This is a Supplemental Agreement No. 1 to a State-Funded Grant Agreement between the State of Florida Department of Transportation (FDOT) and Walton County Board of County Commissioners (BOCC) for the West Bay Parkway Engineering Design Services project. The project involves preliminary engineering and final design of a new two-lane roadway with a shared use path and a bridge structure over the Intracoastal Waterway, extending from the Florida Power and Light right-of-way near US Highway 98 to the Bay County line. The scope of work includes survey, geotechnical investigation, roadway design, preliminary bridge design, stormwater design, and identification of necessary right-of-way requirements. The original agreement was executed on February 25, 2025, under Contract No. G3210 and Fund Project Number 453941-1-34-01. The supplemental agreement, executed on December 23, 2025, modifies Exhibit A regarding right-of-way identification requirements prior to contract expiration and removes the right-of-way certification requirement. The design completion deadline is January 31, 2026, with right-of-way requirements to be identified and provided to the Department prior to the contract expiration date.
The project is funded through FDOT's Transportation Regional Incentive Program (TRIP) as a state-funded grant. Walton County BOCC is required to submit invoices on a quarterly basis, including signed FDOT invoice templates, Project Monitoring Status Reports, consultant invoices with evidence of payment, and copies of cancelled checks or electronic payment confirmations. All plans must be submitted to the Department for review and approval, with a minimum 14-business-day review period. The Recipient must coordinate with the Department's Right of Way Agent if and when right-of-way is identified and must notify the Department prior to commencing any right-of-way activities. Failure to meet the established schedule or obtain written approval for revisions may result in withdrawal of funding. The agreement anticipates future four-laning of the roadway, which must be considered in determining right-of-way requirements and stormwater management facility sizing.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
STATE-FUNDED GRANT
SUPPLEMENTAL AGREEMENT
525-010-60
PROGRAM MANAGEMENT
12/18
SUPPLEMENTAL NO.
CONTRACT NO.
G3210
FPN
453941-1-34-01
Recipient: Walton County BOCC
This Supplemental Agreement (“Supplemental”), dated arises from the desire to supplement the State-Funded
Grant Agreement (“Agreement”) entered into and executed on 02/25/2025 as identified above. All provisions in the
Agreement and supplements, if any, remain in effect except as expressly modified by this Supplemental.
The parties agree that the Agreement is to be amended and supplemented as follows:
Exhibit A - Project Description and Responsibilities Exhibit D- Walton County BOCC New Resolution
Reason for this Supplemental and supporting engineering and/or cost analysis:
This supplemental agreement is required to update Exhibit A: Item (c) right of way identification prior to contract expiration date; Item (d) Removal of right of way certification as a requirement of the agreement. The agreement scope language will also be modified as follows: Westbay Parkway final design of new two-lane roadway with shared use path from the Florida Power and Light right-of-way to the Bay County line and includes preliminary engineering for a new bridge over the ICWW. The future 4-laning shall be considered when determining right-of-way and determining size of stormwater management facilities.
IN WITNESS WHEREOF, the parties have caused these presents to be executed the day and year first above written.
RECIPIENT: STATE OF FLORIDA
Walton County BOCC 176 Montgomery Circle DeFuniak Springs, FL 32435 DEPARTMENT OF TRANSPORTATION
By: By:
Name: Rodney Chamberlain, P.E. Name: Brad Drake
Title: Chair, BOCC Title: Director of Transportation Development
Legal Review:
Docusign Envelope ID: 1835D0A3-3C08-4B9A-960A-F7B879FB3D1CDocusign Envelope ID: 3A939FF5-9DB1-46F6-BBE5-04057473FF78
12/23/2025 | 2:22 PM EST
12/23/2025 | 3:05 PM EST
12/23/2025 | 3:05 PM EST
Alt Form 525-010-60eA STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
STATE-FUNDED GRANT AGREEMENT
525-011-0A
PROGRAM MANAGEMENT
05/21
EXHIBIT A
PROJECT DESCRIPTION AND RESPONSIBILITIES
FPN: 453941-1-34-01
This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and
Walton County BOCC (the Recipient)
PROJECT LOCATION:
The project is on the National Highway System.
The project is on the State Highway System.
PROJECT LENGTH AND MILE POST LIMITS: From east of US 98 at the power line to the Bay County line
PROJECT DESCRIPTION: Westbay Parkway Preliminary engineering plans for a new 2-lane roadway alignment and bridge structure over intracoastal waterway from the the power line to the Bay County line
SPECIAL CONSIDERATIONS BY RECIPIENT:
The Recipient is required to provide a copy of the plans for the Department’s review and approval to coordinate permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. The Recipient must coordinate all reviews with the Department's identified Right of Way Agent if/when right of way is identified. The Recipient will invoice the Department, at the least, on a quarterly cycle. The submittal will include signed FDOT in-voice template, signed Project Monitoring Status Report (PMSP), consultant invoice(s) with copy of cancelled check(s)and/or copy electronic payment confirmation(s).
The Recipient shall commence the project’s activities subsequent to the execution of this Agreement and shall perform in accordance with the following schedule:
a) Study to be complete: Complete
b) Design to be complete: 1/31/2026
c) Right-of-Way requirements identified and provided to the Department: Prior to contract expiration date
d) Right-of-Way to be certified: N/A
e) Construction contract to be let N/A
f) Construction to be completed: N/A
If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is subject to the withdrawal of funding.
SPECIAL CONSIDERATIONS BY DEPARTMENT:
* If applicable- Each phase of the process will be submitted into ERC for review by the Department at a minimum of 14 business days for receipt and response to any comments.
Docusign Envelope ID: 1835D0A3-3C08-4B9A-960A-F7B879FB3D1CDocusign Envelope ID: 3A939FF5-9DB1-46F6-BBE5-04057473FF78
Docusign Envelope ID: 3A939FF5-9DB1-46F6-BBE5-04057473FF78
Docusign Envelope ID: 3A939FF5-9DB1-46F6-BBE5-04057473FF78
| 2025-12-23T12:05:32-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .