This is a Supplemental Agreement No. 1 to a State-Funded Grant Agreement between the State of Florida Department of Transportation (FDOT) and Walton County Board of County Commissioners (BOCC) for the West Bay Parkway Engineering Design Services project. The project involves preliminary engineering and final design of a new two-lane roadway with a shared use path and a bridge structure over the Intracoastal Waterway, extending from the Florida Power and Light right-of-way near US Highway 98 to the Bay County line. The scope of work includes survey, geotechnical investigation, roadway design, preliminary bridge design, stormwater design, and identification of necessary right-of-way requirements. The original agreement was executed on February 25, 2025, under Contract No. G3210 and Fund Project Number 453941-1-34-01. The supplemental agreement, executed on December 23, 2025, modifies Exhibit A regarding right-of-way identification requirements prior to contract expiration and removes the right-of-way certification requirement. The design completion deadline is January 31, 2026, with right-of-way requirements to be identified and provided to the Department prior to the contract expiration date.

The project is funded through FDOT's Transportation Regional Incentive Program (TRIP) as a state-funded grant. Walton County BOCC is required to submit invoices on a quarterly basis, including signed FDOT invoice templates, Project Monitoring Status Reports, consultant invoices with evidence of payment, and copies of cancelled checks or electronic payment confirmations. All plans must be submitted to the Department for review and approval, with a minimum 14-business-day review period. The Recipient must coordinate with the Department's Right of Way Agent if and when right-of-way is identified and must notify the Department prior to commencing any right-of-way activities. Failure to meet the established schedule or obtain written approval for revisions may result in withdrawal of funding. The agreement anticipates future four-laning of the roadway, which must be considered in determining right-of-way requirements and stormwater management facility sizing.

View the file

Other files

File Type Posted
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT_(Addendum_#6_Revision).pdf PDF
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT_(Addendum_#4_Revision).pdf PDF
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT.pdf PDF
RFP_26-10_Hurricane_Special_Needs_Shelter_-_LEGAL_ADVERTISEMENT.docx DOCX document
Addendum_#5_Electrical_Specifications_Permit_Issue.pdf PDF
Addendum_#5_Electrical_Study._Revised.pdf PDF
ITB_2612_Construction_Special_Needs_Shelter_Att_4_Engineering_Study_March_12_2024.pdf PDF
2425301_Revised_Electrical_Drawings_111825_Signe.pdf PDF
Addendum_#5_Design_Specifications_Rev_2.pdf PDF
ITB_2612_Construction_Special_Needs_Shelter_Att_5_Engineering_Drawings_Specifications.pdf PDF
RFP_26-10_Special_Needs_Shelter_Engineering_Drawings_Specifications.pdf PDF
RFP_26-10_Construction_Special_Needs_Shelter_Engineering_Study.pdf PDF
Special_Needs_Retrofit_MOD_#2_-_Fully_Executed_Contract.pdf PDF
Special_Needs_Agreement_Mod_#1.pdf PDF
special_needs_agreement.pdf PDF
RFP_26-10_Speical_Needs_Shelter_Draft_Contract.docx DOCX document
West_Bay_Parkway_Engineering_Design_Services_(Addendum_#3_Revision).pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
West_Bay_Parkway_Engineering_Design_Services_(Addendum_#1_Revision).pdf PDF
West_Bay_Parkway_Engineering_Design_Services.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_E-_Engineer_Performance_Review_Template_FILLABLE.pdf PDF
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

STATE-FUNDED GRANT

SUPPLEMENTAL AGREEMENT

525-010-60

PROGRAM MANAGEMENT

12/18

SUPPLEMENTAL NO.

CONTRACT NO.

G3210

FPN

453941-1-34-01

Recipient: Walton County BOCC

This Supplemental Agreement (“Supplemental”), dated arises from the desire to supplement the State-Funded

Grant Agreement (“Agreement”) entered into and executed on 02/25/2025 as identified above. All provisions in the

Agreement and supplements, if any, remain in effect except as expressly modified by this Supplemental.

The parties agree that the Agreement is to be amended and supplemented as follows:

Exhibit A - Project Description and Responsibilities Exhibit D- Walton County BOCC New Resolution

Reason for this Supplemental and supporting engineering and/or cost analysis:

This supplemental agreement is required to update Exhibit A: Item (c) right of way identification prior to contract expiration date; Item (d) Removal of right of way certification as a requirement of the agreement. The agreement scope language will also be modified as follows: Westbay Parkway final design of new two-lane roadway with shared use path from the Florida Power and Light right-of-way to the Bay County line and includes preliminary engineering for a new bridge over the ICWW. The future 4-laning shall be considered when determining right-of-way and determining size of stormwater management facilities.

IN WITNESS WHEREOF, the parties have caused these presents to be executed the day and year first above written.

RECIPIENT: STATE OF FLORIDA

Walton County BOCC 176 Montgomery Circle DeFuniak Springs, FL 32435 DEPARTMENT OF TRANSPORTATION

By: By:

Name: Rodney Chamberlain, P.E. Name: Brad Drake

Title: Chair, BOCC Title: Director of Transportation Development

Legal Review:

Docusign Envelope ID: 1835D0A3-3C08-4B9A-960A-F7B879FB3D1CDocusign Envelope ID: 3A939FF5-9DB1-46F6-BBE5-04057473FF78

12/23/2025 | 2:22 PM EST

12/23/2025 | 3:05 PM EST

12/23/2025 | 3:05 PM EST

Alt Form 525-010-60eA STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

STATE-FUNDED GRANT AGREEMENT

525-011-0A

PROGRAM MANAGEMENT

05/21

EXHIBIT A

PROJECT DESCRIPTION AND RESPONSIBILITIES

FPN: 453941-1-34-01

This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and

Walton County BOCC (the Recipient)

PROJECT LOCATION:

The project is on the National Highway System.

The project is on the State Highway System.

PROJECT LENGTH AND MILE POST LIMITS: From east of US 98 at the power line to the Bay County line

PROJECT DESCRIPTION: Westbay Parkway Preliminary engineering plans for a new 2-lane roadway alignment and bridge structure over intracoastal waterway from the the power line to the Bay County line

SPECIAL CONSIDERATIONS BY RECIPIENT:

The Recipient is required to provide a copy of the plans for the Department’s review and approval to coordinate permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. The Recipient must coordinate all reviews with the Department's identified Right of Way Agent if/when right of way is identified. The Recipient will invoice the Department, at the least, on a quarterly cycle. The submittal will include signed FDOT in-voice template, signed Project Monitoring Status Report (PMSP), consultant invoice(s) with copy of cancelled check(s)and/or copy electronic payment confirmation(s).

The Recipient shall commence the project’s activities subsequent to the execution of this Agreement and shall perform in accordance with the following schedule:

a) Study to be complete: Complete

b) Design to be complete: 1/31/2026

c) Right-of-Way requirements identified and provided to the Department: Prior to contract expiration date

d) Right-of-Way to be certified: N/A

e) Construction contract to be let N/A

f) Construction to be completed: N/A

If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is subject to the withdrawal of funding.

SPECIAL CONSIDERATIONS BY DEPARTMENT:

* If applicable- Each phase of the process will be submitted into ERC for review by the Department at a minimum of 14 business days for receipt and response to any comments.

Docusign Envelope ID: 1835D0A3-3C08-4B9A-960A-F7B879FB3D1CDocusign Envelope ID: 3A939FF5-9DB1-46F6-BBE5-04057473FF78

Docusign Envelope ID: 3A939FF5-9DB1-46F6-BBE5-04057473FF78

Docusign Envelope ID: 3A939FF5-9DB1-46F6-BBE5-04057473FF78

2025-12-23T12:05:32-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .