EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf

PDF 315 KB Posted

Attached to
Fire Rescue Headquarters and Training Facility Feasibility Study
Solicitation number
26-10
Issued by
Glades County, Florida

About this file

This is a Supplemental Agreement No. 2 document for a TRIP Grant Agreement related to the West Bay Parkway Engineering Design Services project in Florida, executed through DocuSign on December 30-31, 2025, and January 5, 2026. The project, funded by the Florida Department of Transportation (FDOT) Transportation Regional Incentive Program (TRIP) under FPN 453941-4-34-01 and Contract G3210, involves engineering design services for a new two-lane roadway with a shared use path and preliminary bridge design spanning the intracoastal waterway from the powerline easement north of US Highway 98 to the Bay County line. The scope of work encompasses survey, geotechnical analysis, roadway design, preliminary bridge design, stormwater design, and right-of-way requirements identification. Proposers must be licensed to practice engineering in Florida and certified by FDOT, with documentation submitted as part of their proposals. The original solicitation, issued as a Request for Qualifications (RFQ), required submissions by November 6, 2025, at 3:00 PM through the County's eProcurement Portal.

The project is funded through FDOT TRIP grant funds, requiring compliance with applicable state procurement regulations under Chapter 287.055, Laws of Florida (the Consultants' Competitive Negotiation Act). The supplemental agreement document evidences the formal execution and binding nature of the grant agreement terms between involved parties. Contractors must be registered and active with SAM.gov and comply with all federal and state requirements associated with FDOT funding. The proposed roadway will connect to the existing West Bay Parkway infrastructure developed by the St Joe Company and extend northward to the Walton County/Bay County line, positioning this as a significant regional transportation infrastructure project with multiple engineering disciplines required for successful delivery.

View the file

Other files

File Type Posted
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT_(Addendum_#4_Revision).pdf PDF
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT.pdf PDF
RFP_26-10_Hurricane_Special_Needs_Shelter_-_LEGAL_ADVERTISEMENT.docx DOCX document
2425301_Revised_Electrical_Drawings_111825_Signe.pdf PDF
ITB_2612_Construction_Special_Needs_Shelter_Att_4_Engineering_Study_March_12_2024.pdf PDF
Addendum_#5_Electrical_Study._Revised.pdf PDF
Addendum_#5_Design_Specifications_Rev_2.pdf PDF
ITB_2612_Construction_Special_Needs_Shelter_Att_5_Engineering_Drawings_Specifications.pdf PDF
RFP_26-10_Construction_Special_Needs_Shelter_Engineering_Study.pdf PDF
Special_Needs_Retrofit_MOD_#2_-_Fully_Executed_Contract.pdf PDF
Special_Needs_Agreement_Mod_#1.pdf PDF
special_needs_agreement.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
West_Bay_Parkway_Engineering_Design_Services_(Addendum_#1_Revision).pdf PDF
West_Bay_Parkway_Engineering_Design_Services.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
EXHIBIT_E-_Engineer_Performance_Review_Template_FILLABLE.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_E-_Engineer_Performance_Review_Template_FILLABLE.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Docusign Envelope ID: FE9ADF71-5185-49BE-AF87-7E91A770597A

12/30/2025 | 12:19 PM EST

12/31/2025 | 11:11 AM EST

12/31/2025 | 11:11 AM EST

2026-01-05T09:44:36-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .