 7.2 6.5

2.8 1x60,392.00 BTU - AHU-2: NEMA, 3-Phase Air Conditioning, VFD, 110% Current Limit, Intermittent, Single Operating Point, 6 Pulse , 29.1 THDI%

20% 20% 0.6 0.5 6.1 5.5

2.9 1x113.61 BTU - AHU-1: NEMA, 3-Phase Air Conditioning, VFD, 110% Current Limit, Intermittent, Single Operating Point, 6 Pulse , 29.1 THDI%

20% 20% 0.0 0.0 0.0 0.0

2.10 1x78.90 kW - MAC-1: Medical Load, 50 Imaging mA, 15 Imaging kV , 46.7 THDI% 10% 10% 83.1 78.9 83.1 78.9

2.11 1x53.10 kW - MVP-1: Medical Load, 50 Imaging mA, 15 Imaging kV , 46.7 THDI% 10% 10% 55.9 53.1 55.9 53.1

Step 2 Total 10% 10% <5% 7.0% 257.5 238.5 511.5 504.0

Total Through Step 2 530.5 517.0 511.5 504.0

Intermittent Step

3.1 1x15.00 HP - PUMP-3 (P3), PUMP-4 (P4): NEMA, Centrifugal Pump, Soft Starter, 300% Current Limit, Intermittent , 29.1 THDI%

30% 30% 45.4 21.8 15.1 12.6

3.2 1x15.00 HP - PUMP-3 (P3), PUMP-4 (P4): NEMA, Centrifugal Pump, Soft Starter, 300% Current Limit, Intermittent , 29.1 THDI%

30% 30% 45.4 21.8 15.1 12.6

Step 3 Total 10% 10% <5% <5% 90.9 43.6 539.3 529.2

Total Through Step 3 548.8 554.2 511.5 504.0

Load Analysis Summary : Generator set meets site requirements

Maximum Step Maximum Peak Final Running

SkVA SkW SkVA SkW kVA kW

294.5 283.5 548.8 529.1 511.5 504.0

1,634.88 ft³/min

0.22 ft²

24,851.00 ft³/min 0.11 ft²

4,552.05 ft³/min

0.03 lb/ft³

Engine Room Tools Summary

Project Name Gadsden County Emergency Shelter Electricity Supply 60 Hz 480/277 V

Customer Name AE Engineering Rating Type Standby

Region U.S. Max. Ambient Temperature 77.0 F

Prepared By Adam Stone Altitude 278.0 Ft. A.S.L

Modified Date 5-Jan-2024 Humidity 30%

Engine Model (1) of C18 Nameplate Rating 550.0 ekW / 687.5 kVA / 0.8 PF

Fuel Tank Summary

Running Hours hr Fuel Tank Size 72 Hours

Oversize Factor % Usable Capacity

Fuel Consumption @ 100% Load 39.40 US gal/hr

Radiator Duct and Room Fresh Air Louver Designer Summary

Duct Dimensions from Radiator Side (Length) 98.62 in Combustion Airflow

Duct Dimensions from Radiator Side (Width) 73.43 in Minimum Louver Area

Heat Radiation from Engine & Alternator 105.34 kW Temp Rise 15.44 Deg. F

Engine & Alternator Airflow Radiator Duct Area

Exhaust Back Pressure Summary

Total Straight Pipe Length 0 ft Exhaust Gas Flow

Total Number Of 90 Deg Long Radius Elbow 0 Muffler Pressure Drop

Total Number Of 90 Deg Short Radius Elbow 0 Pressure Drop in Exhaust 0.00 psi

Total Number Of 45 Deg Elbow 0 Max Allowable Pressure Drop

Minimum Exhaust Pipe Diameter Data coming soon

Stack Temperature 969.08 Deg. F

Gas Density

Disclaimer: These engine room design calculations are intended for general information and guidance purpose only. A professional engineer, licensed in the appropriate field of engineering, should be consulted for a formal evaluation. Caterpillar disclaims all representations and warranties of any kind and shall have no liability in law or equity for damages consequential or otherwise arising from the use of these calculations.

PRELIMINARY GENERATOR SIZING REPORT,

SHELTER GENERATOR

Project Sizing Report

Sizing Id 11027152 Electricity Supply 60 Hz 480/277 V

Project Name Gadsden County Emergency Shelter - New Load Only Connection STAR

Customer Name AE Engineering Max. Ambient Temperature 77.0 F

Region U.S. Altitude 278.0 Ft. A.S.L

Prepared By Adam Stone Humidity 30%

Modified Date 4-Jan-2024 Project Description

Load Analysis Summary

Max Transient Load Step 190.0 SkVA / 190.0 SkW

Peak Transient Load Step 334.1 SkVA / 277.0 SkW

Final Running Load 235.7 kVA / 232.0 kW / 0.98 PF

Max Running Non Linear Load 11.6 RkVA

Selection Criteria Step 2 Peak SkW requirements

Project THDI 60.72%

Generator Set

Engine Model (1) of C9 Nameplate Rating 300.0 ekW / 375.0 kVA / 0.8 PF

Package Model D300GC Site Output Rating 300 ekW / 375 kVA

Voltage Regulator and Slope D350 2:1 slope; Rating Type Standby

Feature Code C09DE61 Open / Enclosure Open

Fuel Diesel UL Listed UL Listed

Sizing Methodology Conventional Capacity Used 77.3%

Project THDV 3.74% Generator Set Type Stationary

Engine

Make/Model C9 Emissions / Certifications EPA ESE

Aspiration TA Governor ELEC

Cylinder Configuration INLINE - 6 Aftercooler Type ATAAC

Speed 1800 RPM Displacement 537 Cubic Inch / 9 Liter

Engine Performance Number DM8168 Bore 112

Fuel Consumption at 100% Load 22.4 gph Stroke 149

Alternator

Alternator Type/Frame Size SR500 / M2774L4 Insulation Class H

Alternator Winding Pitch 0.6667 Temperature Rise 105 C

Excitation/Winding Type SE / RANDOM Number Of Poles 4

Alternator Arrangement Number 5652322 Number of Leads 12

Subtransient Reactance X''d 0.0993 Rated Amps 451.1

**** See your Caterpillar dealer and/or Spec Sheet for technical information.

***** Package Power Tolerance: +/- 5%

Block Load(Only) Transient Response *

Load Change % FDip % VDip % Recovery Time (sec)

0 - 25 <5% 5.5 < 3

0 - 50 6.8 12.8 < 3

0 - 75 11.2 21.7 < 3

0 - 100 15.8 30.9 < 3

0 - 100 Load Change %

0 < 3

Recovery Time (sec)

Transient Performance Block Load (only) Transient Response values are at factory conditions with a resistive load. This information is representative of a typical Cat generator set, but is not guaranteed. Generator set block load capabilities at site conditions may vary from factory transient response test results due to site altitude, site ambient, and engine to engine variation.

Load Report

Project Name Gadsden County Emergency Shelter - New Load Only Electricity Supply 60 Hz 480/277 V

Customer Name AE Engineering Rating Type Standby

Region U.S. Max. Ambient Temperature 77.0 F

Prepared By Adam Stone Altitude 278.0 Ft. A.S.L

Modified Date 4-Jan-2024 Humidity 30%

Engine Model (1) of C9 Nameplate Rating 300.0 ekW / 375.0 kVA / 0.8 PF

Load Details Permitted Predicted Transient Inrush Running Resultant Peak Cumulative Running

Load Step Load Description FDip VDip FDip VDip SkVA SkW kVA kW SkVA SkW kVA kW

Step 1

1.1 1x190.00 kVA - Resistive Load: Resistive, 3-Phase 30% 30% 190.0 190.0 190.0 190.0

Step 1 Total 30% 30% 9.1% 17.4% 190.0 190.0 190.0 190.0

Total Through Step 1 190.0 190.0 190.0 190.0

Step 2

2.1 12x2.04 Amps - (New) Heat Pump - A Phase:

NEMA, Single Phase Air Conditioning, Line 1-2, Intermittent

30% 30% 53.7 43.5 11.8 10.0

2.2 12x2.04 Amps - (New) Heat Pump - B Phase:

NEMA, Single Phase Air Conditioning, Line 2-3, Intermittent

30% 30% 53.7 43.5 11.8 10.0

Step 2 Total 30% 30% <5% 6.5% 161.0 87.0 220.7 210.0

Total Through Step 2 334.1 277.0 220.7 210.0

Step 3

3.1 12x2.04 Amps - (New) Heat Pump - C Phase:

NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent

30% 30% 53.7 43.5 11.8 10.0

3.2 1x11.60 kVA - Lighting Load: LED Lighting, Distr.

3-Phase, Starting Power Factor: 0.75, Running Power Factor: 0.9 , 60.7 THDI%

30% 30% 13.9 10.4 11.6 10.4

3.3 4x0.25 HP - Exhaust Fan: NEMA, Single Phase Motor, Cap. Start/Ind. Run, Line 1-2, Loaded 30% 30% 13.6 10.8 2.4 1.6

Step 3 Total 30% 30% <5% <5% 120.8 64.7 235.7 232.0

Total Through Step 3 304.8 274.7 235.7 232.0

Intermittent Step

4.1 1x2.04 Amps - (New) Heat Pump - C Phase: NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent 30% 30% 4.5 3.6 1.0 0.8

4.2 1x2.04 Amps - (New) Heat Pump - C Phase: NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent 30% 30% 4.5 3.6 1.0 0.8

4.3 1x2.04 Amps - (New) Heat Pump - C Phase: NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent 30% 30% 4.5 3.6 1.0 0.8

4.4 1x2.04 Amps - (New) Heat Pump - C Phase: NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent 30% 30% 4.5 3.6 1.0 0.8

4.5 1x2.04 Amps - (New) Heat Pump - C Phase: NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent 30% 30% 4.5 3.6 1.0 0.8

4.6 1x2.04 Amps - (New) Heat Pump - C Phase: NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent 30% 30% 4.5 3.6 1.0 0.8

4.7 1x2.04 Amps - (New) Heat Pump - C Phase: NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent 30% 30% 4.5 3.6 1.0 0.8

4.8 1x2.04 Amps - (New) Heat Pump - C Phase: NEMA, Single Phase Air Conditioning, Line 1-3, Intermittent 30% 30% 4.5 3.6 1.0 0.8

Step 4 Total 30% 30% <5% <5% 62.0 29.0 245.1 238.7

Total Through Step 4 280.1 261.0 235.7 232.0

Load Analysis Summary : Generator set meets site requirements

Maximum Step Maximum Peak Final Running

SkVA SkW SkVA SkW kVA kW

190.0 190.0 334.1 277.0 235.7 232.0

916.61 ft³/min

0.22 ft²

21,180.00 ft³/min 0.11 ft²

2,461.22 ft³/min

0.03 lb/ft³

Engine Room Tools Summary

Project Name Gadsden County Emergency Shelter - New Load Only Electricity Supply 60 Hz 480/277 V

Customer Name AE Engineering Rating Type Standby

Region U.S. Max. Ambient Temperature 77.0 F

Prepared By Adam Stone Altitude 278.0 Ft. A.S.L

Modified Date 4-Jan-2024 Humidity 30%

Engine Model (1) of C9 Nameplate Rating 300.0 ekW / 375.0 kVA / 0.8 PF

Fuel Tank Summary

Running Hours hr Fuel Tank Size Data coming soon

Oversize Factor % Usable Capacity Data coming soon

Fuel Consumption @ 100% Load 22.43 US gal/hr

Radiator Duct and Room Fresh Air Louver Designer Summary

Duct Dimensions from Radiator Side (Length) 93.73 in Combustion Airflow

Duct Dimensions from Radiator Side (Width) 56.69 in Minimum Louver Area

Heat Radiation from Engine & Alternator 42.22 kW Temp Rise 7.09 Deg. F

Engine & Alternator Airflow Radiator Duct Area

Exhaust Back Pressure Summary

Total Straight Pipe Length 0 ft Exhaust Gas Flow

Total Number Of 90 Deg Long Radius Elbow 0 Muffler Pressure Drop Data coming soon

Total Number Of 90 Deg Short Radius Elbow 0 Pressure Drop in Exhaust 0.00 psi

Total Number Of 45 Deg Elbow 0 Max Allowable Pressure Drop Data coming soon

Minimum Exhaust Pipe Diameter Data coming soon

Stack Temperature 927.19 Deg. F

Gas Density

Disclaimer: These engine room design calculations are intended for general information and guidance purpose only. A professional engineer, licensed in the appropriate field of engineering, should be consulted for a formal evaluation. Caterpillar disclaims all representations and warranties of any kind and shall have no liability in law or equity for damages consequential or otherwise arising from the use of these calculations.